HKIX Data Centre Equipment Move-In/out Form (For HKIX Primary Site)

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 6

HKIX Data Centre Equipment Move-in/out Form (for HKIX primary site)

To: HKIX Network Operation Centre

Email: [email protected]

AS Number:
Company Name:
Requester Name:
Date (move-in/out):

Equipment Move-in/out Records (Must be filled)


IN/OUT Product Name Description Manufacturer Part No Serial No
1 Dual

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Terms & conditions


1. Only authorized representative(s) of the company/organization identified on the HKIX Data Centre Access Authorization
2. The requester is required to observe and agree to abide by the HKIX Data Centre Policies in http://www.hkix.net/hkix/a
3. The requester is required to observe the HKIX Equipment Move-in/out Guidelines in http://www.hkix.net/hkix/site-acce

FORM-2
Version: 1.01
X primary site)

) Physical Specifications
Power Dimension (mm) Weight (kg) Power Consumption (VA)
S
Dual

entre Access Authorization List may make request to move in/out the equipment for the company/organization
n http://www.hkix.net/hkix/access-policy.htm
www.hkix.net/hkix/site-access.htm
ications
Heat Dissipation (BTU/hour)

for the company/organization
IN/OUT Product N DescriptionManufacturPart No Serial No Power Dimension
1 S
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Terms & co
1. Only authorized representative(s) of the company/organization identified on the HKIX Data Centre Access Authorization
2. The requ
3. The requ

FORM-2
Version: 1.
Weight (kg Power ConsHeat Dissi Feed UPS/300K UPS/400K Owner Rack Machine Label
2 1 1 ISPA Equi Rack GXX
Machine Label