Schedule of Rates 2015-16
Schedule of Rates 2015-16
Schedule of Rates 2015-16
OF ANDHRA PRADESH
A.P. URBAN GREENING AND BEAUTIFICATION CORPORATION LIMITED
SCHEDULE OF RATES
2015 - 16
For
INDEX
Sl. No.
i)
ii)
iii)
I
A
B
C
D
E
F
G
II
Item of work
Special conditions
Calendar of Operations
Watering Schedule
SCHEDULE OF RATES
RAISING OF NURSERIES
Primary Beds
Raising of Poly pot nursery
Maintenance of Poly pot nursery
Raising of Ornamental Potted Plants
Maintenance of Ornamental Potted Plants
Grafting Mango Plants
Grafting / Layering of Sapota, Guava, Acid Lime, Jack Fruit and
Pomagranate
Page No.
i
iv
Vi
1
1
3
4
5
5
5
A
B
C
D
E
F
5
6
8
9
9
10
A
B
C
D
E
F
10
11
12
13
13
14
A
B
C
D
14
14
16
16
III
IV
17
17
18
18
19
A
B
C
D
E
F
19
20
21
22
22
22
22
23
24
25
26
27
27
28
30
VI
VII
A
B
C
D
E
F
G
VIII
IX
17
17
SPECIAL CONDITIONS
_____________________________________________________________________
PREAMBLE:
1. Rates fixed in the Schedule Rates are the maximum and the Officers are
advised to show economy during actual execution of works by adopting lesser
rates to the maximum extent possible.
2. Expenditure should be limited to their Budget allotment, under the
appropriate head of account. The officers should not exceed their allotment
based on the current schedule of rates. Excess expenditure should not be
permitted under any circumstances.
3. If any item of work, which is found essential and is not included in this
Schedule of Rates, the rates provided in the respective circle FSR/Engineering
Departments SSR can be adopted. If no suitable rate is found, specific
quotations shall be submitted to the Managing Director, APUG&BC
/Concerned Authority along with field data duly checked by immediate
superior Gazetted Officer for approval of the rate and till this rate is approved,
payment should not be made at the rate proposed.
4. The rates fixed in this Schedule Rates will come into force w.e.f., 01.07.2015.
5. AREA ALLOWANCES
(A) CORPORATIONS & MUNICIPALITIES:
a)
b)
Allow 20% extra over basic rates on labour component of works in all
District Headquarters and the remaining Municipal limits (up to a belt
of 12Kms. From Municipal limits).
(i)
(ii)
(iii)
Item of work
Period
October - November
3
4
5
November - December
April - May
May/June/July onwards for misc species
depending on seed season, september,
October for Eucalyptus and others.
Cleaning, Ploughing, Making nursery beds, June - July and November depending on
temporary huts, wells etc, and fencing.
species
Sowing of seeds in beds or bags
a) June onwards, depending on viability
and availability of seeds of various
species
10
11
12
13
14
15
16
17
18
19
(iv)
20
21
22
23
24
July
October - November
August - October
August
July - August
Note:
i)
ii)
As watering is being done in the urban conditions some of the operations may be
even carried out in other seasons that the one mentioned, depending on the most
beneficial time for a particular operation.
(v)
July to November
II
December to March
Total
April to June
II
December to March
Total
C. 2nd YEAR
MAINTENACE
I April to June
II
January to March
Total
(vi)
DESCRIPTION OF WORK
UNIT
RAISING OF NURSERIES
PRIMARY BEDS: (Standard size of 12M X 1.2MX 0.3M)
Clearance of site
New sites
100 sqmt.
Old sites
100 sqmt.
Aligning, digging of bed and giving good burn on
Per bed
the top for sterilization.
Cost and transportation of soil mixture Farmyard manure, sand, red earth/ black soil in
1:2:3
Outside GVMC
Within GVMC
Refilling of beds with mixture of sand, black soil
& Farmyard manure after pulverizing (excluding
cost of manure) including cost of transport
(New sites)
Cost of seed including transportation.
Sowing of seed, watering, weeding the beds
twice a day for 2 months.
(a)
(b)
4
5
6
7
9
B
10
11
12
(a)
(b)
(a)
i)
ii)
iii)
iv)
v)
vi)
(b)
vii)
viii)
ix)
x)
xi)
Per bed
Per bed
Per bed
RATE
321.00
81.00
728.00
1320.00
1852.00
180.00
As per actuals
Per bed
529.00
Per bed
115.00
As per actuals
1000 bags
1000 bags
1000 bags
1000 bags
1000 bags
1000 bags
676.00
756.00
1362.00
2619.00
4655.00
5821.00
1000 bags
1000 bags
1000 bags
1000 bags
1000 bags
7078.00
10184.00
15615.00
20368.00
36200.00
REMARKS
DESCRIPTION OF WORK
Filling of bags with mixture of Red soil/tanksilt &
FYM in 3:1 after powdering sieving, opening of
bags and filling with above mixture and
arranging into beds.
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
(b)
4"x7"
5"x5"
5"x9"
6"x12"
8"x12"
8"x15"
10"x16"
12"x16"
14"x18"
16"x18"
18"x24"
Cost of chemicals and fertilizers like DAP @
6kg/1cmt, BHC @2kg/1cmt
1000 bags
653.00
1000 bags
559.00
1000 bags
1008.00
1000 bags
1343.00
1000 bags
1513.00
1000 bags
1636.00
1000 bags
2384.00
1000 bags
3096.60
1000 bags
4739.00
1000 bags
6181.29
1000 bags
13935.00
As per actuals
14
15
Cost of seed
Sowing of seed and pricking out plants from
primary beds into bags (including pre-treatment)
As per actuals
1000 bags
72.00
16
17
As per actuals
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
18
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
4"x7"
5"x5"
5"x9"
6"x12"
8"x12"
8"x15"
10"x16"
12"x16"
14"x18"
16"x18"
18"x24"
Shifting, grading & rearranging in beds Once in
(3) months (wherever trenches are not
provided)
4"x7"
5"x5"
5"x9"
6"x12"
8"x12"
8"x15"
10"x16"
12"x16"
UNIT
RATE
1000 (p.m)
1000 (pm)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
125.00
142.00
152.00
321.00
504.00
629.00
871.00
1129.00
1731.89
2259.00
895.00
1000 (p.m)
1000 (pm)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
27.00
30.00
54.00
104.00
160.00
199.00
321.00
415.82
REMARKS
DESCRIPTION OF WORK
14"x18"
16"x18"
Digging of new trenches of size 12m x 1.2m x
0.6m.
UNIT
1000 (p.m)
1000 (p.m)
Each 500
plants
RATE
637.60
831.65
728.00
20
each/500
plants
369.00
21
1000
plants
1219.00
22
Per bed
1168.00
23
629.00
24
C
25
70.00
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
4"x7"
5"x5"
5"x9"
6"x12"
8"x12"
8"x15"
10"x16"
12"x16"
14"x18"
16"x18"
18"x24"
Shifting, grading & rearranging in beds Once in
(2) months
1000 (p.m)
1000 (pm)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
125.00
142.00
152.00
321.00
504.00
629.00
871.00
1129.49
1731.89
2258.99
895.00
(a)
(b)
(c)
(d)
(e)
(f)
4"x7"
5"x5"
5"x9"
6"x12"
8"x12"
8"x15"
1000 (p.m)
1000 (pm)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
27.00
30.00
54.00
104.00
160.00
199.00
26
REMARKS
DESCRIPTION OF WORK
10"x16"
12"x16"
14"x18"
16"x18"
Pruning of lower branches to 1/3 height of
seedling to facilitate free aeration & hardening
of stems
(2 operations) April & June
UNIT
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 nos /
per
operation
RATE
321.00
415.82
637.60
831.65
70.00
28
Per bed /
per month
629.00
Each plant
3.32
30
Each plant
1.65
31
29
32
33
D
34
(a)
(b)
(c)
35
(a)
(b)
(c)
36
(a)
(b)
(c)
37
(a)
(b)
(c)
38
39
As per actuals
As per actuals
As per actuals
each
each
each
20.92
10.46
1.49
each
each
each
3.32
3.32
1.65
each
4.48
each
2.99
each
1.49
As per actuals
each
1.65
REMARKS
DESCRIPTION OF WORK
Weeding, watering, pruning, application of
fertilizers, (October to March ) 6 months
41
42
E
43
44
45
46
As per actuals
Per month
7171.00
/ 2000 pots
47
As per actuals
F
48
49
UNIT
Per month
/ 2000 pots
RATE
7171.00
As per actuals
As per actuals
100 pots
169.00
191.00
Each stick
each
2.99
10.46
50
II
A
51
52
53
54
55
56
57
58
59
60
100 sqmt.
11.61
As per quotation /
tender
(b)
Each stone
20.00
(c)
Each stone
44.00
(a)
(a)
(b)
As per actuals
As per actuals
100 rmt
290.00
100 rmt
800.00
As per actual
100 nos
3633.00
100 nos
1867.00
REMARKS
DESCRIPTION OF WORK
Retrieval of old tree guards including cutting at
the site transporting to workshop re-welding
and red oxide painting
62
i)
Each stone
91.00
ii)
Each stone
119.00
100 nos
44.00
100 nos
100 nos
1489.00
3539.00
100 pits
646.00
(a)
i)
100 pits
1875.00
(a)
(b)
(c)
(d)
(e)
(f)
(g)
ii)
6"x12"
8"x12"
8"x15"
10"x16"
12"x16"
14"x18"
16"x18"
Over and above 3km lead add following rates
per km per 100 plants
100 plants
100 plants
100 plants
100 plants
100 plants
100 plants
100 plants
288.00
459.00
578.00
620.00
892.00
1367.86
1784.17
(a)
(b)
(c)
(d)
iii)
6"x12"
8"x12"
8"x15"
10"x16", 12"x16", 14"X18" & 16"x18"
Loading and unloading of plants where
departmental vehicles are used
100 plants
100 plants
100 plants
100 plants
2.99
10.46
10.46
10.46
(a)
(b)
(c)
(d)
6"x12"
8"x12"
8"x15"
10"x16", 12"x16", 14"X18" & 16"x18"
100 plants
100 plants
100 plants
100 plants
110.00
194.00
244.00
284.00
RATE
310.00
RAISING OF PLANTATION
63
64
(a)
(b)
65
66
67
UNIT
Each
REMARKS
70
71
DESCRIPTION OF WORK
Internal transport of bag plants to planting site
6"x12"
8"x12"
8"x15"
10"x16"
12"x16"
14"x18" & 16"x18"
Planting of bag plants after refilling the
pits/support sticks
RATE
100 plants
100 plants
100 plants
100 plants
100 plants
100 plants
79.00
140.00
176.00
303.00
436.00
492.00
241.00
582.00
28.00
(a)
(b)
(c)
100 plants
100 plants
Each
(a)
(b)
(a)
As per actuals
100 plants
30.00
As per actuals
(b)
(c)
72
73
74
UNIT
As per actuals
100 plants /
60.00
2 doses
100 plants
1463.00
100 nos
174.00
(a)
100 plants
84.00
(b)
100 plants
253.00
(a)
100 plants
84.00
(b)
100 plants
253.00
76
Each tanker
/ per day
2958.00
77
1064.00
75
(a)
REMARKS
DESCRIPTION OF WORK
Multiple row plantation
UNIT
100 plants /
month
RATE
529.00
78
100 sqm. /
operation
16.58
79
80
81
C
82
83
84
85
86
As per actuals
100 sqmt
82.00
As per actuals
2958.00
100 nos
175.00
(a)
100 plants
84.00
(b)
100 plants
253.00
(a)
100 plants
84.00
(b)
100 plants
253.00
(a)
(b)
(c)
87
As per actuals
(a)
(b)
As per actuals
100 plants /
60.00
2 doses
100 plants /
month
1064.00
100 plants /
month
529.00
88
100 sqmt. /
operation
16.58
89
100 sqmt
82.00
REMARKS
DESCRIPTION OF WORK
Contingencies like repairs to fencing cost of
insecticides, sharpening of departmental tools
etc.
D
91
92
93
UNIT
RATE
As per Actuals
175.00
(a)
100 plants
84.00
(b)
100 plants
253.00
(a)
100 plants
84.00
(b)
100 plants
253.00
94
95
100 plants /
2 doses
60.00
96
Each tanker
/ per day
2958.00
97
(a)
100 plants /
month
1064.00
(b)
100 plants /
month
529.00
98
100 sqmt. /
operation
17.00
99
100 sqmt
82.00
100
E
101
102
(a)
As per actuals
As per Actuals
100 plants
84.00
REMARKS
DESCRIPTION OF WORK
1st Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant (with prior
permission from the MD,
APUG&BC/Competent Authority)
UNIT
100 plants
RATE
253.00
103
Each tanker
/ per day
2958.00
104
100 plants /
month
1064.00
(b)
100 plants /
month
529.00
105
100 sqmt. /
operation
17.00
106
100 sqmt
82.00
107
F
108
109
(a)
(b)
110
111
III
A
112
As per actuals
200 plants /
month
1064.00
200 plants /
month
529.00
100 plants
1220.00
As per actuals
10
175.00
27.00
REMARKS
114
115
116
i)
ii)
iii)
iv)
B
117
118
119
120
UNIT
Ha
RATE
3539.00
Ha
5310.00
100 nos
44.00
(a)
i)
100 pits
991.00
(a)
(b)
(c)
ii)
4"x7", 5"x9"
6"x12"
8"x15"
Over and above 3km lead add following rates
per km per 100 plants
100 pits
100 pits
100 pits
233.00
288.00
578.00
(a)
(b)
(c)
iii)
4"x7", 5"x9"
6"x12"
8"x15"
Loading and unloading of plants where
departmental vehicles are used
100 pits
100 pits
100 pits
2.99
4.48
10.46
(a)
(b)
(c)
4"x7", 5"x9"
6"x12"
8"x15"
Internal transport of bag plants to planting spots
100 pits
100 pits
100 pits
50.00
105.00
244.00
(a)
(b)
(c)
4"x7", 5"x9"
6"x12"
8"x15"
Planting of bag plants after refilling the pits
4"x7", 5"x9"
6"x12", 8"x15"
Cost of BHC (10%) @20grms/pit
100 pits
100 pits
100 pits
50.00
105.00
244.00
121
122
123
DESCRIPTION OF WORK
Clearing unwanted light Jungle growth (bushes,
shrubs etc., wherever necessary)
(a)
(b)
(a)
11
100 pits
81.00
100 pits
241.00
As per actuals
REMARKS
DESCRIPTION OF WORK
Application of BHC (10%) @20gms/pit/dose
Cost of chemicals and fertilizers @
20gms/pit/dose
(2 doses)
UNIT
RATE
100 plants
30.00
As per actuals
(b)
As per actuals
(c)
125
100 plants /
2 doses
60.00
4"x7", 5"x9"
100 plants
413.00
(b)
6"x12", 8"x15"
Inter ploughing with MB plough between the
planting lines to a depth of 30 cms and removal
of root suckers
100 plants
Ha
1463.00
3780.00
(a)
100 plants
84.00
100 plants
253.00
(a)
100 plants
84.00
(b)
100 plants
253.00
129
Per month
7171.00
130
131
100 sqmt
82.00
132
100 rmt
56.00
133
C
134
126
127
(b)
128
As per actual
(a)
4"x7", 5"x9"
100 plants
413.00
(b)
6"x12",8"x15"
100 plants
1463.00
Ha
3780.00
100 plants
135
136
As per actual
(a)
12
84.00
REMARKS
(a)
(b)
138
139
DESCRIPTION OF WORK
1st Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant
UNIT
100 plants
RATE
253.00
As per actual
100 plants /
2 doses
Ha
60.00
3780.00
(a)
100 plants
84.00
(b)
100 plants
253.00
140
Per month
7171.00
141
100 sqmt
82.00
142
100 rmt
56.00
143
D
144
145
(a)
(b)
As per actual
100 plants
84.00
100 plants
253.00
Ha
3780.00
146
147
Per month
7171.00
148
100 sqmt
82.00
149
150
100 rmt
56.00
As per actual
E
151
(a)
13
REMARKS
DESCRIPTION OF WORK
Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant (with prior
permission from the MD,
APUG&BC/Competent Authority)
UNIT
100 plants
RATE
253.00
152
Ha
3780.00
153
Per month
7171.00
154
100 sqmt
82.00
155
156
F
157
158
159
160
IV
A
161
162
(a)
(b)
(1m.
(1m.
100 rmt
56.00
As per actual
100 sqmt
100 rmt
56.00
As per actual
Ha
163
164
165
B
166
167
168
(a)
82.00
5310.00
Ha
1009.00
As per item no. 54
Rmt
100.00
44.00
3144.00
100 nos
562.00
As per actual
14
REMARKS
DESCRIPTION OF WORK
Cost of chemicals fertilizers @25gms/plant
Application of neemcake & fertilizers (2 doses)
UNIT
RATE
As per actual
100 plants /
60.00
2 doses
169
(a)
100 pits
390.00
Application of FYM
Transport of plants from nursery site to planting
site upto a lead of 3km including loading and
unloading where-ever departmental vehicles are
not provided.
100 pits
132.00
170
(b)
i)
(a)
(b)
(c)
ii)
4x7, 5x9
6x12
8x15
Over and above 3km lead add following rates
per km per 100 plants
100 pits
100 pits
100 pits
234.00
288.00
578.00
(a)
(b)
(c)
iii)
4x7, 5x9
6x12
8x15
Loading and unloading of plants where
departmental vehicles are used
100 pits
100 pits
100 pits
2.99
2.99
10.46
(a)
(b)
(c)
4x7, 5x9
6x12
8x15
Internal transport of bag plants to planting site
4x7, 5x9
6x12
8x15
Planting of bag plants after refilling the pits
4x7, 5x9
6x12,8x15
Cost of BHC (10%) @ 20gms/pit
Application of BHC
Replacement of causalities to a maximum of
30%.
100 pits
100 pits
100 pits
50.00
110.00
244.00
100 pits
100 pits
100 pits
50.00
110.00
244.00
(a)
100 plants
84.00
(b)
100 plants
253.00
(a)
100 plants
84.00
(b)
100 plants
253.00
171
(a)
(b)
(c)
172
173
(a)
(b)
(a)
(b)
174
175
176
15
100 pits
81.00
100 pits
241.00
As per actual
100 pits
30.00
100 nos
2291.00
REMARKS
DESCRIPTION OF WORK
Protection, maintenance, tending the plants &
removal of unwanted growth. (9 Months) JulyMarch each plantation
UNIT
Per month
178
179
As per actual
100 sqmt
82.00
180
100 rmt
181
C
182
183
RATE
7171.00
56.00
As per actual
100 nos
100 plants
2291.00
84.00
100 plants
253.00
(a)
100 plants
84.00
(b)
100 plants
253.00
185
Per month
7171.00
186
100 sqmt
82.00
187
100 rmt
56.00
188
D
189
(a)
(b)
184
(a)
As per actuals
st
(b)
100 plants
253.00
(a)
100 plants
84.00
(b)
100 plants
253.00
191
Per month
7171.00
192
100 sqmt
82.00
193
190
16
As per actuals
REMARKS
(b)
DESCRIPTION OF WORK
UNIT
RATE
3rd YEAR MAINTENANCE OF HILL AFFORESTATION PLANTATION
Circular weeding without application of
100 plants
84.00
fertilizers to a radius of 50 cms around the plant
(with prior permission from the MD,
APUG&BC/Competent Authority)
Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant (with prior
permission from the MD,
APUG&BC/Competent Authority)
100 plants
253.00
195
Per month
7171.00
196
100 sqmt
82.00
197
F
198
199
200
V
A
201
202
203
204
B
205
206
207
208
209
210
17
As per actuals
100 sqmt
82.00
As per actuals
27.00
3539.00
Ha
1009.00
As per item No. 54
44.00
100 pits
562.00
As per actual
100 pits
30.00
100 plants
100 plants /
km
233.00
2.99
100 plants
50.00
REMARKS
DESCRIPTION OF WORK
Loading/unloading of 5x9 bag plants where
departmental vehicles are provided.
212
(a)
(b)
(c)
(a)
(b)
RATE
50.00
As per actual
100 plants /
2 doses
60.00
100 plants
100 plants
90.00
467.00
100 plants /
operation
84.00
100 plants /
operation
253.00
215
100 plants /
each
watering
101.00
216
Per month
7171.00
217
218
C
219
220
100 plants
467.00
(a)
100 plants/
operation
84.00
(b)
100 plants/
operation
253.00
222
Per month
7171.00
223
D
224
213
214
221
225
(a)
fertilizers @
UNIT
100 plants
18
100 plants
84.00
REMARKS
DESCRIPTION OF WORK
1st Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant
UNIT
100 plants
RATE
253.00
(a)
100 plants
84.00
(b)
100 plants
253.00
227
Per month
7171.00
228
E
229
226
(a)
100 plants
84.00
(b)
100 plants
253.00
231
Per month
7171.00
232
230
VI
A
233
234
a
b
235
236
(a)
(b)
237
i)
ii)
iii)
As per
actual
RAISING OF SILVIPASTURE PLANTATION :- (4 X 4 Mt. ESPACEMENT)
ADVANCE OPERATIONS:
Survey and demarcation
100 rmt
26.53
Clearing unwanted light Jungle growth ( bushes,
Ha
3539.00
shrubs etc., wherever necessary)
Clearing dense unwanted Jungle growth in
Reserve Forest areas ( bushes, shrubs etc.,
wherever necessary)
Ha
5310.00
Ha
1009.00
Ha
Ha
Ha
19
17612.00
14689.00
9790.00
REMARKS
DESCRIPTION OF WORK
UNIT
RATE
Upto 200 stumps
Ha
4897.00
RAISING OF PLANTATION: ( 4m x 4m ESPACEMENT = 800 PLANTS / HA.)
Tractor ploughing with MB Plough to a depth of
Ha
5351.00
23 cms including removal of left over thorny
bushes & filling pits to facilitate Ploughing.
239
240
i)
241
(a)
(b)
ii)
i)
44.00
100 pits
991.00
100 pits
2143.00
As per actuals
(a)
(b)
(c)
ii)
6x12
8x12
8x15
Over and above 3km lead add following rates
per km per 100 plants
100 plants
100 plants
100 plants
288.00
459.00
578.00
(a)
(b)
(c)
iii)
6x12
8x12
8x15
Loading and unloading of plants where
departmental vehicles are used
100 plants
100 plants
100 plants
4.48
10.46
10.46
(a)
(b)
(c)
6x12
8x12
8x15
Internal transport of bag plants to planting spots
100 plants
100 plants
100 plants
105.00
194.00
244.00
(a)
(b)
(c)
6x12
8x12
8x15
Planting of bag plants after refilling the pits
100 plants
100 plants
100 plants
105.00
194.00
244.00
(a)
(a)
(b)
(c)
100 plants
241.00
As per actual
100 plants
30.00
As per actual
(d)
242
243
244
100 nos
20
100 plants /
2doses
60.00
REMARKS
DESCRIPTION OF WORK
Replacement of causalities to a maximum of
20% of the planted, including re-opening of pits,
transport of plants internal transport and
planting.
UNIT
(a)
(b)
100 plants
100 plants
Ha
(a)
As per actuals
(b)
Ha
259.00
(a)
100 plants
84.00
(b)
100 plants
253.00
(a)
100 plants
84.00
(b)
100 plants
253.00
250
Per month
7171.00
251
100 sqmt
82.00
252
C
253
246
247
248
249
254
1463.00
413.00
3780.00
As per actuals
(a)
100 plants/
operation
84.00
(b)
100 plants/
operation
253.00
100 plants
100 plants
Per month
1463.00
413.00
7171.00
255
256
RATE
21
REMARKS
DESCRIPTION OF WORK
Fire tracing 2mt width around and within (1M
wide) the plantation area
258
259
D
260
261
(a)
(b)
UNIT
100 sqmt
RATE
82.00
262
Per month
7171.00
263
100 sqmt
82.00
264
E
265
(a)
(b)
266
As per actuals
st
84.00
100 plants/
operation
253.00
Per month
7171.00
267
F
268
VII
A
269
270
(a)
22
As per actuals
26.53
3539.00
REMARKS
271
DESCRIPTION OF WORK
Clearing dense unwanted Jungle growth in
Reserve Forest areas (bushes, shrubs etc.,
wherever necessary) with specific approval of
the MD, APUG&BC/Competent Authority
Burning and re-burning of cut material
B
272
RAISING OF PLANTATION
Tractor ploughing with MB Plough to a depth of
23 cms including removal of left over thorny
bushes & filling pits to facilitate ploughing.
273
274
Digging of pits
1.0 m x 1.0 m (5m x 5m apart)
0.60 x 0.60 x 0.60m (3m x 3m apart)
Supply of red earth and black soil
1.00 mt. Cube pits ( 5cft/pit) ( 5m x 5m)
0.60 mt. Cube pits ( 2cft/pit) ( 3m x 3m)
Preparation of soil mixture including breaking of
clouds and distribution
(a)
(b)
275
(a)
(b)
276
(a)
(b)
277
(a)
(b)
278
(a)
(b)
279
RATE
5310.00
Ha
1009.00
Ha
5351.00
100 nos
44.00
100 pits
100 pits
14241.00
2143.00
100 pits
100 pits
17198.00
6879.00
100 nos
100 nos
3099.00
887.00
100 nos
100 nos
7505.00
7505.00
As per Actuals
As per Actuals
(a)
(b)
(a)
100 plants /
2 doses
165.00
(b)
100 plants /
2 doses
165.00
280
281
282
283
(a)
(b)
284
UNIT
Ha
23
As per Actuals
As per Actuals
As per Actuals
100 plants
155.00
100 plants
100 plants
100 plants
1607.00
577.00
587.00
REMARKS
(a)
286
287
DESCRIPTION OF WORK
Watering the plants- through tankers prior
permission to be obtained from the MD,
APUG&BC /Competent Authorityfor engaging
the number of tanker for watering
5000 lts capacity ( 5 trips per day)
Replacement of causalities 20% including cost
UNIT
Each tanker
/ per day
2958.00
100 nos
2360.00
(a)
100 plants/
operation
84.00
(b)
100 plants/
operation
253.00
288
(a)
Ha
3780.00
(b)
Cultivator
Ha
2740.00
100 plants /
Per month
529.00
289
290
As per
Actuals
291
Contingencies
As per
Actuals
C
292
293
294
RATE
(a)
(b)
Each tanker
/ per day
2958.00
100 nos
100 plants/
operation
2360.00
84.00
100 plants/
operation
253.00
295
Ha
3780.00
296
Ha
3780.00
297
298
Ha
577.00
24
REMARKS
DESCRIPTION OF WORK
1.00 mt. Cube: 4 kgs neem cake & 2kgs chemical
fertilizers (super phosphate)
UNIT
RATE
As per Actuals
As per Actuals
As per Actuals
(a)
100 plants /
2 doses
165.00
(b)
100 plants /
2 doses
165.00
301
100 plants /
Per month
529.00
302
303
D
304
305
(a)
Each tanker
/ per day
2958.00
(i)
100 plants/
operation
84.00
(ii)
100 plants/
operation
253.00
306
Ha
2779.00
307
Ha
2779.00
308
(a)
(b)
309
(a)
(b)
(a)
310
As per Actuals
As per Actuals
As per Actuals
As per Actuals
100 plants /
2 doses
25
165.00
REMARKS
DESCRIPTION OF WORK
0.60 mt. Cube pits 100 gms/pit
UNIT
100 plants /
2 doses
RATE
165.00
311
100 plants
Per month
504.00
312
313
E
314
Each tanker
/ per day
2958.00
315
100 plants
each
operation
457.00
316
Ha
2779.00
317
Ha
2779.00
318
As per Actuals
(b)
As per Actuals
319
(a)
(b)
320
As per Actuals
As per Actuals
100 plants /
2 doses
165.00
(b)
100 plants /
2 doses
165.00
321
100 plants
Per month
529.00
322
As per actuals
323
Contingencies
As per actuals
26
REMARKS
(a)
DESCRIPTION OF WORK
UNIT
RATE
4th YEAR MAINTENANCE OF HORTICULTURE PLANTATION
Watering the plants- through tankers prior
permission to be obtained from the MD,
APUG&BC /Competent Authorityfor engaging
the number of tanker for watering
5000 lts capacity ( 5 trips per day)
Each tanker
/ per day
2958.00
325
100 plants
each
operation
890.00
326
Ha
2779.00
327
(a)
(b)
328
As per Actuals
As per Actuals
(a)
(b)
(a)
100 plants /
2 doses
165.00
(b)
100 plants /
2 doses
165.00
330
100 plants
Per month
529.00
331
332
G
333
329
(a)
As per Actuals
As per Actuals
Each tanker
/ per day
2958.00
334
100 plants
each
operation
891.00
335
Ha
2779.00
336
(a)
27
As per Actuals
REMARKS
DESCRIPTION OF WORK
0.60 mt. Cube : 1kg neem cake & 1 kg chemical
fertilizers (super phosphate)
UNIT
RATE
As per Actuals
(a)
(b)
(a)
100 plants /
2 doses
165.00
(b)
100 plants /
2 doses
165.00
339
100 plants
Per month
529.00
340
341
VIII
342
338
343
As per Actuals
As per Actuals
As per actuals
As per actuals
OTHER ITEMS
Construction of dry rubble wall for fencing
i) a. Bottom width - 90cms
b. Top width - 45cms
c. Height -125cms
ii) a. Bottom width - 90cms
b. Top width - 45cms
c. Height -100cms
Digging of pits of 30 x 30 x 30cms for fixing Iron
angular posts in cement concrete.
As per SSR
As per SSR
100 pits
562.00
Sqmt
11.61
344
345
346
100 sqmt
Ha
26.53
3027.00
347
Ha
3503.00
348
Each
4.97
349
each
54.00
350
351
each
each
32.00
54.00
28
REMARKS
DESCRIPTION OF WORK
Drilling of pits of size 60x45x30 cms in the road
median with pneumatic air compressor
UNIT
each
RATE
588.00
353
100 sqmt
2021.00
354
hectare
3015.00
355
hectare
1515.00
356
Per clump
34.00
357
Preparation of soil mixture - root ball technique mixing charges of red soil, manure and sand
uniformly excluding material
per cmt
54.00
358
Preparation of soil mixture - root ball technique application of soil mixture of red soil, manure
and sand into the central media including
ramming charges
per cmt
155.00
359
360
100 nos
per cmt
1015.00
132.00
361
per cmt
182.00
362
per cmt
284.00
363
per cmt
380.00
364
100
334.00
365
100
407.00
29
REMARKS
DESCRIPTION OF WORK
Removal and re-fixing of tree guards on the
pavements and in urban colonies in linear
stretches
UNIT
100
RATE
290.00
367
100
507.00
368
100
538.00
IX
369
LANDSCAPE WORKS
Unit rates for developing soft landscape
FISCUE / SHADE GRASS (Dibbling)
Bed preparation:
Dressing the surface to the desired shape,
laying 6 layer of fine red soil, covered with a
thin layer of sand, watering, rolling with hand
roller (4 thickness after rolling), including the
cost of red earth, sand and labour charges etc
complete but excluding the cost of fertilizers,
chemicals and grass.
Sqmt
245.00
1
(a)
(b)
As per
actuals on
quotations
0.00
(c)
Sqmt
81.00
(d)
Sqmt
7.00
2
(a)
Sqmt
245.00
(b)
(c)
(d)
30
As per actuals on
quotations
Sqmt
43.00
Sqmt
7.00
REMARKS
DESCRIPTION OF WORK
Hedge / shrub planting: Digging the trench of
size 45 cm depth, refilling the trench with red
soil including cost of red soil and farmyard
manure at 4:1 ratio, internal transportation of
plants and planting the plants including the
application of fertilizers and pesticides etc., (@
20 gms/pit/sqmt) complete but excluding the
cost of the fertilizers (@ 20 gms/pit/sqmt) and
plant material.
UNIT
Sqmt
(Not less
than 20
plants)
RATE
698.00
3
(b)
Sqmt
(Not less
than 20
plants)
554.00
3(
c)
Sqmt
(Not less
than 20
plants)
233.00
4
(a)
Each
283.00
Each
547.00
31
REMARKS
DESCRIPTION OF WORK
Planting of individual shrub/rose/ornamental
Bamboo
UNIT
(a)
Each
142.00
(b)
Each
253.00
( c)
Each
95.00
sqmt
224.00
sqmt
23.00
6
a
b
c
Plant cost
7
(a)
7
(b)
8
(i)
32
RATE
sqmt
132.00
seedling
1.65
each
1.65
REMARKS
DESCRIPTION OF WORK
8"x 6" size bags
Raising of seasonal flowering potted plants (Each
pot contains three plants)
UNIT
each
RATE
1.65
each
each
each
Cum
11.61
11.61
13.26
1084.00
Cum
1183.00
11
Cum
As Per
SSR
12
Each
As per
actuals
(i)
(ii)
(iii)
9
10
REMARKS
(b)
Spreading of
distribution
(c)
2
i)
Maintenance of lawns:
Watering the lawns @ 10-15 litres / Sqm. / day
basing on the season and weather conditions
(Sub soil moisture shall be maintained
continuously)
ii)
red
soil
including
33
internal
100 sqmt
1626.00
125.00
As per actual
DESCRIPTION OF WORK
ii) December to May once in 30 days
Edging of the lawns in such a way that the lawn
grass do not penetrate into the plants and in a
defined perfect geometric shapes or smooth
curves.
UNIT
RATE
iv)
v)
(a)
100 sqmt.
Per month
484.00
(b)
100 sqmt.
Per month
216.00
3
i)
ii)
iii)
iv)
i)
ii)
iii)
iv)
(a)
100 Nos .
per month
321.00
(b)
100 Nos .
per month
144.00
100 Sqmt
per month
2148.00
(a)
100 sqmt.
Per month
484.00
(b)
100 sqmt.
Per month
216.00
34
REMARKS
DESCRIPTION OF WORK
Flower bed maintenance:
Pinching of seedlings, racking of soils,
application of fertilizers and pesticides (@ 20
gms/pit/sqmt), drenching of liquid nutrients,
regular removal of dried flowers, weeding,
watering, protection and replacement of
casualties.
Maintenance of traffic island/ central media:
Regular watering, weeding, protection, mowing
etc. inclusive of water cost.
35
UNIT
100 sqmt
RATE
1286.00
100 Sqmt /
month
5077.00
REMARKS