BLE Catalogue 2013
BLE Catalogue 2013
BLE Catalogue 2013
Scenarios
Protected Means
of Escape
When considering the placement
and provision of a protected
means of escape protection from
fire and smoke are the paramount
consideration.
Traditionally a protected means of
escape would be along a brick or
concrete corridor. However, it may
be that the building design does not
lend itself to permanent, structural
barriers. Using BLE Fire Curtains it is
possible to provide a protected means of escape that, when not in use, is retracted into the ceiling
allowing for an unimpeded open area. The length of this escape route is potentially infinite utilising
BLEs overlapping roller technology. The reduced irradiance of heat, combined with the reduction in
temperature and the prevention of smoke egress that a BLE Curtain provides, allows the construction of
an insulating zone in accordance with current smoke & fire legislation and standards.
Elevator
Doors
Elevator shafts are a permanent
compartment breach with the
potential to spread flames and
smoke vertically through a building
very rapidly. While most, if not all
elevator doors provide a degree of
fire integrity this is not the same for
smoke sealing. BLE Smoke & Fire are
able to offer a recognised Smoke
Seal curtain that can be discreetly
installed into the surround facing
the elevator door , rendering the curtain invisible when retracted. Once deployed it permits a greatly
reduced level of smoke leakage falling inside the international leakage requirements.
Scenarios
Elevator
Lobbies
While BLE Smoke & Fire can offer
a smoke sealed curtain for the
immediate face of any elevator
door this may not suit the building
fire strategy. It may be required to
create a protected lobby in front of
a bank of elevator doors. Where this
would previously have required the
construction of a physical fire and
smoke rated partition, a three sided
lobby can now be produced using
curtains. Again, when not in use there is no physical impediment or restriction but once required a full
integrity and, if required, smoke sealed lobby can be created.
Escalators
& Stairs
Both these items create a permanent
breach in the compartment
between floors. Using BLE Curtains
this can be tackled in several
ways depending on the strategy
requirements. There is the option
of using smoke curtains around
the lower level to create a deeper
reservoir depth or fully fledged fire
curtains to seal off the escalator or
stair well completely. In conjunction
with intelligent control systems allowing control to be linked to the escalator operation to facilitate
escape as well as escape buttons this provides a tested and well used solution.
Fire Door
Replacement
Fire doors are a necessary but
cumbersome item. They are
required in a great deal of situations
however they are by nature heavy
and restrictive to movement, difficult
for small children and the elderly
or disabled to open and awkward
if carrying bags, pushing prams or
operating wheelchairs. It is therefore
commonplace to see these vital
parts of a buildings fire strategy
wedged open, breaching all compartmentation requirements. A BLE fire curtain can be specified as
an alternative offering the same levels of integrity and, if required, additional smoke sealing. The curtain
can be recessed within the ceiling and walls, or face fixed depending on customer requirements. It will
then remain there hidden, always ready to deploy in a fire situation due to its gravity fail-to-safe method
of operation, even when all forms of consumable power are unavailable.
External
Fire Escape
Protection
Scenarios
Atrium
Chimney
There are numerous office blocks
and department stores that have
impressive open atria designs
spanning over many floors. To
prevent the spread of smoke and
fire from one floor to another and
to facilitate the rapid extraction of
smoke many of these use a roof level
access system complemented by
an inlet make up air facilty and the
deployment of BLE Curtains around
the perimeter edge. Sophisticated control systems allow for the curtains to facilitate these strategies by
employing staged and separate deployments, level by level or even curtain by curtain, with multiple
alarm inputs being reacted to.
Fire
Compartmentation
Forming fire compartments requires
a curtain to have good levels of
Integrity the I Classification and
low levels of Irradiance of Heat the
W Classification. Curtains installed to
form a compartment must be able
to provide a physical barrier to the
fire and prevent heat flux transfer of
levels sufficient to ignite materials
either side of the compartment. BLE
Curtains provide the highest levels
of protection certified for use around the world.
Smoke
Compartmentation
Smoke compartments are formed
to prevent smoke spreading
throughout a building. They must
be impermeable to smoke leakage,
within set criteria, but also offer
a level of resistance to heat. In
particular protection must be
provided to the rapid build up in
heat caused by hot smoke hitting
the barrier, a scenario in which
some types of glass will shatter. BLE
curtains provide excellent levels of smoke containment as well as high heat resistance.
Smoke
Channelling
It is often desirable to direct smoke
into certain zones for extraction. This
is formed using small, rapid drop
and often zone controlled banks
of curtains. The major requirement
for this type of curtain is fast
deployment, minimum deflection
and a high degree of tolerance to
hot smoke.
Smoke channels should be installed
with consideration given to their
intended use in conjunction with large extract systems.
Draft Curtain
Alternatively known as:
Fixed/Static Barriers
Fixed/Static Curtains
Features
Static Draft Curtain incorporating X32K fabric.
Time/temperature classification D120 to
provide smoke control in industrial and
commercial locations
120 minute integrity (E) to 600C for smoke
channel use.
Meets the requirements of Annex C of BS
EN 12101-1:2006 for smoke sealing.
Unlimited width and drop
Manufactured to suit any shape/size.
Pocket hem for conduit to increase rigidity.
Bespoke fixing methods available to suit
most requirements.
Compliant with
BS EN 12101-1:2006
Appendix C
Appendix D
BS 476
Part 4
Non-Combustibility Test For Materials
Part 6 Fire Propagation
Part 7 Surface Spread Of Flame
NFPA 409
6.1.1(i)
Smoke Curtain
Features
Standard Smoke Curtain incorporating X32K
fabric
120 minute integrity (E) to 600C for smoke
channel use
Excellent compartmentation properties
Use of S Designation provides class
leading smoke sealing
Multiple control options.
Overlapped curtains for large widths
Oversized drops available
Facetted curtains for curves possible.
Compliant with
BS EN 12101 1
Appendix B
Reliability & Response
Appendix C Pressurised Air Leakage
Appendix D
2 Hour Fire Integrity
BS 476 Part 6 Fire Propagation
Part 7 Surface Spread of Flame
BS EN 1634 3
Pressurised Air Leakage System Test
BS 7346
2 Hour Fire Resistance & Integrity Test
Deflection Test
Oversize Test
Overlapping Barrels
UL 10 D
Fire & Smoke Protective Curtains 120 minutes
UL 10 D
S Designation
Above with Smoke Sealing
UL 10 C
UL 10 B
Control System
Group Control Panel
Split Drop Delay
Delayed Descent
Motor Control Cards
Options
Audio Visual,, Heat and / or Smoke Detectors, Building Management System, Emergency Retract
Buttons, Manual Override Switch, Curtain Decals, S Designation for Smoke Seals, OS Designation
for 5.5m 8m on a single barrel
10
Compliant with
BS EN 12101 1
Appendix B
Reliability & Response
Appendix C Pressurised Air Leakage
Appendix D
2 Hour Fire Integrity
BS 476
Part 22
60 minutes integrity.
Long drop
BS 476 Part 6 Fire Propagation
BS 476
Part 7
Surface Spread of Flame & Unlimited Width
BS 7346
2 Hour Fire Resistance & Integrity Test
Deflection Test
Oversize Test
Overlapping Barrels
BS EN1634 1
Fire Integrity & Irradiance of Heat
BS EN1634 3
Pressurised Air Leakage System Test
AS 1530.4 Fire Integrity Test
Control System
Group Control Panel
Split Drop Delay
Delayed Descent
Motor Control Cards
Options
Audio Visual, Heat Detectors, Smoke Detectors, Building Management System, Emergency Retract
Buttons, Manual Override Switch, Curtain Decals, S Designation for Smoke Seals, OS Designation for
5.5m 8m on a single barrel
11
Compliant with
BS 476
Part 22
240 minutes integrity.
Long drop
Unlimited Width
BS 476 Part 6 Fire Propagation
BS 476
Part 7
Surface Spread of Flame
BS EN1634 1
Fire Integrity & Irradiance of Heat
BS EN1634 3
Pressurised Air Leakage System Test
PAS 121 All Sections ex Irradiance
AS 1530.4 Fire Integrity Test
UL 10 D
Fire & Smoke Protective Curtains 120 minutes
UL 10 D
S Designation
Above with Smoke Sealing
UL 10 C
UL 10 B
GB14102 -2005
Integrity Test of Fire Curtain Assembly
GB14102 2005
Appendix B
Requirements & Test Methods of Fire Curtain
Controller
GB602 2006
Test Method for Fire Curtain Motor
GB8624 1997
Test Method for Spread of Flame (Fabric Curtain)
Control System
Group Control Panel
Split Drop Delay
Delayed Descent
Motor Control Cards
Options
Audio Visual, Heat Detectors and / or Smoke Detectors, Building Management System, Emergency
Retract Buttons, Manual Override Switch, Curtain Decals, S Designation for Smoke Seals, OS
Designation for 5.5m 8m on a single barrel
12
Components
Headboxes
BLE Smoke & Fire offer a range of boxing to house the rollers that are intended to keep the profile as
low as possible while minimising the effects of deflection and providing a secure and tested part of the
fire line. Boxing for fire curtains can be as small as 180mm x 180mm up to 210mm x 390mm for extremely
long runs of overlapping barrels. Smoke curtain boxing can be reduced still further to 150mm x 150mm
for the smaller sizes and, on the longer runs, have the option of having the rollers over and under or in
a side by side configuration.
15
Headboxes
Headboxes can be installed to suit a number of required finishes. They can be installed above the
ceiling and hidden from view; in line with the ceiling or installed into a slight recess. Whilst it is always
desirable to minimise the visual impact of these items it must be considered that they are life safety
systems and are required to be easily operable and easy to maintain.
16
Components
Side Guides
All fire curtains require the use of a retaining mechanism at the edges to prevent excessive deflection
under the pressures from a fire and to minimise smoke leakage. BLE Smoke & Fire utilise a low profile guide
that is tested with the rest of the system to form an integral part of the fire line. The fabric incorporates a
durable tabbed mechanism that locks the curtain into the guide to enhance this deflection resistance
and improve the resistance to impact. Further enhancements such as brush strips to the guide and
interior of the headbox can further seal the installation from leakage providing the S Designation.
Smoke curtains do not always require guides however in certain situations they are utilised to better seal
the compartment or to further minimise deflection. With the same modifications we can again offer
the S Designation.
17
18
Components
20
Components
Group Control Panel
Overview
Operation of the BLE Smoke & Fire automatic curtains is carried out via a variant of the Group Control
Panel. Each GCP is capable of controlling up to 6 no. BLE 24v motor assemblies (3 no. when using OS
Curtains).
In normal operating conditions the GCP will provide a 24v AC supply to the curtain motors, and the
curtains will be in the retracted condition. Should the curtain be activated, the fire alarm contact in the
GCP will be opened by the fire alarm control system, the GCP will remove the 24v supply to the curtain
motors and the curtains will descend under the power of gravity in a controlled manner.
As soon as the fire alarm system is reset the GCP will reinstate the 24v supply to the curtain motors and
the curtains will retract, current limiting circuits will detect the curtain has fully retracted and the supply
voltage to the motor will step down to a holding voltage.
Each GCP will be supplied with a 24v 7aph battery, this will enable full control of the system should the
mains power fail. The battery voltage will be monitored, upon the voltage reaching 85% of the nominal
charge it shall be disconnected and the curtains will deploy under gravity at a controlled speed.
Standard Features:
21
Schematic
UNSWITCHED
FUSED SPUR
BY OTHERS
2 CORE
AND EARTH
FLYING LEAD
FROM MOTOR
MOTOR
NOTE:
MOTOR
UNSWITCHED
FUSED SPUR
BY OTHERS
2 CORE
AND EARTH
FLYING LEAD
FROM MOTOR
FLYING LEAD
FROM MOTOR
MOTOR
MOTOR
22
Schematic
23
Test House
BS EN 1364 - 1
BS EN 1364 2
BS EN 1363 1
BS EN 1363 2
BE EN 1634 1
BS EN 1634 3
BRE
BS EN 8524 1 (Draft)
BS EN 8524 2 (Draft)
Warrington
Warrington
AS1530.4
Branz Australasia
EN 55024
EMC
EN 12101 Part C
EN 12101 Part D
EN1634 3
Warrington Fire
Warrington Fire
Warrington Fire
UL 10 D
UL USA
UL 10 D S
UL USA
BS 476: Part 22
Warrington Fire
UL 10 C
UL 10 B
GB14102-2005
GB14102-2005 Appendix B
China
China
GB602 2006
GB8624 1997
China
China
Test Parameter
28
29
Test Name
BS 476: Part 6
Test
Name
BS 476:
Part 7
BS
Part
6B
EN 476:
12101
Part
BS 476: Part 7
EN 12101 Part B
EN 12101 Part C
EN 12101 Part D
EN
12101
Part C
EN1634
3
EN 12101 Part D
EN1634
BS 7346 3
Test House
Warrington Fire
Test
House Fire
Warrington
Warrington
Fire
BRE
Warrington Fire
BRE
Warrington Fire
Warrington Fire
Warrington
Warrington Fire
Fire
Warrington Fire
Warrington
Warrington Fire
Fire
BS 7346
Warrington Fire
UL 10 D
UL USA
UL
UL 10
10 D
DS
UL
UL USA
USA
UL
UL 10
10 D
CS
UL 10 B
UL 10 C
UL 10 B
UL USA
Test Parameters
Fire Propagation of Building Products
Test
Parameters
Surface
Spread of Flame
Fire Propagation
of Building
Products
Reliability&
Response
Time Test
Surface
Spread
of
Flame
10m wide x 3m drop specimen
Reliability&
Response
Time Test
3m wide x 10m
drop specimen
10m
wide x 3m
drop specimen
Pressurised
Air Leakage
Test
3m
wide
x
10m
drop
specimen
2hr FR & Integrity Test
Pressurised Air
Air Leakage
Leakage Test
Test in accordance with
Pressurised
2hr FR & Integrity
Test <25m3
EN12101
not to exceed
Pressurised
Air
Leakage
2hr FR & Integrity Test Test in accordance with
EN12101 not
to exceed <25m3
Deflection
Test
2hr FR & Test
Integrity Test
Oversize
Deflection Test
Overlapping
Barrels
Oversize Test
Overlapping
Fire & SmokeBarrels
Protective Curtains 120minutes FR &
Integrity
Fire
Fire &
& Smoke
Smoke Protective
Protective Curtains
Curtains 120minutes
120minutes FR
FR &
&
Integrity
Integrity with Smoke Sealing
Fire & Smoke Protective Curtains 120minutes FR &