Training Report
Training Report
Training Report
Faculty of Engineering
Non-GPA
GPA module 399: Industrial
Indu trial Training
TRAINING REPORT
Name: B.Ajanthan
Index No: 070013F
Field:: Electronics and Telecommunication Engineering
Training Establishment:
Establishment: Esjay Electronics(Pvt) Ltd.
1 th February 2010-13th August 2010
Duration:: 10
Submission 16th August 2010
Date of Submission:
Industrial Training Report
Preface
The purpose of this report is to present experiences I have got from 10th February 2010 to 13th
August 2010 in Esjay Electronic (Pvt) Ltd.
During my training period I spent all most all the time at head office of Esjay Electronics
(Pvt) Ltd at Ratmalana Industrial Estate. There I was first assigned to improve their repairing
process of CDMA phone and power supply. Then for last half of the training period I
engaged in coinvalidator design.
Chapter one is an introduction to the company. Here I start by giving a brief introduction
about the company and then describe about the corporate information of the company,
product and service of the company, Organizational structure and current projects .then I give
my opinion on current performance, strength and weakness of the company. I terminate the
chapter with my suggestions to improve the performance of the company and my suggestion
on usefulness of the company to the Sri Lankan society.
Chapter two is a brief summary of the work I have done in my twenty four week training. For
ease of presenting I have divided the chapter into four parts according to areas I worked.
Each part first I describe back ground and theoretical perspective of the work then the brief
details about overall process. After that I give details on duties and functions assigned to me
and the problems so far I encountered during the period of I worked on particular area and
solutions. At end of each section I illustrate some special work I have done.
Chapter three is my judgment about training program. Chapter begins with an overview on
training experiences. It continuously gives my point of view on ability of the company to give
training and about training division, department and NAITA. Chapter finishes with my
recommendation on selecting Esjay Electronics as a training place to juniors.
I hope this report gives expected details about works I have done during last 24 weeks to
evaluate my performance on this training program.
Acknowledgement
I hereby take this chance to express my gratitude towards all the peoples who are behind my
successful completion of my industrial Training at Esjay Electronics (Pvt) Ltd from 10
February 2010 to 13 August 2010.
Fist up on all I would like to tell my thanks to director of Industrial Training Division Eng.
N.A. Wijeyewickrame, the senior lecturers of Industrial training division Eng. S.A.S.
Punchihewa and Eng. P. Gunawardena for their support given while arranging this training
Program. Then I would like to express my gratitude towards the officials from National
Apprentice and Industrial Training Authority (NAITA) for their coordination between the
training establishment and training division. Next to that I should thank
Dr.N.W.N.Dayananda,industrial training coordinator of department of electronics and
telecommunication for arranging the Esjay Electronics (Pvt) Ltd as my training
establishment.
Lastly I am thanking all peoples whose names are not mentioned here.
Thank you,
B.Ajanthan
070013F
University of Moratuwa.
Table of Contents
Preface......................................................................................................................................... i
Acknowledgement .....................................................................................................................ii
List Of figures ........................................................................................................................... vi
List of tables .............................................................................................................................vii
List of Equations .................................................................................................................... viii
1 Introduction to Training Establishment .............................................................................. 1
1.1 Introduction to Esjay Electronics (Pvt) Ltd................................................................. 1
1.2 Corporative Information .............................................................................................. 1
1.2.1 Mission................................................................................................................. 1
1.2.2 ESJAY’S Logo..................................................................................................... 1
1.3 Esjay’s Product and Services ...................................................................................... 2
1.3.1 Magnetic components .......................................................................................... 2
1.3.2 PCB assemblies .................................................................................................... 3
1.3.3 Power electronic product ..................................................................................... 3
1.3.4 Security system .................................................................................................... 3
1.3.5 Services ................................................................................................................ 3
1.4 Esjay Organizational Structure.................................................................................... 3
1.5 Current Projects ........................................................................................................... 4
1.6 Current Performance ................................................................................................... 5
1.7 Strength and Weakness ............................................................................................... 5
1.7.1 Strength ................................................................................................................ 5
1.7.2 Weakness ............................................................................................................. 5
1.8 Profitability.................................................................................................................. 6
1.9 Suggestion to improve the performance...................................................................... 6
1.10 Usefulness to Sri Lankan Society................................................................................ 6
2 Training Experiences .......................................................................................................... 8
2.1 CDMA phone PCB trouble shooting .......................................................................... 8
2.1.1 Introduction .......................................................................................................... 8
2.1.2 CDMA fixed line phone....................................................................................... 9
2.1.3 Repairing process detail ..................................................................................... 10
2.1.4 Duties and function ............................................................................................ 10
2.1.5 Problems and difficulties encountered, solutions .............................................. 12
List Of figures
1-1 Logo of Esjay Electronics (Pvt) Ltd.................................................................................................. 2
1-2 Logo of Esjay Electromag (Pvt) Ltd ................................................................................................. 2
1-3 Organizational Structure of Esjay .................................................................................................... 4
2-1 Block Diagram of CDMA Phone ...................................................................................................... 9
2-2 Fume Extractor ............................................................................................................................... 13
2-3 CDMA Phone Repairing process summary .................................................................................... 15
2-4 Rejected Phones Rate Over Batch .................................................................................................. 15
2-5 Inspection Sheet Part 1 ................................................................................................................... 16
2-6 Inspection Sheet part 2 ................................................................................................................... 17
2-7 Unregulated linear power supply ................................................................................................... 18
2-8 Block Diagram of SMPS ................................................................................................................. 19
2-9 Topology-Fly back convertor ......................................................................................................... 20
2-10 Topology-Forward Convertor ...................................................................................................... 20
2-11 Circuit Diagram of SMPS............................................................................................................. 21
2-12 Topology-Half Bridge Convertor ................................................................................................. 22
2-13 Topology-Bipolar Push Pull Convertor........................................................................................ 22
2-14A Typical Coin Validator ............................................................................................................... 27
2-15 Our Coin Validator Prototype Design .......................................................................................... 29
2-16 Testing Circuit .............................................................................................................................. 30
2-17 Sensor Alignment Problem ........................................................................................................... 30
2-18 Speed Variation Problem.............................................................................................................. 31
2-20 Axial Inductor .............................................................................................................................. 34
2-21 Block Diagram of Ballast ............................................................................................................... 36
2-22 ADSL lightening protection circuit............................................................................................... 38
2-23 PLC arrangement ......................................................................................................................... 38
List of tables
2-1 Sample Fault Data Collection Table .............................................................................................. 14
2-2 Comparison between incandescent and discharge lamp ................................................................ 36
List of Equations
Equation 1 ................................................................................................................................ 31
Equation 2 ................................................................................................................................ 32
Equation 3 ................................................................................................................................ 32
1.2.1 Mission
Esjay’s corporate mission is to use advanced technology to bring to their customers top
quality products at competitive prices
Current Transformers
Pulse transformers
Current sensors
Coil forms
1.3.5 Services
Authorized dealers for all types of CDMA/GSM Payphones and Wireless Terminals
from Function Group and service centre.
Authorized dealers for Diagnosys products
CDMA phone repairing Contract from SLT
Authorized dealer for Wipro and Britannia tube lights
There is a one accounting department for both organization lead by Mrs.Shamali Bandara
managing director
Eng.Sirimevan
Samarakkody
Administrative
director
Mr.Thilakarathne
Amunugama
general manager-
manager general manager -
Accountat
electromag electronics
Mrs.Shamali
Mr.Dhammika Mr.Jayasiri
Bandara
Gamage Danthanarayana
Production manager
Personnel Manager
Mr.susantha
Mr.Stephen
Liyanage
shipping and
purchase manager R&D
Mr.Lionel Perera
Personnel manager
Mr.Stephen
R&D
Mr.Nishantha
1.7.1 Strength
• Has enough machinery and infrastructure
• Has enough experiences in manufacturing electronic product
• Attitude of go for new business
• Skilled workers
1.7.2 Weakness
• Lack of strong management
• Hesitance to invest on new projects
• Attitude of workers not to learn new technologies
1.8 Profitability
The main source of their income is export business. They are importing raw materials from
USA for manufacturing the Toroids, assembling them and send back to the same country; this
is just value addition. Other than that a small amount of income they are getting from
subcontracted PCB manufacturing such as Orange fan regulator and digital clock. In addition
to that the CDMA phone repairing is also contribute to their income.
But the overall profitability is affected by the uncontrolled expenses. Still they are running on
lost because of the failure in wire harness business. They have a plan to sell some of the
valuable machinery and invest on new business. They are now working hardly to get a
contract to manufacture wire harness and restore their business.
because in last century electronic industry changed the life style of human being a lot and
created lot of needs related to electronic industries. Therefore it is a vital to Sri Lankan to pay
attention on electronic industry. Esjay is the pioneer company that proved the essential of the
electronic industry to the country.
Esjay like electronic industry is providing employment from Engineers to uneducated normal
workers.
Esjay has enough infrastructures to manufacture a complete product under one roof. They
have over 25 years experience on manufacturing magnetic product, power electronic product,
lighting product and telecommunication product. If we combine both and produce products
for local market then we can reduce large amount of imports from other countries.
2 Training Experiences
Here I rather than presenting my training experiences in the chronological order, present
according to the amount of time each section I have been assigned so far. I have been given
chance to improve the CDMA phone repairing at first. And I have to have work on this all
my training period because I had to observe current process, implement new scheme into the
existing process and get the result of the introduced new scheme. Second most one that
consumed most of the training period is experimental power supply repairing. Then the
modifying the coin validator is the project lastly given to me. And there are some little extra
works I have done whenever I have free time in the training place. In all the projects I and
four of my friends worked together.
2.1.1 Introduction
Finite spectrum and growing amount of customers are the two main factors that lead network
designers to come up with the new technology to efficiently handle these problems. CDMA
(code division multiple access) is the technology uses same spectrum and time for many
communication access link by assigning different code for each channels. CDMA technology
is used in both 2G and 3G networks. CDMA standards for 2G network includes IS-95A and
IS-95B.For 3G network services the CDMA is the foundation technology for which there are
two standards CDMA2000 and WCDMA.
Our company was receiving AIJI AP110 phones which were manufactured by Korean based
company called AIJI.
We were able to identify main function block of the phone as MSM (mobile station modem),
memory, RF unit, power management IC and interfacing circuits.
Memory Power IC
Antenna
Audio Codec
MIC
CDMA RF D
S processor u
Transmitter p
p
e DSP processor l
a e
RF x
k
e e
Key Pad LCD Receiver
r r
MSM6025 : it has DSP processor ,CDMA processor, ADC, DAC and interfacing circuits.
Memory: it contains space to store ringing tones, SMS and phone number and names.
RF unit: RF unit consists of one transmitting IC, a receiving IC, a switch and a dipole antenna
Power management IC: this is the single IC powering all the components. This has capability
to detect overvoltage and low voltage battery.
Interfacing circuits: There are interfacing circuits for keypad, handset, mic, speaker, hook
switch, LCD and RS232 for data communication.
First problem with their fault identification process is the non informative inspection sheet. It
is a good practice to keep a well descriptive inspection sheet .Second most important problem
was their inefficient battery selection process(they have to select good batteries from given
batteries).other non important issues are they don't care about electrostatic charges when they
cleaning the PCB, washing the enclosure using detergent water and workers’ lack of
knowledge on PCB.
Their technicians were not only dealing with phone repairing but also had other works. Thus
they allocate one day for repairing and that day most probably last day. They were on hurry
that day and reject phones as they don't have time to repair. Other than that they had enough
knowledge and experience.
Before collecting the statics on fault we collected all the faults they had encountered in past
and categorized the faults into four main groups. Those are power problems, RF problems,
firmware problems and other hardware problems.
They didn't have any documented data on faults. They only have the number of total phone
received and rejected phones. We could only get that information.
We kept a record book for documenting our repairing work. We entered the received phone
ESN number, fault identified and status (rejected or repaired).
We interviewed both technicians about the common faults and their repairing method. They
also demonstrated some of the repairing techniques.
We were given 20-30 phones in one batch to repair which consists of phones with new and
un-repairable faults. With the knowledge we got we tried to repair that phone using trial and
error.
We succeeded for some extent and mean while in some of instance our effort made the fault
even worst.
4. Experimenting weather the facilities they have is enough or not for repairing
While we were repairing we were able to realize that the facilities they are providing
regarding repairing is not enough. But rather than requesting management to provide new
tools and equipment and giving them trouble we thought it is better to produce new tool from
old discarded tools and equipment by company or repairing them. They also encouraged us as
this is a cost effective solution to lack of tools. We made fume exhaustion setup and repaired
some old soldering irons.
End of each batch we had to summit a progress report which includes the statistic of repairing
process and suggestion for improvement. After management provided approval to implement
some our suggestion we had to make a document describing the new method in workers’
mother language (Sinhala) and had to explain to them.
6. Get the feedback from the appropriate person and modify the process.
Whenever workers faced little problem when they practicing new method we had to present
there to solve the problems and modify the new method to rectify the new problem. Some
time the workers felt the method was very complex to follow. In such instance we had to
remove some complex things and give that to technicians.
When we were repairing the faulty phones to identify the possible new solution we
encountered some problems. The fume which comes from soldering iron was not properly
removed from the workplace. As the solution to the above problem we made small fume
exhaustion system using unused pc power supply fans. The soldering irons which are given to
us had small leakage current which may affect the person who is soldering and PCB
components. Usually the soldering irons come with ceramic barrel around the element to
avoid the current leakage. This kind of soldering irons are more expensive and not to be
affordable by our company. As the solution to this problem an earth wire was attached to
soldering iron and the metal barrel around the element and tip was grounded.
Fume extractor
For some fault we couldn’t find the reason and solution because we had not had a clear idea
about the circuit. Any how we could able to identify the possible components or ICs or part
of circuit responsible for fault. Using that information we were able to re-solder particular IC
or components and get the fault repaired successfully. No dialing and over voltage are such
faults we could repair successfully.
As we don’t have schematic of the PCB we decided to trace the PCB. But the multilayered
nature of the PCB and the many number of SMD components not allowed us to trace the
circuit successfully.
Batch 06
Fault Received Repaired
Power Jack 0 0
Antenna Jack 3 3
LED 10 10
Key not working 0 0
Back light 0 0
No display 7 6
Hook switch 1 1
Charging battery 2 2
Over voltage 7 2
Not dialing 8 2
Restart 0 0
Service required 0 0
Divide by zero 0 0
Fatal error 4 0
No signal 0 0
Total 42 26
faults which is understandable by an engineer who is going to inspect the contract application
and the normal worker who is going to prepare inspection sheet. We already had the statics
on frequently encountered faults. We named the
t faults using simple English which is self
describing. At last we produced a spread document which includes a sheet for each batch and
a last one sheet which consists
ists of overall comparison.
600
500 521 Process Summary
378 Batch Size Total Repaired
200 200183 200190 200184 200179 200179 200179 200179 200179 200179
168
batch 01 batch 02 batch 03 batch 04 batch 05 batch 06 batch 07 batch 08 batch 09 batch 10 batch 11 batch 12
rejection rate %
30
25
20
Axis Title
15 REJECT%
10
REJECTS
5 ALLOWABLE
0
batch 01
batch 02
batch 03
batch 04
batch 05
batch 06
batch 07
batch 08
batch 09
batch 10
batch 11
batch 12
They printed inspection sheet on low cost paper and used for three batch of repair. After that
management decided to stop using new inspection sheet until they will receive the batch of
phone which is beyond the size of 200.because it was not cost effective to use printed
inspection sheet for only 200 phones.
2.2.1 Overview
Our company already had designed and manufactured SMPS for CDMA phones but now the
arrival of low cost power supply from other countries removed their product from the market
and they already gave up the production.
It is a responsible of the company to deliver each phone with a power supply which is in a
good condition.SLT usually supplies same amount of power supplies as phones but only few
amount of power supplies need to be repair. But the management has a plan to receive a batch
(a batch consists of 1000 power supplies) of faulty power supplies and recruit new
technicians to repair. In order to do that they need to know the estimated cost and time to
repair one power supply. They expected us to do investigation and submit a report.
2.2.2 Introduction
The need of AC to DC power converters arises when we want to use DC power appliance and
rechargeable battery with AC power. Generation and transmission of electricity is very
economic in the form of three phase alternating current. Therefore to use the DC power
operated electronic devices we need AC to DC converters.
Diode Bridge
Smoothing
capacitor
The design is very simple, low cost and most reliable. It is suitable for low power application.
SMPS converts the rectified and smoothed direct AC into required DC applying pulse with
modulation. The regulation is achieved by feedback network. Feedback network samples the
output and control the duty cycle of the PWM to get the output regulated.PWM signal is
There are some safety mechanisms should be taken while implementing the design to
stabilize the operation of the power supply. Such as inrush current protection, EMI noise
filter and filtering the high frequency noise in output.
Input Output
Fuse EMI Rectifi Chopp Rectifi connect
connector
and er and er er and
or
surge /RFI filter transfo filter
protect Filter capacit rmer
ion or
The fuse is connected in series with ac line to protect the power supply from over current.
Momentary rise in current is called surge current and this may be harm to the components.
By connecting a series inductor surge current protection can be achieved.
The purpose of the EMI filter is to filter out the high frequency noises.EMI filter is made by
configuring C-L-C (pi) low pass filter.
Rectification is done using a half or full bridge diode rectifier. And small electrolyte
capacitors are used to smooth the rectified current.
The resulted DC current is converted into pulse waveform using switching mechanism. The
duty cycle of the pulse wave form determines the output value and it can be controlled.
The high frequency fly back transformer has two roles. One is converting pulse wave into
continuous DC wave and other is providing the AC-DC isolation.
The output of the fly back transformer contains high frequency ripple. This noise is removed
by the inductor-capacitor
capacitor rectifier presents in the output side.
Random variation of the output due to varying load is regulated by feedback mechanism. The
output voltage is sampled and passed
pas to switching controller. Which is passed through opto-
opto
coupler inorder to provide AC-DC
AC DC isolation.the swithing controller adjests the duty cycle to
grt needed regulation in the output?
2-9 Topology-Fly
Fly back convertor
Forward convertor
2-10 Topology-Forward
Forward Convertor
AC wave form Rectified wave pulse width fly back filtered out
2-12 Topology-Half
Half Bridge Convertor
Bipoler push pull convertor
2-13 Topology-Bipolar
Bipolar Push Pull Convertor
Between these topologies the fly back topologies is most desirable because it has least part
count, only one switching element, no output inductor or fly wheel diode.
which is substantially very small in size, hence the size of the power supply also very small
compared to conventional linear power supplies.
But there is one drawback in SMPS. There is a high frequency noise as a result of switching.
And its design is little complex.
Repairing process starts with replacing the AC and DC wire which have physical damage.
They divide the PCB into two parts. First part consists of components which handle AC
current and second part contains only the components responsible for handling DC current.
The intention for dividing the PCB into two parts is to ease the trouble shooting.
In AC part of the circuit smoothing capacitors .filtering inductors, some resisters and
rectifying diodes mostly fail. There are standard ways to test these components.
Capacitor testing: Remove one lead from the PCB and check the capacitance using multi
meter. Or test whether the resistance of the capacitor is increasing or not when measuring
resistance between two leads.
Resister Testing: Remove one lead from the PCB and test the resistance to rated value.
Diodes: Set the multi meter to diode checking mode and measure the forward voltage drop
for 0.5 voltages and reverse biased voltage infinity.
The DC part of the PCB contains flywheel diode, filter capacitors and inductors, and
feedback MOS-FET. As mentioned above the testing for these components is done.
The components which are connecting both AC part and DC part are Chopper transformer
and opto-coupler. They are checking the continuity of the primary and secondary coils to
identify the fault with chopper transformer. They check the LED site of the opto-coupler to
test the opto-coupler faults.
All the faulty components are replaced with new components and tested with over current
protection circuit.
In order to repair successfully the power supply we need to have clear understanding of the
PCB. Because we don’t have previous experiences on switch mode power supply and
repairing power related PCB have potential electrical hazards as this dealing with high
voltage. We were provided with one book about designing SMPS. We had read the chapters
which needed to us. This gave us introductory theory related to SMPS design, safety issues
and variety of design options.
The fault finding process is very simple because the size of the PCB is small and most of the
components are through -hole components. When we inspected their fault finding method we
couldn’t find any problem with their repairing process. As they had previous experiences
their method of trouble shooting was very efficient.
We allocated two hours per day to repair power supplies .with in that period only two of us
participated in repairing process. The intention behind this is to estimate the time taken by a
technician to repair one power supply. Initially the time taken to repair one power supply by
us was high but when we repaired more and got experience the time reduced to normal
amount. We were required to submit a SMPS repairing manual .In that we were expected to
document the method of repairing they already had. They are going to train technicians who
will be employed providing them with that manual.
SLT usually renew their agreement once the year on repairing power supply. Each year they
issue public tender and select the tender according to their criteria. One of the important
criteria they are strongly taking into account is estimated cost for repairing one power supply.
It should be minimum possible price.
1. After replacing some components in PCB, usually there may be some short circuits or
way to consume more current. This causes burning of components when powering on
the PCB. Connecting an incandescent lamp serially with supply is the standard
protection mechanism used in repairing SMPS. We made a circuit with one three pin
adapter, bulb holder, power indicating LED and socket. Enclosure was made from
wood in order to reduce the cost and electrical shock.
2. There is an opto-coupler to transfer feedback signal from DC output to control IC. On
board testing of opto-coupler was very difficult. As the solution we made a circuit to
test the opto -coupler.the circuit allow a 2 mille-Ampere current to follow through the
LED of the opto-coupler and the working opto-coupler gives 3.4 Volt reading.
3. The smoothing capacitors get charged to nearly 320 Volts when the power is on. After
disconnecting the PCB from the main supply capacitor takes greater than two minutes
to fully discharge. Mean while capacitor is discharging if repairing person accidently
touches the leads of the capacitors he will feel electrical shock. We usually use the tip
of the screw driver to discharge but it is not recommended practice. The best way is to
use high wattage resister connected with high gauge wire to short circuit the leads of
the capacitor.
4. While repairing it was frequent incident touching powered PCB. This could be
avoided wearing safety clothes such as rubber shoes.
2.3.1 Introduction
TriTel lanka (Pvt) Ltd is a leading company in deploying coin operated pay phones all around
the country. They have been operating payphones from when Sri Lanka had only PSTN
network. They have lot of phones which are now replaced by CDMA fixed wireless
payphones. The enclosure and other valuable parts of the old payphones is still valuable if we
integrate the CDMA module with existing electronics and hardware. While analyzing the
technical feasibility of integrating CDMA module into old payphones they encountered a
problem with coin validator of the old payphones. That coin validator accepts 1,2 and 5 rupee
coins.1and 2 rupee coins fill the coin box very quickly than five .The coin collector
frequently has to go and collect coins. If we allow the coinvalidator to validate only 5 rupee
coin then we can reduce the coin filling speed. The Tritell Lanka (Pvt) Ltd requested our
company to modify the coin validator of Sondy payphone(old payphone).
2.3.3 Payphone
Payphone unit consists of
• Main CPU
• Keyboard
• LCD
• Coinvalidator
• Speaker
• Mic
• Handset
• Power supply
• CDMA module
The functionality of payphone is to allow the user to talk predefined time according to
amount he inserted. To ensure reliable operation and security the whole set is kept in the
metal box.
solenoid to direct the coin to coin box or outside. Industrial coin validators use different
method to detect and differentiate the coin.
2. Coin rolling
3. Anvil
6. Acceptation gate
After the customer inserting the coin through coin entry the coin rolls on ramp to remove the
speed variation due to inserting method (gentle push vs. force push).all the sensors on the
ramp way measure some physical properties such as dimension, conductivity, magnetic
permeability and elasticity to take a decision. These measured data are compared with set of
predefine data for each kind of coin and discriminated based on the comparison result. If
more measurements on physical properties are available then the effect of temperature,
noises, sensor accuracy and aging can be avoided. These are the available sensors can be used
in coin discrimination.
1. Optical sensor: light emitting photo diode and phototransistor is used as the barrier when
coin is rolling and the time taken to cross two such barriers can be measured. This time
indirectly tell the width of the coin.
3. Acoustic sensors: When the coin is mechanically excited for instance dropped on hard
surface the properties of the resulted sound depends on elasticity, stiffness and dimension of
the coin .The sound can be captured by microphone and analyzed using digital signal
processing techniques.
4. Impact sensors: As in the case of acoustic sensors when the coin is excited the resulting
force on the body on which coin is excited is depends on some properties of the coin. The
resulted force can be measured using pressure sensors or the acceleration of the body can be
measured using acceleration meters.
2.3.5 Implementation
According to our last decision we need to design new external module which can at least
detect only 5 rupee coin and if the inserted coin is other than 5 rupee it should send jamming
signal to inductor coil by means of additional inductor coil in order to reject the coin.
We divided project into two phases, first phase consists of identifying the 5 rupee coin and in
second phase we will be able to send the jamming signal.
As mentioned above there are many ways to differentiate the coin but we have to select a
method which need to be simple (low cost) and has very compact circuitry. There is no space
for mounting sensor unit inside the payphone. So we need to design an external box to mount
the sensor unit on the top of the coin inlet hole. Using optical sensor was a feasible solution
to satisfy our needs.
Logical unit consist a PIC microcontroller. Which generates interrupt as the sensor unit gives
output and starts the timer. Timer count the number of timer resister overflow until sensor
unit give out put logic 0.the count is compared with the range of value corresponding to
genuine 5 rupee coin to make the decision.
The jamming signal generator just consist of a transistor which is operating as a switch which
allow a PWM signal injected into magnetic circuit of existing coin validator.
variable by one. At the end when the broken beam is reformed the timer stops and the display
shows the counted value.
Top view
2-17 Sensor Alignment Problem Emitter Detector
Lense
2. When the coin is dropped into coin inlet from different elevation the speed of the coin
varies. And the reading for the same coin varies as the dropping elevation changes. We found
a solution to that also. The solution is placing two identical sensor detector pairs. The
distance between both pairs should be greater than biggest width of the coin (2 Rs) in order to
avoid crossing both sensors simultaneously.
Meaning of symbols
U m/s
d T1
Emitter1
Detector 1
T2
h
V m/s
T3 Detector 2
Emitter2
------------------------------------------------------------------- (1)
------------------------------------------------------------------- Equation 1
-------------------------------------------------------- Equation 3
According to above design the microprocessor takes the reading T1 and T2, and at the end it
calculates (Equation 3) the coin width d and compares it with standard value. Comparison
result helps to differentiate the coins.
3. In order to calculate the coin width the microcontroller should do complex calculation
according to our design. The processing power of the microcontroller is not enough to handle
this complex calculation. But the microcontroller has only few jobs to do then wasting
processing power on complex calculation is not a problem. Thus we did not think about the
solution.
4. The noises presents in input to the microcontroller triggered the timer randomly. To avoid
these noises we have placed a capacitor to ground the noises and we used shield wires.
Sensor Microcontroller
GND
2-19 Solution to False Triggering Problem
1. Screen printing: The designed circuit is printed on UV sensitive membrane using UV light.
The membrane is placed on the top of copper board and the screen printing ink is applied on
the membrane. The membrane only allows ink to propagate through transparent part. The
aligning is done manually. They also have capable of doing double side PCB.
2. Etching: For etching they are using FeCl3 solution. The concentration of the solution is
determined by them using previous experience. The screen printed PCB is placed into the
container which consists etching solution. When the container is heated and applied air
bubbles inside the container the etching process more activated than usual.
3. Drilling: They have CNC drilling machine but now it is not working. They are doing
drilling manually.
4. Removing screen printing: When etching the most part of the printing marks are removed.
If some part of the printing marks remaining then they use screen wash to remove them.
5. Tin plating: They have a simple tin coating machine. The machine has a pot of melted tin
the PCB is send on the top of the tin pot using a roller.
6. Solder mask printing: After Tin plating if there is a need to apply solder mask; using same
techniques as screen printing the solder mask ink is printed on the PCB.
7. Cutting etches: Cutting the PCB is done using die press.
8. Inspecting for faults: There is a device which emit fluorescent light .When the PCB is
placed on the top of the light the broken connections can be easily identified and remake the
connection by soldering a wire.
9. Method of making through hole connection: they don’t have facilities to do through hole
plating. They just fill the hole with solder and make connection between top and bottom layer
of the PCB.
Inductor Coil
Coil form
Lead
All parts needs to manufacture a inductor are imported from other countries. Here only the
assembling part is done. The lead is inserted into coil form and glued using Epoxy. Epoxy is
inserted in to small hole by compressed air. Then the inductor is placed in to an oven and
heated four five hours. At last the inductors which pass the tensile test are packed for
shipping.
2.6 Miscellaneous
During my training period there were some instances I was not occupied by any works. Such
that time I was encaged with some work the technicians already doing. I learned new
techniques and helped them.
2.6.1.1 Introduction
Incandescent and gas discharge tube lights are the two types of electric light source available.
Under the type of gas discharge tube fluorescent, mercury vapor, metal halide, high-pressure
sodium (HPS) and low-pressure sodium (LPS) are sub categories. Both convert the electric
energy into use full light energy according to different mechanisms. Incandescent lamp uses
Joule heating process. Here the high resistance Tungsten filament is heated to high
temperature to emit photons. But in the gas discharge tubes first the electrical energy is
converted into kinetic energy and then to electromagnetic radiation.
When we select electrical light from above categories we have to consider some properties of
those products. Such as luminous efficacy, life time of the lamp, lumen depreciation and
color rendering. Here luminous efficacy means amount of luminous per one watt power
consumption, life time of the lamp is related to failure rate of the lamp and lumen
depreciation and problems in color rendering are the results of aging of lamp. Following table
compare above properties for incandescent lamp and discharge tube.
Efficacy 10 % 20-30%
2.6.1.2 Ballast
Gas discharge tube needs an auxiliary part to ignite the discharging process and limit the
current through the discharging tube. The resistance of the tube has negative incremental
coefficient against current. The large drop in the resistance of the tube during operation
allows large current to follow and make damage. In order to limit the current there should be
a load. Most probably inductive impedance in the case of AC operated tubes.
Magnetic ballast and electronic ballast are the two available means of current limiting
auxiliary parts for discharge tube. The electronic ballast is preferred now over magnetic
ballast because magnetic ballast is bulky in size, generate audible hum, visible flicker and has
no cost effective way to regulate the power.
T
AC AC EMI filter Half bridge
u
input rectifier inverter
b
e
The functionality of the electronic ballast is to provide inductive load while operating at high
frequency. It takes the AC line as a input, rectify and smooth to get DC voltage which is
again converted to high frequency AC voltage using half bridge inverter. Half bridge inverter
has two transistors acting as a switch which are opened alternatively to create PWM signal.
That signal is fed Into a LC resonator circuit which has tube as a part of the circuit. And the
inductor of the resonator circuit gives necessary load to the current following through the
tube.
Esjsy Electronics (Pvt) Ltd Page 36
Industrial Training Report
Inrush current protection: To reduce the damages to the components because of inrush
current a fuse should be connected serially. In addition a varister can be connected between
live and nutral to ground the high current. varister is a discrete electronic component whose
resistance is reduce as the current following through it increasing.
EMI filter: The intention of placing EMI filter is to avoid high frequency noise generated
within the ballast propagates into the AC network. The noise affects frequency sensitive
equipments.
Power factor correction: For rectify the AC in ballast usually it is a common practice to use
diode rectifier as it is low cost. However, it has very poor line side Power Factor (PF) and
large Total Harmonic Distortion (THD).the low power factor increases the amount of reactive
power and increases THD. There are two types of power factor correction circuits. Active
power factor correcting circuit uses boost converter while passive power factor correcting
circuit uses LC filter.
1. When I looked the electronic design it had all the circuitry additional safety
arrangement. But the PCB and soldering was very low quality, the PCB was not rigid
and the heat sink of the transistor not mounted properly. The PCB manufacturing
techniques was not updated today technology.
2. The enclosure was not a custom made but the current enclosure is suitable for local
market.
3. Lack of advertisement to the local market about the quality of the product.
However the management has now started a smart business on ballast. Now they are
importing fluorescent lamp from India, fixing their ballast and selling it back to the local
market. In my view this decision looks as a smart one because it is the only available first
step toward restoring their previous business
GND
Ladder LOGIC
Out put
Power AC
230V
Light
3 Conclusion
3.1 In-Plant Training Of Esjay Electronics (Pvt) Ltd.
3.1.1 Overview
At very first day of my training when I was given a CDMA phone to repair after introduction
given by general manager, I was in shock as I expected systematic Engineering training. I
could realize this type of training is suitable to a technician. But after two day I could change
my attitude we can learn even from repairing. There are some faults even the technicians
could not find the solution yet, I challenged myself to find the solution. It was a good
challenge for me because there were no repairing manuals and there were no datasheet for all
the ICs because those are custom made ICs. Only available equipment was multimetre I
could only measure the voltage and continuity. But at last I was able to find solution for some
faults.
Even though there are lots of advanced technologies I should have learnt but as electronics
engineering undergraduate student I got a chance to learn very basic skills like soldering and
PCB debugging. I believe this type of unbalanced training compare to my colleagues will not
affect my feature carrier and studies.
• They don’t have any training program, schedule and responsible person
• Don’t have attitude in providing necessary sources quickly
It is not suitable here giving suggestion on improving training program of Esjay. Because
they have lot of other necessary problems to be solved in order to survive in industry in
future. I also participated with my full potential in their efforts in restoring their industry back
as possible as soon. I think these kind of contribution is only can be provided by Engineers
and that’s Esjay’s expectation from us and future trainees.
The training program is an essential part of every undergraduate’s carrier because it fills the
gap between the theory and practical. It helps a lot to trainees to get the understanding of
industry before their graduatation. And adjust their carrier planning suitable to current
industrial trends.
Another problem is their assessment in training places. It is good to staff come and evaluate
the performance of the trainees but the time they are coming is not suitable. They are coming
at the end of the training and giving feedback on trainees’ performance but no time to correct
trainees’ mistakes according to their feedback. I recommend one month after start of the
training is a suitable time to visit staff from university.
Dr.Pasqual and his group from our department also visited. We had a good discussion with
him about our company and ways to improve its performance think these types of discussions
are very necessary and frequently should be done
4 List of abbreviation
Here is the list of abbreviation I used throughout the report
AC-Alternating Current
DC-Direct Current
PF-Power Factor
5 Reference
1. http://www.esjay.com
2. Datasheet of MSM6025 IC
3. Datasheet of Vipro19
4. Micro C manual
5. Datasheet of PIC16F877A
16.12.1992
7. Kazimierczuk, M.K. and Szaraniec, W., “Electronic ballast for fluorescent lamps,” IEEE
Transactions on Power Electronics, Volume: 8, Issue: 4, Oct. 1993 pp. 386-395