0020 X Material receiving & Handling 01-SAMSS-005, 01-SAMSS-024, & AWWA C205. Random
sampling for verification and suitability.
0030 X Reinforcement Wire, Portland cement and Curing compound. 01-SAMSS-005 & AWWA C205.
0020
0010
***
X
In process inspection & test requirement
Mixing ratio/ slump test
Specification Details / Notes:
01-SAMSS-005 & AWWA C205
0020 X Mortar Testing : Sand, Water and Cement Mortar Per 01-SAMSS-005 Table 1. To be performed before and
during lining operations. Frequency can increase as
determined by the COMPANY.
0030
0010
***
X
Final inspection & test requirements
General Visual inspection, End cap and Curing process
Specification Details / Notes:
01-SAMSS-005 & AWWA C205.
0020 X Handling, Loading & Stacking 01-SAMSS-005 01-SAMSS-024, & AWWA C205
Notes:
(1) May only be waived by the responsible Saudi Aramco, ASC, or AOC Inspection Offices.
(2) See form SA-175 form (000003) for instructions on using this form.
End of IR012500