Reports (Jan.2013)
Reports (Jan.2013)
Reports (Jan.2013)
1-inventory
2-inventory
3-inventory
4-inventory
and
and
and
and
inspection
inspection
inspection
inspection
for
for
for
for
till
05 PM
Exhaust side
GLAC and GNAC
lighting protection
isolaed phase duct
1-inventory and inspection for Exhaust sideand transprort their items from MOE Store to
baghdad Co. Store
2-inventory and inspection for GLAG and GANG for All GT's
3-inventory and inspection for package load ( load compartment ) for all GT's
4-inventory and inspection for isolaed phase duct for all GT's
1-inventory and inspection for Exhaust side and transprort their items from
MOE
Store to baghdad Co. Store
2-inventory and inspection for GLAG and GANG for All GT's
3-inventory and inspection for Hvac for All GT's
1-inventory and inspection for Exhaust side and transprort their items from
MOE
Store to baghdad Co. Store
2-inventory and inspection for GLAG and GANG for All GT's
3-inventory and inspection for Hvac for All GT's
4-inventory and inspection for Lube oil pipes All GT's
1-inventory and inspection for Exhaust side
and transprort their items from MOE Store to baghdad Co. Store
2-inventory and inspection for GLAG and GANG for All GT's
3-inventory and inspection for package load ( load compartment ) for all GT's
4-inventory and inspection for isolaed phase duct for all GT's
5-installing cooling equipments for coolers
Lube
Lube
Load
Load
Al-Haydaria Site(Storages)
Engineers
Technicians
Temprary
Workers
Eng.
15
15
Mohammed Rashid
10
Eng.
13
Eng.
Mohammed Rashid
15
Eng.
Mohammed Rashid
15
Mohammed Rashid
Eng.
Mohammed Rashid
Eng.
Mohammed Rashid
Eng.
Mohammed Rashid
15
19 / 01 / 2013
20 / 01 / 2013
21 / 01 / 2013
22 / 01 / 2013
23-24 / 01 /2013
25-26 / 01 /2013
No. of
Persons
Actual working
hours
Man/Power
Work %
10
50
90%
10
60
50%
10
50
100%
10
50
80%
10
50
90%
6
5
10
10
60
50
75%
100%
10
50
100%
10
50
95%
6
5
10
10
60
50
90%
50%
10
50
95%
10
10
10
50
50
40
100%
50%
10%
10
50
90%
6
5
5
9
10
10
10
10
60
50
50
90
75%
100%
100%
100%
10
50
90%
6
5
10
10
60
50
75%
100%
10
50
100%
27 / 01 /2013
5
6
5
5
10
10
10
10
50
60
50
50
70%
30%
40%
40%
Progress
Plan
Actual
Remarks
Start
Finish
Start
Start
Finish
Start
Finish
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
19/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
21/1/2012
21/1/2012
21/1/2012
21/1/2012
21/1/2012
21/1/2012
21/1/2012
21/1/2012
21/1/2012
21/1/2012
21/1/2012
21/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
22/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
23/01/2013
23/01/2013
23/01/2013
23/01/2013
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
20/1/2012
HOLD
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
27/1/2012
AL-Haydaria Project
No.
Report No.
No A
Damaged Materials
Report apdated from 25th of Dec. 2012 till the25th of Jan. 2013
Case Description
No Action
amaged Materials
Report apdated from 25th of Dec. 2012 till the25th of Jan. 2013
damage description
Action
Remark
AL-Haydaria Project
Revision No. : A
Report No. : 001
Page No. : 1 of 1
No.
1
Arrived on 20
Revision No.: A
Report No.: 002
Page No. : 1 \2\3 of 3
No.
1
2
3
4
5
6
7
0
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Revision No. : A
Report No. : 003
Page No. : 1 of 1
No.
1
Revision No. : A
Revision No. : A
Report No. : 005
Page No. : 1 of 1
No.
1
2
Revision No. : A
Report No. : 006
Page No. : 1 of 1
No.
1
Revision No. : A
Report No. : 007
Page No. : 1 of 1
No.
1
Revision No. : A
Report No. : 008
Page No. : 1 of 1
No.
Revision No. : A
Report No. : 009
Page No. : 1 of 1
No.
1
Revision No. : A
Report No. : 010
Page No. : 1 of 1
No.
1
2
3
4
5
6
7
Revision No. : A
Report No. : 011
Page No. : 1 of 1
No.
1
2
3
4
5
6
7
8
9
Revision No. : A
Report No. : 012
Page No. : 1 of 1
No.
1
2
3
4
5
7
8
9
10
Revision No. : A
Report No. : 013
Page No. : 1 of 1
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Revision No. : A
Report No. : 014
Page No. : 1 of 1
No.
1
Revision No. : A
Report No. : 015
Page No. : 1 of 1
No.
1
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
AL-Haydaria Project
Baghdad Co. for Rehabilitation and installation gas
Turbins Iraqi Ministry of Electricity
Vendor Name : GE
issue Date : 27/5/2012
Type of Packing : Case C1
Item Description
WICKET STOP PLATE
Arrived on 20th Of N
Vendor Name : GE
issue Date : 27/5/2012
Type of Packing ; Case C1
Item Description
SCREW M20x40 A2-70 GB/T5783-2G00
NUTM20 A2-70 GB/T6170-2000
SCREW M12x30 A2-70 GB/T5783-2000
NUT M12 A2-70 G8/T6170-2000
WASHER 12 A140 GB/T97.2-85
SLEEVE SHIMMING 3THK AISI409
SCREW M16x30 A2-70 GB/T5783-2000
NUT M16 A2-70 GB/T6170-2000
SCREW M12X30 A2-70 GB/T57G3-2000
NUT M12 A2-70 GB/T6170-200Q
CLAMP DtA 83.9 JB/ZQ4321-8B
Arrived on 2
NUT Ml2 A2-70 GB/T6170-2000
Arrived on 2
of Nov. 201
SCREW M20x85 A2-70 G8/T5783-2000
NUT M20 A2-70 GB/T5170-2000
Vendor Name : GE
issue Date : 27/5/2012
Type of Packing : Case C1
Item Description
WICKET STOP PLATE
Arrived on 20
Nov.2012
Vendor Name : GE
Nov.2012
A
Vendor Name : GE
issue Date: 19/6/2012
Type of Packing : Case C1
Item Description
PLATE
PLATE
A
Vendor Name : GE
issue Date : 1/12/2012
Type of Packing : Single Item S
Item Description
Bent tool for insulation pin
Vendor Name : GE
issue Date : 1/12/2012
Type of Packing : Single Item S
Item Description
Bent tool for insulation pin
Vendor Name : GE
issue Date : 1/12/2012
Type of Packing : Single Item S
Item Description
Vendor Name : GE
issue Date : 1/12/2012
Type of Packing : Single Item S
Item Description
Bent tool for insulation pin
Vendor Name : GE
issue Date : 2/12/2012
Type of Packing : Container C3
Item Description
WIRE ELECTRIC, H.T.
COMPOUND HEAT TRANSFER
ELECTRICAL CONDUIT 1"
PLATE DETAIL
SUPPORT
SCREW END UN. M.F. 1"
242C2759G0001
557T
Vendor Name : GE
issue Date : 2/12/2012
Type of Packing : Container C3
Item Description
TURBINR STAINLESS STEEL DIA 3/4
TURBINR STAINLESS STEEL DIA 1"
ELECTRICAL CONDUIT 1"
GASKET SPIRAL WOUND 1" 1/2 300LB
BOLT HEXA HEAD
VALVE, BALL SS.
ELECTRICAL CONDUIT 1"
PLATE DETAIL
SUPPORT
Vendor Name : GE
issue Date : 2/12/2012
Type of Packing : Container C3
Item Description
PIPNG SUPPORT
PIPNG SUPPORT
COMPOUND HEAT TRANSFER
NIPPLE 1/2" LG 2"
COMPOUND PIPE SLIP JOINT 1/2"
Vendor Name : GE
issue Date : 2/12/2012
Type of Packing : Container C3
Item Description
TURBINR STAINLESS STEEL DIA 3/4
TURBINR STAINLESS STEEL DIA 1"
ELECTRICAL CONDUIT 1"
WIRE ELECTRIC, H.T.
LOCKING PLATE
Vendor Name : GE
issue Date : 1/12/2012
Type of Packing : CASE C1
Item Description
SEALING COMPOUNDS
Vendor Name : GE
issue Date : 1/12/2012
Type of Packing : CASE C1
Item Description
SEALING COMPOUNDS
Shortage Report
20th Of Nov.2012
Package No. : PROJD21/432A1/O18
Package Gross Weight: 2100 Kg.
Package Dimention : 350x120x100 Cm.
Ref. No.
D01 218D2283 5
D01 218D22835
D01 218D2283 6
D01 218D2283 6
D01 218D2283 6
D01 223D5969 9
D01 223D5969 10
D01 223D5969 10
D01 223D5969 11
D01 223D5969 11
D01 218D19655
d on 20
D01 218D1965 6
D01 223DG329 18
D01 223D6329 19
th
d on 20
v. 2012
D01 223D6329 20
D01 223D6329 20
th
D01 223D6329 21
D01 218D1965 2
D01 223D6329 17
D01 223D6329 26
D01 223DS329 26
D01 223DS329 27
D01 223D6329 30
D01 223D6552 1
D01 223D6552 2
D01 223D6552 3
D01 223DG552 3
D01 223D6552 3
D01 223D6552 3
D01 223D6552 3
D01 223D5973 1
D01 223D5973 1
D01 223D5973 1
D01 223D5973 2
D01 223D5973 2
D01 223D5973 2
D01 223D59734
D01 223D59737
D01 223D59737
D01 223D5973 10
D01 223D5973 12
D01 223D5973 12
D01 223D5973 13
D01 223D5973 14
ed on 20th of
ov.2012
Package No. : PROJD21/221A1/001
ov.2012
Arrived
Package No. : PROJD24/221A1/001
Package Gross Weight: 3688 Kg.
Package Dimention : 618x128x124 Cm.
Ref. No.
8
8
Arrived
Package No. : PROJD21/A041A/003
Package Gross Weight: 4307 Kg.
Package Dimention :290x224x441 Cm.
Ref. No.
N/A
N/A
N/A
N/A
0956 0016
1105 1342
918T 0005
918T 0012
969U 0018
N/A
N/A
N/A
N/A
0106 0012
0963 0051
0963 0008
1105 1342
918T 0005
918T 0012
0956 0016
0956 0022
0984 0066
1160 0004
918T 0005
918T 00012
969A103
969A6645
N/A
N/A
N/A
0106 0001
106 0072
956 0015
956 0021
956 0022
956 0023
963 0004
963 4274
0984 0007
0984 0011
0984 0076
1026 0002
1213 0001
918T 0005
918T 0012
A044 0004
5176
5180
E Gas Turbines
*
System:
Exhaust Stack
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
218D1967
PC
Nil
Draw. No.
Supposed Qtv
Unit
Actual Qtv
218D2283
51
PC
Nil
218D2283
51
PC
Nil
218D2283
PC
Nil
21802283
PC
Nil
218D2283
PC
Nil
223D5969
PC
Nil
223D5969
126
PC
Nil
223D5969
126
PC
Nil
223D5969
19
PC
Nil
223D5969
19
PC
Nil
218D1965
PC
Nil
218D1965
21
PC
Nil
223D6329
168
PC
Nil
223D6329
84
PC
Nil
.2012
System
Exhaust Stack
223D6329
26
PC
Nil
223D6329
26
PC
Nil
223D6329
51
PC
Nil
218D1965
PC
223D6329
42
PC
26
22306329
PC
Nil
223D6329
PC
Nil
223D6329
PC
Nil
223D6329
PC
Nil
223D6552
PC
Nil
223D6552
PC
Nil
223D6552
PC
Nil
223D6552
PC
Nil
223D65S2
PC
Nil
223D6552
PC
Nil
223D6552
PC
Nit
223D5973
17
PC
Ni!
223D5973
17
PC
Nil
223D5973
17
PC
Nil
223D5973
51
PC
Ni!
223D5973
51
PC
Nil
223D5973
51
PC
Ni!
223D5973
PC
Nil
223D5973
34
PC
Nil
223D5973
34
PC
Nil
223D5973
PC
Nil
223D5973
13
PC
Nil
223D5973
13
PC
Nil
223D5973
13
PC
Nil
223D5973
34
PC
Nil
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
218D1967
PC
Nil
System
Exhaust Stack
System:
Foundation Embedded
Pieces
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
91029200
PC
Nil
91029201
PC
Nil
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
91029200
PC
Nil
91029201
PC
Nil
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
N/A
PC
NIL
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
N/A
PC
NIL
Supposed Q'ty
Unit
Actual Q'ty
ved
System:
Foundation Embedded
Pieces
ved
System:
Air Inlet Duct.
System:
Air Inlet Duct.
System:
Air Inlet Duct.
Draw. No.
N/A
PC
NIL
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
N/A
PC
NIL
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
362A2370P025
PC
NIL
235A6987P001
PC
NIL
91434708P025
PC
NIL
91207495G001
PC
NIL
132B9889P001
PC
NIL
261A7267P005
PC
NIL
BA57.01
PC
NIL
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
368A1611P218
368A1611P221
51.3
159.6
M
M
NIL
NIL
91434708P025
11.4
NIL
372A1159P010
PC
NIL
N14DP35104
16
PC
NIL
328A7984P405
PC
NIL
91434708P025
PC
NIL
91207495G001
PC
NIL
132B9889P001
PC
NIL
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
91452373G002
PC
NIL
91452374G002
PC
NIL
235A6987P001
PC
NIL
238A0273P022
PC
NIL
256A1535P143
PC
NIL
System:
Air Inlet Duct.
System:
Gas Turbine Container
System:
Gas Turbine Container
System:
Gas Turbine Container
285A6382P004
PC
NIL
91207495G001
PC
NIL
132B9889P001
PC
NIL
N14DP39040
16
PC
NIL
N403P00025
PC
NIL
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
368A1611P218
368A1611P221
51.3
159.6
M
M
NIL
NIL
91434708P025
11.4
NIL
362A2370P015
100
NIL
261A7644P002
PC
NIL
302A4597P008
PC
NIL
357A1627P004
14
PC
NIL
238A0273P022
PC
NIL
System:
Gas Turbine Container
N14DP33052
20
PC
NIL
238A0273P022
PC
NIL
286A6290P004
PC
91434713P012L100
PC
NIL
N14DP37048
24
PC
NIL
91434744P001
PC
NIL
172A5252P001
PC
NIL
354A1709P102
PC
NIL
91207495G001
PC
NIL
132B9889P001
PC
NIL
302A4597P013
PC
NIL
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
9EA475
PC
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
9EA476
PC
System:
GT ACCESSORY MODULE
System:
GT ACCESSORY MODULE
Container
Draw. No.
Supposed Q'ty
Unit
Actual Q'ty
368A1611P218
368A1611P221
302A4597P008
91434713P012L100
91434744P001
91207495G001
302A4597P013
235A6987P001
91207495G001
368A1611P218
368A1611P221
372A1159P010
91207495G001
51.3
NIL
159.6
NIL
PC
NIL
PC
NIL
PC
NIL
PC
NIL
PC
NIL
PC
NIL
PC
NIL
51.3
NIL
159.6
NIL
PC
NIL
PC
NIL
PC
NIL
PC
NIL
235A6987P001
91207495G001
ot Arrived Materials
Arrived Materials
Shortage Qty
Remark
Shortage Qtv
51
51
2
2
2
8
126
126
19
19
6
21
168
84
Remark
26
26
51
1
16
5
5
2
9
4
4
4
1
1
1
1
17
17
17
51
51
51
4
34
34
4
13
13
13
34
Shortage Qty
1
Remark
Shortage Qty
Remark
2
2
Shortage Qty
Remark
2
2
Shortage Qty
Shortage Qty
Shortage Qty
Remark
Remark
Remark
Shortage Qty
Remark
Shortage Qty
1
1
1
1
1
1
1
Remark
MRR
MRR
MRR
MRR
MRR
MRR
MRR
Shortage Qty
51.3
159.6
No.
No.
No.
No.
No.
No.
No.
212
212
212
212
212
212
212
Remark
11.4
4
16
2
1
Shortage Qty
1
2
1
2
1
Remark
MRR
MRR
MRR
MRR
MRR
No.
No.
No.
No.
No.
214
214
214
214
214
1
1
16
4
MRR
MRR
MRR
MRR
MRR
Shortage Qty
51.3
159.6
11.4
100
3
5
14
2
20
2
2
1
24
1
1
1
1
1
Shortage Qty
Shortage Qty
No.
No.
No.
No.
No.
214
214
214
214
214
Remark
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
MRR
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
215
215
215
215
215
215
215
215
215
215
215
215
215
215
215
215
215
215
215
Remark
Remark
Shortage Qty
51.3
159.6
5
1
1
1
3
1
1
51.3
159.6
4
1
1
1
Remark
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
24
24
24
24
24
24
24
23
23
22
22
22
22
21
21
*
*
AL-Haydaria Project
Report No.
Date
Package No
N0 ACTIO
ng Report( MRR )
Package No.
TION
Case Description
AL-Haydaria Project
Status of GE Boxes
Unit
U21
U22
U23
U24
Pipeing boxes
Missing(received)
Materials.
Total =
Arrived
Qty.
186
179
183
183
9
%
100%
100%
100%
100%
100%
1
741
100%
100%
s
Damaged
Qty.
%
5
3%
3
2%
4
2%
4
2%
Total
186
179
183
183
9
1
16
= 741 box
2%
741
AL-Haydaria Project
Delivery
date
May-13
May-13
May-13
May-13
May-13
Apr2013
Jun 2013
Date of use
Jun. 2013
Jun. 2013
Jun. 2013
Jun. 2013
Jun.2013
May. 2013
Jul.2013
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Perishable Materials(Arrived)
Item Name and Number
Deliverde
on
Delivery
date
Date of use
AL-Haydaria Project
No.
NCR No.
Date
HPP-M-NCR-001
9/18/2012
HPP-M-NCR-002
P r o b11/20/2012
lem Fixed & waiti
Report (Interna
11/29/2012
Proble
m Fixed & waitin
Report (Internal
HPP-M-NCR-003
3
P r o b l e11/29/2012
m Fixed & waitin
Report (Internal
HPP-M-NCR-004
HPP-M-NCR-005
12/12/2012
In Proce
Part Name
Location
223D5968
N/A
F i x e dDiffuser
& w a i t i n121E1572
g for
eport (Internal NCR)
121E1572
F i x e d Diffuser
& waiting
for
port (Internal NCR)
Fixed &
w a i t i n g121E1572
for
Diffuser
port (Internal NCR)
In Process
Diffuser
121E1572
F
i n& GT24
al
GT21
F i nGT23
al
F i nGT23
al
GT22
Stiffener Cutting
Bracking Bar
Nonconforming Condition
Deformation on shaft sleeve (Carbon steel shells) of the
stacks approximately 60% from the total of pieces. The
defomation betureen( 5-17)m m for the mo6t of the
pieces.As shown in photps
Int
ern
al
NC
R's
AL-Haydaria Project
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
daria Project
GT21
100%
23 Boxes of 23
100%
3 Boxes of 3
100%
2 Containers of 2
88%
15 Boxes of 17
GT Acoustical Enclosure
100%
4 of 4
100%
2 of 2
100%
4 of 4
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
3 of 3
100%
4 of 4
100%
7 of 7
100%
2 of 2
100%
GT Acoustical Enclosure Electrical Equipment
2 of 2
100%
Gas Fuel Skid Acoustical Enclosure Electrical Equipment
1 of 1
Exhaust Elbow Expansion Joint
GT Acoustical Enclosure
GT Unit Cooling System ( AIR FIN FAN COOLERS )
Turbine Control Compartment MCC Container
Turbine Control Compartment CTL Container
Isolated Phase Bus Duct ( MV Bus Duct )
Unit Circuit Breaker
Lightning protection
Exhaust Side
Load Coupling Acoustical Enclosure
Load Compartment Acoustical Protection
on base Piping
HVAC Machine of control Room
100%
21 of 21
100%
7 of 7
100%
1 of 1
100%
1 of 1
100%
10 of 10
100%
3 of 3
100%
1 of 1
90%
14of 16
100%
1 of 1
100%
4 of 4
100%
6 of 6
50%
2 of 4
( Update at 31-01-2013 )
GT22
GT23
GT24
78%
18 Boxes of 23
100%
2 Boxes of 2
78%
18 Boxes of 23
100%
2 Boxes of 2
60%
14 Boxes of 23
100%
3 Boxes of 3
100%
100%
2 Containers of 2 2 Containers of 2
100%
2 Containers of 2
88%
15 Boxes of 17
88%
15 Boxes of 17
88%
15 Boxes of 17
5 Boxes of 21
2 boxes of 21
100%
4 of 4
100%
2 of 2
100%
4 of 4
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
3 of 3
100%
4 of 4
100%
4 Boxes of 4
100%
2 of 2
100%
4 of 4
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
3 of 3
100%
4 of 4
50%
2 Boxes of 4
100%
2 of 2
100%
4 of 4
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
1 of 1
100%
3 of 3
100%
4 of 4
85%
6 of 7 ( one Item
borrowed to
Karbala plant)
100%
7 of 7
100%
2 of 2
100%
2 of 2
100%
1 of 1
100%
2 of 2
100%
2 of 2
100%
1 of 1
100%
21 of 21
100%
2 of 2
100%
2 of 2
100%
1 of 1
100%
21 of 21
100%
7 of 7
100%
1 of 1
100%
1 of 1
100%
10 of 10
100%
2 of 2
100%
1 of 1
90%
14 of 16
100%
1 of 1
100%
4 of 4
100%
6 of 6
50%
2 of 4
100%
7 of 7
100%
1 of 1
100%
1 of 1
100%
10 of 10
100%
2 of 2
100%
1 of 1
90%
14 of 16
100%
1 of 1
100%
4 of 4
100%
6 of 6
50%
2 of 4
100%
21 of 21
100%
7 of 7
100%
1 of 1
100%
1 of 1
100%
10 of 10
100%
2 of 2
100%
1 of 1
90%
14 of 16
100%
1 of 1
100%
4 of 4
100%
6 of 6
50%
2 of 4