Schedule of Rates 2015-16

Download as pdf or txt
Download as pdf or txt
You are on page 1of 46

GOVT.

OF ANDHRA PRADESH
A.P. URBAN GREENING AND BEAUTIFICATION CORPORATION LIMITED

SCHEDULE OF RATES
2015 - 16

For

URBAN AREAS OF ANDHRA PRADESH

A.P. Urban Greening and Beautification Corporation Limited

INDEX
Sl. No.
i)
ii)
iii)
I
A
B
C
D
E
F
G

II

Item of work
Special conditions
Calendar of Operations
Watering Schedule
SCHEDULE OF RATES
RAISING OF NURSERIES
Primary Beds
Raising of Poly pot nursery
Maintenance of Poly pot nursery
Raising of Ornamental Potted Plants
Maintenance of Ornamental Potted Plants
Grafting Mango Plants
Grafting / Layering of Sapota, Guava, Acid Lime, Jack Fruit and
Pomagranate

Page No.
i
iv
Vi

1
1
3
4
5
5
5

A
B
C
D
E
F

RAISING OF AVENUE PLANTATION


Advance Operations
Raising of plantation
1st Year Maintenance of plantation
2nd Year Maintenance of plantation
3rd Year Maintenance of plantation
4th Year Maintenance of plantation

5
6
8
9
9
10

A
B
C
D
E
F

RAISING OF SEMI-MECHANICAL PLANTATION


Advance Operations
Raising of plantation
1st Year Maintenance of plantation
2nd Year Maintenance of plantation
3rd Year Maintenance of plantation
4th Year Maintenance of plantation

10
11
12
13
13
14

A
B
C
D

RAISING OF HILL AFFORESTATION PLANTATION


Advance Operations
Raising of plantation
1st Year Maintenance of plantation
2nd Year Maintenance of plantation

14
14
16
16

III

IV

A.P. Urban Greening and Beautification Corporation Limited

E 3rd Year Maintenance of plantation


F 4th Year Maintenance of plantation
V
A
B
C
D
E

RAISING OF TANK FORESHORE PLANTATION


Advance Operations
Raising of plantation
1st Year Maintenance of plantation
2nd Year Maintenance of plantation
3rd Year Maintenance of plantation

17
17
18
18
19

A
B
C
D
E
F

RAISING OF SILVIPASTURE PLANTATION


Advance Operations
Raising of plantation
1st Year Maintenance of plantation
2nd Year Maintenance of plantation
3rd Year Maintenance of plantation
4th Year Maintenance of plantation

19
20
21
22
22
22

RAISING OF HORTICULTURE PLANTATION


Advance Operations
Raising of plantation
1st Year Maintenance of plantation
2nd Year Maintenance of plantation
3rd Year Maintenance of plantation
4th Year Maintenance of plantation
5th Year Maintenance of plantation
OTHER ITEMS
LANDSCAPE WORKS

22
23
24
25
26
27
27
28
30

VI

VII
A
B
C
D
E
F
G
VIII
IX

17
17

A.P. Urban Greening and Beautification Corporation Limited

SPECIAL CONDITIONS
_____________________________________________________________________
PREAMBLE:
1. Rates fixed in the Schedule Rates are the maximum and the Officers are
advised to show economy during actual execution of works by adopting lesser
rates to the maximum extent possible.
2. Expenditure should be limited to their Budget allotment, under the
appropriate head of account. The officers should not exceed their allotment
based on the current schedule of rates. Excess expenditure should not be
permitted under any circumstances.
3. If any item of work, which is found essential and is not included in this
Schedule of Rates, the rates provided in the respective circle FSR/Engineering
Departments SSR can be adopted. If no suitable rate is found, specific
quotations shall be submitted to the Managing Director, APUG&BC
/Concerned Authority along with field data duly checked by immediate
superior Gazetted Officer for approval of the rate and till this rate is approved,
payment should not be made at the rate proposed.
4. The rates fixed in this Schedule Rates will come into force w.e.f., 01.07.2015.
5. AREA ALLOWANCES
(A) CORPORATIONS & MUNICIPALITIES:
a)

(i) 25% extra over the rates on labour component of works is


allowed in all Municipal Corporation Limits of Andhra Pradesh except
Greater Visakhapatnam and Vijayawada municipal Corporations (up to
a belt of 12Kms. from Municipal Corporation limits) and other
corporations as notified by the Government from time to time.
(ii) 40% extra over the rates on labour component of works for
Greater Visakhapatnam and Vijayawada Municipal Corporation (up to
a belt of 12Kms. from Municipal Corporation limits).

b)

Allow 20% extra over basic rates on labour component of works in all
District Headquarters and the remaining Municipal limits (up to a belt
of 12Kms. From Municipal limits).

(i)

A.P. Urban Greening and Beautification Corporation Limited

(B) JAIL COMPOUNDS:


15% extra is allowed over labour rates for the work in the Jail
compounds. Only equivalent number of Man Mazdoor shall be
provided in the Jail premises and no women Mazdoor are allowed
inside.
(C) INDUSTRIALAREA:
20% over basic rates on labour component works allowed for works
situated within 10Kms belt of Industrial areas of situated in AP State.
(D) GHAT ROADS:
For Ghat Roads steeper than 1in20, the length of the road may be
taken as 1.5 times the existing length of the road for the purpose of
leads only for conveyance of materials based on the certificate for the
Ghat Road given by the Superintending Engineer concerned.
Foot Note: Under compelling circumstances, the concerned Chief
Engineer can adopt the equivalent length of road as
2 times of actual length.
Note below area allowances:
If more than one area allowance (such as those) for (1) Municipalities
(2) Agency /Tribal areas (3) Industrial areas are applicable for a
particular situation, only the maximum out of the allowable
percentages is to be allowed.
(E) IMPORTATION OFLABOURANDLABOURAMENITIES:
Maximum 13% towards LI&LA will be allowed only in the case of works
where the labour component i.e. excluding cost of material such as cement
and steel works out to more than Rs.20.00 lakhs on the basis of certificate of
Executive Engineer that the labour available is not adequate and that labour
has to be imported for executing the work, subject to approval of the Chief
Engineer in
terms of G.0.Ms.No.7 Finance (Works &Projects) Dept
Dt.20.06.2005.
Note: (l) Extra percentage towards labour importation and labour amenities
where necessary, is admissible in addition to other percentage
allowed:
(F) If more than one allowance is applicable for a particular place, the
maximum out of the allowable percentages may be allowed.

(ii)

A.P. Urban Greening and Beautification Corporation Limited

(G) Purchase of Materials-tools, implements & other infrastructure material


like pipes etc. Should be done centrally and supplied to the nurseries and
plantations. In case of urgency small purchases may be made, but with
prior permission from the M.D, APUG&BC/Competent Authority.
6.

a) Protection and maintenance charges of plantations on contract basis


for every 15 Hectares of plantation is Rs.7171/- per month for institutional
open lands.
b) Protection and maintenance charges of plantations on contract basis up
to 20 hectares of plantations in Reserve Forest blocks is Rs.7171/-per
month.
c) Protection and maintenance charges of plantations less than 15 hectares
(prior permission of the M.D, APUG&BC/Competent Authority).
d) Protection and maintenance charges on contract basis for Central
Nurseries on day and night basis is Rs.14,342/- per month.

(iii)

A.P. Urban Greening and Beautification Corporation Limited

NURSERY AND PLANTATION TIME TABLE


(CALENDAR OF OPERATIONS)
Sl.
No.

Item of work

Period

Selection of areas for all types of


plantation activity (where planting is
completed by July/Aug)

To be completed latest by August September (10) months before


plantation

Survey and demarcation and preparation


of regeneration plans and treatment
maps
Approval of plans by the MD,
APUG&BC/Competent Authority
Selection of nursery site
Procurement of material such as seeds,
Polypots etc.

October - November

3
4
5

November - December
April - May
May/June/July onwards for misc species
depending on seed season, september,
October for Eucalyptus and others.

Cleaning, Ploughing, Making nursery beds, June - July and November depending on
temporary huts, wells etc, and fencing.
species
Sowing of seeds in beds or bags
a) June onwards, depending on viability
and availability of seeds of various
species

Filling of poly pots.

Pricking out seedlings into bags

10
11
12
13

Shifting of poly pots in the nurseries


1st ploughing before planting
2nd ploughing during the year of planting
1st ploughing in the 1st year maintenance
of plantations
2nd Ploughing in the 1st year
maintenance of plantations
Aligning of planting area
Digging of pits in planting area
Transportation of seedlings to plantation
site
Planting of seedlings
1st weeding, mulching, manuring and
causality replacement

14
15
16
17
18
19

(iv)

a) September for Misc. Species


b) January for Eucalyptus etc.
July onwards as per the availability of
the primary stock
Once in every month
July
October - November
July
October - November
may - June
June
July (commencement of planting)
July - August
15th August - 15th September

A.P. Urban Greening and Beautification Corporation Limited

20
21
22
23
24

1st ploughing in 2nd year semi mechanical plantation


2nd ploughing in 2nd year semi mechanical plantation
1st year cleaning, weeding & soil working
2nd year cleaning, weeding & soil working
3rd year maintenance cleaning, weeding
& soil working

July
October - November
August - October
August
July - August

Note:
i)

In case of nurseries of miscellaneous species other than Euacalyptus, sowing of


seeds will be done 2-3 months earlier, as these seedlings will be 8-9 months old at
the time of planting. Thus all operations commencing with selection of nursery site
will start 2-3 months earlier

ii)

As watering is being done in the urban conditions some of the operations may be
even carried out in other seasons that the one mentioned, depending on the most
beneficial time for a particular operation.

(v)

A.P. Urban Greening and Beautification Corporation Limited

WATERING SCHEDULE FOR AVENUE PLANTATION


A. YEAR OF RAISING
I

July to November

Once a week on non-rainy days Maximum of (10) waterings

II

December to March
Total

Once in a week up to a maximum of (15) Waterings


(25) Waterings in a year of raising

B. 1ST YEAR AINTENANCE


I

April to June

Once in a week upto a maximum of (12) waterings

II

December to March

Once in (10) days upto a maximum of (13) waterings.

Total

C. 2nd YEAR
MAINTENACE
I April to June
II

January to March
Total

D. BEYOND 2ND YEAR


MAINTENANCE
I
April to June
II
January to March
Total

(25) waterings in the year of 1st year maintenance.

Once in (10) days upto a maximum of (10) waterings


Once in (15) days upto a maximum of (6) waterings.
(16) Waterings in the year of 2nd year maintenance

Once in (15) days upto a maximum of (6) waterings


Once in (15) days upto a maximum of (6) waterings.
(12) Waterings

Note: Quantity of water to be supplied per time


Year of Raising
1st Year Maintenance
2nd Year Maintenance
Beyond 2nd Year
Maintenance

: (40) liters per plant per time


: (50) liters per plant per time
: (60) liters per plant per time
: (60) liters per plant per time

(vi)

A.P. Urban Greening and Beautification Corporation Limited

Schedule of Rates 2015 - 16


Sl.No.
I
A
1
(a)
(b)
2

DESCRIPTION OF WORK
UNIT
RAISING OF NURSERIES
PRIMARY BEDS: (Standard size of 12M X 1.2MX 0.3M)
Clearance of site
New sites
100 sqmt.
Old sites
100 sqmt.
Aligning, digging of bed and giving good burn on
Per bed
the top for sterilization.

Cost and transportation of soil mixture Farmyard manure, sand, red earth/ black soil in
1:2:3
Outside GVMC
Within GVMC
Refilling of beds with mixture of sand, black soil
& Farmyard manure after pulverizing (excluding
cost of manure) including cost of transport
(New sites)
Cost of seed including transportation.
Sowing of seed, watering, weeding the beds
twice a day for 2 months.

(a)
(b)
4

5
6
7

Covering the beds with hay including cost of hay.


(if required with prior permission)

Cost of chemicals, fertilizers, insecticides,


pesticides etc., including cost of application

9
B
10
11
12

(a)
(b)

(a)

i)
ii)
iii)
iv)
v)
vi)
(b)
vii)
viii)
ix)
x)
xi)

Per bed
Per bed
Per bed

RATE

321.00
81.00
728.00

1320.00
1852.00
180.00

As per actuals
Per bed
529.00
Per bed

115.00

As per actuals

Cost of nursery implements


As per actuals
Misc., & unforeseen items
As per actuals
RAISING OF POLYPOT NURSERY
Clearance of site
100 sqmt.
321.00
Cost of Polythene bags
As per actuals
Cost & conveyance of soil mixture such as red
soil, Tanksilt & FYM in 3:1 proportion over a lead
of
25 Kms (10%) extra is allowed towards
wastage in breaking clouds and sieving)
4"x7"
5"x5"
5"x9"
6"x12"
8"x12"
8"x15"
Conversion of bag plants for raising tall plants
10"x16" (8.34 cmt - 2.25 cmt = 6.09 cmt)
12"x16" (12 cmt - 2.25 cmt = 9.75 cmt)
14"X18" (18.4 cmt - 2.25 cmt = 16.15 cmt)
16"X18" (24 cmt - 2.25 cmt = 21.75 cmt)
18"x24"

1000 bags
1000 bags
1000 bags
1000 bags
1000 bags
1000 bags

676.00
756.00
1362.00
2619.00
4655.00
5821.00

1000 bags
1000 bags
1000 bags
1000 bags
1000 bags

7078.00
10184.00
15615.00
20368.00
36200.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
13
(a)

DESCRIPTION OF WORK
Filling of bags with mixture of Red soil/tanksilt &
FYM in 3:1 after powdering sieving, opening of
bags and filling with above mixture and
arranging into beds.

i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
(b)

4"x7"
5"x5"
5"x9"
6"x12"
8"x12"
8"x15"
10"x16"
12"x16"
14"x18"
16"x18"
18"x24"
Cost of chemicals and fertilizers like DAP @
6kg/1cmt, BHC @2kg/1cmt

1000 bags
653.00
1000 bags
559.00
1000 bags
1008.00
1000 bags
1343.00
1000 bags
1513.00
1000 bags
1636.00
1000 bags
2384.00
1000 bags
3096.60
1000 bags
4739.00
1000 bags
6181.29
1000 bags
13935.00
As per actuals

14
15

Cost of seed
Sowing of seed and pricking out plants from
primary beds into bags (including pre-treatment)

As per actuals
1000 bags
72.00

16
17

Cost of insecticides etc.


Watering and weeding the plants from the date
of pricking out/sowing of seed till end of march

As per actuals

(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
18

(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)

4"x7"
5"x5"
5"x9"
6"x12"
8"x12"
8"x15"
10"x16"
12"x16"
14"x18"
16"x18"
18"x24"
Shifting, grading & rearranging in beds Once in
(3) months (wherever trenches are not
provided)
4"x7"
5"x5"
5"x9"
6"x12"
8"x12"
8"x15"
10"x16"
12"x16"

UNIT

RATE

1000 (p.m)
1000 (pm)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)

125.00
142.00
152.00
321.00
504.00
629.00
871.00
1129.00
1731.89
2259.00
895.00

1000 (p.m)
1000 (pm)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)

27.00
30.00
54.00
104.00
160.00
199.00
321.00
415.82

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(i)
(j)
19

DESCRIPTION OF WORK
14"x18"
16"x18"
Digging of new trenches of size 12m x 1.2m x
0.6m.

UNIT
1000 (p.m)
1000 (p.m)
Each 500
plants

RATE
637.60
831.65
728.00

20

Dressing up of old trenches for use by cleaning


the debris & removal of soil in 12m x 1.2m x
0.6m trenches

each/500
plants

369.00

21

Conversion of plants from smaller size to bigger


bags and arranging in the beds / trenches(tall
plants only)

1000
plants

1219.00

22

Refilling the trench to the extent of the gaps in


between the arranged bags with soil from
outside 12m x 1.2m x 0.6m

Per bed

1168.00

23

Weeding and watering the polypot plants in


Per bed
trenches by flooding the beds once in a week
including formation of channels wherever
necessary and application of
fertilizers/insecticides/ standard beds of 12m x
1.2m
Pruning of lower branches to 1/3 height of
1000
seedling to facilitate free aeration & hardening
plants
of stems
MAINTENANCE OF POLY POT NURSERY
Watering (once in a day) and weeding (once in
fortnight) the potted plants including application
of chemicals, and fertilizers ( without trenches)
per month

629.00

24

C
25

70.00

(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)

4"x7"
5"x5"
5"x9"
6"x12"
8"x12"
8"x15"
10"x16"
12"x16"
14"x18"
16"x18"
18"x24"
Shifting, grading & rearranging in beds Once in
(2) months

1000 (p.m)
1000 (pm)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)

125.00
142.00
152.00
321.00
504.00
629.00
871.00
1129.49
1731.89
2258.99
895.00

(a)
(b)
(c)
(d)
(e)
(f)

4"x7"
5"x5"
5"x9"
6"x12"
8"x12"
8"x15"

1000 (p.m)
1000 (pm)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)

27.00
30.00
54.00
104.00
160.00
199.00

26

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(g)
(h)
(i)
(j)
27

DESCRIPTION OF WORK
10"x16"
12"x16"
14"x18"
16"x18"
Pruning of lower branches to 1/3 height of
seedling to facilitate free aeration & hardening
of stems
(2 operations) April & June

UNIT
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 (p.m)
1000 nos /
per
operation

RATE
321.00
415.82
637.60
831.65
70.00

28

Weeding, pruning of lower branches and


watering the polypot plants in trenches by
flooding the beds once in a week including
formation of channels wherever necessary and
application of fertilizers/insecticides.
Conditioning the plants by taking out tall plants
from the trench beds and keeping under shade
before transporting to planting site for recovery
of shock including watering.

Per bed /
per month

629.00

Each plant

3.32

30

Grading of small seedlings after taking out from


the trench and arranging them into trenches and
filling with soil.

Each plant

1.65

31

Maintenance of previous year seedlings

29

50% of rate allowed in


regular watering,
shifting, grading and
weeding.
Cost of chemicals and fertilizers
As per actuals
Miscellaneous and unforeseen expenditure
As per actuals
RAISING OF ORNAMENTAL POTTED PLANTS FOR DISPLAY
Cost of pots including transportation, loading
and unloading

32
33
D
34
(a)
(b)
(c)
35
(a)
(b)
(c)
36
(a)
(b)
(c)
37
(a)
(b)
(c)
38
39

12" size ( top dia )


9" size ( top dia )
6" size ( top dia )
Collection of soils including transport
12" size ( top dia )
9" size ( top dia )
6" size ( top dia )
Cleaning, sieving and filling soil mixture in pots
12" size
9" size
6" size
Cost of Farmyard manure including transport
12" size
9" size
6" size
Cost of Ornamental plants, including
transportation, loading, unloading
Transplanting into pots

As per actuals
As per actuals
As per actuals
each
each
each

20.92
10.46
1.49

each
each
each

3.32
3.32
1.65

each
4.48
each
2.99
each
1.49
As per actuals
each

1.65

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
40

DESCRIPTION OF WORK
Weeding, watering, pruning, application of
fertilizers, (October to March ) 6 months

41
42

Cost of fertilizers, pesticides, fungicides etc.


Miscellaneous and unforeseen expenditure 10%
of the total cost

E
43

MAINTENANCE OF ORNAMENTAL POTTED PLANTS


Refilling the pots with soil mixture FYM including
100 pots
cost of material

44

Re-transplanting of ornamental plants in the


causalities (Actual Nos.)

45
46

Cost of Ornamental plants for replacement


Weeding, watering, pruning, application of
fertilizers, (April to March ) 12 months

As per actuals
Per month
7171.00
/ 2000 pots

47

Cost of fertilizers, pesticides & other misc.


expenditure

As per actuals

F
48
49

UNIT
Per month
/ 2000 pots

RATE
7171.00

As per actuals
As per actuals

100 pots

169.00
191.00

GRAFTING MANGO PLANTS


Cost of scion material
Grafting labour charges including cost of tying
material.

Each stick
each

2.99
10.46

GRAFTING / LAYERING OF SAPOTA, GUAVA, POMAGRANATE, ACID LIME


AND JACK FRUIT

50
II

Labour charges for Layering


100 nos
1009.00
RAISING OF AVENUE PLANTATIONS Single Row & Multiple row Strip
Plantation
ADVANCE OPERATIONS
Survey and demarcation
100 rmt
26.53
Clearing of unwanted light Jungle growth
100 sqmt.
34.00
(bushes, shrubs etc., wherever necessary)

A
51
52
53
54

55
56
57
58
59
60

Burning & re-burning the cleared growth


Cost of stone monoliths (size 1.75m x 0.15m x
0.10m) including cost and conveyance to site

100 sqmt.
11.61
As per quotation /
tender

(b)

Aligning and staking the points and digging of


pits of 45cm deep to receive the pillar

Each stone

20.00

(c)

Internal distribution of stone monoliths to


respective points and erection of pillar in the pit
in upright manner by fixing up the pillar with the
broken stone

Each stone

44.00

(a)

(a)
(b)

Cost & supply of barbed wire


Cost & supply of binding wire
Internal transport of barbed wire ( in 6 strands)
Stretching of barbed wire ( in 6 strands)
Cost of Iron Mesh tree guards
Transportation of iron mesh tree guards
including loading and unloading.

As per actuals
As per actuals
100 rmt
290.00
100 rmt
800.00
As per actual
100 nos
3633.00

Fixing of Iron mesh tree guards in the ground


including internal transportation

100 nos

1867.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
61

DESCRIPTION OF WORK
Retrieval of old tree guards including cutting at
the site transporting to workshop re-welding
and red oxide painting

62

i)

Retrieval of barbed wire from old plantation


along with stone monoliths and re-fixing at new
site and stretching barbed wire upto a lead of 10
km.

Each stone

91.00

ii)

Retrieval of barbed wire from old plantation


along with stone monoliths and re-fixing at new
site and stretching barbed wire over and above
10km distance upto 35km lead.

Each stone

119.00

Alignment and staking including cost of stakes.


Digging of pits
0.45 mt x 0.45 mt x 0.45 mt
0.60 mt x 0.60 mt x 0.60 mt
Application of red soil and FYM including
internal distribution

100 nos

44.00

100 nos
100 nos

1489.00
3539.00

60cm cube pits


Cost and conveyance of well-decomposed
Farmyard manure to planting site

100 pits

646.00

(a)
i)

60 cm cube ( 0.50 cft/pit)


Transport of plants from nursery site to planting
site upto a lead of 3km including loading and
unloading wherever departmental vehicles are
not provided.

100 pits

1875.00

(a)
(b)
(c)
(d)
(e)
(f)
(g)
ii)

6"x12"
8"x12"
8"x15"
10"x16"
12"x16"
14"x18"
16"x18"
Over and above 3km lead add following rates
per km per 100 plants

100 plants
100 plants
100 plants
100 plants
100 plants
100 plants
100 plants

288.00
459.00
578.00
620.00
892.00
1367.86
1784.17

(a)
(b)
(c)
(d)
iii)

6"x12"
8"x12"
8"x15"
10"x16", 12"x16", 14"X18" & 16"x18"
Loading and unloading of plants where
departmental vehicles are used

100 plants
100 plants
100 plants
100 plants

2.99
10.46
10.46
10.46

(a)
(b)
(c)
(d)

6"x12"
8"x12"
8"x15"
10"x16", 12"x16", 14"X18" & 16"x18"

100 plants
100 plants
100 plants
100 plants

110.00
194.00
244.00
284.00

RATE
310.00

RAISING OF PLANTATION

63
64
(a)
(b)
65

66

67

UNIT
Each

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
68
(a)
(b)
(c)
(d)
(e)
(f)
69

70
71

DESCRIPTION OF WORK
Internal transport of bag plants to planting site
6"x12"
8"x12"
8"x15"
10"x16"
12"x16"
14"x18" & 16"x18"
Planting of bag plants after refilling the
pits/support sticks

RATE

100 plants
100 plants
100 plants
100 plants
100 plants
100 plants

79.00
140.00
176.00
303.00
436.00
492.00

241.00
582.00
28.00

(a)
(b)
(c)

6"x12", 8"x12", 8"x15"


10"x16", 12"x16", 14"X18" & 16"x18"
Cost, transport and fixing of support sticks for
tall plants

100 plants
100 plants
Each

(a)
(b)
(a)

Cost of BHC (10%) @20grms/pit


Application of BHC (10%) @20gms/pit/dose
Cost of chemicals and fertilizers @
20gms/pit/dose
(2 doses)

As per actuals
100 plants
30.00
As per actuals

(b)
(c)

Cost of neem cake @ 1kg/plant ( Tall plant)


Application of chemicals and fertilizers/ Neem
cake etc (2 doses)

72

Replacement of causalities to a maximum of


20% of the planted, including re-opening of pits,
transport of plants internal transport and
planting. (8"x15" & 10"x16" Tall plants)

73

Removal & re-fixing of tree guards to facilitate


Soil working

74

UNIT

As per actuals
100 plants /
60.00
2 doses
100 plants

1463.00

100 nos

174.00

(a)

1st Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

1st Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant

100 plants

253.00

(a)

2nd Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

2nd Soil working 10 cms deep using crowbars to


a radius of 50 cms around the plant

100 plants

253.00

76

Watering the plants through Tankers of 5000


Ltrs each trip capacity (5 trips per day 25,000
Ltrs)

Each tanker
/ per day

2958.00

77

Protection, maintenance, watering, tending the


plants, upkeep of fencing & removal of
unwanted growth from July to March ( 9
months)
100 plants /
month

1064.00

75

(a)

Single row plantation

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(b)

DESCRIPTION OF WORK
Multiple row plantation

UNIT
100 plants /
month

RATE
529.00

78

Cutting back of coppice growth and removal of


weeds in the plantation area (2 operations)

100 sqm. /
operation

16.58

79

Cost of sign boards, tools, pipes other


equipment

80

Tracing fire lines around (2m. wide) and within


(1m. wide) plantation area.

81

Contingencies like repairs to fencing, cost of


insecticides, sharpening of departmental tools
etc.

C
82

1st YEAR MAINTENANCE OF AVENUE PLANTATION


Watering the plants through Tankers of 5000
Each tanker
Ltrs each trip capacity (5 trips per day 25,000
/ per day
Ltrs)

83

Removal & re-fixing of tree guards to facilitate


Soil working

84

85

86

As per actuals
100 sqmt

82.00

As per actuals

2958.00

100 nos

175.00

(a)

1st Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

1st Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant

100 plants

253.00

(a)

2nd Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

2nd Soil working 10 cms deep using crowbars to


a radius of 50 cms around the plant

100 plants

253.00

(a)

Cost of chemicals and fertilizers@


20gms/pit/dose
(2 doses)

(b)
(c)

Cost of neemcake @ 1kg/plant (Tall plants)


Application of chemicals and fertilizers
/Neemcake etc (2 doses)

87

As per actuals

(a)

Protection, maintenance, watering, tending the


plants, upkeep of fencing & removal of
unwanted growth from April to March (12
months)
Single row plantation

(b)

As per actuals
100 plants /
60.00
2 doses

100 plants /
month

1064.00

Multiple row plantation

100 plants /
month

529.00

88

Cutting back of coppice growth and removal of


weeds in the plantation area operation (2
operations)

100 sqmt. /
operation

16.58

89

Tracing fire lines around (2m. wide) and within


(1m. wide) plantation area.

100 sqmt

82.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
90

DESCRIPTION OF WORK
Contingencies like repairs to fencing cost of
insecticides, sharpening of departmental tools
etc.

D
91

2nd YEAR MAINTENANCE OF AVENUE PLANTATION


Removal & re-fixing of tree guards to facilitate
100 nos
Soil working

92

93

UNIT
RATE
As per Actuals

175.00

(a)

1st Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

1st Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant

100 plants

253.00

(a)

2nd Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

2nd Soil working 10 cms deep using crowbars to


a radius of 50 cms around the plant

100 plants

253.00

94

Cost of chemicals and fertilizers @ 40gms per


plant in two equal doses for 50% of the plants

95

Application of chemicals and fertilizers (2 doses)

100 plants /
2 doses

60.00

96

Watering the plants through Tankers of 5000


Ltrs each trip capacity (5 trips per day 25,000
Ltrs)

Each tanker
/ per day

2958.00

97

(a)

Protection, maintenance, watering, tending the


plants, upkeep of fencing & removal of
unwanted growth from April to March (12
months)
Single row plantation

100 plants /
month

1064.00

(b)

Multiple row plantation

100 plants /
month

529.00

98

Cutting back of coppice growth and removal of


weeds in the plantation area operation ( 2
operations)

100 sqmt. /
operation

17.00

99

Tracing fire lines around (2m. wide) and within


(1m. wide) plantation area.

100 sqmt

82.00

100

Contingencies like repairs to fencing, cost of


insecticides, sharpening of departmental tools
etc.

E
101

3rd YEAR MAINTENANCE OF AVENUE PLANTATION


Removal & re-fixing of tree guards to facilitate
100 nos
175.00
Soil working

102

(a)

1st Circular weeding without application of


fertilizers to a radius of 50 cms around the plant
(with prior permission from the MD,
APUG&BC/Competent Authority)

As per actuals

As per Actuals

100 plants

84.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(b)

DESCRIPTION OF WORK
1st Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant (with prior
permission from the MD,
APUG&BC/Competent Authority)

UNIT
100 plants

RATE
253.00

103

Watering the plants through Tankers of 5000


Ltrs each trip capacity (5 trips per day 25,000
Ltrs) (with prior permission from the MD,
APUG&BC/Competent Authority)

Each tanker
/ per day

2958.00

104

Protection, maintenance, watering, tending the


plants, upkeep of fencing & removal of
unwanted growth from April to March (12
months)
(a)

Single row plantation

100 plants /
month

1064.00

(b)

Multiple row plantation

100 plants /
month

529.00

105

Cutting back of coppice growth and removal of


weeds in the plantation area operation (1
operation)

100 sqmt. /
operation

17.00

106

Tracing fire lines around (2m. wide) and within


(1m. wide) plantation area.

100 sqmt

82.00

107

Contingencies like repairs to fencing, cost of


insecticides, sharpening of departmental tools
etc.

F
108

4th YEAR MAINTENANCE OF AVENUE PLANTATION


Removal & re-fixing of tree guards to facilitate
100 nos
Soil working

109

(a)

Protection, maintenance, watering, tending the


plants, upkeep of fencing & removal of
unwanted growth from April to March (12
months)
Single row plantation

(b)

Multiple row plantation

110

111

III
A
112

Removal of Treeguards, clearing of weeds,


removal of congestion by pruning lower
branches, soil working to a radius of 50 cms
around the plant to a depth of 10cms, formation
of saucer and re-fixing the tree guards
Contingencies like repairs to fencing, cost of
insecticides, sharpening of departmental tools
etc.

As per actuals

200 plants /
month

1064.00

200 plants /
month

529.00

100 plants

1220.00

As per actuals

RAISING OF SEMI MECHANICAL PLANTATION


ADVANCE OPERATIONS
Survey and demarcation
100 rmt

10

175.00

27.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
113 a)
b)

114
115
116
i)
ii)
iii)
iv)
B
117

118
119

120

Clearing dense unwanted Jungle growth in


planting area (bushes, shrubs etc., wherever
necessary)

UNIT
Ha

RATE
3539.00

Ha

5310.00

Burning & re-burning the cleared growth


Ha
1009.00
Fencing
As per item no. 54 to 58
Digging and removal of all stumps
500 - 750 stumps
Ha
17612.00
400 - 500 stumps
Ha
14689.00
200 - 400 stumps
Ha
9790.00
Upto 200 stumps
Ha
4897.00
RAISING OF PLANTATION: (3M X 3M ESPACEMENT - 1110 PLANTS/HA.)
Tractor ploughing with MB Plough to a depth of
Ha
5351.00
23 cms including removal of left over thorny
bushes & filling pits to facilitate ploughing.
Alignment and staking including cost of stakes.
Digging of pits of 45cm cube pits in ploughed
area (2/3 of original rate of pitting)

100 nos

44.00

(a)
i)

45cm cube pits


Transport of plants from nursery site to planting
site upto a lead of 3km including loading and
unloading where-ever departmental vehicles are
not provided.

100 pits

991.00

(a)
(b)
(c)
ii)

4"x7", 5"x9"
6"x12"
8"x15"
Over and above 3km lead add following rates
per km per 100 plants

100 pits
100 pits
100 pits

233.00
288.00
578.00

(a)
(b)
(c)
iii)

4"x7", 5"x9"
6"x12"
8"x15"
Loading and unloading of plants where
departmental vehicles are used

100 pits
100 pits
100 pits

2.99
4.48
10.46

(a)
(b)
(c)

4"x7", 5"x9"
6"x12"
8"x15"
Internal transport of bag plants to planting spots

100 pits
100 pits
100 pits

50.00
105.00
244.00

(a)
(b)
(c)

4"x7", 5"x9"
6"x12"
8"x15"
Planting of bag plants after refilling the pits
4"x7", 5"x9"
6"x12", 8"x15"
Cost of BHC (10%) @20grms/pit

100 pits
100 pits
100 pits

50.00
105.00
244.00

121

122

123

DESCRIPTION OF WORK
Clearing unwanted light Jungle growth (bushes,
shrubs etc., wherever necessary)

(a)
(b)
(a)

11

100 pits
81.00
100 pits
241.00
As per actuals

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(b)
124 (a)

DESCRIPTION OF WORK
Application of BHC (10%) @20gms/pit/dose
Cost of chemicals and fertilizers @
20gms/pit/dose
(2 doses)

UNIT
RATE
100 plants
30.00
As per actuals

(b)

Cost of neemcake @ 1kg/plant ( Tall plants)

As per actuals

(c)

Application of chemicals and fertilizers/


Neemcake etc. (2 doses)

125

100 plants /
2 doses

60.00

Replacement of causalities to a maximum of


20% of the planted, including re-opening of pits,
transport of plants internal transport and
planting.
(a)

4"x7", 5"x9"

100 plants

413.00

(b)

6"x12", 8"x15"
Inter ploughing with MB plough between the
planting lines to a depth of 30 cms and removal
of root suckers

100 plants
Ha

1463.00
3780.00

(a)

1st Circular weeding without application of


fertilizers to a radius of 50 cms around the plant
1st Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant

100 plants

84.00

100 plants

253.00

(a)

2nd Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

2nd Soil working 10 cms deep using crowbars to


a radius of 50 cms around the plant

100 plants

253.00

129

Protection, maintenance, tending the plants &


removal of unwanted growth. (9 Months) JulyMarch

Per month

7171.00

130

Cost of sign boards

131

Tracing of fire lines (2m. wide) and within


(1m. wide) plantation area

100 sqmt

82.00

132

Maintenance of inspection paths

100 rmt

56.00

133

Contingencies such as repairs to fencing cost of


insecticides etc.

C
134

1st YEAR MAINTENANCE OF SEMI-MECHANICAL PLANTATION


Replacement of causalities to a maximum of
15% including reopening of pits, internal
transport & planting

126

127

(b)
128

As per actual

(a)

4"x7", 5"x9"

100 plants

413.00

(b)

6"x12",8"x15"

100 plants

1463.00

1st Inter ploughing with MB plough between the


planting lines to a depth of 30 cms and removal
of root suckers

Ha

3780.00

1st Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

135

136

As per actual

(a)

12

84.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(b)
137

(a)

Cost of chemicals and fertilizers @


20gms/pit/dose

(b)

Application of chemicals and fertilizers/


Neemcake etc

138

139

DESCRIPTION OF WORK
1st Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant

UNIT
100 plants

RATE
253.00

As per actual

2nd Inter ploughing with MB plough between


the planting lines to a depth of 30 cms and
removal of root suckers

100 plants /
2 doses
Ha

60.00
3780.00

(a)

2nd Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

2nd Soil working 10 cms deep using crowbars to


a radius of 50 cms around the plant

100 plants

253.00

140

Protection, maintenance, tending the plants &


removal of unwanted growth. (12 Months) AprilMarch

Per month

7171.00

141

Tracing of fire lines (2m. wide) and within ( 1m.


wide) plantation area

100 sqmt

82.00

142

Maintenance of inspection paths

100 rmt

56.00

143

Contingencies such as repairs to fencing cost of


insecticides etc.

D
144

2nd YEAR MAINTENANCE OF SEMI-MECHANICAL PLANTATION


1st Inter ploughing with MB plough between the
Ha
3780.00
planting lines to a depth of 30 cms and removal
of root suckers

145

(a)
(b)

Circular weeding without application of


fertilizers to a radius of 50 cms around the plant
Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant

As per actual

100 plants

84.00

100 plants

253.00

Ha

3780.00

146

2nd Inter ploughing with MB plough between


the planting lines to a depth of 30 cms and
removal of root suckers

147

Protection, maintenance, tending the plants &


removal of unwanted growth. (12 Months) AprilMarch

Per month

7171.00

148

Tracing of fire lines (2m. wide) and within ( 1m.


wide) plantation area

100 sqmt

82.00

149
150

Maintenance of inspection paths


Contingencies such as repairs to fencing cost of
insecticides etc.

100 rmt
56.00
As per actual

E
151

3rd YEAR MAINTENANCE OF SEMI-MECHANICAL PLANTATION


Circular weeding without application of
100 plants
84.00
fertilizers to a radius of 50 cms around the plant
(with prior permission from the MD,
APUG&BC/Competent Authority)

(a)

13

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(b)

DESCRIPTION OF WORK
Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant (with prior
permission from the MD,
APUG&BC/Competent Authority)

UNIT
100 plants

RATE
253.00

152

Inter ploughing with MB plough between the


planting lines to a depth of 30 cms and removal
of root suckers

Ha

3780.00

153

Protection, maintenance, tending the plants &


removal of unwanted growth. (12 Months) AprilMarch

Per month

7171.00

154

Tracing of fire lines (2m. wide) and within


wide) plantation area

100 sqmt

82.00

155
156

Maintenance of inspection paths


Contingencies such as repairs to fencing cost of
insecticides etc.

F
157

4th YEAR MAINTENANCE OF SEMI-MECHANICAL PLANTATION


Protection, maintenance, tending the plants &
Per month
7171.00
removal of unwanted growth. (12 Months) AprilMarch

158

Tracing of fire lines (2m. wide) and within


wide) plantation area

159
160

Maintenance of inspection paths


Contingencies such as repairs to fencing cost of
insecticides etc.

IV
A
161
162

(a)
(b)

(1m.

(1m.

100 rmt
56.00
As per actual

100 sqmt

100 rmt
56.00
As per actual

RAISING OF HILL AFFORESTATION PLANTATION


ADVANCE OPERATIONS:
Trench cum pit method 1m x 0.5m x 0.3m trench and 30cm pits in center
Survey and demarcation
100 rmt
26.53
Clearing unwanted light Jungle growth (bushes,
Ha
3539.00
shrubs etc., wherever necessary)
Clearing dense unwanted Jungle growth in
Reserve Forest areas (bushes, shrubs etc.,
wherever necessary) with specific approval of

Ha

163
164

Burning & re-burning the cleared growth


Erection of stone monoliths at salient points, not
more than 10 nos. 0.75 x 0.15 x 0.10 mts size
including cost and transportation.

165

Digging of cattle proof trenches of 1.90 M top,


0.60 M bottom & 1.0M depth inner side vertical.

B
166
167

RAISING OF PLANTATION (1600 PLANTS / HA.)


Alignment and staking at 2.5m x 2.5m
100 nos
Digging of trenches of size 1.0m x 0.50m x 0.30m
100
= 0.15 cum
trenches

168

Digging of 30cm cube central pits


Cost of Neemcake @1/2kg/plant

(a)

82.00

5310.00

Ha
1009.00
As per item no. 54

Rmt

100.00

44.00
3144.00

100 nos
562.00
As per actual

14

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(b)
(c)

DESCRIPTION OF WORK
Cost of chemicals fertilizers @25gms/plant
Application of neemcake & fertilizers (2 doses)

UNIT
RATE
As per actual
100 plants /
60.00
2 doses

169

(a)

Cost and transport of well decomposed FYM @


10cft/100 pits

100 pits

390.00

Application of FYM
Transport of plants from nursery site to planting
site upto a lead of 3km including loading and
unloading where-ever departmental vehicles are
not provided.

100 pits

132.00

170

(b)
i)

(a)
(b)
(c)
ii)

4x7, 5x9
6x12
8x15
Over and above 3km lead add following rates
per km per 100 plants

100 pits
100 pits
100 pits

234.00
288.00
578.00

(a)
(b)
(c)
iii)

4x7, 5x9
6x12
8x15
Loading and unloading of plants where
departmental vehicles are used

100 pits
100 pits
100 pits

2.99
2.99
10.46

(a)
(b)
(c)

4x7, 5x9
6x12
8x15
Internal transport of bag plants to planting site
4x7, 5x9
6x12
8x15
Planting of bag plants after refilling the pits
4x7, 5x9
6x12,8x15
Cost of BHC (10%) @ 20gms/pit
Application of BHC
Replacement of causalities to a maximum of
30%.

100 pits
100 pits
100 pits

50.00
110.00
244.00

100 pits
100 pits
100 pits

50.00
110.00
244.00

(a)

1st Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

1st Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant

100 plants

253.00

(a)

2nd Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

2nd Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant

100 plants

253.00

171
(a)
(b)
(c)
172

173

(a)
(b)
(a)
(b)

174
175

176

15

100 pits
81.00
100 pits
241.00
As per actual
100 pits
30.00
100 nos
2291.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
177

DESCRIPTION OF WORK
Protection, maintenance, tending the plants &
removal of unwanted growth. (9 Months) JulyMarch each plantation

UNIT
Per month

178
179

Cost of sign boards


Tracing of fire lines (2m. wide) and within (1m.
wide) plantation area

As per actual
100 sqmt
82.00

180

Maintenance of inspection paths

100 rmt

181

Contingencies such as repairs to fencing cost of


insecticides etc.

C
182
183

RATE
7171.00

56.00

As per actual

1st YEAR MAINTENANCE OF HILL AFFORESTATION PLANTATION


Replacement of causalities to a maximum if 30%.
1st Circular weeding without application of
fertilizers to a radius of 50 cms around the plant
1st Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant

100 nos
100 plants

2291.00
84.00

100 plants

253.00

(a)

2nd Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

2nd Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant

100 plants

253.00

185

Protection, maintenance, tending the plants &


removal of unwanted growth. (12 Months) AprilMarch each plantation

Per month

7171.00

186

Tracing of fire lines (2m. wide) and within (1m.


wide) plantation area

100 sqmt

82.00

187

Maintenance of inspection paths

100 rmt

56.00

188

Contingencies such as repairs to fencing, cost of


insecticides etc.

D
189

2nd YEAR MAINTENANCE OF HILL AFFORESTATION PLANTATION


1 Circular weeding without application of
100 plants
84.00
fertilizers to a radius of 50 cms around the plant

(a)
(b)

184

(a)

As per actuals

st

(b)

1st Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant

100 plants

253.00

(a)

2nd Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

2nd Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant

100 plants

253.00

191

Protection, maintenance, tending the plants &


removal of unwanted growth. (12 Months) AprilMarch each plantation

Per month

7171.00

192

Tracing of fire lines (2m. wide) and within (1m.


wide) plantation area

100 sqmt

82.00

193

Contingencies such as repairs to fencing cost of


insecticides etc.

190

16

As per actuals

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
E
194 (a)

(b)

DESCRIPTION OF WORK
UNIT
RATE
3rd YEAR MAINTENANCE OF HILL AFFORESTATION PLANTATION
Circular weeding without application of
100 plants
84.00
fertilizers to a radius of 50 cms around the plant
(with prior permission from the MD,
APUG&BC/Competent Authority)
Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant (with prior
permission from the MD,
APUG&BC/Competent Authority)

100 plants

253.00

195

Protection, maintenance, tending the plants &


removal of unwanted growth. (12 Months) AprilMarch each plantation

Per month

7171.00

196

Tracing of fire lines (2m. wide) and within (1m.


wide) plantation area

100 sqmt

82.00

197

Contingencies such as repairs to fencing cost of


insecticides etc.

F
198

4th YEAR MAINTENANCE OF HILL AFFORESTATION PLANTATION


Protection, maintenance, tending the plants & Per month
7171.00
removal of unwanted growth. (12 Months) AprilMarch each plantation

199

Tracing of fire lines (2m. wide) and within (1m.


wide) plantation area

200

Contingencies such as repairs to fencing cost of


insecticides etc.

V
A
201
202

RAISING OF TANK FORESHORE PLANTATION:


ADVANCE OPERATIONS:
Survey and demarcation
100 rmt
Clearance of rank growth, bushes, shrubs
Ha
(wherever necessary)

203
204

Burning & re-burning the cleared growth


Erection of stone monoliths of 0.75 x 0.15 x 0.10
mts including cost and transportation and fixing
not more than 10nos./each plantation

B
205

RAISING OF PLANTATION (3M X 3 M 1100 PLANTS/HA.


Alignment and marking at 3m x 3m espacement.
100 pits

206
207
208
209

Digging of pits of 30cm cube


Cost of BHC 10%
Application of BHC 10%
Transportation of 5x9 bag plants from nursery
to planting site including loading and unloading
(a)
(b)

210

Upto a lead of 3 kms


Over 3kms per 100 plants per each addl. Km
Internal transport of 5x9 bag plants

17

As per actuals

100 sqmt

82.00

As per actuals

27.00
3539.00

Ha
1009.00
As per item No. 54

44.00

100 pits
562.00
As per actual
100 pits
30.00

100 plants
100 plants /
km

233.00
2.99

100 plants

50.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
211

DESCRIPTION OF WORK
Loading/unloading of 5x9 bag plants where
departmental vehicles are provided.

212

(a)

Cost of chemicals fertilizers @ 20gms/ dose


(2 operations)

(b)

Application of chemicals and


20gms/dose

(c)

Planting of bag plants 5x9


Replacement of causalities 20% maximum
including re-opening of pits, transport and
planting.

(a)

(b)

RATE
50.00

As per actual
100 plants /
2 doses

60.00

100 plants
100 plants

90.00
467.00

Circular weeding without application of


fertilizers to a radius of 50 cms around the plant
(2 operations)

100 plants /
operation

84.00

Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant (2 operations)

100 plants /
operation

253.00

215

Watering 2nd phase T.F.S. plantation after


planting till end of March whenever required to
a maximum of 8 times.

100 plants /
each
watering

101.00

216

Protection, maintenance, tending the plants &


removal of unwanted growth. (9 Months) JulyMarch upto 10 Ha area

Per month

7171.00

217
218
C
219

Contingencies such as cost of implements etc.


As per actuals
Cost of plantation boards
As per actuals
1st YEAR MAINTENANCE OF TANK FORESHORE PLANTATIONS
Watering T.F.S. plantation raised in 2nd phase
100 plants /
104.00
from April June whenever required to a
each
maximum of 8 times.
watering

220

Replacement of causalities 15% maximum


including re-opening of pits, transport and
planting. (Subject to when watering is not
carried out in raising year)

100 plants

467.00

(a)

Circular weeding without application of


fertilizers to a radius of 50 cms around the plant
(2 operations)

100 plants/
operation

84.00

(b)

Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant (2 operations)

100 plants/
operation

253.00

222

Protection, maintenance, tending the plants &


removal of unwanted growth. ( 12 Months)
April-March upto 10 Ha area

Per month

7171.00

223
D
224

Contingencies such as cost of implements etc.


As per actuals
2nd YEAR MAINTENANCE OF TANK FORESHORE PLANTATIONS
Pruning of lower branches to a height of 1.5 ft.
100 plants
54.00
from bottom for a clear stem.

213

214

221

225

(a)

fertilizers @

UNIT
100 plants

1st Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

18

100 plants

84.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(b)

DESCRIPTION OF WORK
1st Soil working 10 cms deep using crowbars to a
radius of 50 cms around the plant

UNIT
100 plants

RATE
253.00

(a)

2nd Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

2nd Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant

100 plants

253.00

227

Protection, maintenance, tending the plants &


removal of unwanted growth. ( 12 Months)
April-March upto 10 Ha area

Per month

7171.00

228
E
229

Contingencies such as cost of implements etc.


As per actual
3rd YEAR MAINTENANCE OF TANK FORESHORE PLANTATIONS
Pruning of lower branches to a height of 1.5 ft.
100 plants
56.00
from bottom for a clear stem.

226

(a)

1st Circular weeding without application of


fertilizers to a radius of 50 cms around the plant
(with prior permission from the MD, APUG&BC
/Competent Authority)

100 plants

84.00

(b)

1st Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant (with prior
permission from the MD,
APUG&BC/Competent Authority)

100 plants

253.00

231

Protection, maintenance, tending the plants &


removal of unwanted growth. ( 12 Months)
April-March upto 10 Ha area

Per month

7171.00

232

Contingencies such as cost of implements etc.

230

VI
A
233
234

a
b

235
236
(a)
(b)

237
i)
ii)
iii)

As per
actual
RAISING OF SILVIPASTURE PLANTATION :- (4 X 4 Mt. ESPACEMENT)
ADVANCE OPERATIONS:
Survey and demarcation
100 rmt
26.53
Clearing unwanted light Jungle growth ( bushes,
Ha
3539.00
shrubs etc., wherever necessary)
Clearing dense unwanted Jungle growth in
Reserve Forest areas ( bushes, shrubs etc.,
wherever necessary)

Ha

5310.00

Burning & re-burning the cleared growth


Fencing
With barbed wire and stone monoliths
With brush wood, to a height of 1.5M planting
cutting of brushwood & thorny material 15cm
apart in staggered manner, securing brushwood
tightly including cost of brushing transport.

Ha

1009.00

Digging & removal of all stumps


500 750 stumps
400 500 stumps
200 400 stumps

As per item no. 54 to 58


1rmt
30.00

Ha
Ha
Ha

19

17612.00
14689.00
9790.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
iv)
B
238

DESCRIPTION OF WORK
UNIT
RATE
Upto 200 stumps
Ha
4897.00
RAISING OF PLANTATION: ( 4m x 4m ESPACEMENT = 800 PLANTS / HA.)
Tractor ploughing with MB Plough to a depth of
Ha
5351.00
23 cms including removal of left over thorny
bushes & filling pits to facilitate Ploughing.

239

Alignment and staking including cost of stakes.


(4m x 4m)

240

i)

241

(a)
(b)
ii)
i)

44.00

100 pits
991.00
100 pits
2143.00
As per actuals

(a)
(b)
(c)
ii)

6x12
8x12
8x15
Over and above 3km lead add following rates
per km per 100 plants

100 plants
100 plants
100 plants

288.00
459.00
578.00

(a)
(b)
(c)
iii)

6x12
8x12
8x15
Loading and unloading of plants where
departmental vehicles are used

100 plants
100 plants
100 plants

4.48
10.46
10.46

(a)
(b)
(c)

6x12
8x12
8x15
Internal transport of bag plants to planting spots

100 plants
100 plants
100 plants

105.00
194.00
244.00

(a)
(b)
(c)

6x12
8x12
8x15
Planting of bag plants after refilling the pits

100 plants
100 plants
100 plants

105.00
194.00
244.00

(a)
(a)
(b)
(c)

6x12, 8x12, 8x15


Cost of BHC (10%) @20grms/pit
Application of BHC (10%) @20gms/pit/dose
Cost of chemicals fertilizers @ 20gms/ dose
(2 operations)

100 plants
241.00
As per actual
100 plants
30.00
As per actual

(d)

Application of chemicals and fertilizers @


20gms/dose

242

243

244

Digging of pits of 45cm cube pits in ploughed


area (2/3 of original rate of pitting) cost of stakes
45cm cube pits
60cm cube pits
Cost of chemical fertilizers to ground fodder
Transport of plants from nursery site to planting
site upto a lead of 3km including loading and
unloading where ever departmental vehicles are
not provided.

100 nos

20

100 plants /
2doses

60.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
245

DESCRIPTION OF WORK
Replacement of causalities to a maximum of
20% of the planted, including re-opening of pits,
transport of plants internal transport and
planting.

UNIT

(a)
(b)

6x12, 8x12, 8x15 ( Tall plants)


5 x 9 (Small plants)
Inter ploughing with MB plough between the
planting lines to a depth of 30 cms and removal
of root suckers

100 plants
100 plants
Ha

(a)

Cost of grass seed @ 5 kg/Ha.

As per actuals

(b)

Sowing of grass seed

Ha

259.00

(a)

1st Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

1st Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant

100 plants

253.00

(a)

2nd Circular weeding without application of


fertilizers to a radius of 50 cms around the plant

100 plants

84.00

(b)

2nd Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant

100 plants

253.00

250

Protection, maintenance, tending the plants &


removal of unwanted growth. ( 9 Months) JulyMarch for every 10 Hectares

Per month

7171.00

251

Fire tracing 2mt width around and within (1M


wide) the plantation area

100 sqmt

82.00

252

Contingencies like repairs to plantation fencing


cost of insecticides.

C
253

1st YEAR MAINTENANCE OF SILVIPASTURE PLANTATION


Inter ploughing with MB plough between the
Ha
3780.00
planting lines to a depth of 30 cms and removal
of root suckers

246

247

248

249

254

1463.00
413.00
3780.00

As per actuals

(a)

Circular weeding without application of


fertilizers to a radius of 50 cms around the plant
(2 operations)

100 plants/
operation

84.00

(b)

Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant (2 operations)

100 plants/
operation

253.00

100 plants
100 plants
Per month

1463.00
413.00
7171.00

255

Replacement of causalities to a maximum of


15% of the planted, including re-opening of pits,
transport of plants internal transport and
planting
(a)
(b)

256

RATE

6x12, 8x12, 8x15 ( Tall plants)


5 x 9 ( Small plants)
Protection, maintenance, tending the plants &
removal of unwanted growth. ( 12 Months)
April-March for every 10 Hectares

21

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
257

DESCRIPTION OF WORK
Fire tracing 2mt width around and within (1M
wide) the plantation area

258
259

Maintenance of brushwood fence


rmt
12.00
Contingencies like repairs to plantation fencing
As per actuals
cost of insecticides.
2nd YEAR MAINTENANCE OF SILVIPASTURE PLANTATION
Inter ploughing with MB plough between the
Ha
3780.00
planting lines to a depth of 30 cms and removal
of root suckers
Circular weeding without application of
100 plants/
84.00
fertilizers to a radius of 50 cms around the plant
operation
(2 operations)
Soil working 10 cms deep using crowbars to a
100 plants/
253.00
radius of 50 cms around the plant (2 operations)
operation

D
260

261

(a)

(b)

UNIT
100 sqmt

RATE
82.00

262

Protection, maintenance, tending the plants &


removal of unwanted growth. ( 12 Months)
April-March for every 10 Hectares

Per month

7171.00

263

Fire tracing 2mt width around and within (1M


wide) the plantation area

100 sqmt

82.00

264

Contingencies like repairs to plantation fencing


cost of insecticides

E
265

3rd YEAR MAINTENANCE OF SILVIPASTURE PLANTATION


1 Circular weeding without application of
100 plants/
fertilizers to a radius of 50 cms around the plant
operation
(with prior permission from the MD, APUG&BC
/Competent Authority)

(a)

(b)

266

As per actuals

st

1st Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant (with prior
permission from the MD,
APUG&BC/Competent Authority)
Protection, maintenance, tending the plants &
removal of unwanted growth. ( 12 Months)
April-March for every 10 Hectares

84.00

100 plants/
operation

253.00

Per month

7171.00

267

Contingencies like repairs to plantation fencing


cost of insecticides

F
268

4rd YEAR MAINTENANCE OF SILVIPASTURE PLANTATION


Protection, maintenance, tending the plants &
Per month
7171.00
removal of unwanted growth. ( 12 Months)
April-March for every 10 Hectares

VII
A
269
270

RAISING OF HORTICULTURE PLANTATION:


ADVANCE OPERATIONS
Survey and demarcation
100 rmt
Clearing unwanted light Jungle growth (bushes,
Ha
shrubs etc., wherever necessary)

(a)

22

As per actuals

26.53
3539.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(b)

271

DESCRIPTION OF WORK
Clearing dense unwanted Jungle growth in
Reserve Forest areas (bushes, shrubs etc.,
wherever necessary) with specific approval of
the MD, APUG&BC/Competent Authority
Burning and re-burning of cut material

B
272

RAISING OF PLANTATION
Tractor ploughing with MB Plough to a depth of
23 cms including removal of left over thorny
bushes & filling pits to facilitate ploughing.

273

Alignment and staking including cost of stakes


(5m x 5m), (3m x 3m)

274

Digging of pits
1.0 m x 1.0 m (5m x 5m apart)
0.60 x 0.60 x 0.60m (3m x 3m apart)
Supply of red earth and black soil
1.00 mt. Cube pits ( 5cft/pit) ( 5m x 5m)
0.60 mt. Cube pits ( 2cft/pit) ( 3m x 3m)
Preparation of soil mixture including breaking of
clouds and distribution

(a)
(b)
275
(a)
(b)
276
(a)
(b)
277
(a)
(b)
278
(a)
(b)
279

1.00 mt. Cube pits


0.60 mt. Cube pits
Cost of Farm yard manure
1.00 mt. Cube pits ( 2cft/pit)
0.60 mt. Cube pits ( 2cft/pit)
Cost of neem cake and chemical fertilizers
1.00 mt. Cube : 4 kgs neem cake & 2kgs chemical
fertilizers (super phosphate)
0.60 mt. Cube : 1kg neem cake & 1 kg chemical
fertilizers (super phosphate)

RATE
5310.00

Ha

1009.00

Ha

5351.00

100 nos

44.00

100 pits
100 pits

14241.00
2143.00

100 pits
100 pits

17198.00
6879.00

100 nos
100 nos

3099.00
887.00

100 nos
100 nos

7505.00
7505.00

As per Actuals
As per Actuals

(a)
(b)

Cost of BHC (10%) powder


1.00 mt. Cube pits 200 gms/pit
0.60 mt. Cube pits 100 gms/pit
Application of fertilizers and pesticide ( 2 doses)

(a)

1.00 mt. Cube pits 200 gms/pit

100 plants /
2 doses

165.00

(b)

0.60 mt. Cube pits 100 gms/pit

100 plants /
2 doses

165.00

280

281

Cost of grafts including transportation and 20%


causalities.

282
283

Internal transport of grafts


Planting the grafts.
Mango ( in 8x15 polybags)
Guava & Anar & others in 6x6 polybags
Fixing of support stakes including cost

(a)
(b)
284

UNIT
Ha

23

As per Actuals
As per Actuals

As per Actuals
100 plants

155.00

100 plants
100 plants
100 plants

1607.00
577.00
587.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
285

(a)
286
287

DESCRIPTION OF WORK
Watering the plants- through tankers prior
permission to be obtained from the MD,
APUG&BC /Competent Authorityfor engaging
the number of tanker for watering
5000 lts capacity ( 5 trips per day)
Replacement of causalities 20% including cost

UNIT

Each tanker
/ per day

2958.00

100 nos

2360.00

(a)

Circular weeding without application of


fertilizers to a radius of 50 cms around the plant
(2 operations)

100 plants/
operation

84.00

(b)

Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant (2 operations)

100 plants/
operation

253.00

2nd tractor ploughing

288
(a)

M.B. plough one direction

Ha

3780.00

(b)

Cultivator

Ha

2740.00

100 plants /
Per month

529.00

289

Protection, maintenance, tending the plants &


removal of unwanted growth. ( 9 Months) JulyMarch

290

Cost of fungicides, insecticides

As per
Actuals

291

Contingencies

As per
Actuals

C
292

1st YEAR MAINTENANCE OF HORTICULTURE PLANTATION


Watering the plants- through tankers prior
permission to be obtained from the MD,
APUG&BC /Competent Authorityfor engaging
the number of tanker for watering
(a)

293
294

RATE

(a)

(b)

5000 lts capacity ( 5 trips per day)

Each tanker
/ per day

2958.00

Replacement of causalities 20% including cost


Circular weeding without application of
fertilizers to a radius of 50 cms around the plant
(2 operations)

100 nos
100 plants/
operation

2360.00
84.00

Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant (2 operations)

100 plants/
operation

253.00

295

1st Inter ploughing with M.B. to the depth of


30cm between the planting lines

Ha

3780.00

296

2nd Inter ploughing with M.B. to the depth of


30cm between the planting lines

Ha

3780.00

297
298

Fixing of support stakes including cost


Cost of neem cake and chemical fertilizers

Ha

577.00

24

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(a)
(b)
299
300

DESCRIPTION OF WORK
1.00 mt. Cube: 4 kgs neem cake & 2kgs chemical
fertilizers (super phosphate)

UNIT
RATE
As per Actuals

0.60 mt. Cube: 1kg neem cake & 1 kg chemical


fertilizers (super phosphate)

As per Actuals

Cost of grafts 20% of original planting


Application of fertilizers and pesticides (2 doses)

As per Actuals

(a)

1.00 mt. Cube pits 200 gms/pit

100 plants /
2 doses

165.00

(b)

0.60 mt. Cube pits 100 gms/pit

100 plants /
2 doses

165.00

301

Protection, maintenance, tending the plants &


removal of unwanted growth. ( 12 Months)
April-March

100 plants /
Per month

529.00

302
303
D
304

Cost of fungicides, insecticides


As per actuals
Contingencies
As per actuals
2nd YEAR MAINTENANCE OF HORTICULTURE PLANTATION
Watering the plants- through tankers prior
permission to be obtained from the MD,
APUG&BC /Competent Authorityfor engaging
the number of tanker for watering

305

(a)

5000 lts capacity (5 trips per day)

Each tanker
/ per day

2958.00

(i)

Circular weeding without application of


fertilizers to a radius of 50 cms around the plant
(2 operations)

100 plants/
operation

84.00

(ii)

Soil working 10 cms deep using crowbars to a


radius of 50 cms around the plant (2 operations)

100 plants/
operation

253.00

306

1st Inter ploughing to the depth of 15cm with


cultivator

Ha

2779.00

307

2nd Inter ploughing to the depth of 15cm with


cultivator

Ha

2779.00

308

Cost of neem cake and chemical fertilizers


1.00 mt. Cube : 4 kgs neem cake & 2kgs chemical
fertilizers (super phosphate)

(a)
(b)
309

0.60 mt. Cube : 1kg neem cake &1 kg chemical


fertilizers (super phosphate)

(a)
(b)

Cost of BHC (10%) powder


1.00 mt. Cube pits 200 gms/pit
0.60 mt. Cube pits 100 gms/pit
Application of fertilizers and pesticides (2 doses)

(a)

1.00 mt. Cube pits 200 gms/pit

310

As per Actuals
As per Actuals

As per Actuals
As per Actuals
100 plants /
2 doses

25

165.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(b)

DESCRIPTION OF WORK
0.60 mt. Cube pits 100 gms/pit

UNIT
100 plants /
2 doses

RATE
165.00

311

Protection, maintenance, tending the plants &


removal of unwanted growth. ( 12 Months)
April-March

100 plants
Per month

504.00

312
313
E

Cost of fungicides, insecticides


As per Actuals
Contingencies
As per Actuals
3rd YEAR MAINTENANCE OF HORTICULTURE PLANTATION

314

Watering the plants- through tankers prior


permission to be obtained from the MD,
APUG&BC /Competent Authorityfor engaging
the number of tanker for watering
(a)

5000 lts capacity (5 trips per day)

Each tanker
/ per day

2958.00

315

Weeding cum soil working including


mulching/mound formation around the stem
and saucer formation to a radius of 0.75 mt
around the plants (2 operation)

100 plants
each
operation

457.00

316

1st Inter ploughing to the depth of 15cm with


cultivator

Ha

2779.00

317

2nd Inter ploughing to the depth of 15cm with


cultivator

Ha

2779.00

318

Cost of neem cake and chemical fertilizers


(a)

1.00 mt. Cube : 4 kgs neem cake & 2kgs chemical


fertilizers (super phosphate)

As per Actuals

(b)

0.60 mt. Cube : 1kg neem cake &1 kg chemical


fertilizers (super phosphate)

As per Actuals

319
(a)
(b)
320

Cost of BHC (10%) powder


1.00 mt. Cube pits 200 gms/pit
0.60 mt. Cube pits 100 gms/pit

As per Actuals
As per Actuals

Application of fertilizers and pesticides (2 doses)


(a)

1.00 mt. Cube pits 200 gms/pit

100 plants /
2 doses

165.00

(b)

0.60 mt. Cube pits 100 gms/pit

100 plants /
2 doses

165.00

321

Protection, maintenance, tending the plants &


removal of unwanted growth. ( 12 Months)
April-March

100 plants
Per month

529.00

322

Cost of fungicides, insecticides

As per actuals

323

Contingencies

As per actuals

26

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
F
324

(a)

DESCRIPTION OF WORK
UNIT
RATE
4th YEAR MAINTENANCE OF HORTICULTURE PLANTATION
Watering the plants- through tankers prior
permission to be obtained from the MD,
APUG&BC /Competent Authorityfor engaging
the number of tanker for watering
5000 lts capacity ( 5 trips per day)

Each tanker
/ per day

2958.00

325

Weeding cum soil working to a radius of 1mt and


10cm depth (2 operations)

100 plants
each
operation

890.00

326

Inter ploughing to the depth of 15cm with


cultivator

Ha

2779.00

327

Cost of neem cake and chemical fertilizers


1.00 mt. Cube : 4 kgs neem cake & 2kgs chemical
fertilizers (super phosphate)

(a)
(b)
328

0.60 mt. Cube : 1kg neem cake & 1 kg chemical


fertilizers (super phosphate)

As per Actuals
As per Actuals

(a)
(b)

Cost of BHC (10%) powder


1.00 mt. Cube pits 200 gms/pit
0.60 mt. Cube pits 100 gms/pit
Application of fertilizers and pesticides (2 doses)

(a)

1.00 mt. Cube pits 200 gms/pit

100 plants /
2 doses

165.00

(b)

0.60 mt. Cube pits 100 gms/pit

100 plants /
2 doses

165.00

330

Protection, maintenance, tending the plants &


removal of unwanted growth. ( 12 Months)
April-March

100 plants
Per month

529.00

331
332
G
333

Cost of fungicides, insecticides


As per actuals
Contingencies
As per actuals
5th YEAR MAINTENANCE OF HORTICULTURE PLANTATION
Watering the plants- through tankers prior
permission to be obtained from the MD,
APUG&BC /Competent Authorityfor engaging
the number of tanker for watering

329

(a)

As per Actuals
As per Actuals

5000 lts capacity ( 5 trips per day)

Each tanker
/ per day

2958.00

334

Weeding cum soil working to a radius of 1mt and


10cm depth (2 operations)

100 plants
each
operation

891.00

335

Inter ploughing to the depth of 15cm with


cultivator

Ha

2779.00

336

Cost of neem cake and chemical fertilizers


1.00 mt. Cube : 4 kgs neem cake & 2kgs chemical
fertilizers (super phosphate)

(a)

27

As per Actuals

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(b)
337

DESCRIPTION OF WORK
0.60 mt. Cube : 1kg neem cake & 1 kg chemical
fertilizers (super phosphate)

UNIT
RATE
As per Actuals

(a)
(b)

Cost of BHC (10%) powder


1.00 mt. Cube pits 200 gms/pit
0.60 mt. Cube pits 100 gms/pit
Application of fertilizers and pesticides (2 doses)

(a)

1.00 mt. Cube pits 200 gms/pit

100 plants /
2 doses

165.00

(b)

0.60 mt. Cube pits 100 gms/pit

100 plants /
2 doses

165.00

339

Protection, maintenance, tending the plants &


removal of unwanted growth. (12 Months) AprilMarch

100 plants
Per month

529.00

340
341
VIII
342

Cost of fungicides, insecticides


Contingencies

338

343

As per Actuals
As per Actuals

As per actuals
As per actuals

OTHER ITEMS
Construction of dry rubble wall for fencing
i) a. Bottom width - 90cms
b. Top width - 45cms
c. Height -125cms
ii) a. Bottom width - 90cms
b. Top width - 45cms
c. Height -100cms
Digging of pits of 30 x 30 x 30cms for fixing Iron
angular posts in cement concrete.

As per SSR

As per SSR

100 pits

562.00

Sqmt

11.61

344

Fencing with chain link ( labour charges for


stretching)

345
346

Cutting of grass in the plantation


Cutting back of coppice growth and removal of
weeds and unwanted growth in old leneiar
plantations along road margins, removing the
material to outside the plantation area

100 sqmt
Ha

26.53
3027.00

347

Cutting of BODA Grass and Misc. unwanted


grasses, bundling them and removing them to a
place outside the plot area on hill slopes.

Ha

3503.00

348

Crescent shape saucer by bund formation with


local stones on hilly slopes size 50 cm radius
saucer

Each

4.97

349

Massing of plants in the divider (taking out of


plants along with ball of earth and wrapping in
gunny bags)

each

54.00

350
351

Cutting and removal of Prosophis Juliflora tree


Uprootal of Prosophis Juliflora tree stumps and
removal of uprooted material from the site

each
each

32.00
54.00

28

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
352

DESCRIPTION OF WORK
Drilling of pits of size 60x45x30 cms in the road
median with pneumatic air compressor

UNIT
each

RATE
588.00

353

Collection of Jammu or Tunga from local lake /


pond, transportation by head loads from lake to
loading point, transporting by vehicle over a
distance of 10 to 12 Km to the wetland area ,
including unloading, internal transport, planting
in two feet deep water in puddle conditions in
the constructed wetland with an espacement of
50 cms

100 sqmt

2021.00

354

Clearance of weed growth manually in FRCTC,


Tellapur once in a month

hectare

3015.00

355

Hygienic clearing in plantations during 1st, 2nd


and 3rd year maintenance (With prior permission
from the MD, APUG&BC/Competent Authority)

hectare

1515.00

356

Loosening of soil to a depth of 15 cms and


digging around the Bamboo clump at a distance
of 0.5 mtrs from periphery of the clump and
spreading the dug up soil around the clump and
numbering with red paint.

Per clump

34.00

357

Preparation of soil mixture - root ball technique mixing charges of red soil, manure and sand
uniformly excluding material

per cmt

54.00

358

Preparation of soil mixture - root ball technique application of soil mixture of red soil, manure
and sand into the central media including
ramming charges

per cmt

155.00

359
360

Planting charges of 18"x24" size bag plants


Internal transport and application of red soil in
plantation areas and parks

100 nos
per cmt

1015.00
132.00

361

Internal transport and application of red soil for


a distance of 50 mts. in hill blocks

per cmt

182.00

362

Internal transport and application of red soil for


a distance of 51 to 100 mts.

per cmt

284.00

363

Internal transport and application of red soil for


a distance of 101 to 200 mts.

per cmt

380.00

364

Internal transport of bag plants 8"x12" to


planting site where the number of plants are less
than 300 at a spot and in urban colonies, roads
in linear stretches

100

334.00

365

Planting of 8"x12" and 8"x15" bag plants where


number of plants are limited to less than 300
nos at a spot

100

407.00

29

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
366

DESCRIPTION OF WORK
Removal and re-fixing of tree guards on the
pavements and in urban colonies in linear
stretches

UNIT
100

RATE
290.00

367

For soil working the plants where the number of


plants less than 300 and scattered

100

507.00

368

Removal of weeds, pruning of lower branches,


soil working to a radius of 50 cms around the
plant to a depth of 10 cms and formation of
saucer and application of fertilizers excluding the
cost of material in open space plantations

100

538.00

IX
369

LANDSCAPE WORKS
Unit rates for developing soft landscape
FISCUE / SHADE GRASS (Dibbling)
Bed preparation:
Dressing the surface to the desired shape,
laying 6 layer of fine red soil, covered with a
thin layer of sand, watering, rolling with hand
roller (4 thickness after rolling), including the
cost of red earth, sand and labour charges etc
complete but excluding the cost of fertilizers,
chemicals and grass.

Sqmt

245.00

1
(a)

(b)

Cost of the grass for dibbling including


conveyance etc

As per
actuals on
quotations

0.00

(c)

Dibbling the rooted slips of grass at 3-4 apart


and ramming (excluding the cost of grass slips)

Sqmt

81.00

(d)

Regular watering and removal of weeds,


protection etc for 45 days for initial
establishment.

Sqmt

7.00

2
(a)

CARPET GRASS KOREAN / MEXICAN


Bed preparation :
Dressing the surface to the desired shape,
laying 6 layer of fine red soil, covered with a
thin layer of sand, watering, rolling with hand
roller (4 thickness after rolling), including the
cost of red earth, sand and labour charges etc
complete but excluding the cost of fertilizers,
chemicals & grass.

Sqmt

245.00

(b)

Cost of carpet grass

(c)
(d)

Carpet grass laying and ramming


Regular watering and removal of weeds,
protection etc for 45 days for initial
establishment.

30

As per actuals on
quotations
Sqmt
43.00
Sqmt
7.00

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
3
(a)

DESCRIPTION OF WORK
Hedge / shrub planting: Digging the trench of
size 45 cm depth, refilling the trench with red
soil including cost of red soil and farmyard
manure at 4:1 ratio, internal transportation of
plants and planting the plants including the
application of fertilizers and pesticides etc., (@
20 gms/pit/sqmt) complete but excluding the
cost of the fertilizers (@ 20 gms/pit/sqmt) and
plant material.

UNIT
Sqmt
(Not less
than 20
plants)

RATE
698.00

3
(b)

Hedge / shrub planting: Digging the trench of


size 30 cm depth, refilling the trench with red
soil including cost of red soil and farmyard
manure at 4:1 ratio, internal transportation of
plants and planting the plants including the
application of fertilizers and pesticides etc., (@
20 gms/pit/sqmt) complete but excluding the
cost of the fertilizers (@ 20 gms/pit/sqmt) and
plant material.

Sqmt
(Not less
than 20
plants)

554.00

3(
c)

Hedge / shrub planting: Digging the trench of


size 15 cm depth, refilling the trench with red
soil including cost of red soil and farmyard
manure at 4:1 ratio, internal transportation of
plants and planting the plants including the
application of fertilizers and pesticides etc., (@
20 gms/pit/sqmt) complete but excluding the
cost of the fertilizers (@ 20 gms/pit/sqmt) and
plant material.

Sqmt
(Not less
than 20
plants)

233.00

4
(a)

Topiary / Palms / Garden tree planting Digging


of 60x60x60 cm pit, filling with soil mixture of
red soil, farmyard manure, sand at 3:1:1 ratio
including internal transport, application of
fertilizers and chemicals (@ 20 gms/pit/sqmt),
internal transportation of plants and planting
the plants (excluding cost of plant material,
fertilizers and chemicals (@ 20 gms/pit/sqmt))

Each

283.00

4(b) Topiary / Palms / Garden tree planting Digging


of 75x75x75 cm pit, filling with soil mixture with
red soil and farmyard manure at 4:1 ratio
including internal transport, application of
fertilizers and chemicals (@ 20 gms/pit/sqmt),
internal transportation of plants and planting
the plants (excluding cost of fertilizers (@ 20
gms/pit/sqmt) and plant material)

Each

547.00

31

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
5

DESCRIPTION OF WORK
Planting of individual shrub/rose/ornamental
Bamboo

UNIT

(a)

Digging the pit of size 0.45x0.45x0.45 m, refilling


the pit with red soil including cost red soil and
farmyard manure at 4:1 ratio, internal
transportation of plants and planting the plants
including the application of fertilizers and
pesticides (@ 20 gms/pit/sqmt) etc., complete
but excluding the cost of the fertilizers (@ 20
gms/pit/sqmt) and plant material.

Each

142.00

(b)

Digging the pit of size 0.60x0.60x0.45 m, refilling


the pit with red soil including cost red soil
farmyard manure at 4:1 ratio, internal
transportation of plants and planting the plants
including the application of fertilizers(@ 20
gms/pit/sqmt) and pesticides etc., complete but
excluding the cost of the fertilizers (@ 20
gms/pit/sqmt) and plant material.

Each

253.00

( c)

Digging the pit of size 0.30x0.30x0.30 m, refilling


the pit with red soil including cost red soil and
farmyard manure at 4:1 ratio, internal
transportation of plants and planting the plants
including the application of fertilizers and
pesticides (@ 20 gms/pit/sqmt) etc., complete
but excluding the cost of the fertilizers (@ 20
gms/pit/sqmt) and plant material.
Ground covers
Bed preparation 6" layer of soil mixture 3:1:1
ratio red soil, farmyard manure and river sand
and application of fertilizers (@ 20
gms/pit/sqmt), smooth surface as per design
including cost of soil mixture, filling of the soil
mixture and internal transportation.
Internal transportation of plants and planting of
the ground cover.

Each

95.00

sqmt

224.00

sqmt

23.00

6
a

b
c

Plant cost

7
(a)

Preparation of flower bed and planting:


laying 6 layer of fine red soil, covered with a
thin layer of sand, watering, including the cost of
red earth, sand and labour charges etc complete
but excluding the cost of fertilizers.

7
(b)
8

Renewal of flower bed and planting


Raising of floriculture primary beds (excluding
cost of seeds)

Raising of poly pot nursery for seasonal


flowering plants (3 plants in each bag)

(i)

5"x5" size bags

32

RATE

as per the actuals on


Quotation
sqmt
377.00

sqmt

132.00

seedling

1.65

each

1.65

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
(ii)
b

DESCRIPTION OF WORK
8"x 6" size bags
Raising of seasonal flowering potted plants (Each
pot contains three plants)

UNIT
each

RATE
1.65

5" top dia


6" top dia
7" top dia
Importation of good quality red earth congenial
for plant growth of light textured, crystalline,
porous and friable, generally acidic or neutral
but not alkaline, fertile, cost, transportation,
loading, unloading etc complete
Cost and conveyance of well-decomposed
Farmyard manure to planting site including the
transport, loading unloading etc. complete.

each
each
each
Cum

11.61
11.61
13.26
1084.00

Cum

1183.00

11

Supply of sand at site obtained from natural


disintegrated rock which has been deposited by
streams or glacial agencies composed of hard
silicons material and should be clean, sharp and
angular type free from adherent coatings,
organic matter and shall not contain any amount
of clay, clay balls or pellets etc. complete
including the cost of sand, loading, unloading
etc. complete.

Cum

As Per
SSR

12

Providing seating benches (with the approval of


the MD, APUG&BC/Competent Authority)

Each

As per
actuals

(i)
(ii)
(iii)
9

10

REMARKS

For Item Nos. 371 no area allowances will be allowed


Wherever plant material is not available at departmental nursery the required material
has to be procured in the local market by obtaining three quotations and with the prior
approval of the competent authority (Implementing Agency)
370
1
(a)

MAINTENANCE OF LAWNS & GARDENS


Top dressing of lawns with 1.5 cm thickness
Cost of red earth including transportation,
100 sqmt
loading, unloading etc complete (No area
allowance will be allowed)

(b)

Spreading of
distribution

(c)

Cost of fertilizers and insecticides chemicals etc.

2
i)

Maintenance of lawns:
Watering the lawns @ 10-15 litres / Sqm. / day
basing on the season and weather conditions
(Sub soil moisture shall be maintained
continuously)

ii)

Lawn mowing and edging of the lawns in the


following frequency. Keeping the lawn grass
blade not more than 2 cm.
i)

red

soil

including

June to November once in 15 days

33

internal

100 sqmt

1626.00

125.00

As per actual

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
iii)

DESCRIPTION OF WORK
ii) December to May once in 30 days
Edging of the lawns in such a way that the lawn
grass do not penetrate into the plants and in a
defined perfect geometric shapes or smooth
curves.

UNIT

RATE

iv)

Keeping the lawns always in lush green & weedfree condition.

v)

Application of fertilizers, insecticides, Fungicides


etc.

(a)

With Manual watering

100 sqmt.
Per month

484.00

(b)

With Drip / Sprinkler system

100 sqmt.
Per month

216.00

3
i)
ii)

Maintenance of hedge / shrub planting


Trimming of hedges / shrubs once in 15 days.
Watering hedges / shrubs once in a day @ 5
litres / per Sqmts / per day (sub soil moisture
shall be maintained continuously).

iii)
iv)

Formation of basins 1 ft. away from the hedge.


Application of fertilizers, insecticides, Fungicides
(@ 20 gms/pit/sqmt) etc.,

Maintenance of individual shrubs, rose plants,


topiary, ornamental bamboo and palms etc

i)
ii)

Trimming once in 15 days.


Watering once in a day @ 5 litres / per plant /
per day (sub soil moisture shall be maintained
continuously).

iii)

Formation of basins for each and every plant


upto 1 ft. away from the plant.

iv)

Application of fertilizers, insecticides, Fungicides


(@ 20 gms/pit/sqmt) etc.,

(a)

With Manual watering

100 Nos .
per month

321.00

(b)

With Drip / Sprinkler system

100 Nos .
per month

144.00

100 Sqmt
per month

2148.00

Maintenance of ground covers:


Watering @ 10-15 litres / Sqm. / day basing on
the season and weather conditions (Sub soil
moisture shall be maintained continuously) ,
weeding, trimming and keeping the ground
cover in healthy condition

(a)

With Manual watering

100 sqmt.
Per month

484.00

(b)

With Drip / Sprinkler system

100 sqmt.
Per month

216.00

34

REMARKS

A.P. Urban Greening and Beautification Corporation Limited


Sl.No.
6

DESCRIPTION OF WORK
Flower bed maintenance:
Pinching of seedlings, racking of soils,
application of fertilizers and pesticides (@ 20
gms/pit/sqmt), drenching of liquid nutrients,
regular removal of dried flowers, weeding,
watering, protection and replacement of
casualties.
Maintenance of traffic island/ central media:
Regular watering, weeding, protection, mowing
etc. inclusive of water cost.

35

UNIT
100 sqmt

RATE
1286.00

100 Sqmt /
month

5077.00

REMARKS

You might also like