QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION AND

COMPLETION OF PROPOSED JALAN PENKALAN REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG,


SARAWAK.
Item
1

Description

Quantities

Unit

Rate (RM)

Amount (RM)

Preliminaries

1.1

Allow for compliance with the terms of the


Preliminaries, General Conditions of Contract,
Specification and Preambles to the Bills of Quantities.

Lump Sum

10,000.00

1.2

Survey and setting out of all the field testing location by


an approved licensed surveyor

Lump Sum

15,000.00

TOTAL OF BILL NO.1 TO SUMMARY OF BILL OF QUANTITIES

252221971.xls.ms_office - Rev1

BQ - 1

25,000.00

QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION AND
COMPLETION OF PROPOSED JALAN PENKALAN REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG,
SARAWAK.
Item
2

Description
FIELD INVESTIGATION

2.1

Mobilisation / Demobilisation

2.1.1

2.2

Quantities

Mobilisation of men, materials and all equipment to site


for the timely execution and completion of the works
within the stated time schedule including site
transportation facilities and demobilisation upon
completion of said works, including set up on first
drilling position

Moving, drilling rig plant, equipment, personnel, etc.


from one borehole position to next borehole position as
shown in the drawings (either on land or on water).

2.2.2

Boring cased or uncased, through soil using wash-boring


or other approved technique :-

2.3

Rate (RM)

Lump Sum

Amount (RM)

12,000.00

Boring

2.2.1

2.2.3

Unit

NOS

1,500.00

10,500.00

a) From existing ground level to a depth not exceeding 10


m

80

25.00

2,000.00

b) From a depth exceeding 10 m to a depth not exceeding


20 m

80

25.00

2,000.00

c) To depth exceeding 20 m to a depth not exceeding 30m

80

30.00

2,400.00

d) To depth exceeding 30m

150

35.00

5,250.00

40

140.00

5,600.00

Extra over Item 2.2.2 (a) to (c) inclusive of diamond


core of minimum dia. (50mm)

Augering, Trial Pit, Mackinstosh Probing.

2.3.1

Carry out hand auger boring including soil


identification, provision of disturbed samples and
submission of fieldlogs, depth from natural ground level
or bottom of trial pit generally not exceeding 7.5 m.

10

NOS

120.00

1,200.00

2.3.2

Carrying out mackintosh probing as per specification


depth from natural ground or water level generally not
exceeding 15 m including submission of field records.

34

NOS

75.00

2,550.00

2.3.3

Excavate trial pits (2m x 2m x2m deep) and obtain bulk


samples.

NOS

250.00

1,500.00

TOTAL OF BILL NO.2 TO SUMMARY OF BILL OF QUANTITIES

252221971.xls.ms_office - Rev1

BQ - 2

45,000.00

QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION AND
COMPLETION OF PROPOSED JALAN PENKALAN REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG,
SARAWAK.
Item
3

Description
Sampling and Field Testing

Quantities

Unit

Rate (RM)

3.1

Carry out Standard Penetration Test, including the


provision of disturbed samples in the borehole at 1.5 m
interval :a) At a depth between existing ground level and a depth not
exceeding 10 m at 1.5 m interval.

48

NOS

20.00

960.00

b) At a depth between 10 m and a depth not exceeding 20


m at 1.5 m interval.

56

NOS

20.00

1,120.00

c) To depth exceeding 20m and to a depth not exceeding


30m at 1.5m interval.

56

NOS

25.00

1,400.00

d) To depth exceeding 30m

112

NOS

30.00

3,360.00

a) At a depth between existing ground level and a depth not


exceeding 10 m.

24

NOS

18.00

432.00

b) At a depth between 10 m and a depth not exceeding 20


m.

24

NOS

20.00

480.00

3.3

Collect 1 litre of representative ground water sample in


water-tightclean container from a borehole.

NOS

20.00

160.00

3.4

Carry out insitu Vane Shear Test without borehole on


soft ground to depth not exceeding 15m (Push in Type)

16

NOS

180.00

3.2

Amount (RM)

Obtain undisturbed samples with Tube Samples or as


required thick wall drive sample :-

TOTAL OF BILL NO.3 TO SUMMARY OF BILL OF QUANTITIES

252221971.xls.ms_office - Rev1

BQ - 3

2,880.00

10,792.00

QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION AND
COMPLETION OF PROPOSED JALAN PENKALAN REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG,
SARAWAK.
Item
4

Laboratory Testing

Quantities

Unit

Rate (RM)

4.1

Classification Tests

4.1.1

Visual examination

240

Nos

10.00

2,400.00

4.1.2

Moisture content

150

Nos

8.00

1,200.00

4.1.3

Liquid limit

60

Nos

20.00

1,200.00

4.1.4

Plastic limit

60

Nos

15.00

900.00

4.1.5

Specific gravity

30

Nos

18.00

540.00

4.1.6

Particle size distribution for fine-grained soils (sieve


analysis)

30

Nos

25.00

750.00

4.1.7

Particle size
(hydrometer)

soils

30

Nos

40.00

1,200.00

4.2.1

Unconsolidated undrained triaxial compression without


pore-water measurement involving at least 3 speciments
to obtain cohesive value and friction angle.

24

Nos

130.00

3,120.00

4.2.2

Consolidated undrained triaxial compression test with


pore water pressure measurement in accordance with the
method recommended by Bishop and Henkel. At least 3
speciments are required to obtain the cohesion value and
friction angles.

Rate

4.2.3

One-dimensional consolidation

24

Nos

180.00

4,320.00

4.2.4

Compaction tests

Nos

300.00

1,200.00

4.2.5

CBR Test

Nos

350.00

1,400.00

4.2.6

To carry out Point Load Test for rock sample at 1m c/c

50

Nos

100.00

5,000.00

4.2

Description

distribution

for

fine-grained

Amount (RM)

Soil Strength Tests

SUB-TOTAL (C/F)

252221971.xls.ms_office - Rev1

BQ - 4

4,000.00
800.00

27,230.00

QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION AND
COMPLETION OF PROPOSED JALAN PENKALAN REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG,
SARAWAK.
Item
4.3

Description

Quantities

Unit

Rate (RM)

Amount (RM)

Chemical Test
(Sample shall be below water table and for bore-hores
only).

4.3.1

Total sulphate content

16

Nos

45.00

720.00

4.3.2

PH value

16

Nos

45.00

720.00

Copies

300.00

1,800.00

4.4
4.4.1

Final Reports
Provide final reports enclosing all field & laboratory
results and recommendation for foundation design.

TOTAL OF BILL NO.4 TO SUMMARY OF BILL OF QUANTITIES

252221971.xls.ms_office - Rev1

BQ - 5

30,470.00

QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION AND
COMPLETION OF PROPOSED JALAN PENKALAN REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG,
SARAWAK.
Item
5.0

Description
Water Level Monitoring

5.1

Install standpipe in boreholes and carry out water level


monitoring daily basis for a period of one (1) month.

Quantities

Unit

Rate (RM)

Rate

500.00

TOTAL OF BILL NO.5 TO SUMMARY OF BILL OF QUANTITIES

252221971.xls.ms_office - Rev1

BQ - 6

Amount (RM)

4,000.00

4,000.00

REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE

Item
1

Description

Quantities

Unit

Rate (RM)

Amount (RM)

Preliminaries

1.1

Allow for compliance with the terms of the


Preliminaries, General Conditions of Contract,
Specification and Preambles to the Bills of Quantities.

Lump Sum

1.2

Survey and setting out of all the field testing location by


an approved licensed surveyor

Lump Sum

TOTAL OF BILL NO.1 TO SUMMARY OF BILL OF QUANTITIES

PLS-120079(SI)

BQ -7

REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE

Item
2
2.1

Description

Quantities

Unit

FIELD INVESTIGATION
Mobilisation / Demobilisation

2.1.1

Mobilisation of men, materials and all equipment to site


for the timely execution and completion of the works
within the stated time schedule including site
transportation facilities and demobilisation upon
completion of said works.

Lump Sum

2.1.2

Eract staging over shallow water to support drilling Rig


at all borehole location

Lump Sum

2.2

Boring

2.2.1

Moving, drilling rig plant, equipment, personnel, etc.


from one borehole position to next borehole position as
shown in the drawings (either on land or on water).

2.2.2

Boring cased or uncased, through soil using wash-boring


or other approved technique :-

2.3

NOS

a) From existing ground level to a depth not exceeding 10


m

60

b) From a depth exceeding 10 m to a depth not exceeding


20 m

60

c) To depth exceeding 20 m to a depth not exceeding 30 m

Rate Only

d) To depth exceeding 30 m

Rate Only

Mackinstosh Probing.

2.3.2

Carrying out mackintosh probing at Astana Substation


Site and at 100m interval along the cable line route as
per specification depth from natural ground or water
level generally not exceeding 15 m including submission
of field records.

2.3.3

Excavate trial pits (2m x 2m x 2m) and obtain bulk


samples

113

NOS

Rate only

TOTAL OF BILL NO.2 TO SUMMARY OF BILL OF QUANTITIES

PLS-120079(SI)

BQ -8

Rate (RM)

Amount (RM)

REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE

Item

PLS-120079(SI)

Description

Quantities

BQ -9

Unit

Rate (RM)

Amount (RM)

REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE

Item

3
3.1

3.2

Description

Quantities

Unit

a) At a depth between existing ground level and a depth not


exceeding 10 m at 1.5 m interval.

36

NOS

b) At a depth between 10 m and a depth not exceeding 20


m at 1.5 m interval.

30

NOS

Rate (RM)

Amount (RM)

Sampling and Field Testing


Carry out Standard Penetration Test, including the
provision of disturbed samples in the borehole at 1.5 m
interval :-

c) To depth exceeding 20m and to a depth not exceeding


30m at 1.5m interval

Rate Only

d) To depth exceeding 30m

Rate Only

Obtain undisturbed samples with Tube Samples or as


required thick wall drive sample :a) At a depth between existing ground level and a depth not
exceeding 10 m.

12

NOS

b) At a depth between 10 m and a depth not exceeding 20


m.

12

NOS

3.3

Collect 1 litre of representative ground water sample in


water-tightclean container from a borehole.

Rate Only

3.4

Carry out insitu Vane Shear Test without borehole on


soft ground to depth not exceeding 15m (Push in Type)

NOS

TOTAL OF BILL NO.3 TO SUMMARY OF BILL OF QUANTITIES

PLS-120079(SI)

BQ -10

REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE

Item

Description

Quantities

Unit

Laboratory Testing

4.1

Classification Tests

4.1.1

Visual examination

60

NOS

4.1.2

Moisture content

36

NOS

4.1.3

Liquid limit

18

NOS

4.1.4

Plastic limit

18

NOS

4.1.5

Specific gravity

18

NOS

4.1.6

Particle size distribution for fine-grained soils (sieve


analysis)

18

NOS

4.1.7

Particle size
(hydrometer)

soils

18

NOS

4.2.1

Unconsolidated undrained triaxial compression without


pore-water measurement involving at least 3 speciments
to obtain cohesive value and friction angle.

18

NOS

4.2.2

Consolidated undrained triaxial compression test with


pore water pressure measurement in accordance with the
method recommended by Bishop and Henkel. At least 3
speciments are required to obtain the cohesion value and
friction angles.

4.2

distribution

for

fine-grained

Soil Strength Tests

NOS
-

4.2.3

One-dimensional consolidation

18

4.2.4

Compaction tests

4.2.5

CBR Test (Soaked)

NOS

4.2.6

To carry out Point Load Test for rock sample at 1m c/c

NOS

Rate Only

SUB-TOTAL (C/F)

PLS-120079(SI)

NOS

BQ -11

Rate (RM)

Amount (RM)

REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE

Item

4.3

Description

Quantities

Unit

Rate (RM)

Amount (RM)

Chemical Test
(Sample shall be below water table and for bore-hores
only).

4.3.1

Total sulphate content

Nos

4.3.2

PH value

Nos

Copies

4.4
4.4.1

Final Reports
Provide final reports enclosing all field & laboratory
results and recommendation for foundation design.

TOTAL OF BILL NO.4 TO SUMMARY OF BILL OF QUANTITIES

PLS-120079(SI)

BQ -12

REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE

Item

Description

Quantities

5.0

Water Level Monitoring

5.1

Install standpipe in boreholes and carry out water level


monitoring daily basis for a period of one (1) month.

Unit

BQ -13

Amount (RM)

Rate Only

TOTAL OF BILL NO.5 TO SUMMARY OF BILL OF QUANTITIES

PLS-120079(SI)

Rate (RM)

QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR


THE CONSTRUCTION AND COMPLETION OF PROPOSED JALAN PENKALAN
REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG, SARAWAK.

SUMMARY OF BILL OF QUANTITIES


Bill NO. DESCRIPTION

PAGE

CERTIFIED
AMOUNT
(RM)

Preliminaries

BQ/1

25,000.00

Field Investigation

BQ/2

45,000.00

Sampling and Field Testing

BQ/3

10,792.00

Laboratory Testing

BQ4-5

30,470.00

Water Level Monitoring

TOTAL AMOUNT

BQ6

4,000.00

115,262.00

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item
1

Description

Quantities

Unit

Rate
(RM)

Amount
(RM)

Preliminaries

1.1

Allow for compliance with the terms of the


Preliminaries, General Conditions of Contract,
Specification and Preambles to the Bills of Quantities.

Lump
Sum

4,750.00

1.2

Survey and setting out of all the field testing location by


an approved licensed surveyor

Lump
Sum

1,200.00

TOTAL OF BILL NO.1 TO SUMMARY OF BILL OF QUANTITIES

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item

Description

Quantities

Unit

Rate
(RM)

Amount
(RM)

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item
2
2.1
2.1.1

2.2

Description

Rate
(RM)

Amount
(RM)

Mobilisation / Demobilisation
Mobilisation of men, materials and all equipment to site
for the timely execution and completion of the works
within the stated time schedule including site
transportation facilities and demobilisation upon
completion of said works.

Lump
Sum

7,500.00

Boring
Moving, drilling rig plant, equipment, personnel, etc.
from one borehole position to next borehole position as
shown in the drawings (either on land or on water).

2.2.2

Boring cased or uncased, through soil using wash-boring


or other approved technique :-

2.3

Unit

FIELD INVESTIGATION

2.2.1

2.2.3

Quantities

NOS

#######

a) From existing ground level to a depth not exceeding 10


m

41.40

b) From a depth exceeding 10 m to a depth not exceeding


20 m

46.80

c) To depth exceeding 20 m

54.00

162.00

Extra over Item 2.2.2 (a) to (c) inclusive of diamond


core of minimum dia. (50mm)
Augering, Trial Pit, Mackinstosh Probing.

2.3.1

Carry out hand auger boring including soil identification,


provision of disturbed samples and submission of
fieldlogs, depth from natural ground level or bottom of
trial pit generally not exceeding 7.5 m.

Rate only

337.50

2.3.2

Carrying out mackintosh probing as per specification


depth from natural ground or water level generally not
exceeding 15 m including submission of field records.

NOS

75.00

2.3.3

Excavate trial pits (2m x 2m x2m deep) and obtain bulk


samples.

NOS

630.00

TOTAL OF BILL NO.2 TO SUMMARY OF BILL OF QUANTITIES

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item

Description

Quantities

Unit

Rate
(RM)

Amount
(RM)

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item

3
3.1

Description

Quantities

Unit

Rate
(RM)

Amount
(RM)

Sampling and Field Testing


Carry out Standard Penetration Test, including the
provision of disturbed samples in the borehole at 1.5 m
interval :a) At a depth between existing ground level and a depth not
exceeding 10 m at 1.5 m interval.

NOS

66.00

b) At a depth between 10 m and a depth not exceeding 20


m at 1.5 m interval.

NOS

70.00

c) To depth exceeding 20m

NOS

80.00

a) At a depth between existing ground level and a depth not


exceeding 10 m.

NOS

45.00

b) At a depth between 10 m and a depth not exceeding 20


m.

NOS

50.00

3.3

Collect 1 litre of representative ground water sample in


water-tightclean container from a borehole.

Rate

56.00

3.4

Carry out insitu Vane Shear Test without borehole on


soft ground to depth not exceeding 15m (Push in Type)

Rate

120.00

3.2

Obtain undisturbed samples with Tube Samples or as


required thick wall drive sample :-

TOTAL OF BILL NO.3 TO SUMMARY OF BILL OF QUANTITIES

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item

Description

Quantities

Unit

Rate
(RM)

Amount
(RM)

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item

Description

Quantities

Unit

Rate
(RM)

Amount
(RM)

Laboratory Testing

4.1

Classification Tests

4.1.1

Visual examination

Nos

10.00

4.1.2

Moisture content

Nos

5.00

4.1.3

Liquid limit

Nos

13.00

4.1.4

Plastic limit

Nos

12.00

4.1.5

Specific gravity

Nos

22.00

4.1.6

Particle size distribution for fine-grained soils (sieve


analysis)

Nos

43.00

4.1.7

Particle size
(hydrometer)

soils

Nos

60.00

4.2.1

Unconsolidated undrained triaxial compression without


pore-water measurement involving at least 3 speciments
to obtain cohesive value and friction angle.

Nos

130.00

4.2.2

Consolidated undrained triaxial compression test with


pore water pressure measurement in accordance with the
method recommended by Bishop and Henkel. At least 3
speciments are required to obtain the cohesion value and
friction angles.

Rate

800.00

4.2.3

One-dimensional consolidation

Nos

250.00

4.2.4

Compaction tests

Nos

63.00

4.2.5

CBR Test

Nos

410.00

4.2.6

To carry out Point Load Test for rock sample at 1m c/c

Nos

100.00

4.2

distribution

for

fine-grained

Soil Strength Tests

SUB-TOTAL (C/F)

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item

Description

Quantities

Unit

Rate
(RM)

Amount
(RM)

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item

4.3

Description

Quantities

Unit

Rate
(RM)

Amount
(RM)

Chemical Test
(Sample shall be below water table and for bore-hores
only).

4.3.1

Total sulphate content

Nos

65.00

4.3.2

PH value

Nos

22.00

Copies

300.00

4.4
4.4.1

Final Reports
Provide final reports enclosing all field & laboratory
results and recommendation for foundation design.

TOTAL OF BILL NO.4 TO SUMMARY OF BILL OF QUANTITIES

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item

Description

Quantities

Unit

Rate
(RM)

Amount
(RM)

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item

Description

5.0

Water Level Monitoring

5.1

Install standpipe in boreholes and carry out water level


monitoring daily basis for a period of one (1) month.

Quantities

TOTAL OF BILL NO.5 TO SUMMARY OF BILL OF QUANTITIES

Unit

Rate
(RM)

nos

500.00

Amount
(RM)

13,450.00

BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)

Item

Description

Quantities

Unit

Rate
(RM)

Amount
(RM)

You might also like