1 EXECUTIVE SUMMARY
The undersigned, Amit Anand & Bo Hu, Superintendents from Wallem
Shipmanagement Ltd., attended vessel M.V. QI SHAN on 13rd June,
2015, to carry out a pre-purchase inspection, whilst the vessel
was anchored at SW Lamma Anchorage, Hong Kong.
The vessel (date of delivery 21st March 2011) had been drifting
between Machong and Hong Kong since 19th January 2015. Her last
discharge port was Machong. General cosmetic appearance of the
ship side was average; Superstructure along with funnel was fair.
The ship has 7 nos. of cargo holds and had carried generally
carries grain, fertilizers, coal etc. The vessel does not have
any installed Planned Maintenance System onboard. The Kamsarmax
vessel was not maintaining any proper maintenance record. This
Hong Kong registered vessel is classed with Lloyds Register
(LR). Annual surveys are valid till 20th June 2015.
The registered owner is QISHAN SHIPPING LTD and ship manager is
TIANJIN COSBULK SHIP. There were the two more following partiesUnivan(2 persons) & Ravenscroft (4 persons). Found out later on
that one of the 4 persons in their team, was reportedly an
Argentinian ship owner himself. Though UMS classed, the engine
room was kept manned.
Engine room generally in clean condition, however had some
leakages and but was well illuminated. Prominent leakage was at
main engine fuel pumps. Auxiliary engine bilges were not clean.
Engine room bottom bilges found few places with water
accumulated. As per the available in-water survey report
carried out at Hong Kong, no area of concern found. The last
lube oil analysis report was dated 03 Mar 2014) wherein M/E,
A/Es & Stern Tube were found normal). It was reported that the
owner had not asked the vessel to send any samples since then.
The vessel had not carried out any complete overhaul of main
engine units and auxiliary engines.

2 PREAMBLE
Afloat
Anchored

X Dry Dock

Draft Fwd
Draft Aft

0.00 M
0.00 M

Spaces available

Page 2 of 22

Inspection Date & Time


dd-mmm-yyyy
0000 hrs

B allast water spaces


Yes
Yes
Yes

No.5(S) WBTST
No.5(P) WBTST
No.3(P) WBTST

Cargo spaces
No.1, No.4 & No.6 cargo holds
None

Cargo holds
Void Spaces

Persons attending and other details

Logbooks & other documents examined


Dec
k

yes Engine

yes Other

Ship certificates
(statutory and
trading), ships plan,
list of machinery
particulars and
navigational
equipment, maintenance
record and PMS records
not available, shore
lube oil analysis
report last 03 Mar
2014. Boiler and
cooling water report,
major spares ROB, FFA
& LSA inspection
record not available.

3 Principal particulars
1
2
3
4
5

Name
Type of vessel
Flag
Port of Registry
Class

M.V. QI SHAN
Bulk Carrier
Hong Kong
Hong Kong
Lloyds Register

Page 3 of 22

Class notation

7
8
9
10

Official Number
IMO No
MMSI
Shipyard

11
12
13
14
15
16
17

Keel Laid
Delivery Date
Call Sign
GRT
NRT (1969)
DWT
Displacement

18
19
20
21
22
23
24
25
26
27
28

LOA
LBP
Breadth
DEPTH
Draft
No. of holds
No. of container in hold
No. of container on deck
No. of Reefer container
Crane
Engine

+100A1,BC-A,SHC 2,4,6. ESP:


ESN,ShipRight(SDA,FDA,CM,
*IWS:Ll:Ice Class 1D,*LMC,
UMS
HK-2495
9469510
477317600
Fujian Crown Ocean
Shipbuilding Industry Co.
Ltd, China. Yard/Hull
NoGH402C
30 Dec 2009
21 Mar 2011
VRFR4
43717
26386
79791
93006 MT at Summer draft:
14.580 M
229.000 M
222.660 M
32.270 M
20.260 M
14.580 M
7
NA
NA
NA
NA
YMD-Wartsila,1x 7RT-Flex
50, MCR:11620 KW at 124 rpm
Tiller I Reg.13.3

29

Propeller

30
31

Ballast Capacity
Bunker Capacity

4 blades- Single Fixed


Pitch Propeller)
19873.5 M3
FO:3481.2 MT & DO:101.2 MT

Page 4 of 22

4 VESSEL FEATURES
DESIGN
The vessel is classed as Panamax/Kamsarmax Bulk Carrier and
built to the specification of Lloyds Register having
Classification characters: +100A1,BC-A,SHC 2,4,6. ESP:ESN,
ShipRight(SDA,FDA,CM, *IWS: Ll: Ice Class 1D,*LMC, UMS.
The ship complies with the requirements of SOLAS chapter II-1,
Part E, Periodically Unattended Machinery spaces (UMS).
Built by Fujian Crown Ocean Shipbuilding
China, Yard/Hull No-GH402C and delivered on
It has single deck, stem with bulbous bow,
and transom stern. Deadweight of the vessel

Industry Co. Ltd,


21st March 2011.
a raised forecastle
is 79791 MT.

Vessel is fitted with main engine of Make: YMD-Wartsila,1x


7RT-Flex 50, MCR:11620 KW at 124 rpm. CSR: 9877 KW at 117 rpm.
Fixed Pitch Propeller is 4 bladed, solid, and keyless, Dia
6300 mm &Pitch 3600 mm.
Its designed speed at NSR is 14.0 knots with F.O consumption
of 36.0 MT/day.
CONSTRUCTION
Vessel has a double skin construction. It has seven cargo
holds. Each hatch cover is weather tight side rolling type
with Staffo motor fitted on each side of hatch cover to open
and close. MacGregor is the maker for hatch covers. Hull
material is steel.
Vessels ballast system consists of 13 double bottom water
ballast tanks, 8 top side ballast tanks, Washing FW / BW Tk
(P), Dirty Water Tk/BW tank (S), a fore peak tank and an Aft
peak tank.
There is an electric driven Provision crane & Machinery parts
davit of capacity 2 MT at stern, bunker davit capacity 0.99 T
at both the Port side & Starboard side life rafts platform.
There are 6 Fuel oil storage tanks: 2 wing tanks (between
fr.65- fr.98), 2 wing tanks (between fr.36-fr.65) and 2 deep
tanks (between fr.30-fr.36).

Page 5 of 22

Accommodation and Engine room are located aft. Apart from this
there is one H.F.O settling tank, one H.F.O service tank, one
L.S.F.O settling tank, one L.S.F.O service tank, one Diesel
oil storage tank and one D.O Settling Tk, one Diesel Oil
service tank.
SPECIAL FEATURES
Ice Class ID
TRADING AREAS
In last one year vessel has been trading in US, Latin America,
Black sea, Australia, Far East and Europe.

5 MAINTENANCE STATUS
The
vessel
does
not
have
Planned
Maintenance
system.
Maintenance record book could not be sighted onboard during
inspection. The vessel had been drifting between Machong and
Hong Kong since 19 Jan 2015. Her last discharge port was
Machong.
CONDITION OF HULL AND MACHINERY
External Hull, Structures including Deck Machinery &
Cargo Gear:
DECK PLATING, PIPES, RAILINGS, STANCHIONS AND FITTINGS
Hull:
The vessels hull was inspected above the water line and found
to be free from any major damage and /or structural defect on
hull. Watertight integrity of hull appeared satisfactory.
Colour scheme for Hull: Top side zone & Bulwark outside Black,
Boot top zone -Red oxide, Bottom/Flat bottom zone Red.
The general above-water hull paint condition except the ship
sides was fair & port of registry and vessels name were
clearly visible at bow and stern. But draft markings found
little faded. Vessel had few rust marks at bow flare region
especially along the weld seems and at the stern.

Page 6 of 22

Found ship side (Topside and Boot top zones) with scratch
marks, rusted patches and paint peeled off (about 10-12% area
affected). Rust could noticeably be seen along weld seems.
No visible indentation was found at ship sides. Scupper stains
marks & paint scrap marks were present on port and starboard
side hull.
No appreciable Marine growth was found along the ships length
when observed with bare eyes at the water line. Propeller was
not visible.
Deck:
Both sides of the main deck (colour scheme: Grey) were found
satisfactory with scattered rust spots.
It was evident that ship staff had done touch-ups recently.
Forecastle
deck,
cross
decks,
bulwark,
poop
deck
and
accommodation decks were in serviceable condition.
All the ballast tanks vent heads were externally
satisfactory and firmly attached to the deck plating.

found

Hatch Coamings, accommodation ladder, vent heads are in


serviceable
condition.
Bollards,
fair
leads
etc.
were
stenciled with SWL.
On physical verification, pipe lines on deck noted to be
painted and maintained however the actual condition can be
determined by UTG only.
Railings were found in satisfactory condition. But rubber
packing of few weather tight doors and booby hatches needed
replacement.
No hydraulic pipe leaks found. No stencil on bunker lines and
fire lines was found for the last pressure test done.
SUPERSTRUCTURE & ACCOMMODATION
SUPERSTRUCTURE PORT AND STARBOARD SIDES:
Found in order with assorted rust spots. Colour scheme: White.

Page 7 of 22

ACCOMMODATION INTERIOR:
Found satisfactory and clean. Flooring has Vinyl Sheet.
All the accommodation doors (accessing the accommodation decks
weather tight doors) found satisfactory. No wastage noted on
the door frames.
Upholstery in the dining saloon, smoke rooms, cabins etc found
satisfactory.
Galley flooring and general condition found satisfactory with
all the scuppers clear.
Total of 6 decks are provided on board namely the Wheel house,
Upper deck, Deck A, B, C & D. Access stairs found well
maintained. Each of the decks floors is clean and maintained.
Colour
code
(painted
part
only):
Ceiling
&
Wall

white/yellow; Floor - Blue.


WHEEL HOUSE:
Found well maintained. Various bridge equipment reported to be
in serviceable condition.
Bridge doors found well maintained and easy to operate and
weather tight. Bridge wings found well maintained with coating
intact. Colour code: White.
MONKEY DECK:
Found to be well maintained with coating intact. Colour code:
Green. Radar mast, white in colour, found in order including
the Christmas tree lights base plates. All cables well
secured. Access ladder for Monkey Island found in order with
no wastage noted and coating in order.
ACCOMMODATION DECKS:
Colour code: Green. All decks found satisfactory with few
scattered rust spots which needs to be attended to in future.
All the lighting fixtures found in order with no wastage noted
on the base plates.
MUSHROOM VENTILATORS:

Page 8 of 22

All the vents located on accommodation decks found in order


and operational. Internals of these mushroom ventilators could
not be inspected as none of them could be opened up during
inspection.
MESS ROOM, SMOKE ROOM, GALLEY:
Found in order and maintained well and clean.
All the hot plates and other equipment
reported to be in order with no defects.

associated

were

ACCOMMODATION INTERNALS:
Generally found in order and maintained. Fire detectors fitted
in alley ways. It was reported that all the fire detectors are
being tried out regularly and found in order.
Currently twenty five crew members, all Chinese national are
on board. Fresh water consumption is reported to be
approximately 7~8 tonnes/day.
Funnel colour: external- combination
logo in Red; internal-silver.
Several
natural
accommodation

ventilators

mesh

of

Yellow/black/blue,

required

cleaning

in

CARGO HOLDS, HATCH COVERS, COAMINGS AND INTERNAL FITTINGS:


HATCH COVERS:
Maker- MacGregor, It has seven cargo holds. Each hatch cover is
weather tight side rolling type with Staffo motor fitted on
each side of hatch cover to open and close.
Colour scheme: underside- Red oxide; top- Grey.
No damage found and in general, paint condition was fair.
Though there were few patches of rust and paint peel-off
(about 4%). Recent touch up by ships crew was noticeable.
Hatch packing channels are in good condition. Packing appears
to be serviceable.
C/O reported that no leaks were found during last hose test.

Page 9 of 22

Rest pads, track ways are partly rusted, rollers greasing


appeared satisfactory. Compression bars appear to be in good
condition. Hatch cleats, nuts & studs were in serviceable
condition.
Hydraulic lines, controls and flexible hoses were found
without any leaks and were serviceable. Greasing in general
was found satisfactory.
CARGO HOLDS:
Colour scheme: Overhead and side walls, tank top - Grey.
There are 7 cargo holds. As per mid ship drawing, the maximum
uniform loads on hold tank top (inner bottom plating) are as
follows:
No -1, 3, 5 & 7 holds: 30.53 T / M2
No -4 hold: 21.47 T / M2
No -2 & 6 holds: 20.95 T / M2
No.4 cargo hold can be ballasted (100% filling only) during
heavy weather condition.
Neither Smoke extraction system nor CO2 firefighting system
fitted for cargo holds.
All cargo holds fitted with only natural
mechanical ventilation for the holds.

ventilators.

No

At this time only No.1, No.4 & No.6 Cargo holds were opened
for inspected from inside and general condition noted to be
fair with scratches, patches of paint peeled-of on lower
bulkhead and hopper regions (affected region 15%), except tank
top where almost 90% of paint had peeled off and needed to be
de-rusted & re-painted.
No particular structural issues noted in holds. Heavy ballast
hold No. 4 did not have any sacrificial anode.
Hatch covers rubber seal were generally in serviceable
condition except at few at corners where new packing needed to
be put.

Page 10 of 22

Greasing was lacking. No hydraulic leak


ladders were in serviceable condition.

noticed.

Access

RAILINGS ON PORT AND STARBOARD SIDES ON MAIN DECK: Found no


issues on railings. Colour code: Grey.
WINDLASS AND MOORING WINCHES:
Maker- Nantong Masada Ship Machinery Co. Ltd. Type, MOK-H15.
There are 2 windlasses with mooring drums on forecastle deck,1
mooring winch between No.1 & 2 Cargo holds, 1 mooring winch
between No.6 & 7 Cargo holds and 2 mooring winches on the poop
deck. Brake linings found serviceable.
It was reported that these windlass & mooring winches were in
order and no problems encountered during operations.
Few of the fair lead rollers found tight to rotate which need
to be freed up in due course.
General housekeeping for fore peak store required improvement.
ACCOMMODATION LADDER:
Both the port and starboard sides ladders fitted on board are
of steel and vertical stowing type located abreast of cargo
hold no5.
Hoisting drum is operated by electric motors. Both have been
reported to be working in order.
There are 2 auxiliary pilot ladders made of steel and vertical
stowing type and winch driven by electric motor.
Both have been reported to be working in order.
STEERING GEAR:
Maker: Yoowon Industries Ltd, Type: Electro; Hydraulic, 1-Ram
2-Cylinder,
YDFT-125-2,
Hydraulic
pump:
MakeHyosung
Corporation, Type 1V-FH2B-MK X 2sets, Elec. Motor 37 KW x 2
sets.
No leak noted from the ram and was reportedly
satisfactorily.No operational test was shown.
HOLD FANS:

Page 11 of 22

working

NIL
CRANES:
No cargo cranes fitted on board.
BALLAST WATER TANKS:
Colour code: Grey.
No.5 (starboard) Top side ballast tank and No.5 (Port) Top
side ballast tank and No.3 (Port) top side ballast tank were
readied for inspection. On inspection found the general
condition fair.
Paint condition was fair with few patches of rust. Paint
Coating was affected at about 3~4% area. However, noticeably
defect found common in all inspected tanks was detached
sacrificial anodes at many locations (almost 80%).
This required urgent attention as it shall surely lead to
accelerated deterioration of tanks coatings in future.
No structural issues like indentation
tanks. No mechanical damage found.

were

found

in

these

All the structural members, frames, longitudinal, stiffeners,


brackets, web & face plates, longitudinal and transverse
floors together with their access manholes, lightening holes
etc were intact and in serviceable condition.
Suction bell mouth, water pipelines and their supports,
sounding pipes, plug, access ladders etc found in serviceable
condition.
NAVIGATIONG BRIDGE:
Communication Equipment:
Vessel is provided with 1 nos INMARSATC(Make: Furuno, Type:
Felcom 15 )
INMARSAT-F terminal (Make: Furuno, TT-3052AANTENAA).
M/H VHF NBDP (Furuno, FS-2571C), 2 Nos VHF- Radio telephone
(Furuno, FM-8800S) are provided. Weather facsimile receivers
make Furuno, type FAS408 Navtex receiver (Furuno NX-700A).
Navigation Equipment:

Page 12 of 22

There are two radars, make Furuno; S-Band type FAR-2827 and XBand. Vessel has Echo sounder (Furuno FE-700), GPS (Furuno
GP150), Gyro compass (Furuno). Anemometer- Furuno P249.
AIS unit is from Furuno (FA-1S02)
VDR- Beijing
(HLDB2)

Highlander

Digital

Availability of latest notice


could not be verified on board.
During discussion
operational.

master

to

reported

Technology
mariners
all

Stock
and

bridge

Co.

Ltd

publications
equipment

are

MACHINERY SPACES:
Main Engine:
MAKER: YMD-Wartsila
MODEL: 7RT-Flex 50, MCR:
11620 KW at 124 rpm,
CSR: 9877 KW at 117 rpm.
Critical speed: 50-60 rpm
Tiller I Reg.13.3
Main engine manoeuvring controls are provided
engine control room and emergency local stand.

from

bridge,

Manoeuvrings were reportedly always done from bridge control.


Vessel had been operated at charter party eco speed.
Main engine was found to generally clean but had some
leakages. Prominent leakage was at main engine fuel pumps near
flywheel.
On-going through E/R log book exhaust temperatures of M/E at
102 rpm were found on higher side above 405 deg C highest
being 427 deg C. No M/E performance report was provided to us
for our checking.
Consumptions as follows:
Its designed speed at NSR is 14.0 knots with F.O consumption
of 36.0 MT/day.
As per E/R log book:
ME FO: 26.2~26.5 TONS PER DAY at 101 RPM on last laden voyage.

Page 13 of 22

ME CYLINDER OIL: 165 LITRES PER DAY ME


SYSTEM OIL: about 40 LITRES PER DAY.

M/E bearing clearance record not available on board.


Crank shaft deflection record available was for 18 May 2012.
Jacket cooling water test analysis reports not provided for
checking.
ME running hours as on 12 Jun 2015 was 22555 hrs with none of
the unit having been overhauled.
Lubricating oil analysis last record on-board: 03 Mar 2014
wherein M/E were found normal. It was reported that the owner
had not asked the vessel to send any samples since then.

Auxiliary Engines:
Vessel is fitted with 3 sets of ZJMD - MAN B&W . Type:
6L23/30H
780 KW at 720 rpm, Tiller I Reg.13.3
Alternator
(brushless):
HyundaiZhenjiang
China
Marine
Xiandai Generating Co. Ltd. 700 kw, 3 ph, 450 volts, 60 Hz.
During inspection, only A/E no.2,No.3 generators were running
No.2 diesel engine :cyl jacket water temp:74,75,75,76,74,75
deg C, exhaust temp:300,300,290,300,310,330deg C ,Load was 205
KW, some local thermometers were out of order.
No.3 diesel engine cyl jacket water temp:74,75,75,74,75,75 deg
C, exhaust temp:300,300,300,300,310,330 deg C, Laod was 203
KW, some local thermometers were out of order .
All 3 nos generators had been reported to be working in order
with no problems.
As per log book, FO consumption as per log book is 2.0~2.2
mt/day. System L.O consumption is high 50 L/DAY
The Aux engine running hours ending as on 12 Jun 2015 were
A/E1:17215, A/E2:14267 & A/E3:10985

Page 14 of 22

Last lube oil analysis report was dated 03 Mar 2014 wherein
all A/E were found normal. Last performance data reports dated
12 May 2015 were found normal.
Generator bilges found not clean. The DG engines need to be
overhauled but there is not enough spares on board.
Aux. Boiler & Exhaust Gas Economizer:
The vessel has a vertical composite boiler, model:ZYC 1.6/3000.7, Working pressure- 0.7 Mpa. MAKE: Zhangjiagang Green
Shazhou Boiler Co Ltd,, 0.7 MPa. Steam output: Oil fired- 1600
kg/h,exhaust gas- 1200 kg/h.
FO consumption as per log book is 1.3~1.5 mt/day. Boiler water
test record was not shown.
Cascade tank inside when viewed through inspection glass found
normal.
Other Auxiliaries:
Purifiers:
F.O Purifier: ALFA LAVAL : SA-846(2 nos) D.O
Purifier: ALFA LAVAL : PA-605(1 no)
L.O Purifier: ALFA LAVAL : PA-615(2 nos)
Air Compressors:
Maker: J.P SAUER & SOHN MASCHINENBAU GMBH WP240, Fresh water
cooled; Two sets of main air compressors are fitted on-board
and both have been reported to be working in order.
There is one deck air compressor fitted in Fore peak store
having its own air reservoir but reportedly not in use as no
pressure found in it.
Two main
provided.

Air

Receivers

and

one

Control

air

receiver

are

Pumps:
All the pumps (AZCUE make) are provided with Mechanical seal.
No serious leak found from any of the seal.

Page 15 of 22

For sea water system, 3 main cooling S.W pump, two Ballast
pumps, one fire & GS pumps, one Bilge & GS pumps and one Bilge
pump, one sludge pump and other pumps are provided.
Three are 3 LT FW pumps for LT cooling system. These pumps are
located on various Engine room platforms.
No leakage was observed for the running pumps.
Fresh Water Generator
Maker: ALFA LAVAL; Plate type; Capacity 25 T/day. Present
Fresh water production as per E/R log book was found to be
around 15~16 T/day.
Heat Exchangers:
Main L.O cooler: plate
Main F.W cooler: Shell
Central Coolers: plate
Purifier L.O heater: 2
Purifier F.O heater: 2
Main F.O heater: shell
Atmospheric condenser:

type,1 no.
& Tube type,1 no.
type,2 no.
no.
nos.
& Tube type 2nos.
Shell & Tube type,1 no.

Accommodation Ac & Reefer Plant:


AIR CONDITIONING PLANT:
Maker: BIZER KUHL MASHINENBAU GMBH. Compressor: Semi-Hermetic
Type 4G-30.2Y-40P, 2 set; condenser: Horizontal, Shell and
Fin Tube Type Vessel,2 set;fan:2 set.
Plant found in order and operational.
environment/temperature was comfortable.

The

accommodation

DOMESTIC FRIDGE COMPRESSOR:


Maker: BIZER KUHL MASHINENBAU GMBH.Compressor: Semi-Hermetic
multi cylinder 4TCS-8.2Y-40P, 2 sets; condenser: Shell and
Fin Tube Type , 2 sets.
No.1 (stbd) Plant was in use and following temperatures noted:
Meat room: -10 deg c

Page 16 of 22

Fish room: -12 deg c


Veg room: +8 deg c

MARPOL ITEMS:
Oily Water Separator:
Maker:
JOWA
3SEP,CAPACITY10
M3/H
15
PPM
alarm
monitor(SEAGUARD. Oil record book entries were not shown.
Waste oil Incinerator:
Maker: CSSC NANJING LUZHOU MACHINE CO. LTD, Type OG-200C.
Sewage Treatment Plant:
Maker:JIANGSU NANJI MACHINERY CO. LTD PRC ,Capacity- 30
Persons, Type: WCMBR-30(U)
The plant was found in use at the time of inspection.
SAFETY EQUIPMENTS:
Life-saving appliance and Fife Fighting appliance maintenance
and inspection record not available on board. Emergency
generator, Emg fire pump (below fore peak store), Emg
generator (battery start & spring motor start), free fall life
boat (1 in nos.), rescue boat were physically found without
any issue. None were shown in running condition.
Life boat:
JYB66FC, Free fall FRP totally enclosed, capacity 25 person,
maker: Jiangjin Beihai LSA Co Ltd, 1 in no; engine- Dezhou
Hengli Electrical MACHINERY Co. Ltd, water cooled Y160L-4-H,
15 KW.
Life boat davit:
Gravity davit, FA65, MAKER- Jiangjin Beihai LSA Co Ltd.
Rescue boat:
FRP maker: Jiangjin Beihai LSA Co Ltd, 1 in no; engine- Dezhou
Hengli Electrical MACHINERY Co. Ltd, water cooled Y112M-4-H,
4KW.
Rescue boat davit:

Page 17 of 22

Gravity davit, SA21, MAKER- Jiangjin Beihai LSA Co Ltd.


Emergency fire pump:
Centrifugal vertical electrical motor driven;
CO2 Fixed fire extinguisher:
Only for engine room,
Maker- SEAPLUS CO. LTD
Emg Alternator:
M442L12C6/4, maker- LEROY SOMER, 140KW, 1800RPM, 60 Hz, 450 V,
3ph.
Emg diesel:
TBD2341/6, MAKER: Henan Diesel Engine Industries Co. Ltd-222kw
x 1800 rpm.

6 PERFORMANCE & CONSUMPTION


AT SEA
M/E FO consumption:
Its designed speed at NSR is 14.0 knots with F.O consumption
of 36.0 MT/day. As per E/R log book,
ME FO: 26.2~26.5 TONS PER DAY at 101 RPM on last laden voyage
System LO consumption for M/E: About 40 LITRES PER DAY
Cylinder LO consumption for M/E: 165 LITRES PER DAY AT 101 RPM
A/E FO consumption: 2.0~2.2 mt/day
System LO consumption for M/E: A/E System L.O consumption is
high-50 L/DAY
AT PORT
Boiler: 1.3~1.5 MT/day.
One A/E: 2.0~2.2 MT/day
Total consumption: 3.3~3.7 MT/day with one A/E depending on
load.

Page 18 of 22

7 MANAGEMENT AND CREW


The vessel at the time of inspection had 25 Crew members all
of Chinese nationality.

8 CLASS RECORDS
Class Condition/Memos:
All the class certificates and statutory certificates were
valid till 20 June 2015 only. Dry docking and special surveys
shall be due by 20 March 2016.As per in-water survey report
carried out on 01 Marc 2014 at Hong Kong, no issue of concern
noted. Class LR had given clean report.
More detail please refers the attached class survey status.
8.1.2

Class status

Classed

8.1.3 Conditions of class / overdue items / memos to owners

Conditions of class :

(give particulars of all COCs recently cleared or due)

None
Overdue items (CSM) :

(list all machinery surveys overdue)

None

Memo to Owners :

(give particulars of all memos to owners, repairs due at owners convenience etc)

9 PORT STATE CONTROL (PSC) INPECTIONS


The last PSC inspection was done at 01 Dec 2014 at New Orleans,

Page 19 of 22

USA with NIL deficiency.

10 SPARES AND STORES


Important M/E spares on-board the vessel:
Main engine cylinder liner: 1 no
Main engine piston complete: 1 no
Thrust pads: 1 set
Main bearing: 1 set
Bottom
bearing
lower
shall:
1
no
Exhaust valves complete: 3 sets.
Main engine cylinder cover complete: 1 no
The vessel is extremely low on spares and stores.

11 RISKS & CONCERNS:


1. Found ship side (Topside and Boot top zones) with scratch
marks, rusted patches and paint peeled off (about 10-12%
area affected).
2. Draft markings at forward and aft found faded.
3. The vessel had been drifting between Machong-Hong Kong
since 19 Jan 2015. Her last discharge port was Machong.
4. Prominent leakage was at main engine fuel pumps.
Auxiliary engine bilges were not clean. Bottom bilges
found few places with water accumulated.
5. Rubber packing of few weather tight doors and booby
hatches needed replacement.
6. The last lube oil analysis report was dated 03 Mar 2014)
7. The vessel had not carried out any decarbonisation of
main engine units and auxiliary engines.
8. Too less spares/stores on board. The DG engines need to be
overhauled but there is not enough spares on board.
9. No stencil on bunker lines and fire lines was found for
the last pressure test done. Probably same not done for
long time.
10.
No.1, No.4 & No.6 Cargo holds were opened for
inspected from inside and general condition noted to be
fair with scratches, patches of paint peeled-of on lower
bulkhead and hopper regions (affected region 15%), except
tank top where almost 90% of paint had peeled off and
needed to be de-rusted & re-painted.

Page 20 of 22

11.
Few of the fair lead rollers found tight to rotate
which need to be freed up in due course.
12.
Too high Lube oil consumption: M/E- 40 L/day, Each
A/E-50 L/day.
13.
The vessel does not have Planned Maintenance system.
Maintenance record book could not be sighted on board
during inspection.
14.
No performance taken for M/E for long time.
15.
No crank shaft deflection taken for M/E & A/E for
long time.
16.
Ballast tanks paint Coating was affected at about
3~4% area. However, noticeably defect found common in all
inspected tanks was detached sacrificial anodes at many
locations (almost 80%). This required urgent attention as
it shall surely lead to accelerated deterioration of
tanks coatings in future.
17.
As per the temperature indicating of provision
plant, we doubt the plant or cold room exist some
trouble. Since the meat room and fish room cant be to
-18.
18.
According to the memorandum of class survey status,
some items need to be noted. For example ID AF Report
No.
Imposed 20110718,Report No. TPI1200545
Imposed 20120516
Inspection Conclusions:
The vessel appeared to be in reasonable condition according to the
inspection.
If owners decide to purchase this good vessel, it is advisable to
not only evaluate some risks and concerns mentioned above, but
also pay more attention to the vessel proper maintenance, since
the proper maintenance of two vessel were not carried out, as
some records cannot get and relevant PMS system was not installed
on board. The spare parts and stores show less during inspection.
The memorandum of class survey status shall be paid attention to.
The cabins of accommodation were line with European crews habits,
but Decoration and furniture appliances update include galley
equipment etc. may be necessary.
The vessel though UMS classed, E/R was kept manned. No specific
reason was given, other that they had surplus man power.
Strict supervision, enough spare parts and stores
essential to ensure the good condition of vessel.