1 Preliminaries: 252221971.xls - Ms - Office - Rev1 BQ - 1
1 Preliminaries: 252221971.xls - Ms - Office - Rev1 BQ - 1
1 Preliminaries: 252221971.xls - Ms - Office - Rev1 BQ - 1
Description
Quantities
Unit
Rate (RM)
Amount (RM)
Preliminaries
1.1
Lump Sum
10,000.00
1.2
Lump Sum
15,000.00
252221971.xls.ms_office - Rev1
BQ - 1
25,000.00
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION AND
COMPLETION OF PROPOSED JALAN PENKALAN REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG,
SARAWAK.
Item
2
Description
FIELD INVESTIGATION
2.1
Mobilisation / Demobilisation
2.1.1
2.2
Quantities
2.2.2
2.3
Rate (RM)
Lump Sum
Amount (RM)
12,000.00
Boring
2.2.1
2.2.3
Unit
NOS
1,500.00
10,500.00
80
25.00
2,000.00
80
25.00
2,000.00
80
30.00
2,400.00
150
35.00
5,250.00
40
140.00
5,600.00
2.3.1
10
NOS
120.00
1,200.00
2.3.2
34
NOS
75.00
2,550.00
2.3.3
NOS
250.00
1,500.00
252221971.xls.ms_office - Rev1
BQ - 2
45,000.00
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION AND
COMPLETION OF PROPOSED JALAN PENKALAN REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG,
SARAWAK.
Item
3
Description
Sampling and Field Testing
Quantities
Unit
Rate (RM)
3.1
48
NOS
20.00
960.00
56
NOS
20.00
1,120.00
56
NOS
25.00
1,400.00
112
NOS
30.00
3,360.00
24
NOS
18.00
432.00
24
NOS
20.00
480.00
3.3
NOS
20.00
160.00
3.4
16
NOS
180.00
3.2
Amount (RM)
252221971.xls.ms_office - Rev1
BQ - 3
2,880.00
10,792.00
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION AND
COMPLETION OF PROPOSED JALAN PENKALAN REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG,
SARAWAK.
Item
4
Laboratory Testing
Quantities
Unit
Rate (RM)
4.1
Classification Tests
4.1.1
Visual examination
240
Nos
10.00
2,400.00
4.1.2
Moisture content
150
Nos
8.00
1,200.00
4.1.3
Liquid limit
60
Nos
20.00
1,200.00
4.1.4
Plastic limit
60
Nos
15.00
900.00
4.1.5
Specific gravity
30
Nos
18.00
540.00
4.1.6
30
Nos
25.00
750.00
4.1.7
Particle size
(hydrometer)
soils
30
Nos
40.00
1,200.00
4.2.1
24
Nos
130.00
3,120.00
4.2.2
Rate
4.2.3
One-dimensional consolidation
24
Nos
180.00
4,320.00
4.2.4
Compaction tests
Nos
300.00
1,200.00
4.2.5
CBR Test
Nos
350.00
1,400.00
4.2.6
50
Nos
100.00
5,000.00
4.2
Description
distribution
for
fine-grained
Amount (RM)
SUB-TOTAL (C/F)
252221971.xls.ms_office - Rev1
BQ - 4
4,000.00
800.00
27,230.00
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION AND
COMPLETION OF PROPOSED JALAN PENKALAN REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG,
SARAWAK.
Item
4.3
Description
Quantities
Unit
Rate (RM)
Amount (RM)
Chemical Test
(Sample shall be below water table and for bore-hores
only).
4.3.1
16
Nos
45.00
720.00
4.3.2
PH value
16
Nos
45.00
720.00
Copies
300.00
1,800.00
4.4
4.4.1
Final Reports
Provide final reports enclosing all field & laboratory
results and recommendation for foundation design.
252221971.xls.ms_office - Rev1
BQ - 5
30,470.00
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION AND
COMPLETION OF PROPOSED JALAN PENKALAN REJAB, BONG ABAI/TELAHAT, MERITAM, LIMBANG,
SARAWAK.
Item
5.0
Description
Water Level Monitoring
5.1
Quantities
Unit
Rate (RM)
Rate
500.00
252221971.xls.ms_office - Rev1
BQ - 6
Amount (RM)
4,000.00
4,000.00
REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE
Item
1
Description
Quantities
Unit
Rate (RM)
Amount (RM)
Preliminaries
1.1
Lump Sum
1.2
Lump Sum
PLS-120079(SI)
BQ -7
REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE
Item
2
2.1
Description
Quantities
Unit
FIELD INVESTIGATION
Mobilisation / Demobilisation
2.1.1
Lump Sum
2.1.2
Lump Sum
2.2
Boring
2.2.1
2.2.2
2.3
NOS
60
60
Rate Only
d) To depth exceeding 30 m
Rate Only
Mackinstosh Probing.
2.3.2
2.3.3
113
NOS
Rate only
PLS-120079(SI)
BQ -8
Rate (RM)
Amount (RM)
REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE
Item
PLS-120079(SI)
Description
Quantities
BQ -9
Unit
Rate (RM)
Amount (RM)
REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE
Item
3
3.1
3.2
Description
Quantities
Unit
36
NOS
30
NOS
Rate (RM)
Amount (RM)
Rate Only
Rate Only
12
NOS
12
NOS
3.3
Rate Only
3.4
NOS
PLS-120079(SI)
BQ -10
REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE
Item
Description
Quantities
Unit
Laboratory Testing
4.1
Classification Tests
4.1.1
Visual examination
60
NOS
4.1.2
Moisture content
36
NOS
4.1.3
Liquid limit
18
NOS
4.1.4
Plastic limit
18
NOS
4.1.5
Specific gravity
18
NOS
4.1.6
18
NOS
4.1.7
Particle size
(hydrometer)
soils
18
NOS
4.2.1
18
NOS
4.2.2
4.2
distribution
for
fine-grained
NOS
-
4.2.3
One-dimensional consolidation
18
4.2.4
Compaction tests
4.2.5
NOS
4.2.6
NOS
Rate Only
SUB-TOTAL (C/F)
PLS-120079(SI)
NOS
BQ -11
Rate (RM)
Amount (RM)
REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE
Item
4.3
Description
Quantities
Unit
Rate (RM)
Amount (RM)
Chemical Test
(Sample shall be below water table and for bore-hores
only).
4.3.1
Nos
4.3.2
PH value
Nos
Copies
4.4
4.4.1
Final Reports
Provide final reports enclosing all field & laboratory
results and recommendation for foundation design.
PLS-120079(SI)
BQ -12
REQUEST FOR QUOTATION FOR SOIL INVESTIGATION WORKS FOR ASTANA 132KV SUBSTATION
ESTABLISHMENT, SEJINGKAT 132KV SUBSTATION EXTENSION AND 132KV UNDERGROUND CABLE
Item
Description
Quantities
5.0
5.1
Unit
BQ -13
Amount (RM)
Rate Only
PLS-120079(SI)
Rate (RM)
PAGE
CERTIFIED
AMOUNT
(RM)
Preliminaries
BQ/1
25,000.00
Field Investigation
BQ/2
45,000.00
BQ/3
10,792.00
Laboratory Testing
BQ4-5
30,470.00
TOTAL AMOUNT
BQ6
4,000.00
115,262.00
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
1
Description
Quantities
Unit
Rate
(RM)
Amount
(RM)
Preliminaries
1.1
Lump
Sum
4,750.00
1.2
Lump
Sum
1,200.00
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
Description
Quantities
Unit
Rate
(RM)
Amount
(RM)
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
2
2.1
2.1.1
2.2
Description
Rate
(RM)
Amount
(RM)
Mobilisation / Demobilisation
Mobilisation of men, materials and all equipment to site
for the timely execution and completion of the works
within the stated time schedule including site
transportation facilities and demobilisation upon
completion of said works.
Lump
Sum
7,500.00
Boring
Moving, drilling rig plant, equipment, personnel, etc.
from one borehole position to next borehole position as
shown in the drawings (either on land or on water).
2.2.2
2.3
Unit
FIELD INVESTIGATION
2.2.1
2.2.3
Quantities
NOS
#######
41.40
46.80
c) To depth exceeding 20 m
54.00
162.00
2.3.1
Rate only
337.50
2.3.2
NOS
75.00
2.3.3
NOS
630.00
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
Description
Quantities
Unit
Rate
(RM)
Amount
(RM)
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
3
3.1
Description
Quantities
Unit
Rate
(RM)
Amount
(RM)
NOS
66.00
NOS
70.00
NOS
80.00
NOS
45.00
NOS
50.00
3.3
Rate
56.00
3.4
Rate
120.00
3.2
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
Description
Quantities
Unit
Rate
(RM)
Amount
(RM)
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
Description
Quantities
Unit
Rate
(RM)
Amount
(RM)
Laboratory Testing
4.1
Classification Tests
4.1.1
Visual examination
Nos
10.00
4.1.2
Moisture content
Nos
5.00
4.1.3
Liquid limit
Nos
13.00
4.1.4
Plastic limit
Nos
12.00
4.1.5
Specific gravity
Nos
22.00
4.1.6
Nos
43.00
4.1.7
Particle size
(hydrometer)
soils
Nos
60.00
4.2.1
Nos
130.00
4.2.2
Rate
800.00
4.2.3
One-dimensional consolidation
Nos
250.00
4.2.4
Compaction tests
Nos
63.00
4.2.5
CBR Test
Nos
410.00
4.2.6
Nos
100.00
4.2
distribution
for
fine-grained
SUB-TOTAL (C/F)
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
Description
Quantities
Unit
Rate
(RM)
Amount
(RM)
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
4.3
Description
Quantities
Unit
Rate
(RM)
Amount
(RM)
Chemical Test
(Sample shall be below water table and for bore-hores
only).
4.3.1
Nos
65.00
4.3.2
PH value
Nos
22.00
Copies
300.00
4.4
4.4.1
Final Reports
Provide final reports enclosing all field & laboratory
results and recommendation for foundation design.
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
Description
Quantities
Unit
Rate
(RM)
Amount
(RM)
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
Description
5.0
5.1
Quantities
Unit
Rate
(RM)
nos
500.00
Amount
(RM)
13,450.00
BILL OF QUANTITIES
QUOTATION DOCUMENT FOR DETAILED SOIL INVESTIGATION WORKS FOR THE PROPOSED MEMBINA JALAN BARU
KE LAPANGAN TERBANG LIMBANG, SARAWAK. (PHASE I)
Item
Description
Quantities
Unit
Rate
(RM)
Amount