INSPECTION & TESTING REQUIREMENTS REVISION: 05/09/2011 CODE NUMBER: PAGE:

SAUDI ARAMCO FORM-175 REPLACES: 03/01/1998 IR012500 1 of 1


SCOPE: CONCRETE MORTAR LINING: For Internal Surfaces of Line Pipe and Fittings.

TEST AND INSPECTION PER: 01-SAMSS-005, and Specifications As Noted Below.

(1) VISUAL INSPECTION WITNESSING BY INSPECTOR (Note 1)


(2) CERTIFICATES / RECORDS TO BE CHECKED BY INSPECTOR
(3) CERTIFICATES / DATA TO BE PROVIDED BY VENDOR / SUPPLIER / MANUFACTURER
0010
0010
*** X
Pre-Fabrication/Production Requirements
Quality Program Procedure
Specification Details / Notes:
Per 01-SAMSS-005 Sec IV

0020 X Material receiving & Handling 01-SAMSS-005, 01-SAMSS-024, & AWWA C205. Random
sampling for verification and suitability.

0030 X Reinforcement Wire, Portland cement and Curing compound. 01-SAMSS-005 & AWWA C205.

0020
0010
***
X
In process inspection & test requirement
Mixing ratio/ slump test
Specification Details / Notes:
01-SAMSS-005 & AWWA C205

0020 X Mortar Testing : Sand, Water and Cement Mortar Per 01-SAMSS-005 Table 1. To be performed before and
during lining operations. Frequency can increase as
determined by the COMPANY.

0030 X Surface Preparation 01-SAMSS-005 & SIS-05-59-00: Cleaned in accordance with


St2.

0040 X Thickness 01-SAMSS-005 & AWWA C205.

0050 X Mortar Lining Test Cylinders 01-SAMSS-005 & AWWA C205.

0030
0010
***
X
Final inspection & test requirements
General Visual inspection, End cap and Curing process
Specification Details / Notes:
01-SAMSS-005 & AWWA C205.

0020 X Handling, Loading & Stacking 01-SAMSS-005 01-SAMSS-024, & AWWA C205

Notes:
(1) May only be waived by the responsible Saudi Aramco, ASC, or AOC Inspection Offices.
(2) See form SA-175 form (000003) for instructions on using this form.

End of IR012500