PROJECT
DATA SHEET
Project Title:
CUSTODY TRANSFER METERING SYSTEM
SENG SEGAT PHASE-3 DEVELOPMENT PROJECT
Client :
Contractor :
1 COVER PAGE
2 TABLE OF CONTENT
PURCHASE
Service Custody Transfer Gas
GENERAL
2 43 Model :
3 P&ID No. HHI-EMP-P&ID-001 44 Serial No. : VTA
4 No of Units Required 2
5 Piping Specification ANSI/ASME B31.3 600# Class
SITE DATA
30 Model NG
31 Operating frequency 200 kHz
32 Material Full metal: Titanium (Ti Gr 2)
33 Mechanical design pressure 255 barg
34 Mechanical design temperature -40 to 90oC
35 Electrical connection M20 cable entries (5 off)
SIGNAL PROCESSING UNIT
Notes :
(1) From Qt to Qmax, relative calibration laboratory and undistrurbed inlet / outlet section of 10D / 3 D respectively
(2) Analogue outputs and digital outputs sharing the terminal connections
(3) The metering shall cover for flow turn down of 1 : 70
(4) All welding with the nominal thickness more than 20 mm shall be PWHT as per ASME B31.3
(5) The meter bore shall have the roughness of 250 micro inch (Ra) or less including upstream/downstream metering piping spool
DATA SHEET
FLOW COMPUTER
PROJECT: SENG SEGAT PHASE 3 DEVELOPMENT
PT. HANDIYAN
REV DATE DESCRIPTION
PREP'D BY CHK'D BY APP'D BY
A 08-Jun-18 Issued For Review
Contractor : PT. Handiyan Hulu Instrumen CLIENT
Client : EMP Bentu Ltd. CHK'D APP'D
Document No : HHI-EMP-DS-002-FC
1 Tag Number 39 Manufacture : FloBoss
PURCHASE
GENERAL
36 Mounting Provided
37 Configuration cable Provided
38 Interface Dedicated communication port at panel front for the config pro interface
DATA SHEET
GAS CROMATOGRAPH
PROJECT: SENG SEGAT PHASE 3 DEVELOPMENT
PT. HANDIYAN
REV DATE DESCRIPTION
PREP'D BY CHK'D BY APP'D BY
A 08-Jun-18 Issued For Review MC IP SER
Contractor : PT. Handiyan Hulu Instrumen CLIENT
Client : EMP Bentu Ltd. CHK'D APP'D
Document No : HHI-EMP-DS-004-GC
1 Tag Number 50 Manufacture ABB/Galvanic
PURCHASE
Service Custody Transfer Gas Model NGC 8206
GENERAL
2 51
3 P&ID No. HHI-EMP-P&ID-001 52 Serial No. VTA
4 No of Units Required 2
5 Piping Specification ANSI/ASME B31.3 600# Class
SITE DATA
17 Housing Material ATEX Type 4x (IP 66 Eq.), CSA Type 4x, IECEx IP56
18 Power Requirement 220 VAC
19 Power Consumption Normal: 7 W for non heated version; Less than 120 W for heated version
20 Range Operation 800 to 1500 BTU/SCFD less than 100 ppm H2S
21 Installation Inside 3 side Shelter, close to sample point
22 Mounting Stand Alone Pipe Mount
23 Hardware 2 Paralel Isothermic GC Modules with narrow-bore capillary column technology in combination with
ANALYTICAL SECTION
35 Functional Test Acc. Manufacture Standard 41 Sample Outlet Size 1/2" NPT
SYSTEM
PURCHASE
Service Custody Transfer Gas
GENERAL
39 Filter Included
40 Contaminant Trap Included
41 Pressure Reducer Included
42 Heated Pressure Reducer Included
43 Utility Gas Nitrogen, 47 L
OTHER
PURCHASE
Service Custody Transfer Gas Model No. 933
GENERAL
2 37
3 P&ID No. HHI-EMP-P&ID-001 38 Serial No. VTA
4 No of Units Required 2
5 Piping Specification ANSI/ASME B31.3 600# Class
SITE DATA
PURCHASE
GENERAL
4 No of Units Required 2 35
9 1000 Max:
PURCHASE
GENERAL
4 No of Units Required 2
17
25 Material 316 SS
3 Thermowell shall be stamped with the material, nominal "U" dimension and tag no.
4
DATA SHEET
PRESSURE INDICATOR
PROJECT : SENG SEGAT PHASE 3 DEVELOPMENT
PT. HANDIYAN
REV. DATE DESCRIPTION
PREP'D BY CHK'D BY APP'D BY
A 08-Jun-18 Issued For Review MC IP SER
Contractor : PT. Handiyan Hulu Instrumen CLIENT
Client : EMP Bentu Ltd. CHK'D APP'D
Document No : HHI-EMP-DS-009-PI
1 Tag Number PG 601A, PG 602A 29 Manufacture : Wika
PURCHASE
GENERAL
4 No of Units Required 2
9 1000 Max:
16 Mounting Direct
18 Case SS 316
19 Ring Standard
CONSTRUCTION
27 Fluid Glycerine
28 Protection Weather Proof
1 All instrument shall be tagged with 316SS name plate, hard stamped with the instrument tag no.
PURCHASE
GENERAL
4 No of Units Required 2
9 1000 Max:
14 Stem Threaded
25 Include Yes
THERMOWELL
26 Material 316 SS
1 All instrument shall be tagged with 316SS name plate, hard stamped with the instrument tag no.
2 Dial Shall be White Back Ground with Black Figure
NOTES
4 The Thermowell length and bore diameter shall match elements stem length and stem diameter