ZONE 2 (100 % impedance of the protected feeder + 50% impedance of the adjacent shortest feeder)
Z 2 Py 0.776 10.543
Z 2 Sy 0.427 5.798
Zo Py 8.937 35.555
Z0 Sy 4.915 19.555
ZONE 3 ( 100 % impedance of the protected feeder + 110% impedance of the adjacent longest feeder)
Z 3 Py 1.087 14.760
Z 3 Sy 0.598 8.118
Z0 Py 12.512 49.777
Z0 Sy 6.881 27.378
ZONE 4 ( 25 % of Zone 1 impedance)
Z 4 Py 0.041 0.562
Z4 SY 0.023 0.309
Z0 Py 0.477 1.896
z0 Sy 0.262 1.043
Zone 2 z0/z1=
Zone 3 z0/z1=
Zone 4 z0/z1=
2000A/1A
400KV/110V
(Z) (THETA)
0.253 86.675
1.030 76.072
0.332 85.400
1.064 75.790
KAM DC LINE #
Z THETA
KAM DC LINE #
5.638 85.790
3.101 85.790
19.553 75.891
10.754 75.891
st feeder)
10.571 85.790
5.814 85.790
36.661 75.891
20.164 75.891
st feeder)
14.800 85.790
8.140 85.790
51.326 75.891
28.229 75.891
0.564 85.790
0.310 85.790
1.955 75.891
1.075 75.891
7.047 85.790
3.876 85.790
24.441 75.891
13.442 75.891
3.468 -9.899
3.468 -9.899
3.468 -9.899
3.468 -9.899
7.718 71.930
9.303 85.790
0.830 -13.859
14.471 71.930
17.442 85.790
0.830 -13.859
20.259 71.930
24.419 85.790
0.830 -13.859
0.772 71.930
0.930 85.790
0.830 -13.859
The resistive reach is calculated with 85 % of rated voltage and 50 % of over loading
condition and the power factor may be greater than 30 deg.
Z load Py = 0.85*400 KV
3*1.5*D5 A
= 67.111
Zload Sy = 36.911
So the max resistive reach (Right Blinder) for phase fault distance
Rph max = Zload min-0.4*Zloadmin
= 22.147
Maximum Resistive reach (Right Blinder) for Ground fault distance
RG max = Zload min-0.2*Zloadmin
= 29.529
Delta R= 10-30% of R3ph 0.77 I max Line > Phase Current threshold
(We take 30%) Min Setting = 1.2 * Max Power Swing current
Delta X= 10-30% of R3ph 0.77 Max. Power Swing current = 2 * In = 2*1A=2A
(We take 30%) Min Setting = 2.4 Amps
Zload Sy = 36.91
PSB
Delta R Delta X
0.77 0.77
*** Note Z3 is more than Zload Sy so Z3 Can be set to less than Zload Sy
K value in
Polar
0.5505477 6.2811944
0.5505477 6.2811944
0.5505477 6.2811944
0.5505477 6.2811944
The ground resistive limiters cross the R-axis with an angle equal to arg(Z1n).
- Directional line angle: it is equal to the setting (Quadrilateral Characteristic Directional Line Angle) plu
Consolidated Settings
SUBSTATION NAME OTTIYABAKKAM 400/230/110KV SS
FEEDER NAME 400KV GUINDY DC LINE #
CT RATIO 2000.00
PT RATIO 3636.36
CT/PT RATIO FACTOR 0.5500
Total Distance of Protected # in KM 23.24
Zone Settings R X Z THETA
Z1 Sy 0.2277 3.0925 3.1009 85.7896
Z 2 Sy 0.4269 5.7984 5.8141 85.7896
Z 3 Sy 0.5976 8.1178 8.1398 85.7896
Z4 SY 0.0228 0.3093 0.3101 85.7896
Total Line Impedence (SY) 0.2846 3.8656 3.8761 85.7896
Zload Sy = 36.91
PSB
Delta R Delta X
0.77 0.77
*** Note Z3 is more than Zload Sy so Z3 Can be set to less than Zload Sy
K value in
Polar
0.5505477 6.2811944
0.5505477 6.2811944
0.5505477 6.2811944
0.5505477 6.2811944
The ground resistive limiters cross the R-axis with an angle equal to arg(Z1n).
- Directional line angle: it is equal to the setting (Quadrilateral Characteristic Directional Line Angle) plu
Sub Station OTTIYABAKKAM 400/230/110KV SS
Feeder 400KV GUINDY DC LINE #
System Voltage 230 KV
Fault MVA 3Ph 10714 MVA
Fault MVA 1Ph 7539 MVA
CT RATIO 1200 1A
PT RATIO 230000 110 V
Line Imp IN Primary 7.047443 Ohms
Line Current Carring Capacity 855 A LINE 855 0.7125
CT/PT RATIO 0.573913 CABLE 855 0.7125
PH-PH E/F
KV^2/MVA
Source Imp
4.937465 Ohms 7.016846 Ohms
Total Imp 11.98491 Ohms 14.06429 Ohms
KV^2/Total Imp
Fault MVA at end of the line
4413.885 MVA 3761.299 MVA
Fault Current 11080.14 A 9441.961 A
Relay Plug setting 100% 1200 A 40% 480
9.23345 19.67075
Setting Multiplier
9.23345 19.67075
Time Required 1 sec 200msec + ZONE 3 TIME
TLS 0.324712 0.32 0.438525 0.44
rth Fault
Actual py ct (A)
960
1920
2400
3840
4800
9441.9605516836
| | Power Swing Detector in GE D60
Zone reach Resistive reach
Fwd Reach = Zone 3 Reach + 0.1 of Zone 3 Reach 8.95 0.66
Quad Fwd Out = 1.2 times of Fwd Reach 10.74 0.79
Inner Rgt Bld = Rph (Z3)+ 0.1 of Rph (Z3) 2.84 2.84
Outer Rgt Bld = 1.2 times of Inner Rgt Bld 3.40 3.40
Inner Lft Bld = Z3 left Bld + 0.1 of Z3 left Bld 1.10 1.10
Outer Lft Bld = 1.2 times of Inner lft Bld 1.32 1.32
Rev Reach = Zone 4 Reach + 0.1 of Zone 4 Reach 0.34 0.03
Quad Rev Out = 1.2 times of Rev Reach 0.41 0.03
Note
1. Z3 Left Bld assumed as 1
2. All Mid assumed as 0.1
ld assumed as 1.0
FAULT LEVEL IN MVA
Phase Phase
Name of the Substations
Fault level Fault level
1.Ottiyambakkam 400/230/110 KV SS
400 KV 16406 7404
230 KV 10714 7539
110 KV 4771 3536