The document contains details of a field density test conducted using the sand replacement method. It lists the weights of sand before and after pouring into a pit, the weight of soil extracted from the pit, and calculations to determine the bulk density, water content, and dry density of the soil sample. The test was repeated for multiple samples, with the data presented in a table containing weights and measurements for each test.
The document contains details of a field density test conducted using the sand replacement method. It lists the weights of sand before and after pouring into a pit, the weight of soil extracted from the pit, and calculations to determine the bulk density, water content, and dry density of the soil sample. The test was repeated for multiple samples, with the data presented in a table containing weights and measurements for each test.
The document contains details of a field density test conducted using the sand replacement method. It lists the weights of sand before and after pouring into a pit, the weight of soil extracted from the pit, and calculations to determine the bulk density, water content, and dry density of the soil sample. The test was repeated for multiple samples, with the data presented in a table containing weights and measurements for each test.
The document contains details of a field density test conducted using the sand replacement method. It lists the weights of sand before and after pouring into a pit, the weight of soil extracted from the pit, and calculations to determine the bulk density, water content, and dry density of the soil sample. The test was repeated for multiple samples, with the data presented in a table containing weights and measurements for each test.
Download as XLS, PDF, TXT or read online from Scribd
Download as xls, pdf, or txt
You are on page 1of 2
Sample SDBC
S.No Test no 1 Test no 2 Test no3
1 3 4 4 1 6800 6800 6800 2 6223 6290 6290 3 577 510 510 4 353 353 353 5 224 157 157 6 2 2 2 7 112.000 78.500 78.500 8 399 452 452 9 3.563 5.758 5.758 10 3.563 5.758 5.758 11 153.755 248.509 248.509 Sample SDBC S.No Test no 1 Test no 2 Test no 3 1 3 4 4 1 6800 6800 6800 2 6130 6295 6290 3 670 505 510 4 353 353 353 5 317 152 157 6 2 2 2 7 158.500 76.000 78.500 8 424 432 452 9 2.675 5.684 5.758 10 0.000 0.000 5.758 11 2.675 5.684 248.509 12 115.45 245.33 Sample SDBC S.No Test no 1 Test no 2 Test no 3 1 3 4 4 1 6800 6800 6800 2 6130 6295 6290 3 670 505 510 4 353 353 353 5 317 152 157 6 2 2 2 7 158.500 76.000 78.500 8 424 432 452 9 2.675 5.684 5.758 10 0.000 0.000 5.758 11 2.675 5.684 248.509 12 115.45 245.33 FIELD DENSITY BY SAND REPLACEMENT METHOD Sample SDBC Description 2 Weight of sand(+cylinder) before pouring in to pit= W1 in gms Weight of sand after pouring in to pit= W2 in gms Volume of pit=W5/Density of sand =V in cm Weight of soil from pit= W in gms Bulk Density of soil = W/V in gm/cm Dry Density=Bulk Density /Water content= Weight of sand in pit+ cone =W3= W1-W2 in gms Weight of sand in cone = W4 in gms Weight of sand in pit =W3-W4= W5 in gms Density of sand in gm/cm Weight of sand after pouring in to pit= W2 in gms Weight of sand in pit+ cone =W3= W1-W2 in gms Weight of sand in cone = W4 in gms Weight of sand in pit =W3-W4= W5 in gms O.M.C Description 2 Weight of sand(+cylinder) before pouring in to pit= W1 in gms Water content in % Dry Density=Bulk Density /Water content= O.M.C Description Density of sand in gm/cm Volume of pit=W5/Density of sand =V in cm Weight of soil from pit= W in gms Bulk Density of soil = W/V in gm/cm Weight of sand in cone = W4 in gms Weight of sand in pit =W3-W4= W5 in gms Density of sand in gm/cm Volume of pit=W5/Density of sand =V in cm 2 Weight of sand(+cylinder) before pouring in to pit= W1 in gms Weight of sand after pouring in to pit= W2 in gms Weight of sand in pit+ cone =W3= W1-W2 in gms O.M.C Weight of soil from pit= W in gms Bulk Density of soil = W/V in gm/cm Water content in % Dry Density=Bulk Density /Water content= S.No Test no 1 Test no 2 Test no 3 1 3 4 4 1 6800 6800 6800 2 6130 6295 6290 3 670 505 510 4 353 353 353 5 317 152 157 6 2 2 2 7 158.500 76.000 78.500 8 424 432 452 9 2.675 5.684 5.758 10 0.000 0.000 5.758 11 2.675 5.684 248.509 12 115.45 245.33 FIELD DENSITY BY SAND REPLACEMENT METHOD Sample SDBC S.No Test no 1 Test no 2 Test no3 1 3 4 4 1 6800 6800 6800 2 6130 6295 6290 3 670 505 510 4 353 353 353 5 317 152 157 6 2 2 2 7 158.500 76.000 78.500 8 424 432 452 9 2.675 5.758 10 0.000 5.758 11 2.675 248.509 12 115.45 Description 2 Weight of sand(+cylinder) before pouring in to pit= W1 in gms Density of sand in gm/cm Volume of pit=W5/Density of sand =V in cm Weight of soil from pit= W in gms Bulk Density of soil = W/V in gm/cm Weight of sand after pouring in to pit= W2 in gms Weight of sand in pit+ cone =W3= W1-W2 in gms Weight of sand in cone = W4 in gms Weight of sand in pit =W3-W4= W5 in gms 2 Weight of sand(+cylinder) before pouring in to pit= W1 in gms Weight of sand after pouring in to pit= W2 in gms Weight of sand in pit+ cone =W3= W1-W2 in gms Water content in % Dry Density=Bulk Density /Water content= O.M.C Description O.M.C Weight of soil from pit= W in gms Bulk Density of soil = W/V in gm/cm Water content in % Dry Density=Bulk Density /Water content= Weight of sand in cone = W4 in gms Weight of sand in pit =W3-W4= W5 in gms Density of sand in gm/cm Volume of pit=W5/Density of sand =V in cm
Yaws - Chemical Properties Handbook Physical, Thermodynamics, Engironmental Transport, Safety & Health Related Properties For Organic & Inorganic Chemical