Estimating/ Construction Planning/ Scheduling and Programming/ Feasibility Project Studies
Estimating/ Construction Planning/ Scheduling and Programming/ Feasibility Project Studies
Estimating/ Construction Planning/ Scheduling and Programming/ Feasibility Project Studies
CONSTRUCTION PLANNING/
SCHEDULING AND
PROGRAMMING/
FEASIBILITY PROJECT STUDIES
ESTIMATING/CONSTRUCTION PLANNING
SCHEDULING AND PROGRAMMING/FEASIBILITY PROJECT STUDIES
I. IDENTIFICATION
II. ENUMERATION
2. Materials
a. availability and costs of local materials
b. cost and transport of not locally available materials
c. distance from supplier and fabricators
C. The method of cost estimating varies with the stage of development of the project.
The cost estimating stages are:
1. Budgetary Estimates
2. Schematic Design Estimate
3. Design Development Estimate
4. Contract Documents Estimate
5. Construction and Bidding Estimate
I. IDENTIFICATION
___________ 2. Factor that affects the square meter cost of a particular building.
___________ 4. An estimating method wherein cubage provides the basis for cost.
___________ 7. An estimating method used when the project is only partially defined.
___________ 10. Normally used in earthwork, civil construction and air conditioning.
___________ 11. The function of coordinating in a logical order all the activities,
persons, machines, and materials necessary to complete the subject
and considers only technology and sequence.
___________ 12. The placing of the plan on a calendar timetable and showing the
allocation of the equipment and manpower that will put the plan into
effect.
___________ 16. A special activity which is drawn as a dotted line and indicates that no
work is involved in that activity.
___________ 18. Used to calculate the schedule for a project and also to find those
activities that are controlling the amount of time needed to get the
project done.
___________ 21. An input for cost monitoring and cash requirement calculations.
___________ 23. An input for resource requirement and calculations such as men,
money, materials and equipment.
___________ 24. Shows the time necessary for each function but does not show how
they are related to one another.
___________ 25. Had its inception in the Navy for its fleet Ballistic Missile Program
dated 1958.
___________ 26. A word defined as capable of being done or carried out; practicable,
possible and within reason.
___________ 27. A study wherein the project is studied to be capable of being used or
dealt with and when carried out shall have a reasonable return of
investment or ROI to the financiers or developers.
___________ 28. A case wherein the owner of the land wants to be a partner of the
developer and participate in the profits.