Gravity Fluid Flow Design Guide
Gravity Fluid Flow Design Guide
Gravity Fluid Flow Design Guide
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
17
PTD-DGS-121
PREPARED BY
PAGE
OF
13
DATE
APPROVED BY
DEPARTMENT:
SUBJECT:
PROCESS ENGINEERING
JRB
REVISION DATE
REV.
11/01/02
TABLE OF CONTENTS
Section
1.0
SCOPE.............................................................................................................
2.0
RESPONSIBILITIES........................................................................................
3.0
DEFINITION OF SYMBOLS............................................................................
4.0
CALCULATIONS..............................................................................................
4.1
4.2
Discussion Guidelines.............................................................................
Calculation Methods................................................................................
LIST OF ILLUSTRATIONS
Figure
1
2
3
4
5
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
17
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
11
13
1.0
SCOPE
This design guide1 describes the procedure for sizing gravity flow lines.
2.0
RESPONSIBILITIES
The process section is responsible for the hydraulic analysis and line sizing of
aboveground gravity flow piping systems.
3.0
DEFINITION OF SYMBOLS
Definition
Coefficient for entrance loss
(0.5 for sharp edge entrance)
32.17 feet/second2
hv
Roughness coefficient
Differential pressure, pi
Ve
V1
V2
Rev. 0 of the Design Guide was adapted with minimal changes from a Pasadena document, DSG-MP6K, 11/92
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
11
13
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
17
4.0
CALCULATIONS
4.1
Discussion Guidelines
Calculation Methods
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
17
PROCEDURE NO.
REV.
DATE
PAGE OF
PTD-DGS-121
11/01/02
17
(2.)
Entrance Loss
Entrance loss =
Ce V2 V1
2g
) , feet
(Eq. 5-1)
(3.)
Velocity Head
2
V
Velocity head, hv = 2 , feet
2g
(Eq. 5-2)
(Eq. 5-3)
Control Valve
Control Valve =
P ( psi ) x 2.31
= loss, in feet liquid (or slurry)
specific gravity liquid (orslurry )
(Eq. 5-4)
(6.) Factor of Safety
Factor of safety usually equals 3 or 4 feet or 20 percent of friction loss for
pipe flows less than 100 feet. For long distance pipe lines, more detailed
analysis is required (these are generally computed by the civil engineer).
When liquid is of an undetermined viscosity (e.g., slurry or froth), increase
the factor of safety. A rule of thumb is to add 50 percent to the friction loss.
b. Pipe Flowing Partially Full
The following factors must be considered for gravity flow by pipe flowing
partially full (Figure 5):
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
17
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
17
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
17
h=
2
Ce Ve V1
V
h= e +
2g
2g
1.5 Ve
h=
2g
(Eq. 5-5)
h = 1.5 ( hv )
Freeboard is the distance from the liquid level to the top of the tank. It
does not affect head loss calculations. Allow 9 inches for most cases,
except if liquid is agitated; then allow 12 to 18 inches.
If liquid is frothy, allow maximum froth buildup plus 9 inches. These
freeboard dimensions are a guide. Other cases may exist where greater or
lesser freeboard is required. Freeboard should be sufficient to include a
factor of safety on the computed value of h.
(3.) Slope
To arrive at slope, obtain gravity flow tables from the mechanical process
section. Read the required slope for the selected pipe diameter flow and
velocity.
NOTE
Gravity flow tables are for water in steel pipe. In the case of
slurries or froth, check with process and/or project to
determine if the fluid viscosity is significantly greater than
water. Then adjust the slope accordingly.
(4.) The following is an example of the calculation of pipe flowing partially full,
in sequence.
Given flow = 743 gpm
d/D = 0.5
Convert gpm to cubic feet per second by dividing by 7.48 gallons per cubic
foot times 60 seconds per minute.
Q=
743
= 1.65ft 3 / sec.
( 7.48 x 60 )
Find D:
Enter Table 2 at d/D = 0.5 and read 1.3955 under Q/D 5/2.
(Eq. 5-6)
PROCEDURE NO.
REV.
DATE
PAGE OF
PTD-DGS-121
11/01/02
17
1.65
D=
1.3955
2/5
= 1.07 feet
(Eq. 5-7)
5/2
1.65
=
1.0
5/2
= 1.65
(Eq. 5-8)
Enter Table 2 under column Q/D 5/2 at 1.65, read horizontally to column
hv
and find 0.2224.
D
therefore:
hv = 0.2224 x D = 0.2224 x 1 = 0.2224 foot
(Eq. 5-9)
(Eq. 5-10)
(Eq. 5-11)
d+h
0.55 + 0.33
0.88 foot
(Eq. 5-12)
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
17
d. Additional Relations
Table 3 provides additional relations that are of use in other gravity flow
problems.
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
11
13
hv
D
Q
D5/2
P
D2
hv
D
Q
D5/2
P
D2
hv
D
Q
D5/2
P
D2
0.01
0.02
0.03
0.04
0.05
0.0033
0.0067
0.0101
0.0134
0.0168
0.0006
0.0025
0.0055
0.0098
0.0153
0.0000
0.0000
0.0001
0.0002
0.0003
0.34
0.35
0.36
0.37
0.38
0.1243
0.1284
0.1326
0.1368
0.1411
0.6657
0.7040
0.7433
0.7836
0.8249
0.0332
0.0356
0.0381
0.0407
0.0434
0.67
0.68
0.69
0.70
0.71
0.2974
0.3048
0.3125
0.3204
0.3286
2.4464
2.5182
2.5912
2.6656
2.7414
0.1644
0.1700
0.1753
0.1816
0.1875
0.06
0.07
0.08
0.09
0.10
0.0203
0.0237
0.0271
0.0306
0.0341
0.0220
0.0298
0.0389
0.0491
0.0605
0.0005
0.0007
0.0010
0.0013
0.0017
0.39
0.40
0.41
0.42
0.43
0.1454
0.1497
0.1541
0.1586
0.1631
0.8671
0.9103
0.9545
0.9396
1.0458
0.0462
0.0491
0.0520
0.0551
0.0583
0.72
0.73
0.74
0.75
0.76
0.3371
0.3459
0.3552
0.3648
0.3749
2.8188
2.8977
2.9783
3.0607
3.1450
0.1935
0.1996
0.2053
0.2121
0.2185
0.11
0.12
0.13
0.14
0.15
0.0376
0.0411
0.0416
0.0482
0.0517
0.0731
0.0868
0.1016
0.1176
0.1347
0.0021
0.0026
0.0032
0.0038
0.0015
0.44
0.45
0.46
0.47
0.48
0.1676
0.1723
0.1769
0.1817
0.1865
1.0929
1.1410
1.1899
1.2399
1.2988
0.0616
0.0650
0.0634
0.0720
0.0757
0.77
0.78
0.79
0.80
0.81
0.3855
0.3967
0.4085
0.4210
0.4343
3.2314
3.3200
3.4112
3.5050
3.6019
0.2249
0.2314
0.2380
0.2447
0.2525
0.16
0.17
0.18
0.19
0.20
0.0553
0.0589
0.0626
0.0862
0.0689
0.1530
0.1724
0.1828
0.2144
0.2371
0.0053
0.0061
0.0070
0.0080
0.0091
0.49
0.50
0.51
0.52
0.53
0.1914
0.1964
0.2014
0.2085
0.2117
1.3427
1.3955
1.4423
1.5041
1.5598
0.0795
0.0833
0.0873
0.0914
0.0856
0.82
0.83
0.84
0.85
0.86
0.4485
0.4633
0.4803
0.4982
0.5177
3.7021
3.3061
3.9144
4.0276
4.1465
0.2584
0.2653
0.2723
0.2794
0.2865
0.21
0.22
0.23
0.24
0.25
0.0736
0.0773
0.0811
0.0848
0.0887
0.2809
0.2857
0.3116
0.3326
0.3667
0.0103
0.0115
0.0128
0.0143
0.0157
0.54
0.55
0.56
0.57
0.58
0.2170
0.2224
0.2279
0.2335
0.2393
1.6164
1.6735
1.7327
1.7923
1.8530
0.0998
0.1042
0.1037
0.1133
0.1179
0.87
0.88
0.89
0.90
0.91
0.5002
0.5632
0.5900
0.6204
0.6555
4.2721
4.4056
4.5486
4.7033
4.8725
0.2933
0.3011
0.3064
0.3158
0.3233
0.26
0.27
0.28
0.29
0.30
0.0925
0.0963
0.1002
0.1042
0.1081
0.3857
0.4259
0.4571
0.4893
0.5225
0.0173
0.0190
0.0207
0.0226
0.0255
0.59
0.60
0.61
0.62
0.63
0.2451
0.2511
0.2572
0.2635
0.2699
1.9146
1.9773
2.0409
2.1057
2.1716
0.1227
0.1276
0.1326
0.1376
0.1423
0.92
0.93
0.94
0.95
0.96
0.6855
0.7159
0.8065
0.8841
0.9885
5.0603
5.2726
5.5183
5.8118
6.1787
0.3308
0.3011
0.3064
0.3158
0.3233
0.31
0.32
0.33
0.1121
0.1161
0.1202
0.5568
0.5921
0.6284
0.0666
0.0287
0.0309
0.64
0.65
0.66
0.2765
0.2833
0.2802
2.2386
2.3867
2.3760
0.1481
0.1534
0.1589
0.97
0.98
0.99
1.1410
1.3353
1.3700
6.8592
7.4063
8.8263
0.3692
0.3770
0.3818
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
13
17
--
--
--
--
--
--
--
--
1.00
--
--
0.3927
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
d
D
area
D2
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.20
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.30
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.40
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.50
0.0013
0.0037
0.0069
0.0105
0.0147
0.0192
0.0242
0.0294
0.0350
0.0409
0.0470
0.0534
0.0600
0.0668
0.0739
0.0811
0.0885
0.0961
0.1039
0.1118
0.1199
0.1281
0.1365
0.1449
0.1535
0.1623
0.1711
0.1800
0.1890
0.1982
0.2074
0.2167
0.2260
0.2355
0.2450
0.2546
0.2642
0.2739
0.2836
0.2934
0.3032
0.3130
0.3229
0.3328
0.3428
0.3527
0.3627
0.3727
0.3827
0.3927
wet.per.
D
0.2003
0.2838
0.3482
0.4027
0.4510
0.4949
0.5355
0.5735
0.6094
0.6435
0.6761
0.7075
0.7377
0.7670
0.7954
0.8230
0.8500
0.8763
0.9020
0.9273
0.9521
0.9764
1.0003
1.0239
1.0472
1.0701
1.0928
1.1152
1.1373
1.1593
1.1810
1.2025
1.2239
1.2451
1.2661
1.2870
1.3078
1.3284
1.3490
1.3694
1.3898
1.4101
1.4303
1.4505
1.4706
1.4907
1.5108
1.5308
1.5508
1.5708
hyd rad
D
0.0065
0.0130
0.0198
0.0261
0.0326
0.0388
0.0452
0.0513
0.0574
0.0636
0.0695
0.0755
0.0813
0.0871
0.0929
0.0985
0.1041
0.1097
0.1152
0.1206
0.1259
0.1312
0.1365
0.1415
0.1466
0.1517
0.1566
0.1614
0.1662
0.1710
0.1756
0.1802
0.1847
0.1891
0.1935
0.1978
0.2020
0.2062
0.2102
0.2143
0.2182
0.2220
0.2258
0.2294
0.2331
0.2366
0.2401
0.2435
0.2468
0.2500
d
D
area
D2
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.60
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.70
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.80
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.90
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
0.4027
0.4127
0.4227
0.4327
0.4426
0.4526
0.4723
0.4822
0.4920
0.5018
0.5115
0.5212
0.5308
0.5404
0.5499
0.5594
0.5687
0.5780
0.5872
0.5964
0.6054
0.6143
0.6231
0.6318
0.6404
0.6489
0.6573
0.6655
0.6736
0.6815
0.6893
0.6969
0.7043
0.7115
0.7186
0.7254
0.7320
0.7384
0.7445
0.7560
0.7504
0.7560
0.7642
0.7662
0.7707
0.7749
0.7785
0.7816
0.7841
0.7854
wet.per.
D
hyd rad
D
1.5908
1.6108
1.6308
1.6509
1.6710
1.6911
1.7113
1.7315
1.7518
1.7722
1.7926
1.8132
1.8338
1.8546
1.8755
1.8965
1.9177
1.9391
1.9606
1.9823
2.0042
2.0264
2.0488
2.0714
2.0944
2.1176
2.1412
2.1652
2.1895
2.2143
2.2395
2.2653
2.2916
2.3186
2.3462
2.3746
2.4038
2.4341
2.4655
2.4981
2.5322
2.5681
2.6061
2.6467
2.6906
2.7389
2.7934
2.8578
2.9412
3.1416
0.2531
0.2562
0.2592
0.2621
0.2649
0.2676
0.2703
0.2728
0.2753
0.2776
0.2799
0.2821
0.2842
0.2862
0.2881
0.2900
0.2917
0.2933
0.2948
0.2962
0.2976
0.2988
0.2998
0.3008
0.3017
0.3024
0.3031
0.3036
0.3040
0.3042
0.3043.
0.3043
0.3041
0.3038
0.3033
0.3026
0.3018
0.3007
0.2995
0.2980
0.2963
0.2944
0.2932
0.2895
0.2864
0.2829
0.2787
0.2735
0.2666
0.2499
PAGE OF
12
13
PROCEDURE NO.
REV.
DATE
PAGE OF
PTD-DGS-121
11/01/02
11
13
Job Number
Cost Center
Pate Number
Sheet
of
Calculation Sheet
Rev
Date
By
Ck
Title
ENG-GE-30 (050492)
PROCEDURE NO.
REV.
DATE
PTD-DGS-121
11/01/02
PAGE OF
13
17