Chemical Filtration Unit
Chemical Filtration Unit
Chemical Filtration Unit
PART 1 - GENERAL
1.01 DESCRIPTION
D
Codes and Standards issued by the listed professional societies
and organizations shall form the reference basis for requirements
BI
of this project.
B. ASTM
R
American Society for Testing and Materials
Specification
FO
C. ASHRAE American Society of Heating, Refrigerating and
Air-Conditioning Engineers Publications
Standards
I. ARAMCO SAES-K-002
1.03 SUBMITTALS
2. Quality Assurance.
3. Certificates of Compliance.
4. Test Reports.
5. Manufacturers Instructions.
PART 2 - PRODUCTS
2.01 GENERAL
2.02 DESIGN
D
the equipment schedules and shall fit into the spaces allotted
and shall allow adequate and acceptable clearances for entry,
BI
servicing and maintenance.
R
systems. The system shall provide a minimum airflow capacity as
outlined in the specification parameters.
FO
C. The air purification system shall have filters, chemical media
cells, and final filters to suit the specific requirements.
G. The chemical media shall have the capability of being loaded and
unloaded, this shall be accomplished through the removal cells.
D. All access doors and hatches shall use closed cell neoprene
gasketing to prevent any air leakage.
F. Service doors and all unit access shall be oriented to suit field
conditions or requirements.
D
H. Any preheating, cooling, or humidification to temper the incoming
BI
air stream shall be provided by equipment manufacturer.
A.
R
The pre filter section shall prevent particulates
downstream sections of the air purification system.
into the
FO
B. The filter section shall include a 40% roughing prefilter, based
on ASHRAE Standard 42.1, and shall carry Class 2 certification
in accordance with UL Standard 900.
C. Media bed face velocities shall not exceed the specified rate for
this application.
D
C. Extruded aluminum particulate filter tracks with positive air
BI
seals shall be used to allow easy changing of the filters, and
to ensure air does not bypass the filters.
D. Access doors to the filters shall use quick release, snap acting
R
type, positive pressure latches.
FO
E. The final filter section shall monitor the pressure drop by a
magnehelic differential pressure gauge or a photohelic pressure
switch/gauge.
D
PART 3 – EXECUTION
BI
3.01 INSTALLATION
R
locations as shown on the contract drawings, in accordance with
the manufacturer’s recommendations.
FO
3.02 TESTING AND COMMISSIONING
A. The package fresh air filter unit shall be tested with the
completed air conditioning system in accordance with the
ED
- END OF SECTION -