Examples:
1. One welding joint of 8 inch diameter pipe = 8 Dia Inch
2. Two welding joints of 12 inch diameter pipe = 24 Dia Inch
Ratio
Field Welded
Dia-Inch
Area
Service
UGC340
OWS
2272
848
37.3
650
550
1622
298
N200
UA
5313.5
2420
45.5
822.75
734
4490.75
1686
N100
LS
11220
4276.25
38.1
5543.25
4266.25
5676.75
10
N200
EL1
2668
1509
56.6
586
561
2082
948
N200
HS
20463.5
7717
37.7
7615
6811
12848.5
906
N100
FG
2943
1113
37.8
1029
981
1914
132
N100
1239
444
35.8
396
348
843
96
S330
LC
551.25
551.25
TOTAL DIA-INCH
THIS WEEKLY
THIS MONTH
JOINTS
DIA-INCH
JOINTS
DIA-INCH
TOTAL JOINTS
DONE
TOTAL WELDED
DIA-ICH
BALANCE DIAINCH
PROGRESS (%)
SHOP
23,057.50
4.00
1,410
17,931.00
5,126.50
77.77%
FIELD
108,889.00
109
1,348
452
4,875.00
3,848
56,049.50
52,839.50
51.47%
131,946.50
109
1,348.00
454
4,879.00
5,258
73,980.50
57,966.00
56.07%
SHOP
115,136.00
109
1,215
617
6,651.00
7,915
78,622.00
36,514.00
68.29%
FIELD
299,991.00
270
2,519
1,214
10,382.00
6,934
58,224.00
241,767.00
19.41%
Sub-TOTAL
415,127.00
379
3,734.00
1,831
17,033.00
14,849
136,846.00
278,281.00
32.96%
SHOP
51,641.00
67
375
353
1,255.00
5,039
35,098.50
16,542.50
67.97%
FIELD
136,284.00
218
1,012
776
4,220.00
6,213
41,900.00
94,384.00
30.74%
Sub-TOTAL
187,925.00
285
1,387.00
1,129
5,475.00
11,252
76,998.50
110,926.50
40.97%
SHOP
60,881.00
14
154
253
1,310.75
2,305
16,358.00
44,523.00
26.87%
FIELD
103,656.00
15
57
90
770.00
466
4,046.00
99,610.00
3.90%
Sub-TOTAL
164,537.00
29
210.75
343
2,080.75
2,771
20,404.00
144,133.00
12.40%
A/G TOTAL
767,589.00
693
5,331.75
3,303.00
24,588.75
28,872.00
234,248.50
533,340.50
30.52%
GRAND TOTAL
899,535.50
802
6,679.75
3,757
29,467.75
34,130
308,229.00
591,306.50
34.27%
UG PIPING WORK
(RAYMOND)
U/G TOTAL
SMP-4 PIPING WORK
(DAEAH)
WCS status
Total Piping Construction status
Interface Test Package (ITP) status