SKD Esperanza GRST P2 Pending Items New PDF
SKD Esperanza GRST P2 Pending Items New PDF
SKD Esperanza GRST P2 Pending Items New PDF
Major
Tow
123
In what format has the safety case been prepared Critical
and has the case been approved by any regulatory
authorities?
Tow
Tow
Tow
136
Is there evidence that the HSE Case has/is being
operationalized?
140.1
Major
144
Critical
Tow
K2 Inspections of Mast has not been received.
GRST inspection revealed several issues (unable to crossheck if K2
had identified same issues).
Loose Anco nuts SKD to advise what there philosophy is on reusing
Anco nuts (eg dolley tracks)
New deflection sheave is not drops compatible..
Double nutting on the Hawkjaw system
Bent fingers and unsatisfactory latch retention.
Numerous kick plate issues.
LRST to check that K2 report covers the identified issues if it does then
closeout of drops actions will closeout this action. If the report is not
comprehensive enough then Shell should get an independent company
eg Andy Little who was used on Stena Clyde.
3.18.
2
Tow
Major
Some of the lifting equipment inspected did not have valid certification. Tow
Need to remove from service to close out this out.
SKD to prepare lifting gear register
385
Confirm that wire ropes are properly maintained for
cranes, winches, etc. Slip and cut programme in place,
Magnetic Flux Leakage testing, else change out schedule in
place based on either number of cycles or time based?
Critical
Tow
- Review the wire rope load test certificates for utility and
man riding winches, cranes, etc.
386
Confirm dedicated lifting accessory store available Major
where equipment is protected and ideally locked
and signed out/in.
392
401
436
Tow
major
Tow
major
Tow
438
Critical
Tow
major
Tow
447
Review the Emergency Response Plan and
Checklists, consider the following
- Plans and check lists for Well related Major Accident Events
(MAE) in the HSE Case?
- Any obvious omissions? (verify last revision date, less than 3
years?)
- Emergency contact numbers available?
- Clear link between MAE, plans, checklists and Emergency Drill
Scenarios?
451
Major
Is a Medical Emergency Response Plan readily
available with correct contact numbers? Displayed
and updated?
Combining item 463 - Are there Tier 3/4 hospital (specialist medical
care) in the area and are the details included in the MERP? What is
the transport plan and duration?
Since both the item 452 and item 463 pertains to MERP, combining
these. Closing out the item 463
Tow
452
Fire and Gas system logic and cause & effect
diagram/drawing. Clearly documented and
understood?
5.1.2
9
Critical Check with Nivas. Benito to chase Richard with the document required. Tow
631
Are Certificates Of Conformance (COC), Certificates
Of Service (COS) and where applicable Certificates of
Compatibility readily available?
Certificate Of Service (CO S)
All well control equipment shall be subject to a COS
on an annual basis with an auditable trail and verified
by the Wells Supervisor (WE & CWI).
This certification is to verify that the equipment has
been inspected, properly maintained and tested in
accordance with OEM specifications. A COS may be
issued by OEMs or a thirdparty inspection company or
be self-certified.
8.5.8
930
Tow
major
Still awaiting for the red zone drillfloor mat, barriers and signs to be put TTR
up.
Wikus to order chain barrier to isolate poop deck zone during hiline
ops.
333
345
Critical
TTR
Minor
TTR
393
Has a comprehensive TR impairment assessment Critical
been undertaken against clear acceptance criteria?
Compared against an EER study?
Benito to close in Remedial Action Plan register. Need to provide proof TTR
of closure. Benito to give story.
441
Emergency Drills for Well related Major Accident
Events
453
453.2
453.3
Major
TTR
Combined SIMOPS drill as per SSP btw TLP and TAD as per SSP
TTR
2.2
Spud
Spud
81
2.6
84
Are well control manual differences with the Drilling
contractor manual bridged?
Critical
146
147
Major Benito to follow up with Kerry Williams
Spud
Spud
Spud
149
149.1
3.5.2
152
3.6.1
6
177
3.18.
5
372
Spud
Spud
Major
Spud
Minor
Spud
413
Spud
Major
How has it been assured that the total personnel
on board (POB) can evacuated from the TR safely?
- When was this last tested?
Spud
Spud
440
457
Spud
458
533
4.2.6
8.6.6
940
1269
8.31.6.
1
8.31.6.
16
1283
8.31.6.
27
1292
10.1.
2
Major Yuen to confirm that this requirement is in Malakai well control plan.
Spud
Minor New chokes are installed the DSV should physically check that
adequate spares for these chokes are in the warehouse.
Spud
Spud
Spud
1335
Are all instruments connected to purged air systems as
per design? Are audible alarms functional? Is purge air
10.2. taken from non hazardous areas and away from engine
3 exhausts? (also 3rd party containers)
1347
Major
Spud
23
18
7
P2 on Tow
P2 before Spud