Engine Model
Application Group
Power as per MTU Sales Program
2240 ( 3045 )
2000
25
25
100
kW (hp)
rpm
C
C
Kpa
2180 ( 2967 )
2000
45
95
32
100
3.0
kW (hp)
rpm
C
%
C
Kpa
%
On-site Power
Power per engine (ISO 3046)
Engine speed
Intake air temperature
Relative Humidity
Coolant temperature
Altitude
Power reduction at 45 C/32 C
Technical Data:
DATA-RELEVANT ENGINE DESIGN CONFIGURATION
* = contract value, L = limit value, G = guaranteed value, R = guideline value
Main dimensions (engine incl. standard accessories):
L (mm)
W (mm)
H (mm)
3995
1525
1850
M.P.I
Page 1 of 16
TECHNICAL DATA
Quantities
Total of 1 object(s)
4 engine(s) per object
Engine assignment
1
2
3
4
1)
engine 1
engine 2
engine 3
engine 4
item appears only once per object
Selection
Two-engine plant
IMO
still unknown
GL (Germanischer Lloyd)
Commercial
International waters
1DS
45 /32
Engine rotation counterclockwise
Horicontal & driving end down
BV (Bureau Veritas)
With solas
Gearbox, ZF 12020
TBD ( to be discussion)
Unrestricted service
Unrestricted service
Cement gray (RAL 7023)
Extended storage
TBD
english
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
1-4,
M.P.I
Page 2 of 16
ENGINE EQUIPMENT
A.
A.1
A.2
A.3
Fuel delivery pump with fuel priming pump, fuel duplex prefilter with diverter valve block
type, with water separator, pressure gauge and water level monitor, hose lines to and from
engine, fuel safety equipment (jacketed HP lines incl. leak-off fuel tank with level monitor,
flameproof hose line), fuel injection pump with emergency shutdown level and cylinder
cutout system with 24 VDC solenoid control valve, injection timer.
A.4
Oil change equipment with semi rotary hand pump. Lube oil priming system incl. electrical
pump control (400 VAC, 3-ph, 50 HZ, 0.75 kw)
A.5
Set of air intake adaptors on turbocharger intake elbows (for vertical Hose connection from
above), Set of intake air filters (plastic filter element. Seawater resistant filter housing),
Brackets for filters installation and hose connection, Set of hose lines including hose clamps
for engine to- air filter connection.
A.6
Exhaust junction (insulated Y-pipe) for both turbochargers including bellows after
turbochargers including bellows with companion flange. for resilient connection of ships
exhaust system to the junction (Exhaust Pipe work along engine centerline towards flywheel
end inclined 30 upwards form the horizontal), Connecting elbow, Insulated elbow for exhaust
junction changes exhaust outlet from 30 Upwards form the horizontal to Vertical upwards or
30 downwards from the horizontal.
A.7
Cooling-to-row water platecore heat exchanger including coolant expansion tank with
breather valve, swivel-type raw outlet with threaded flange. Engine driven, self- priming raw
water pump, raw water inlet with Threaded flange. Flameproof raw water inlet/ outlet
including engine side connection. Flameproof hose lines for row water system venting and
rubber sleeve for engine coolant venting /overflow.
A.8
Coolant preheating system including on-engine connecting hardware and flameproof hose
lines (400 VAC, 3 ph, 50 Hz, 4.5 kw)
A.9
Resilient engine mounts, (For free-standing gearbox arrangement), Resilient engine mount,
M.P.I
Page 3 of 16
ENGINE EQUIPMENT
Engine control and monitoring system (ECS) with Integrated load profile recorder, installed
in sheet metal housing (for Separate installation in engine room), with plug connectors and
the Following function /subassemblies.
-Engine speed control in response to speed setting signal with fuel Injection and speed
limitation as a function of engine status and operating condition.
-MTU sequential - turocharging control (for engines with sequential turbocharging) and
cylinder-cutout control.
-Automatic start / stop /emergency stop sequence system. Engine emergency stop system
with manual operation capability and automatic shutdown in response to following criteria:
-Engine over speed, Low engine oil pressure, ECS failure (governor defective), Low gearbox
lubes oil pressure, Low gearbox clutch oil pressure (If transmitter available)
-Data processing logic for serial data transfer (RS 422) to Local Operating panel (LOP) and
instrumentation in main control stand.
-Processing logic for gearbox control during local operation, Connection for gearbox
transmitters /monitors (oil pressure before filter or oil differential pressure, oil temperature.
oil level shaft speed).
- Data modules, programmed with engine and plant related data.
- Electric governor actuator (24 VDC).
A.11
ENGINE EQUIPMENT
A.12
A.13
M.P.I
Page 5 of 16
ENGINE ACCESSORIES
B.
B.1
ENGINE ACCESSORISE
Air in cylinder starting system (max .40 bar) with solenoid starting valve (24VCD) and hose
line.
B.2
Coolant preheating system including on -engine connecting hardware and flameproof hose
lines (440 VAC; 3 PH; 60 Hz: 4,5 Kw)
B.3
B.4
B.5
B.6
B.7
B.8
B.9
B.10
B.11
Paintwork
Paint finishes cement grey single component paint, single color (RAL 7023).
B.12
Spare parts
shipboard spare parts kit to manufactures recommendation
- small kit (1x per ship)
a - for engine
e - for monitoring system and remote control
TOOLS
Shipboard tool kit to manufacturers recommendation
- small kit (1x per shit)
a - for engine
e - for monitoring system and remote control
B.13
M.P.I
Page 6 of 16
C.2
C.3
C.4
C.5
C.6
C.7
Connecting Interface
- CCS connecting interface in sheet metal housing with plug in connecting cable to ECS, for
external signal adapting and connecting to ECS, and remote control signal conversion and
amplification, including terminal for ships conversion and Amplification, including terminal for
ships cables.
M.P.I
Page 7 of 16
C.8
C.9
Connecting Cables
Set of connecting cables, comprising:
1- 2 Connecting cable 12m each with plug connectors at both ends for ECS / ETB connection.
2- 1 Connecting cable 15 m with ETB side connection for ETB/ CCS connection.
3- 1Connecting cable 2 m with plug connectors at both ends for ECS / LOP connection.
Labeling of LOP in English
C.10
U
C.11
C.11.1
Electronic Engine and Gearbox Remote Control System for the Main Control Stand
Remote control unit MTU RCS 5 FPP Fully redundant system unit, ready for installation in
housing with dimmer, with integrated control logic and the following equipment:
1- Propulsion control lever for control of engine speed and gear box coupling status.
2- Operating display tableau for control stands selection and single lever control for multi
engine plants.
3- Integrated monochrome LCD display with selection keys for operating mode display and
program information.
4- Optical alarm with alarm acknowledgement.
Connection of remote control unit to ECS / LOP via CAN Interface coupling.
Version for closed control stand with protection class IP66 front panel and IP65 for real panel.
Electronic engine and Gearbox Remote Control System for the Slave Control Stand.
Scope of function as for main control stand / closed version
C.11.2
C.11.3
C.11.4
Control system UGS-PN for ship side exhaust flaps (surface /underwater discharge) , installed
in sheet metal housing for wall mounting, comprising the flowing equipment :
1- Control logic
2- 5/2 Way solenoid for pneumatic exhaust flat control.
3- Illuminated push buttons for selection and display operating mode ( manual or automatic ).
4- Illuminated push buttons for manual operation and exhaust flat status display
C.12
C.12.1
Monitoring and Control System MC55 Type 2 for the Control Stand /1 per Ship
The basic system installed in the main control stand consist of two control stations operating
independently from each other in compliance with classification society
rules and regulations with active process visualization via color monitors.
By means of graphic display each MC55 type 2 workstation shows on several screen pages all
ship sections monitored by the system the date it acquires is integrated in the graphic display
according to its allocations. Inadmissible operating data results in visual and acoustic alarms
.the screens ball can be comfortably selected from tool bars via track ball required voltage
supply is 24 VCD.
Basic Configuration Two Control Stations for Installation in Consoles Consisting of:
1- 2 TET color monitors (15screen size) with cable, chassis.
2- 2 Track balls
3- 1 Key switches
4- 1 Alarm buzzer
5- 2 Management computer units 19 slide- in chassis including operating software.
C.12.3
C.12.4
C.12.5
C.12.6
M.P.I
Page 9 of 16
C.12.7
C.12.8
C.12.9
C.12.10
C.12.11
M.P.I
Page 10 of 16
POWER TRANSMISSION
D
D.1
POWER TRANSMISSION
Resilient Coupling
(For free- standing gearbox)
-Heat-resistant. Non aging resilient coupling integrated and aligned in a bell housing
including offset compensating coupling (short version) with engine connecting hardware.
(Subject to torsinal vibration calculation)
D.2
D.3
M.P.I
Page 11 of 16
DOCUMENTATION
E
E.1
Documentation
The following documentation and drawings will be supplied upon receipt of order:
Standard Publication engine & Gearbox
10 sets per vessel (5 sets of manual and 5 sets of CDs. For all items).
1- Description / operation Manual in English
2- Spare parts catalogue in English
3- Tools catalogue in English
4- Fluid & Lubrication in English
5- Maintenance manual
6- Tolerance and wear list
E.2
E.3
E.4
M.P.I
Page 12 of 16
COMPRESSOR
F.
F.1
F.2
11.2
230
1150
5.3
3
3
5.8
50
approx.
m3/h
bar
rpm
kW
kj/sec
air- cooled
direct drive
deg. C.
245 kg
All capacity data with 5 % tolerance and based on 20 deg. C. ambient temp And 1013 m
bar.
F.3
F.4
Motor design
Type
ISO- Rating
Speed
Voltage
Frequency
Model
System of protection
Insulation Class
Regular equipment
Air intake/ silencing filter system
Re- cooler after each stage
Axial fan
Flywheel
Oil and water separator of the 2 n d and 3 rd stage
Automatic condensate drain from drainage of the 2 n d and 3 rd stage, 220 V, 60HZ
Standard relief, integrated in the condensate drain automatic system
Pressure oil lubrication
Oil pressure switch
M.P.I
Page 13 of 16
COMPRESSOR
M.P.I
Page 14 of 16
TRAINING
G. Training
G.1
Engine training for Customers Personal
G.2
Course Objective
Target Trainees
Curriculum
ELECTRONICAL TRANING
Target
MCS5- Type 2
Target
M.P.I
Page 15 of 16
SUPERVISION
H.
H.1
Supervision
Supervision of Installation
- Upon award of contract and request by the buyer the Seller will make available trained
personal to supervise the installation of supplied engines, gearbox as well as monitoring
and control system.
- Upon award of contract and request by the Buyer the Seller will make available trained
personnel to attend HAT and SAT.
- During HAT and SAT our personnel will record all relevant reading and parameters
concerning the supply MTU engines.
Seller is responsible to obtain required entry permits as convening all local cost for the
buyers team
The buyer send a technical team for inspection in during assembly and FAT test of engines
to MTU factories.
M.P.I