These Guidelines do not constitute professional advice from the Marine Institute for marina development nor do they in any way create a legally binding obligation upon the Marine Institute or form in any way a legal document or a legal basis for same. Professional advisors should be retained at all times for all aspects of marina development.
ISBN: 1-902895-16-9
The MAYA project is a project executed within the scope of the Interreg II C programme in the NWMA region, with the support of the European Union.
ii
TABLE OF CONTENTS
1.
INTRODUCTION
2.
3.
APPENDIX 1 FORESHORE ACTS 1933 - 1998 GENERAL GUIDANCE NOTES APPENDIX 2 PROCEDURES FOR DEALING WITH FORESHORES LEASES AND LICENCES APPENDIX 3 PLANNING PROCEDURE APPENDIX 4 ENVIRONMENTAL IMPACT STATEMENT SCOPING
13 14
15 16
iii
iv
Marine Leisure and boating is an increasingly popular activity in Irish coastal waters. An ESRI (1996) survey indicated that many more people could be encouraged to participate in coastal boating and watersports if facilities were improved. These facilities can range from simple structures such as slipways and floating pontoons to large scale marina complexes. In response to the growing demand for better facilities, funding will be provided under the National Development Plan 2000-2006 for the upgrading or enhancement of coastal facilities and the development of new facilities. This funding will be administered by the Department of the Marine and Natural Resources. The Marine Institute is the national agency charged with responsibility for co-ordinating marine research in Ireland. During 2000-2001 the Marine Institute participated in an Interreg IIc Project MAYA Marinas and Yachting in the North West Metropolitan area. A key objective of this European project was to develop common standards for marina development. As part of this project, the Institute commissioned Brady Shipman Martin, Kirk McClure Morton and Fitzpatrick Associates to assess planning, technical and safety issues relevant to marina development. The resulting publication, Guidelines for Planning a Marina Development illustrates the steps to be taken when preparing an application for Planning Permission and a Foreshore Lease/Permission for a coastal marina development. The guidelines highlight that the development of marine leisure infrastructure is a process which requires careful planning. Consultation, particularly at an early stage, with both the Department of the Marine and Natural Resources and the relevant Local Authority on key issues such as planning policy, navigation, safety, and conservation designations can greatly enhance the prospect of achieving a successful marina development.
2.1
Most of these obstacles can, however, be avoided by careful planning and project management. 2.3 During the pre-planning/organisation stage the intending developer, whether public or private or a partnership of both, will be obliged to address a number of key questions. For example: What is the scope, scale and objective of the project? Where can the project be situated, what are its needs in terms of access, location, etc? Is the chosen site suitable for the scale and scope of development planned? Is there scope for future expansion of the development? Are there alternative sites available? Is there a plan or strategy in existence that would/should guide location and scale? Will the Local Authority/community/ others be supportive of the project? If local or sectoral opposition is anticipated how might it be assuaged? What is the market/need/demand for the planned developments? Is the project likely to attract finance is it an economic proposition? What is the competition like? What permissions or licenses are needed for such a development? What technical expertise is needed to develop the project concept and guide it through to implementation? Is the site in proximity to a designated environmentally sensitive area?
for an Assessment
2.2
For the private developer, the critical factors most likely to hinder development are: Poor or ill advised choice of site. Ill conceived project, not properly researched. Failure to consult the relevant statutory authorities and interests. The attachment of otherwise avoidable conditions to the Foreshore Lease/ Permission due to lack of pre-planning consultation with the Department of the Marine and Natural Resources. Failure to understand the market or to
A development on privately owned foreshore requires Foreshore Permission from the Minister for the Marine and Natural Resources
2.5
2.6
Following this informal consultative phase, the project concept can be reviewed and preliminary development studies commenced. Alternatively it may be necessary to rethink the scope and scale of the project or to conduct a new site search. A considerable amount of relevant information is readily available at both national and local level. By accessing this information at the beginning, serious mistakes can be avoided and time and money saved on the project. Getting the project in scale and harmony with local capacities and local community aspirations is a vital first step in the process.
2.7
2.8 Development of a marina or berthing facility will require both Planning Permission from the Local Authority and a Foreshore Lease / Permission from the Department of the Marine and Natural Resources.
These various studies are complementary and can usually be undertaken in parallel, however, in planning a development programme it is important to allow sufficient resources in terms of time and funding for their preparation. The scope of these investigations will depend upon the nature and scale of the development. Context studies will usually include description and analysis of the physical and social environment of the proposed project. The Context Study will also establish the planning context for the project and confirm the steps and documentation needed to progress the development to implementation stage. In this investigation the significance of any relevant Government policies, programmes and/or guidelines need to be considered. Other key documents will include the relevant Local Authority Development Plan and any Local Action Plans or special sectoral studies. For example, tourism or aquaculture or any plans likely to affect the development of the area and/or provide support or act as a constraint on the proposal. The County Development Plan, which is reviewed every 6 years, is the basic policy document of the Local Authority. The Plan sets out any objectives which the Local Authority have in relation to marine/coastal development and will provide information on any special
2.15
2.11
2.12
2.16
Planning permission is not required for exempted development which is specified in the Planning Acts and Regulations
2.20 Site investigation and analysis concern the details of the physical and environmental characteristics of the subject site and might include, for example, topographical/marine survey, hydrology, assessment of ground conditions (soil testing), vegetation cover, fish and fisheries/ aquaculture, archaeology (marine and terrestrial) and landscape/seascape evaluation. 2.21 Technical studies will be required to address such issues as water depth, tidal conditions, weather patterns, the need for dredging, navigation requirements, the need for storm protection, construction standards and access. (See section 3 Technical Guidelines for Marina Developments.) A technical (feasibility) study may be required as an integral part of the process to identify the most suitable site for marine development. Alternatively, a site may have already been identified for reasons other than technical, in which case, a study would be required to confirm technical feasibility. A technical feasibility study will typically comprise the following elements: Topographic survey to provide details of the (adjacent) land Hydrographic survey to provide information on water depths and impacts
2.22
It is important to remember that each of these options carries its own time penalty. 2.18 Development Plans also contain certain landscape and nature conservation designations, such as Special Area of Conservation (SAC), Special Protection Area (SPA) and Natural Heritage Area (NHA). It is unlikely that any development which adversely
2.23
2.24 Economic Appraisal. A complete economic appraisal of projects is usually necessary to firstly determine whether the project is feasible, and secondly to establish what the optimum scale of development is (e.g. the number of berths and level of ancillary facilities). The Economic Appraisal will have a number of elements: A thorough examination of the socioeconomic profile of the marinas catchment area is necessary to gauge the likely level of local demand for resident berths, which is typically crucial to the ongoing viability of most marina developments. Elements of this analysis would include an examination of population levels and trends within defined catchment areas (e.g. 1-20 miles, 1-40 miles), a review of economic growth and income levels, and analysis of trends in employment growth and unemployment. It will also be necessary to review the market for marina-based activities in the area. This might require primary and secondary research to determine the levels of marine leisure activity among local residents, the location of this activity, or the propensity to take up marina activities if more facilities are provided. Information on visitor activity at other marinas in the area would also be pertinent, including analysis of future prospects in key visitor markets. In particular, it would be important to show the extent to which the project would provide additional visitor activity (e.g. by expanding the coastal network of
2.25
A typical economic appraisal will examine the pattern and functioning of existing/proposed marine facilities in the area, market conditions, the socio-economic profile of the area, existing and potential participation in marine activities, cash flow, potential financing arrangements, returns on investment and phasing. This, together with the analysis of market demand will help identify the gap in the market and will assist in establishing the scope, size and type of facility that is required and that is most likely to succeed. Development Scoping Proposal and Pre-Planning
2.26 Once the various feasibility studies have been completed it will be possible to prepare a preliminary development proposal or concept development plan for the site. It is at this stage that formal pre-planning discussions are entered into with the Local Authority. The situation with regard to Planning Permission is itself an important aspect of feasibility. This will allow the Local Authority to communicate any concerns relating to the proposal and, as noted above, these will need to be addressed in detail in the formal Planning Application. These discussions also give the developer an early indication of what the views of the Local Authority are on the development. 2.27 During these pre-planning discussions the Department of the Marine and Natural Resources and the Local Authority the developer should seek to clarify whether or not an Environmental Impact Assessment will be required. If it is required, the scope will also
2.32
Once the EIS has been prepared and the design documentation is completed the Planning Application can be lodged with the relevant Local Authority.
Appendix 2 outlines procedures for dealing with applications for Foreshore Leases/Permission.
2.35
2.36
2.37
3.1
The marina as we know it today is the result of an evolutionary process which has taken place since the 1960s. Technical improvements have been driven by the requirement for cost effective, convenient and reliable pontoon berthing systems and the increasing need for efficient use of land and water space, having due regard to environmental considerations. The present day marina as defined by the Yacht Harbour Association is a facility for the berthing of pleasure craft providing direct walkway access to each boat, and adequate depth of water at all times, car parking, toilet facilities, services and other amenities. The term marina has been applied to many pontoon berthing facilities around the country not all of which can fulfil the above criteria. Frequently, the size of the marina determines the range and quality of facilities provided. The number of berths in a marina can be as few as 25 in the smaller developments and up to over 1,000 in the larger developments. A successful marina must have sufficient berths to be economically viable, sufficient berths to satisfy the demand from the catchment population and sufficient additional berths available at all times for visiting boats. Berth holders expectations will differ and in some locations, the provision of all amenities may not be appropriate, in more affluent areas, a complete range of facilities may be expected. Location
3.7
3.2
3.3
3.8
3.4
3.5
Marinas are normally located in areas where boating activity is already present or where there is substantiated demand for such facility. The marina site should have an adequate catchment population for financial viability, drawing from a suitable socio-economic area. It should be readily accessible by land and sea so that resident berth holders and visiting
3.10
3.12
3.14
3.19
3.15
3.20 A minimum water depth of 2.7m to 3.0m will cater for the vast majority of leisure craft using
10
3.26
3.28
3.24
3.30
11
3.33
Conclusion
The development of a good network of coastal facilities has the potential to increase marine tourism and recreational activity as well as offer improved amenity and leisure benefits. These guidelines highlight the basic procedures which need to be followed for a coastal marina development. The information provided is intended to supplement professional advice which will be necessary for the implementation of a marina development project. A well planned project should ultimately lead to a marine leisure facility, designed to meet the highest safety and quality standards, in harmony with the principles of sustainable development.
3.34
12
13
Guidelines for Planning a Marina Development APPENDIX 2 PROCEDURES FOR DEALING WITH APPLICATIONS FOR FORESHORE LEASES AND LICENCES
(BEST TIMESCALES ARE SHOWN AS INDICATIVE ONLY)
PREPLANNING CONSULTATION
APPLICATION RECEIVED AND ACKNOWLEDGED
W E E K 1
SEND TO ENGINEERING DIVISION, MARINE SURVEY OFFICE, FISHERIES OFFICER, DCHAS, ETC. FOR INITIAL VIEWS (SEE LIST OF CONSULTEES BELOW)
WEEK 6
ASSESS RENT
PUBLIC CONSULTATION PROCESS BEGINS (21 DAYS IF NO EIS OR 1 MONTH IF EIS) INDEPENDENT CONSULTANTS ASKED TO EXAMINE THE ADEQUACY OF THE EIS (IF APPROPRIATE)**
WEEK 10
EIS ADEQUATE
EIS INADEQUATE
WEEK 14
RESPONSES OF APPLICANT TO OBJECTIONS RECEIVED AND CONSIDERED BY ENGINEERS, MLVC AND, IF ENGAGED, CONSULTANTS
ISSUE APPROVED AND TERMS OFFERED TO APPLICANT TERMS ACCEPTED AND LEASE/LICENCE ISSUED
The following is a list of the Departments Specialist Advisors, who are consulted in relation to projects: Department of the Marine & Natural Resources, Engineering Division Department of the Marine & Natural Resources, Sea Fisheries Control Division Marine Survey Office Dchas, The Heritage Service Marine Licence Vetting Committee Oceanographer (Marine Institute),
Senior Chemist (Marine Institute) Biologist (Marine Institute) Marine Survey Office Senior Sea Fisheries Officer Biologist, Central Fisheries Board Engineer, Grade II * The longer period is required for engrossment of Leases ** THIS SECTION OF THE PROCESS, IF USED, MAY ADD 2-3 MONTHS TO THE TIMETABLE
14
SITE SELECTION
CONTEXT STUDIES
Establishes physical detail and characteristics of the site, e.g. Topography/marine survey Flora and Fauna Hydrology Fisheries and Aquaculture Ground / soil conditions Archaeology Marine Life Landscapes/Seascape Scope depends on the nature of the project. e.g. Navigation Access Water depth Dredging requirements Tidal conditions Construction standards Storm protection Social/Economic profile of the area Financial/Funding arrangements Cash Flow Projections Establish demand a supply factors Studies trends Establishes the scope of the project Reviews competition
TECHNICAL STUDIES
MARKET ANALYSIS
PLANNING FEASIBILITY
REVISIT FEASIBILITY IF NECESSARY If EIS required, agree scoping report with Local Authority and Department of the Marine and Natural Resources
LODGE APPLICATION
15
Guidelines for Planning a Marina Development APPENDIX 4: ENVIRONMENTAL IMPACT STATEMENT SCOPING ENVIRONMENTAL IMPACT STATEMENT REQUIRED
SCOPING EIS (OPTIONAL BUT ADVISED BY ENVIRONMENTAL PROTECTION AGENCY AS 'BEST PRACTICE'
PREPARE SCOPING DOCUMENT & SUBMIT TO LOCAL AUTHORITY/D oMNR REQUEST FOR ADDITIONAL INFORMATION. LOCAL AUTHORITY RECEIVE SUBMISSION ETC.
TYPICALLY FLORA & FAUNA HYDROLOGY AIR QUALITY DUST NOISE AND VIBRATION MATERIAL ASSETS LANDSCAPE AND VISUAL APPRAISAL CULTURAL HERITAGE MARINE AND TERRESTRIAL ARCHAEOLOGY MARINE BIOLOGY