Budni CDP English
Budni CDP English
Budni CDP English
DRAFT CITY DEVELOPMENT PLAN BUDNI NAGAR PARISHAD Report on City Vision, Sector Goals, Strategies, DISTRICT SEHORE, MADHYA Projects and Priorities PRADESH
City Development Plan for Shahganj
January 2012
Submitted to Commissioner Urban Administration and Development Department, Palika Bhawan, Nr. 6 No. Stop, Shivaji Nagar, Bhopal Phone: +91-755-2552356 Fax: +91-755-2552591
Project Co-ordination:
City Profile
CompanyName ULB Name Whether the Sectoral Analysis report is as per UADD requisites Geographical location (Town) Average rainfall (annual) Height above mean sea level Town Brief Municipal area (1991) Municipal area (2001) Municipal area (2011) Date of Constitution of ULB Latitude Longitude MM Mts Sq kms Sq kms Sq kms Date In one or two sentences 23.47 23.47 Located on the Banks of River Narmada hence it is a town with relgious importance and is a part of Narmada Parikrma 13,358 13,791 Town level 16,812 CAGR considered as 2.5 % till 2021 and then 3% for 2031 & 2041 18,922 25,927 35,871 % Standard (as per UDPFI) 45-50 02to 3 6 to 8 Balance 8 to 10 10 to 12 12 to 14 Land use (Tentative in Sq kms ) 1.6 0.05 0.2 21.2 0.05 0.25 0.03 Land use (Tentative in percentage) ICRA Management Consulting Services ltd (IMaCS) Budni Nagar Parishad Yes
22 46' 60 N 77 40' 60 E
1200 305
Historic importance
Population Year 1981 (under Municipal boundary only) Population Year 1991 (under Municipal boundary only) Population Population Year 2001 (under Municipal boundary only) Population Year 2011 (under Municipal boundary only) Name of Population projection Method Projected population adopted Year 2015 Projected population adopted Year 2025 Projected population adopted Year 2035 Land Use Residential Commercial Land Use Public - semi public Agriculture Industrial Roads Green area Sensitive Water bodies Total Balance 0.09 23.47
0.38
100
Ward 1
Indira Gandh i
Ward 2
Mahat ma Gandh i
Ward 3
Arjun
Ward 4
Gurun anak
Ward 5
Lal bahad ur Shastr i
Ward 6
Jawa har lal Nehru
Ward 7
Pt. Ravi shanka r
Ward 8
Bhagat singh
Ward 9
Dr. Rajend ra prasad
Ward 10
Narmad a
Ward 11
Sarda r Patel
Ward 12
Rani Laxmib ai
Ward 13
Subas h Chand ra Bose
Ward 14
Chand rashe khar Azad
Ward 15
Dr. Ambed kar
Total
15
776 1.95 398 398 378 289 180 119 960 74.74 -
1401 1.34 1046 739 662 282 135 139 896 68.95 -
1554 2.08 747 850 704 492 236 197 828 66.85 -
1451 1.93 752 764 687 219 202 208 899 69.60 -
1178 1.20 982 601 577 169 360 135 960 72.32 1
11
183 0 6 207 -
137 1 1 158 -
239 6 14 187 -
311 57 0 145 1
202 20 0 231 -
166 0 1 132 -
284 8 4 238 -
222 11 12 181 -
268 3 6 246 -
149 8 57 121 -
235 24 9 214 -
342 13 5 163 -
319 14 0 248 -
242 7 0 217 -
161 57 0 123 -
ii
Ward 2 8 -
Ward 4 16 -
Ward 6 22 -
Ward 7 9 -
Ward 8 11 -
Ward 10 7 -
56
62
82
133
82
177
109
104
97
54
113
72
41
1182
50
1 1 2 1
2 1 5 5 1 6 2 3 1
1 1
1 1 3 1 80 188 79 -
8 13 51 4
1 1
82 140 71 -
80 122 44 -
85 184 56 -
40 238 109 -
50 167 63 -
90 91 39 -
60 197 38 -
70 167 43 -
10 82 21 -
iii
Ward 1 -
Ward 2 -
Ward 3 -
Ward 4 -
Ward 5 -
Ward 6 -
Ward 7 -
Ward 8 -
Ward 9 -
Ward 10 1
Ward 11 -
Ward 12 -
Ward 13 -
Ward 14 -
Ward 15 -
Total 1
2 194
2 168
3 309
2 400
0 232
1 188
3 344
3 239
1 350
3 185
1 285
1 389
3 363
2 295
0 265
27 4204
14
190 40 1600 -
130 30
480 60
2300 600
960 410
1480 350
2140 1300
1360 950
1180 400
3000
1000
4000
240
220
310
160
150
380
600
310
470
210
360
390
296
4096
iv
Ward 1
Ward 2
Ward 3
Ward 4
Ward 5
Ward 6
Ward 7
Ward 8
Ward 9
Ward 10
Ward 11
Ward 12
Ward 13
Ward 14
Ward 15
Total
60
40
150
2500
400
200
450
1000
750
350
800
1800
850
425
2000
11775
135
40
60
30
50
80
260
350
80
240
1329
30 141 101 1
10 128 68 5
21 142 1 1 87 6
85 281 1 1 1 241 4
32 113 34 2
36 255 194 -
19 209 142 -
31 214 143 -
41 129 1 128 -
42 167 123 1
32 267 1 194 9
27 242 184 -
19 161 103 -
31 89 17 1
21
21
30
114
33
87
88
38
36
21
48
15
21
581
102
73
93
245
36
134
194
142
143
128
124
203
184
103
18
1922
Ward 1 -
Ward 2 -
Ward 3 -
Ward 4 -
Ward 5 -
Ward 6 --
Ward 7 -
Ward 8 -
Ward 9 -
Ward 10 1
Ward 11 -
Ward 12 -
Ward 13 -
Ward 14 -
Ward 15 -
Total 1
*Slum not notified. Information given as per the discussion with the Nagar Parishad officials **Primary = Agriculture labours + Cultivators (As per Census 2001), Secondary = HH industry (As per census 2001), Tertiary = Others (as per census 2001)
vi
Sectoral Analysis
Existing Source Source No. of Tubewell / River / Well Tubewell 14 Well River/Lake -
Water Supply
Water Supplied by Tubewell / River / Well in 1.3 MLD Total water supply in the town (MLD) Existing Supply rate (LPCD) considering distribution losses Water Charges per household per month (Rs.) Flat/Metered % Coverage under paid water supply Whether any treatment plant exists (Y/N),If yes mention capacity (MLD) Proposed source (Surface) Total sewage generation (MLD)
2 119 60 (Flat) 0 Narmada River 0.8 No 954 1 1 As required (Once in 6 months) As required (Once in 6 months) 13 Narmada river 4.1 10% No 238 4 1 80 No No on Shahganj Road (SH 15)
Physical Infrastructure
Total no. of individual septic tanks Total no. of community septic tanks Total no. of Sewage/Mud pumps available with the ULB Frequency of Cleaning Individual Septic tanks Frequency of Cleaning Community Septic tanks Name of natural nallah (Storm water drain) Length of natural nallah (Storm water drain) Kms Ultimate disposal point of nallah Length of road side drain (Kms) Coverage of road side drainage w.r.t roads (%) Ultimate disposal point of Road side drains Any treatment plant/procedure adopted Per capita Solid waste generation (Considering Standards) (in gms) Total SW generation (in Tons) Frequency of SW collection by the ULB (1 time per day/2 times per day) Collection efficiency of the ULB (%) Any initiative for DTDC (Yes /No) Any initiative for scientific disposal of waste Name of dumping/ landfill site
vii
Is the existing site Dumping site or allotted site for Scientific disposal Area of allotted landfill site for Scientific disposal Distance of the Dumping site/landfill site from main settlement area (Kms) No. of Tractor trolleys/vehicles available with the ULB for carrying Solid waste to the LF site If site for Scientific disposal is not allotted then whether formally requested by the ULB Name of National Highway passing from or nearby from the town
NH 69
abutting
Roads
SH-15
Passing
Physical Infrastructure
WBM Total (kms) 13.6 9.03 19 1073 (approx) Yes Yes 1 Mini-Bus service NH - 69 (Arterial road)
Total length of Kuccha roads (kms) Gap w.r.t Standards Total no. of vehicles in the town
(kms) (kms)
Bus stand (yes/No) Any intracity mass transport mode (yes/no) Name of locations facing major traffic issues
2 3
Name of the street beautified as per the instructions of UADD Total no. of street lights No. of Streetlights under working condition No. of Streetlights having Tubes 469 188
Street lighting
viii
No. of Streetlights having CFL No. of Streetlights having Incandescent bulbs No. of Streetlights having LED No. of Streetlights having LPS 400 KV Location of Substation http://www.mptransco.nic.in 220KV 132KV
281 -
Hoshangabad No 15 Budni Ghat ULB Budni Ghat Around 2000-3000 on Makar Sankrant, Sarvapitri Amavasya, Narmada Jayanti etc Narmada River (Vindyachal forest, Rahatpali) Madhya Pradesh Environ.Act 199.. Temple Ghat of Narmada river 1 1 30 No Bhopal, Hoshangabad 60, 7
Power Heritage & tourism Environment Health Heritage & tourism Social Infrastructure
Total no. of residential connections Total no. of Commercial connections Any subsidy for BPL (Y/N) Duration of Electricity supply per day (in Hrs) Name of Heritage site/s Ownership/agency Prevailing Heritage Act/s Name of Tourist site/s Ownership/agency Total no. of Pilgrims/ Tourists visiting town per day
Name of River/Lake/Forest range/Any specific species Prevailing Environmental Act/s Areas facing threats No. of Primary Health centres/Dispensary Government Beds No. of Hospitals Private Multispeciality hospital if any (Y/N) Name of Nearby town reffered for Treatment No. of Primary schools Beds Yes Name of town Distance (Kms) 11 1 1 1
Education
ix
No. of Beneficiaries under SJSRY (Street Vendor) No. of Beneficiaries under Haath thela/Rickshaw chalak yojna
NA NA NA NA NA
Beneficiaries
No. of Rain Basera/Night Shelter Ownership of Rain Basera (with ULB/Rental) No. of Beneficiaries under Gharelu Kamkaji Mahila Yojana
NA
NA NA NA
*Data of Slums not available as the slums are not yet notified
Municipal Finance (amount in Rs Lakh) Year Rates and Tax Revenue Assigned Revenues & Compensation Rental Income from Municipal Properties Fees & User Charges Sale & Hire Charges Revenue Grants, Contribution and Subsidies Income from Investments Interest Earned Other Income Total - Revenue Income Capital Receipts Grants, Contribution for specific purposes Secured Loans Unsecured Loans Deposits Other
0.2 81 30.9 2.0 26.6 0.3 124 50.7 4.7 25.8 0.1 88 40.2 1.3 36.4 0.2 134 49.8 10.1 36.0 0.2 179 73.7 5.3 25.4 81.4 80.5 81.4 123.5 76.3 87.5 117.9 133.6 141.1 178.6 20.6 15.7 18.6 30.9 34.6
2005-06
2006-07
9.8 41.2 1.2 8.6
2007-08
16.7 35.3 1.9 11.7
2008-09
9.8 36.8 0.9 10.1
2009-10
9.2 67.8 0.9 9.1
2010-11
9.3 85.9 1.8 9.6
Revenue Income
Total Capital Receipts Establishment Expenses Revenue Expenditure Administrative Expenses Operations & Maintenance Interest & Finance Charges Programme Expenses Revenue Grants, Contribution and Subsidies Miscellaneous Expenses Transfer to Fund
3.0
3.3
5.0
7.9
7.5
2.8 73.3
0.7 86.4
0.5 100.8
2.7 119.9
1.0 153.2
Total - Revenue Expenditure Capital Expenditures Fixed Assets Capital Work-in-Progress Investments -General Fund Investments-Other Funds Stocks/Inventory Loans, Advances and Deposits Other Assets Miscellaneous Expenditure Total Capital Expenditure Total Income Total Expenditure
42.9 162.02 116.58 1.3 43.8 205.18 133.23 1.3 163.91 102.12 132.3 251.66 253.84 197.7 319.92 350.89 50.9 0.1 43.6 18.7 145.8 238.1
xi
2012-13
Full migration of double accounting System N
2013-14
Completion and adoption of Manual. Training of personnel
2014-15
Training of personnel
2015-16
Migration to Double entry accrual based accounting
State/ ULB
Property tax reforms, 85% coverage ratio and 90% collection ratio
Migration to the GIS-based property tax system. Review and Revision of Property Tax guidelines
Establish Taxpayer education programme. Defining user charge structure for the services. Achievement of targeted service standards for the services
Collection Efficiency. Coverage Ratio (Registered Properties / Actual No. of Properties) Establishment of proper accounting system for each service. Recovery of O&M cost Achievement of actual fund allocation budget
State/ ULB
Levy of user charges : full recovery of O & M charges for sewerage, water supply and SWM
State/ ULB
ULB
xii
Reforms
Achieve d (Y/N)
2012-13
E-governance N
2013-14
Appointment of Software consultant(s) / agency for deployment/traini ng
2014-15
Implementation of e-governance against 1.Birth and death registration 2.Citizens grievance monitoring 3.Personnel management system
2015-16
State/ ULB
Provision of basic services to urban poor including security of tenure at affordable prices, improved housing, water supply, sanitation
Slum Notification
To identify the needs of urban poor in the areas of infrastructure and socioeconomic upliftment.
DPR preparation
Implementation of projects
ULB
xiii
SECTORIAL GOALS
YEAR Components 2015 2025 2035 City specific Strategies Revamping of existing network and construction of additional network Water Augmentation for increase in per capita supply Preliminary estimate (Rs. In lakh) Implementing agency Mode of Implementation (PPP etc.)
100%
100%
100%
567.00
ULB
135
135
135
71.00
ULB
PHYSICAL INFRASTRUCTURE
No Good 15%
No Good 15%
Yes Good 15% Metering of all the water connections to reduce NRW and supply effieciently User charges reforms Water treatment facility/ Filteration 76.00
WATER SUPPLY
Consumer metering
70%
80%
100%
20.00
ULB
Yes No
ULB ULB
No
ULB
xiv
YEAR
2015
2025
2035
70% Desilting of drains to increase their capacity Cleaning of drains to increase their capacity No more water logging due to better coverage of drains 70%
85%
100%
100%
100%
12.00
ULB
100%
100%
Dredging, desilting and widening of the existing natural drains, this will also include the removal of encroachments and construction of a retaining wall
DRAINAGE
60.00
ULB
none
none
85%
258.00
ULB
Treatment Plant
48.00
ULB
xv
YEAR
Components
2015
2025
2035
Implementing agency
Sewage Recycling and reuse Cost recovery (as a % of O&M ) Safe sanitation facilities (with focus on Urban poor)
Treated water could be used for agricultural purpose, not for drinking use 60% 70% of the household s 80% 100% Construction of Individual toilets and Construction and maintenance of public toilets. 100% house to house collection by promotions in the town Creation of general awareness amongst the residents. Improve the skills of the conservancy staff Up-gradation of the infrastructure required for effective collection and disposal of waste Levy of user charges
ULB
13.00
ULB
80%
100%
100%
ULB
Source segregation
Yes
Yes
Yes
SWM
Improve waste collection efficiency Mechanized waste handling Scientific waste disposal Landfill site adequacy Cost recovery of O&M Private sector
xvi
YEAR
2025
2035
Implementing agency
12.26 km
17.4 km
372.00
Road upgradations
9.5 Widening of the existing roads Road Signs and FOB's on State Highway
112.00
ULB
Widening/ strengthening
122.00
ROBs/flyovers
500.00
ULB
None
developmen t of bus stand and transport nagar Regulating traffic through better managemen t -
Improvement of existing infrastructure Awareness and regulations enforcement/ Improvement of existing infrastructure
10.00
ULB
ULB
xvii
YEAR
Components
2015
2025
City specific Strategies Improvement of existing infrastructure Achieve the goal of 100% coverage of road network by street light Underground cabling for street lights to improve the aesthetics of the town and to avoid the illegal connections
Implementing agency
Parking facilities
ULB
New Installation
581 -
369 -
24.00
ULB
STREET LIGHTNING
Upgradation
Underground cabling
17.5
11
17.4
38.00
ULB
Energy savings 24/7 electricity supply 100 % electricity supply Development of alternative energy sources
POWER
ULB
FIRE FIGHTING
Yes
Yes
Yes
xviii
YEAR
Components
2015
2025
2035
City specific Strategies To ensure 100% safety against fire, capacity addition in terms of equipments and workforce should be carried out
Implementing agency
ULB
ENVIRONMENT
Identify archaeological resources in the city (Heritage listing) Development of green areas as per norms Water bodies preservation/Conservati on Tourist accommodation adequacy Tourist attraction and circuits regional and city level Clean and healthy environment
HERITAGE &TOURISM
Yes Yes Yes Yes Yes Yes Desilting and digging of water bodies/ removing of encroach ments
Yes Yes Yes Yes Yes Yes Desilting and digging of water bodies/ removing of encroachme nts
Yes Yes Yes Yes Yes Yes Desilting and digging of water bodies/ removing of encroachme nts 5.00 120.00 3.00
xix
YEAR
Components Eco-friendly vehicles Disposal of treated sewage in nallahs Desilting of nallahs Incineration of biomedical waste Implementation of norms/standards for pollution control 100% doctor-patient ratio 100% patient-bed ratio
Implementing agency
Yes
Yes
Yes
50% 50% To be carried in coordinati on of Dept. of Health, GoMP Yes (Provision to be made for necessary infrastruct ure) 85%
SOCIAL INFRASTRUCTURE
HEALTH
Effective implementation of health programmes and related services in the slum areas of the city
266.00
Regular checks for water contamination in all water bodies of the city Literacy rates
Yes
Yes
Control on Preventable diseases by safe drinking water, quality control on food items and safe sanitation facilties Education
xx
E D U C AT IO N
95%
100%
YEAR
Components
2015
2025
2035
90% 60% of prescribed teacher student ratio It already has one graduatio n college Yes
100% 80% of prescribed teacher student ratio It already has one graduation college Yes
100% 100% of prescribed teacher student ratio One technical education institute Yes Allocation and identification of land Allocation and identification of land Upgradation of existing facilities
260.00
Education dept.
Education dept.
Technical, engineering & medical education in the city Developed existing parks
Education dept.
ULB
RECREATIONAL
Area coverage under recreational facilities Playing facilities Provision for green-belts in future development plans Sufficient infrastructure at mela/exhibition ground
ULB ULB
Yes
Yes
Yes
ULB
xxi
YEAR
Components
2015
2025
2035
City specific Strategies Provision of basic services in slum areas Slum improvement and rehabilitation programme to cover the whole cross-section of the urban poor Community empowerment for establishing linkages between community and bankers so as to facilitate assistance to beneficiaries. Identify institutions for imparting specialized training to the community for improving their skills and talents Improvement of housing conditions
Implementing agency
Yes
Yes
Yes
ULB
Inclusion of 100% urban poor population under various central and state govts social sectors schemes like old-age pension schemes, Scheme for handicapped persons, deen-dayal antyoday yojana, mid-day meals schemes, etc Pucca housing for urban poor Access to water connection
Yes
Yes
Yes
ULB
Yes 100% 100% of household s (with 1 public toilet per 35 users) Door to door Collection (estimated in the overall
Yes 100% 100% of households (with 1 public toilet per 35 users) Door to door Collection (estimated in the overall projections for the town)
Yes 100% 100% of households (with 1 public toilet per 35 users) Door to door Collection (estimated in the overall projections for the town)
ULB ULB
Access to public toilets and urinal facilities for all slum households
ULB
ULB
xxii
YEAR
Components
2025
2035
Implementing agency
Education facilities
CC Road network in the slums Constructi on of Pucca open and pucca closed drains in slums Provision of street lights in the slums Yes (Special focus on slum areas while planning new facilities)
CC Road network in the slums Construction of Pucca open and pucca closed drains in slums Provision of street lights in the slums
CC Road network in the slums Construction of Pucca open and pucca closed drains in slums Provision of street lights in the slums
ULB
ULB
ULB
ULB
xxiii
YEAR
Components
2015 Yes (Special focus on slum areas while planning new facilities) Yes (Special focus on slum areas while planning new facilities)
2025
2035
Implementing agency
ULB
ULB
xxiv
Sector of Investment
Total Investment (In Crore) 13.9 4.81 13.52 1.25 0.13 24.88 1.65 0 8.18 2.11 0.1 0.21 10.8 9.28 2.5
Responsible agency/deptt. BNP BNP BNP BNP BNP BNP/PWD BNP/State State State BNP BNP BNP State State BNP
Storm Water Drainage Solid Waste Management Sanitation Traffic & Transportation Electricity & Street Lighting Fire Fighting Basic Services for Urban Poor Environment Urban Governance Heritage Education Health Social Infrastructure & Other Projects
xxv
Executive Summary
The Urban Administration and Development Department (UADD) of Government of Madhya Pradesh (GoMP) retained ICRA Management Consulting Services Limited (IMaCS) for assistance in the .preparation of City Development Plan for Budni town. The objectives of the exercise are three-fold: a) to assess existing demand-supply gaps in service delivery and derive a comprehensive infrastructure improvement plan (including a Capital Investment Plan) required, b) to identify revenue enhancement and financial improvement measures and c) to develop a Financial and Operating Plan to implement a sustainable infrastructure improvement plan.
xxvi
Potential for setting up industrial area - City has good connectivity , accessibility to water and availability of land in and around , for setting up industries
SNo Name of the Indicator Water Supply: 1 Daily Per Capita Supply (LPCD) 2 Storage Capacity / Daily Supply (%) 3 Distribution Network / Road Length (%)
Value 119 25 50
Comments Current supply on a per capita basis is below municipal norms prescribed by UDPFI and theres is a need for augmentation of water supply infrastructure at source, storage and especially in distribution. Public convenience facilities needs augmentation to meet the UDPFI norms from its current level.
Sanitation: 5 Presence of a Safe Disposal Mechanism for Waste Water 6 Slum Population per Public convenience (nos.) Roads and Street Lights: 7 Road length (Km) 8 Road length per Street Light (m)
No 1000
42 87
Poor condition of roads, narrow width, lack of parking facilities resulting in poor transportation infrastructure. In addition, NH69 passing through the city poses treat of accidents and hampers the network flow in the town. Waste amanagement practice needs to be revamped in view of keeping the city hygienic and clean and also in view of checking the waste which gets its way into the Narmada River
238
xxvii
22.0 47.0
Observations on Municipal Accounts: 1. CUR: Capital Utilisation Ratio of BNP is 0.93 which is less than 1 which indicates that BNP is in revenue deficit. Assigned revenue (52%) is the major contributor to revenue income. Tax revenue accounts only 12% of the revenue income whereas Non tax revenue accounts 12%, which indicates need for identification of new tax and non tax revenue streams. Property Tax contribution low: Property tax as a revenue source accounts is very limited in BNP indicates the need of property tax rationalisation with improved collection efficiency. Salaries as an expense head: Expenditure on salaries is found to be very high in BNP, accounting for 53% of the revenue expenditure and 65% of the revenue income.
2. 3.
xxviii
2. Accord high priority to planning and developing Social Infrastructure to cater to the population growth - The potentially high growth in the population, as envisaged would require a combination of Government / Private investment to address Budnis capital requirements, particularly in education and health infrastructure. While discussions, stakeholders in particular cited the need for specific social infrastructure development such as a) Educational institutions, and c) Health facilities. 3. To actualize the citys existing economic potential with a focus on industries and generate new opportunities for the prosperity in all sections of the community. With the development of requisite infrastructure and envisaged future investment, Budni on its inherent strength of availability of water, good connectivity and land availability holds potential to further expand the existing Industrial base. An industrial development plan (in Budni and adjacent villages) should be devised for the harnessing of citys economic potential. 4. Conservation of Narmada River and Ground Water Table to help in achieving the ultimate goal of Sustainable Development 5. To develop & promote Household wooden toy making industry.
1. Water Supply:
Proposed Interventions for way forward: As a proactive measure, Budni Nagar Parishad is already proposed a water supply projectunder UIDSSMT scheme of Government of India (GoI). Although this project, which is currently under implementation, meets most of the demands for the year 2035, but there are still a few gaps which are identified through gap analysis done in this CDP, and to meet those following additional projects/interventions has been identified: a) Source Augmentation:The ongoing project plan to withdraw around 4.5 MLD of water from Narmada River, whereas CDP analysis suggests that there would be a demand of 5.6 MLD of water by year 2035. It is further recommended that extraction of water from tube wells should be discouraged and contribution expected from tube wells should be brought from other sources. The additional water requirement can be met by adopting either of the following options: a. Drawing additional water from Narmada River b. Sourcing water from rain water harvesting b) Water treatment facility:The water treatment of 3 MLD is already under use in Budni, hence treatment infrastructure does not require any augmentation in short term, but eventually an
xxix
additional 2.6 MLD treatment infrastructure would be needed to meet the demand for the year 2035. c) Distribution Network: As discussed with Budni Nagar Parishad officials, at present, Budni has a distribution network of 10 km which is approximately 25 % of the road network. The proposed water supply scheme includes the strengthening of distribution network. In total, to meet the growing demand, Budni would need an additional network of 18 Km by 2015 and 44 km so that total network length is 54 Km to increase the coverage to 85% of road network by the year 2035. In addition at present the Number of water connections are 54% of the assessed properties (35% of total households) which need to be increased to 85% of the assessed properties by 2015-16. d) Elevated Storage Capacity: As per the prescribed norm, 33% of net water requirement should be the Elevated storage capacity which at present is around 50% for the Budni. No augmentation in storage capacity would be required in short term, which would be required to increase by 0.85 ML to meet the demand for 2035.
xxx
the commute hassle between the eastern and the western halfs of the city which lie on either side of the railway line, a rail over bridge is also proposed near to the existing railway station.
xxxi
way forward for pooling of resources to address some of the challenges in MSW management. Regional facilities may incorporate treatment as well as disposal facilities, and generate sufficient scale to enhance technical and financial efficiencies. Furthermore, it would also facilitate the monitoring of environmental outcomes and performance due to a reduced number of sites. This approach would enable smaller ULBs to achieve compliance with minimal financial burden. One third of the disposal site to develop as Vermi composting plant to take care of the organic waste form the towns. The Disposal site would have to be well-equipped to ensure proper waste segregation and composting facilities. In addition, the site would need to be provided with the basic facilities of compound walls, BT/CC approach road, electrification, etc.
Education
Proposed Interventions for way forward:
xxxii
a) Primary Schools: The overarching goal in this sector is to achieve 100% literacy rate in the city. Budni has the required number of primary schools to meet the demand by the year 2015. The infrastructure provision in the existing schools also needs upgradation. b) Senior Secondary Schools: By year 2015, Budni would require additional 1 Sr. Secondary School, each of which would accommodate around 500 students. The total area required for the school will be 0.4 ha along-with playground of 0.20 ha.
8. Economic Development
Proposed Interventions for way forward: a) Development of Industrial Area for Small & Medium scale industries: With the objective of diversifying the economic base of Budni Town, an industrial park for small & medium scale industries should be developed. A land should be identified either within the municipal limits or near to the city boundary and proposal should be sent to the appropriate authorities for the same. This would thrust to the employment generation activities result into the overall upliftmentof the society. Existing wooden toy making household industry should be further given a boost by developing promotional plans and marketing strategies. b) Development of Tourism: There is an existing tourist/pilgrim inflow in the town because of presence of Narmada River. This potential should be further explored by developing tourism circuit which may include excursions. Good facilities for tourist should be planned and developed in Budni. Rural tourism project should be further promoted by developing a rural set up in the town giving an entire package. c) Development of Commercial Areas: This can further be divided into development of new commercial areas and upgradation of existing commercial areas. New commercial areas can include dedicated markets for important commodities or general markets. In addition to the development of new markets, existing markets can be upgraded to increase their capacity and provide better services to the users and customers.
xxxiii
development with landscaped garden and walkway as it has substantial amount of relatively undeveloped land alongside the riverbank. The implementation of this component could be phased out along with land development component. b) Development of better facilities for tourist Night Shelters are proposed along with public conveniences along the river stretch c) Promotional activities for Rural tourism concept d) Promotion of toy making industry e) Development of Entry Gates
Environment
Proposed Interventions for way forward: a) Air Quality: Periodic monitoring and review is essential to check air quality. To create awareness amongst user groups, the status of air pollution may be revealed through display systems instituted at major locations in the city. Suitable plantations or green cover should be provided on major routes to supplement better air quality. This would partially be addressed by the development of Parks in the town and a massive tree plantation drive. b) Water Pollution: Efforts/schemes should be designed to check the diversion of sewage flow into Narmada River through appropriately located sewage treatment plants. Considering the issues related to the demand for treating large amounts of sewage generated in Budni, decentralized sewage treatment is recommended. This aspect would be addressed by the development and upgradation of Sewerage & Sanitation facilities, Storm water drainage infrastructure and strengthening of solid waste collection/transportation system. c) Water Bodies Conservation: For water body conservation and rejuvenation, proper attention should be given to River Narmada. A comprehensive water body restoration or revival program in the region is of utmost importance. d) Green Spaces: Budni has Public parks and allocation of land for development of more parks in future should be taken care in the proposed land use plan/ development plan of the town e) Development of a Regional Plan: To ensure sustainable development with optimum resource utilization, it may be necessary to develop Budnis Development Plan or Master Plan. For maintenance of open space, the planning authority at the regional level should prepare a detailed inventory of the space and explore its probable multiple uses or forms for recreation and visual pleasure. Possibilities to include the private sector for maintenance of these areas should be explored.
xxxiv
a) For the planning and implementation of any slum development scheme, it is essential to create an updated database on the conditions of slum settlements, preferably through GIS and maintain this updated data. b) While planning for redevelopment of slums, Nagar Parishad should focus on infrastructure such as sewers, piped water, and electricity grids. c) Effective hygiene education and awareness-building programs are essential to create demand for sanitation and to ensure its adequate use by all household members. Other investments required as part of slum up gradation include investment in storm water drainage, community facilities, local markets, and street lighting. Health services require investments as well.. Clinics/health posts need to be more accessible and hence should be located at an easy access, and open during hours that can accommodate the schedules of the working poor.
Sectors A B C D E F G H Water Supply Sewerage and Sanitation Urban Roads, Transport & Traffic Storm Water Drains Street Lighting Solid Waste Management Urban Poor/ Slums' Improvement Health Infrastructure
xxxv
Investment Required S.No. Budni Nagar Parishad Investment by 2015 Rs. Lakhs 260 100 15 8 125 6 150 4,251 Investment by 2025 Rs. Lakhs 300 5 63 2 2,138 Investment by 2035 Rs. Lakhs 520 8 23 2 2,955 Total Investment Need Rs. Lakhs 1,080 100 15 20 210 10 150 9,345
Sectors I J K L M N O Education Infrastructure Socio-Cultural Facilities Economy Heritage & Tourism Urban Environment Urban Governance Others
xxxvi
b. User charges through increased penetration of water connections and new sewerage connections could potentially triple user charges income from the current levels. c. NGOs / Corporate participation - Intensify focus on attracting NGOs/advertising revenue for city beautification projects to reduce reliance on grants for such projects.
xxxvii
Contents
1. INTRODUCTION ............................................................................................................................. 1 1.1. BACKGROUND ......................................................................................................................................... 1 1.2. OBJECTIVES AND SCOPE OF W ORK ....................................................................................................... 1 1.3. DESCRIPTION OF TASKS (AS OUTLINED IN RFP) ................................................................................... 2 1.3.1. Inception ........................................................................................................................................ 2 1.3.2. Development of strategies and priority actions ........................................................................ 4 1.3.3. Preparing a City Investment Plan (CIP) and a financing strategy ......................................... 4 1.3.4. Draft CDP ...................................................................................................................................... 5 1.3.5. Final CDP document.................................................................................................................... 5 1.4. APPROACH .............................................................................................................................................. 5 1.4.1. Guiding Principle .......................................................................................................................... 5 1.4.2. Approach and Methodology ........................................................................................................ 6 1.4.3. Module I: Inception and Kick off ................................................................................................. 7 1.4.4. Module II: Consultations and Analysis ...................................................................................... 9 1.4.5. Module III: Finalisation .............................................................................................................. 11 1.5. STAKEHOLDERS INTERACTION ............................................................................................................. 12 1.5.1. Interaction with Municipal Body and other Stakeholders ..................................................... 12 1.5.2. Formation of Steering Group .................................................................................................... 14 1.5.3. Workshops .................................................................................................................................. 14 1.6. REPORT CONTENTS .............................................................................................................................. 15 2. PHYSICAL FEATURES OF THE TOWN ...................................................................................... 17 2.1. INTRODUCTION...................................................................................................................................... 17 2.2. DISTRICT INFORMATION ........................................................................................................................ 17 2.3. LOCATION (LINKAGES AND CONNECTIVITY) ......................................................................................... 18 2.4. PHYSIOGRAPHY AND LANDFORM .......................................................................................................... 19 2.4.1. Climate & Rainfall ....................................................................................................................... 19 2.4.2. Wind direction ............................................................................................................................. 19 2.5. MUNICIPAL AREA AND PLANNING AREA ................................................................................................ 19 2.6. CONCLUSIONS ...................................................................................................................................... 20 3. DEMOGRAPHIC PROFILE OF THE TOWN................................................................................. 21 3.1. 3.2. 3.3. 3.4. 3.5. 3.6. 4. INTRODUCTION...................................................................................................................................... 21 POPULATION GROWTH .......................................................................................................................... 21 POPULATION PROJECTION .................................................................................................................... 22 POPULATION DENSITY .......................................................................................................................... 23 OTHER DEMOGRAPHIC INDICATORS ..................................................................................................... 24 ISSUES .................................................................................................................................................. 24
SOCIO ECONOMIC PROFILE OF THE TOWN ........................................................................... 26 4.1. INTRODUCTION...................................................................................................................................... 26 4.2. INDICATORS .......................................................................................................................................... 26 4.2.1. Sex ratio and Literacy rate ........................................................................................................ 26 4.2.2. Average household size ............................................................................................................ 27 4.2.3. Workforce participation (Primary, Secondary and Tertiary occupation and income levels) 28 4.3. ECONOMIC ACTIVITIES .......................................................................................................................... 29 4.3.1. Agricultture activities .................................................................................................................. 29 4.3.2. Industrial activities ...................................................................................................................... 29 4.3.3. Trade and commerce ................................................................................................................ 30 4.3.4. Tourism ........................................................................................................................................ 30
xxxviii
4.4. 5.
ISSUES .................................................................................................................................................. 30
SPATIAL PLANNING AND GROWTH MANAGEMENT .............................................................. 31 5.1. SPATIAL GROWTH TRENDS ................................................................................................................... 31 5.2. SPATIAL DISTRIBUTION OF POPULATION............................................................................................... 31 5.2.1. Municipal level mapping (1:1000) ............................................................................................ 31 5.2.2. Ward delineation map................................................................................................................ 32 5.3. LAND-USE ANALYSIS ............................................................................................................................. 32 5.4. HOUSING SCENARIO ............................................................................................................................. 32 5.4.1. Present and future Housing demand ...................................................................................... 32 5.4.2. Illegal colonies ............................................................................................................................ 33 5.4.3. Future growth possibilities ........................................................................................................ 33 5.5. CONCLUSIONS ...................................................................................................................................... 33
6. CITYS INFRASTRUCTURE EXISTING STATUS, GAPS, ISSUES, SWOT, GOALS AND STRATEGIES ....................................................................................................................................... 34 6.1. W ATER SUPPLY .................................................................................................................................... 34 6.1.1. Quality and quantity of water at source .................................................................................. 34 6.1.2. Quality and quantity of water in distribution system .............................................................. 35 6.1.3. Other sources ............................................................................................................................. 35 6.1.4. Water distribution arrangements and water charges ............................................................ 35 6.1.5. Water treatment facilities .......................................................................................................... 36 6.1.6. Present and Future Demand and Supply Gaps ..................................................................... 36 6.1.7. Water supply projects ................................................................................................................ 37 6.1.8. SWOT analysis ........................................................................................................................... 38 6.1.9. Issues ........................................................................................................................................... 38 6.2. SEWERAGE AND SANITATION ............................................................................................................... 39 6.2.1. Existing sewerage system ........................................................................................................ 39 6.2.2. Means of sewage disposal ....................................................................................................... 39 6.2.3. Household toilets (Dry Latrines and Flush latrines) .............................................................. 39 6.2.4. Public toilets ................................................................................................................................ 39 6.2.5. Present and Future Demand and Supply Gaps ..................................................................... 39 6.2.6. Sewerage projects ..................................................................................................................... 40 6.2.7. SWOT analysis ........................................................................................................................... 40 6.2.8. Issues ........................................................................................................................................... 41 6.3. SOLID WASTE MANAGEMENT ................................................................................................................ 41 6.3.1. Current practices of Solid waste management ...................................................................... 41 6.3.2. Present and Future Demand and Supply Gaps ..................................................................... 42 6.3.3. SWOT analysis ........................................................................................................................... 43 6.3.4. Issues ........................................................................................................................................... 43 6.4. DRAINAGE ............................................................................................................................................. 44 6.4.1. Existing drainage system .......................................................................................................... 44 6.4.2. Present and Future Demand and Supply Gaps ..................................................................... 44 6.4.3. SWOT analysis ........................................................................................................................... 45 6.4.4. Issues ........................................................................................................................................... 45 6.5. TRAFFIC AND TRANSPORTATION .......................................................................................................... 45 6.5.1. Existing traffic & transportation scenario ................................................................................ 45 6.5.2. Travel characteristics ................................................................................................................. 46 6.5.3. Public transport / mass transit .................................................................................................. 47 6.5.4. Traffic management and circulation ........................................................................................ 47 6.5.5. Parking Current arrangements and requirements ............................................................. 47 6.5.6. Present and Future Demand and Supply Gaps ..................................................................... 47
xxxix
6.5.7. SWOT analysis ........................................................................................................................... 48 6.5.8. Issues ........................................................................................................................................... 48 6.6. STREET LIGHTING AND FIRE FIGHTING ................................................................................................. 48 6.6.1. Existing situation of Street lights .............................................................................................. 48 6.6.2. Fire service .................................................................................................................................. 49 6.6.3. Power generation and distribution ........................................................................................... 49 6.6.4. Present and Future Demand and Supply Gaps ..................................................................... 49 6.6.5. SWOT Analysis .......................................................................................................................... 50 6.6.6. Issues ........................................................................................................................................... 50 6.7. URBAN POOR AND THEIR ACCESSIBILITY TO BASIC SERVICES............................................................. 50 6.7.1. Poverty in the town .................................................................................................................... 50 6.7.2. Separate information on BPL population and Slum population .......................................... 51 6.7.3. General characteristics of slum ................................................................................................ 51 6.7.4. Urban basic services in slums (In line with JNNUR Ms 7 point charter) ............................ 51 6.7.5. SWOT analysis ........................................................................................................................... 51 6.7.6. Issues ........................................................................................................................................... 51 6.8. SOCIAL INFRASTRUCTURE .................................................................................................................... 52 6.8.1. Overall Health facilities in the town ......................................................................................... 52 6.8.2. Overall Educational facilities in the town ................................................................................ 53 6.8.3. Recreational facilities (Parks, Playgrounds etc) .................................................................... 54 6.9. ENVIRONMENT ...................................................................................................................................... 55 6.9.1. Pollution levels (Air, Water and Soil) ....................................................................................... 55 6.9.2. City green spaces ...................................................................................................................... 55 6.9.3. Water front development and conservation ........................................................................... 55 6.9.4. Existing environmental regulations .......................................................................................... 55 6.9.5. SWOT analysis ........................................................................................................................... 56 6.9.6. Issues ........................................................................................................................................... 57 6.10. HERITAGE AND CONSERVATION ....................................................................................................... 57 6.10.1. Identification of Heritage structures/Areas ............................................................................. 58 6.10.2. Existing status of Heriatge buildings ....................................................................................... 58 6.10.3. Possibility of tourism circuits at the regional level ................................................................. 58 6.10.4. SWOT analysis ........................................................................................................................... 58 6.10.5. Issues ........................................................................................................................................... 58 6.11. EXISTING INSTITUTIONAL FRAMEWORK FOR DEVELOPMENT ........................................................... 59 6.11.1. Urban Local body structure ...................................................................................................... 59 6.11.2. Town and Country planning department ................................................................................ 60 6.11.3. Development authority .............................................................................................................. 60 6.11.4. Public health engineering department .................................................................................... 61 6.11.5. Madhya Pradesh housing board .............................................................................................. 61 6.11.6. Madhya Pradesh pollution control board ................................................................................ 61 6.11.7. Issues ........................................................................................................................................... 62 6.12. CONCLUSION .................................................................................................................................... 62 7. INVESTMENT PLAN AND FINANCING STRATEGIES ............................................................... 63 7.1. FINANCIAL STATUS AT A GLANCE......................................................................................................... 63 7.2. REVENUE ACCOUNT.............................................................................................................................. 64 7.2.1. Revenue income ........................................................................................................................ 64 7.2.2. Own Sources .............................................................................................................................. 64 7.2.3. Revenue expenditure ................................................................................................................ 67 7.3. CAPITAL ACCOUNT ................................................................................................................................ 68 7.4. KEY FINANCIAL INDICATORS ................................................................................................................. 69 7.5. STRATEGIES TO IMPROVE FINANCIAL CONDITION................................................................................. 71
xl
7.6.
CONCLUSION ........................................................................................................................................ 72
8. CITY VISION, SECTOR GOALS, STRATEGIES, ACTION PLAN, PROJECTS AND PRIORITIZATION ................................................................................................................................. 73 8.1. FORMULATION OF CITY VISION ............................................................................................................ 73 8.1.1. Vision for the Town .................................................................................................................... 73 8.1.2. Mission Statements.................................................................................................................... 74 8.2. SECTOR GOALS, STRATEGIES, ACTION PLAN AND PROJECTS ........................................................... 75 8.2.1. Water supply ............................................................................................................................... 75 8.2.2. Sewerage and Sanitation .......................................................................................................... 78 8.2.3. Solid waste management .......................................................................................................... 82 8.2.4. Drainage ...................................................................................................................................... 85 8.2.5. Traffic and transportation .......................................................................................................... 87 8.2.6. Street lighting and Fire fighting ................................................................................................ 89 8.2.7. Urban poor and their accessibility to basic Services ............................................................ 92 8.2.8. Health ........................................................................................................................................... 94 8.2.9. Education .................................................................................................................................... 96 8.2.10. Other Social Infrastructure - Recreational .............................................................................. 97 8.2.11. Environment ................................................................................................................................ 99 8.2.12. Economic Development .......................................................................................................... 100 8.2.13. Heritage Conservation and Tourism ..................................................................................... 101 8.2.14. Urban Governance ................................................................................................................... 102 8.2.15. Conclusion................................................................................................................................. 103 9. CITY INVESTMENT PLAN .......................................................................................................... 104 9.1. CITY INVESTMENT PLAN (CIP) ........................................................................................................... 104 9.2. INSTITUTIONALISING THE CIP PROCESS ............................................................................................ 104 9.3. CITY PRIORITIES ................................................................................................................................. 105 9.4. SUMMARY OF INVESTMENTS .............................................................................................................. 107 9.5. CAPITAL NEEDS/ INVESTMENTS PHYSICAL INFRASTRUCTURE ....................................................... 108 9.5.1. Water Supply ............................................................................................................................ 108 9.5.2. Sewerage& Sanitation ............................................................................................................. 109 9.5.3. Roads, street lighting and traffic management .................................................................... 110 9.5.4. Storm Water Drainage ............................................................................................................. 111 9.5.5. Solid Waste Management ....................................................................................................... 112 9.6. CAPITAL NEEDS/ INVESTMENTS SOCIAL INFRASTRUCTURE............................................................ 113 9.6.1. Health Infrastructure ................................................................................................................ 113 9.6.2. Education Infrastructure .......................................................................................................... 113 9.6.3. Socio-Cultural Infrastructure ................................................................................................... 114 9.7. CAPITAL NEEDS/ INVESTMENTS LOCAL ECONOMY ......................................................................... 114 9.8. CAPITAL NEEDS/ INVESTMENTS ENVIRONMENT AND HERITAGE &TOURISM .................................. 115 9.8.1. Urban Environment .................................................................................................................. 115 9.8.2. Heritage and Tourism .............................................................................................................. 115 9.9. SLUMS AND BASIC SERVICES FOR URBAN POOR .............................................................................. 116 9.10. CAPITAL NEEDS/ INVESTMENTS URBAN GOVERNANCE .............................................................. 117 9.11. FINANCING OPTIONS AND STRUCTURING ....................................................................................... 117 9.11.1. Project structuring and risk assessment ............................................................................... 117 9.11.2. Financing options for the identified projects: ........................................................................ 120 10. FINANCIAL OPERATING PLAN ............................................................................................. 125 INTRODUCTION................................................................................................................................ 125 FINANCING STRATEGIES FOR THE CIP .......................................................................................... 125
10.1. 10.2.
xli
10.3. FINANCE PROJECTIONS .................................................................................................................. 126 10.3.1. Municipal Account Growth Projections and Assumptions .............................................. 126 10.3.2. Investment Capacity/ Sustenance ......................................................................................... 128 10.4. FUND REQUIREMENT ...................................................................................................................... 129 10.5. FINANCIAL OPERATING PLAN.......................................................................................................... 130 10.6. CONCLUSION .................................................................................................................................. 131 11. URBAN REFORMS ................................................................................................................. 132
11.1. INTRODUCTION................................................................................................................................ 132 11.2. MANDATORY REFORMS AT THE LEVEL OF THE STATE GOVERNMENT .......................................... 132 11.2.1. Implementation of the 74th Constitutional Amendment Act ............................................... 132 11.2.2. Public Disclosure Law ............................................................................................................. 133 11.2.3. Rationalization of Stamp Duty ................................................................................................ 133 11.2.4. Repeal of Urban Land Ceiling and Regulation Act ............................................................. 133 11.2.5. Rent Control .............................................................................................................................. 134 11.2.6. Community Participation Law ................................................................................................. 134 11.2.7. City Planning Functions .......................................................................................................... 134 11.3. MANDATORY REFORMS AT THE LEVEL OF THE URBAN LOCAL BODY............................................ 135 11.3.1. Municipal Accounting ............................................................................................................... 135 11.3.2. E-Governance........................................................................................................................... 136 11.3.3. User Charges ............................................................................................................................ 136 11.3.4. Basic Services to the Urban Poor .......................................................................................... 137 11.3.5. Internal earmarking for basic services for poor ................................................................... 138 11.3.6. Property Tax ............................................................................................................................. 139 11.4. OPTIONAL REFORMS AT LEVEL OF THE STATE GOVERNMENT/URBAN LOCAL BODY ................... 140 11.5. CONCLUSION .................................................................................................................................. 141 ANNEXURE I WORKSHOP PROCEEDINGS................................................................................. 142 ANNEXURE II QUESTIONNAIRE ................................................................................................... 153 ANNEXURE III FINANCIAL PROJECTIONS.................................................................................. 161 ANNEXURE IV - MAPS ...................................................................................................................... 166 ANNEXURE V PRESENTATION OF FINAL WORKSHOP ............................................................ 167
xlii
Exhibits
Exhibit 1-2 List of Members of Steering Group ..................................................................................... 14 Exhibit 2-1 District Information - Sehore ............................................................................................... 18 Exhibit 2-2 Nagar Parishad area Village wise .................................................................................... 20 Exhibit 3-1 Population & Decadal Growth ............................................................................................. 21 Exhibit 3-2 Decadal growth rate ............................................................................................................ 21 Exhibit 3-3 Population Projection by various method ........................................................................... 22 Exhibit 3-4 Assumed Population projection .......................................................................................... 22 Exhibit 3-5 Tentative ward area and densities ...................................................................................... 23 Exhibit 3-6 Ward wise demographic details .......................................................................................... 24 Exhibit 3-7 Demographic Indicators - Budni vis-a-vis Sehore district and MP State ............................ 24 Exhibit 4-1 Literacy rate and Sex ratio .................................................................................................. 26 Exhibit 4-2 Categorisation of Sex Ratio ................................................................................................ 27 Exhibit 4-3 Categorisation of Literacy rate ............................................................................................ 27 Exhibit 4-4 Ward wise household size .................................................................................................. 28 Exhibit 4-5 Work Participation rate ........................................................................................................ 28 Exhibit 5-1 Land-use analysis ............................................................................................................... 32 Exhibit 5-2 Housing demand ................................................................................................................. 32 Exhibit 6-1 Demand Collection Balance Water Supply ................................................................... 35 Exhibit 6-2 Service level indicators ....................................................................................................... 36 Exhibit 6-3 Water Supply Demand and Gap Analysis .......................................................................... 36 Exhibit 6-4 Sanitation Facilities in Budni .......................................................................................... 39 Exhibit 6-5 Sewage and sanitation gap analysis................................................................................... 40 Exhibit 6-6 Details of Existing Solid waste management ...................................................................... 41 Exhibit 6-7 Solid Waste Management - Service Level Indicators ................................................... 42 Exhibit 6-8 Solid waste management gap analysis .............................................................................. 42 Exhibit 6-9 Storm water drainage gap analysis..................................................................................... 44 Exhibit 6-10 Existing Road Network ...................................................................................................... 46 Exhibit 6-11 Demand - Gap analysis of roads ...................................................................................... 47 Exhibit 6-12 Details of existing Street Lighting...................................................................................... 49 Exhibit 6-13 Demand gap analysis for Street Light ............................................................................... 49 Exhibit 6-14 Demand Gap analysis of health facilities .......................................................................... 52 Exhibit 6-15 Educational Institutions in Budni ....................................................................................... 53 Exhibit 6-16 Demand Gap Analysis of Education facilities ................................................................... 53 Exhibit 6-17 Recreational facilities in Budni .......................................................................................... 54 Exhibit 7-1 Financial Status at a Glance ............................................................................................... 63 Exhibit 7-2 Revenue income for last 5 years - Budni Nagar Parishad .................................................. 64 Exhibit 7-3 Tax Revenue - Budni Nagar Parishad (last 5 years) in lakhs (Rs) ..................................... 65 Exhibit 7-4 Property tax Demand Collection Balance (last 5 years) in lakhs (Rs) ............................. 65 Exhibit 7-5 Non Tax Revenue - Budni Nagar Parishad (Last 5 years) in lakhs (Rs) ............................ 66 Exhibit 7-6 DCB Statement for Water Charge Collection ..................................................................... 66 Exhibit 7-7 Assigned reveue and Compensation - Budni Nagar Parishad (Last five years) in lakh (Rs) .............................................................................................................................................................. 67 Exhibit 7-8 Revenue Grants, Contributions and Subsidies Budni Nagar Parishad in lakh (Rs) ........... 67 Exhibit 7-9 Revenue expenditure - Budni ............................................................................................. 67 Exhibit 7-10 Capital Income - Budni Nagar Parishad (Past 5 years) .................................................... 68 Exhibit 7-11- Capital Expenditure Budni Nagar Parishad (past 5 years) in lakh (Rs) .......................... 69 Exhibit 7-12 Resource Mobilization ....................................................................................................... 69 Exhibit 7-13 Expenditure Management ................................................................................................. 70 Exhibit 7-14 Financial Indicators ........................................................................................................... 70 Exhibit 8-1 Water Supply: Achievement Targets .................................................................................. 75 Exhibit 8-2 Water Supply Long Term and Short Term Interventions .................................................... 76 Exhibit 8-3 Projects identified for Water sector ..................................................................................... 77
xliii
Exhibit 8-4 Water Supply: Project development initiatives to be taken by the Nagar Parishad ............ 78 Exhibit 8-5 Sewerage & Sanitation: Achievement Targets ................................................................... 79 Exhibit 8-6 Sewerage and Sanitation: Long Term and Short Term Interventions ................................ 79 Exhibit 8-7 Projects identified for Sewerage Sector .............................................................................. 80 Exhibit 8-8 Sewerage & Sanitation: Initiatives to be taken by the Nagar Parishad .............................. 81 Exhibit 8-9 Solid Waste Management: Achievement Targets ............................................................... 82 Exhibit 8-10: Solid Waste Management: Long Term and Short Term Interventions ............................ 82 Exhibit 8-11: Projects identified for Solid Waste Management ............................................................. 83 Exhibit 8-12 Solid Waste Management: Initiatives to be taken by the Nagar Parishad ........................ 85 Exhibit 8-13 Storm Water Drainage: Achievement Targets .................................................................. 85 Exhibit 8-14: Storm Water Drainage: Long Term and Short Term Interventions .................................. 86 Exhibit 8-15: Projects identified for Storm Water Drainage .................................................................. 86 Exhibit 8-16: Storm Water Drainage: Initiatives to be taken by the Nagar Parishad ............................ 87 Exhibit 8-17 Roads & Transportation: Achievement Targets ................................................................ 87 Exhibit 8-18: Roads and Street Lights: Long Term and Short Term Interventions ............................... 88 Exhibit 8-19: Projects identified for Roads ............................................................................................ 89 Exhibit 8-20 Roads & Transportation: Initiatives to be taken by Budni Nagar Parishad ....................... 89 Exhibit 8-21 Street Lighting & Fire Fighting: Achievement Targets ...................................................... 89 Exhibit 8-22Street Lighting, Fire Fighting and Power: Long Term and Short Term Interventions ........ 90 Exhibit 8-23: Projects identified for Street Lighting and Fire Fighting Sector ....................................... 91 Exhibit 8-24 Street Lighting, Fire Fighting and Power: Initiatives to be taken ...................................... 91 Exhibit 8-25 Urban Poor : Achievement targets .................................................................................... 92 Exhibit 8-26 Urban Poor : Short term and Long term Strategies .......................................................... 93 Exhibit 8-27 Projects identified for Slums & basic services for urban poor .......................................... 94 Exhibit 8-28 Health: Achievement Target ............................................................................................. 94 Exhibit 8-29- Health: Long Term and Short Term Interventions ........................................................... 95 Exhibit 8-30 Health: Implementation Agencies ..................................................................................... 96 Exhibit 8-31- Education: Achievement Targets ..................................................................................... 96 Exhibit 8-32- Education: Long Term and Short Term Interventions ..................................................... 97 Exhibit 8-33- Education: Implementation Agencies .............................................................................. 97 Exhibit 8-34 Other Social Infrastructures: Achievement Target ............................................................ 98 Exhibit 8-35 Other Social Infrastructures: Long Term and Short Term Interventions .......................... 98 Exhibit 8-36 Other Social Infrastructures: Implementation Agencies ................................................... 99 Exhibit 8-37- Local Economy: Long Term and Short Term Interventions ........................................... 101 Exhibit 8-38- Local Economy: Long Term and Short Term Interventions ........................................... 102 Exhibit 8-39 Urban Governance - Achievement Targets .................................................................... 102 Exhibit 9-1 Status of Infrastructure Facilities................................................................................. 106 Exhibit 9-2 Ranking of Infrastructure Facilities ............................................................................. 106 Exhibit 9-3 Critical Sectoral Issues ................................................................................................. 106 Exhibit 9-4 State of Social Infrastructure ........................................................................................ 107 Exhibit 9-5 Period wise summary of Capital Investments ............................................................ 107 Exhibit 9-6 Summary of Capital Investments ................................................................................. 108 Exhibit 9-7Priority needs (2015) / Long term needs (2035) ................................................................ 109 Exhibit 9-8 Action Plan for Implementation (2015) ............................................................................. 109 Exhibit 9-9 Priority needs (2015) /Long term needs (2035) ................................................................ 110 Exhibit 9-10 Action Plan for Implementation (2015) ........................................................................... 110 Exhibit 9-11 Priority needs (2015) /Long term needs (2035) .............................................................. 110 Exhibit 9-12 Action Plan for Implementation (2015) ........................................................................... 111 Exhibit 9-13 Priority needs (2015) / Long term needs (2035) ............................................................. 111 Exhibit 9-14 Action Plan for Implementation (2015) ........................................................................... 111 Exhibit 9-15 Action Plan for Implementation (2015) ........................................................................... 112 Exhibit 9-16 Priority needs (2015) / Long term needs (2035) Health Infrastructure ........................ 113 Exhibit 9-17 Action Plan for Implementation (2015) - Health Infrastructure ....................................... 113 Exhibit 9-18 Priority needs (2015) /Long term needs (2035) - Education Infrastructure .................... 113 Exhibit 9-19 Action Plan for Implementation (2015) - Education infrastructure .................................. 114
xliv
Exhibit 9-20 Priority needs (2015) / Long term needs (2035) - Socio- cultural infrastructure ............. 114 Exhibit 9-21 Action Plan for Implementation (2015) - Socio - cultural infrastructure .......................... 114 Exhibit 9-22 Priority needs (2015) / Long term needs (2035) - Economy........................................... 115 Exhibit 9-23 Action Plan for Implementation (2015) - Economy ......................................................... 115 Exhibit 9-24 Priority needs (2015) / Long term needs (2035) - Environment ..................................... 115 Exhibit 9-25 Action Plan for Implementation (2015) - Environment .................................................... 115 Exhibit 9-26 Priority needs (2015) / Long term needs (2035) - Heritage and tourism ........................ 116 Exhibit 9-27 Action Plan for Implementation (2015) - Heritage and Tourism ..................................... 116 Exhibit 9-28 Action Plan for Implementation (2015) - Urban Poor ...................................................... 116 Exhibit 9-29 Priority needs (2015) / Long term needs (2035) - Urban Governance ........................... 117 Exhibit 9-30 Action Plan for Implementation (2011-12 to 2015-16) - Urban Governance .................. 117 Exhibit 9-31 Funding options - Water supply ...................................................................................... 120 Exhibit 9-32 Funding option - Sewerage ............................................................................................. 121 Exhibit 9-33 - Funding option - Roads and urban transport ................................................................ 122 Exhibit 9-34 Funding option - Storm water Drainage .......................................................................... 122 Exhibit 9-35 Funding option - Solid Waste Management .................................................................... 123 Exhibit 9-36 Funding option - Urban poor ........................................................................................... 124 Exhibit 10-1 Important assumptions made in the projections ............................................................. 126 Exhibit 10-2 Different scenarios to assess investment sustainability ................................................. 128 Exhibit 10-3 Impact of reforms and grants on investment capacity .................................................... 129 Exhibit 10-4 CIP Funding Pattern ....................................................................................................... 130 Exhibit 10-5 Financial Operating Plan ................................................................................................. 130 Exhibit 11-1 Municipal Accounting: Reform Action Plan ..................................................................... 135 Exhibit 11-2 E-Governance: Reform Action Plan ............................................................................... 136 Exhibit 11-3 User Charges: Reform Action Plan ................................................................................. 137 Exhibit 11-4 Internal Earmarking for Poor: Reform Action Plan.......................................................... 139 Exhibit 11-5 Property Tax: Reform Action Plan .................................................................................. 139
xlv
Figures
Exhibit 1.1 Approach and Methodology .................................................................................................. 8 Exhibit 1.2 Developing a City Vision (Source: JnNURM Toolkit) .......................................................... 10 Figure 1-1 Second Workshop ............................................................................................................... 16 Figure 2-1 Map Showing location of Sehore district in MP ................................................................... 17 Figure 2-2 Map Showing location of Budni in Sehore district ............................................................... 17 Figure 6-1 Existing Storm water drains ................................................................................................. 44 Figure 6-2 Heavy vehicular traffic on Arterial Road .............................................................................. 46 Figure 6-3 Primary Health care center .................................................................................................. 52 Figure 6-5 Public park ........................................................................................................................... 54 Figure 6-4 Dusserah Maidan................................................................................................................. 54 Figure 6-6 Budni Ghat ........................................................................................................................... 57 Figure 6-7 Steps at Budni Ghat ............................................................................................................ 57 Figure 7-1 Capital Account - Budni Nagar Parishad ............................................................................. 63 Figure 7-2 Revenue Account - Budni Nagar Parishad .......................................................................... 63 Figure 7-3 Sources of revenue ............................................................................................................. 64 Figure 7-4 Items of expenditure ............................................................................................................ 68 Figure 7-5 Capital expenditure .............................................................................................................. 68
List of Maps
Map 1 - Location map with respect to country/ state/ district Map 2 - District map showing Railway and road network Map 3 - Base Map of the town Map 4 Ward map Map 5 Population Density Map 6 Sex Ratio Map 7 Literacy Rate Map 8 Slum Location Map 9 Social Infrastructure Map 10 - Existing Land-use map Map 11 - Existing Road network map Map 12 Drainage System Map 13 - Proposed Landuse Map 14 - Proposed Road network Map 15 - Proposed Water Supply System Map 16 Proposed drainage Map 17 Solid Waste - Dumping ground
xlvi
xlvii
PHFW PSC PWD ROB RZTS SADA SC/ST SDM SFC SH STP SWOT TCPD TFC UADD UDPFI UGD UIDSSMT ULB ULCRA
Department of Public Health and Family Welfare Public Sanitary Conveniences Public Works Department Road Over Bridge Root Zone Treatment system Special Area Development Authority Scheduled Caste/ Scheduled Tribe Sub Divisional Magistrate State Finance Commission State Highway Sewage Treatment Plant Strengths, Weaknesses, Opportunities and Threats Town and Country Planning Department Twelfth Finance Commission Urban Administration and Development Department Urban Development and Plan Formulation and Implementation Under Ground Drainage Urban Infrastructure Development Scheme for Small and Medium Towns Urban Local Body Urban Land Ceiling and Regulation Act
xlviii
1. Introduction
1.1. Background
Madhya Pradesh is urbanizing at a fast rate and the Urban Local Bodies (ULBs) in the state are facing the challenge of meeting the requirements of the growing population with limited technical and financial resources. The Government of India (GoI) and Government of Madhya Pradesh (GoMP) have initiated a number of programmes to meet the growing demands of infrastructure and service delivery. These include both GoI schemes [including Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) and Integrated Housing and Slum Development Programme (IHSDP)] and GoMP initiated schemes [such as the Madhya Pradesh Urban Services for the Poor (MPUSP), a DFID assisted program, which links reform with investment in infrastructure for the poor. After the assessment of the performance of the ULBs and their capacity for exploiting the above said resources it was felt that such a plan is essential, not only for accessing GoI/GoMP funding but also for providing a strategic framework for converging and co-ordinating various development inputs towards positioning the city on a development path. Therefore, the Urban Administration and Development Department (UADD) of Government of Madhya Pradesh (GoMP) has launched an initiative to support 5 Municipal councils, 245 Nagar Parishads and 30 urban centres in the state in preparing City Development Plans (CDPs). This initiative aims to provide a comprehensive Medium Term Strategy (25 years) and a City Investment Plan (CIP) for each Urban Local Body, based on which the concerned ULB will be able to access funds under schemes of Government of India (GoI) and GoMP as well as from its own sources for implementation of priority actions and projects, identified from this exercise. The document was also envisaged to provide a Financial Operating Plan (FOP) to direct the ULBs for mobilising various financial resources to implement the identified projects, adhering to the JNNURMs CDP preparation toolkit and keeping in view the Master Plan (wherever exists) provisions as prepared by Town and Country Planning Department. The preparation of the CDP will take advantage of the Revised CDP preparation toolkit/Heritage cities toolkit prepared by GoI under JNNURM and UADD/CMAMP guidelines. It is also expected that the CDP would provide Urban Reform Action Plan for the ULBs as envisaged under JNNURM. In this regard, MPUADD retained ICRA Management Consulting Services Limited (IMaCS) for assistance in preparation of City Development Plans for Budni city.
The CDP will generate specific priority actions and projects that can be the basisfor mobilizing funding from diverse sources.
1.3.1. Inception
This stage includes a preliminary analysis of the town including strengths and weaknesses of the city and finalization of the approach and methodology for the preparation of CDP for the town. This stage also gives an understanding of what impedes service delivery and management within the existing set-up and what contributes to better service provision. This stage consists of the following tasks:
Reconnaissance
During the first week of the assignment a reconnaissance exercise has been conducted, which included the following activities: 1. Introductory meetings with the Mayor/President, Municipal Commissioner/Chief Municipal Officer, Heads of Departments, Councilors, representatives of ongoing urban programmes, etc. 2. Determination of the feasibility and composition of a city level Steering Group (comprising of Citizen forum) for the CDP 3. Formation of Citizen Forum comprising of 15 eminent persons from different walks of life. 4. Obtain base maps, and available secondary data on the citys demographics, master plan, reports prepared under past and current urban development programmes, ULBs annual budget reports, other reports giving status of service delivery, and other relevant documents on heritage listing, data on slums and urban poor, government policy documents, etc. 5. Identification of the line departments and key stakeholders for urban service delivery and development such as PHED, Town and Country Planning Department, Development Authority, SADA, local chamber of commerce, NGOs, CBOs, religious organizations, financial institutions, commerce and industry etc. 6. Field reconnaissance to determine growth patterns of the city, characteristics of slums and environmentally sensitive areas etc. 7. Identification of economic opportunities and blocks in tapping these (eg. Tourism, industry etc.) 8. Mapping: Preparation of City level base maps using Auto-CAD/GIS.
Elected representatives, Mayor/President, Municipal Commissioner/Chief Municipal Officer etc. City level planning and service providing agencies viz., ULB, Town and Country Planning Department, Development Authority, SADA etc. Line Departments of the state government such as pollution control board, health department, tourism department, PHED, PWD, Traffic and Transportation etc Private sector agencies such as chambers of commerce and industry, Non-governmental and community based organizations Representatives of the poor communities Representatives of ongoing urban development programmes Representatives of media, academic institutions, etc.
Inception report
At the completion of this phase, an inception report consisting of a preliminary analysis of the town and final approach and methodology for CDP preparation has been submitted to the ULB. Further to which a presentation on the same report has been undertaken with the stakeholders to seek their inputs on the approach and methodology suggested in the inception report.
Sector analysis
Based on the interactions with various stakeholder groups (meetings, workshops, focus group discussions, etc.) and review of relevant documents (publications, reports, GOs, resolutions, procedures, laws etc.) an analysis of the current situation in all the identified sectors has been undertaken. This sector analysis has been carried out in the consultation with local counterparts and further a methodology for the sector analysis has been developed, which includes the following: Study of economic opportunity and potential for Local/regional economic development, with special reference to the poor Physical infrastructure benchmarking) demand and gap assessment (considering service level
Transport study with emphasis on low cost public transport and livelihoods Heritage conservation and tourism Environmental sustainability Access to housing, employment and social and environmental services by the poor Health and Education services gap in the town Sectoral Issues addressed under the Master Plan (as prepared by the TCPD)
City profile
The findings from the sector analysis are used to prepare the City Profile consisting of the assessment of the existing situation in all identified sectors, emerging issues, SWOT analysis and projection of the present gaps and future requirements. Development of city vision and sector goals and strategies Discussion on strategies, priorities and major actions that may be required in the next five years to move towards the vision 2035 have been discussed to develop city vision, sector strategies and strategies.
Sector strategies
After reviewing relevant cases from national and international best practices, learning are identified to explore if the same can be applied in relevant sectors to bring in improved and efficient ways of working. This stages also includes consultations with the local counterparts to develop sector strategies in consonance with the city vision and sector goals.
scheduling to make the whole package work financially. The City Investment plan is supported with a Financial Operating Plan (FOP).
Performance Monitoring
Performance- monitoring/sustainability indicators have been identified to assist ULB in review the progress and outcomes of the CDP on an annual basis and to enable them in setting the agenda for the future.
1.4. Approach
The City Development Plan (CDP) is the Nagar Parishads strategy that presents both a vision of a desired future perspective for the town and the Parishads organization, and mission statements on how the Nagar Parishad, together with other stakeholders, intends to work towards achieving the short term and long-term vision. CDP should be very comprehensive and should cover all the aspects where town needs intervention. To achieve a comprehensive CDP, we have adopted few guiding principles as discussed below.
current initiatives for developing a strategic framework for development agenda in the next 25 year time horizon.
In addition, we had a significant on-the-ground interaction effort through our research and support staff to compile data and information from the cities. From our experience in handling such studies, very often it is critical to spend substantial time with ULB staff/do sample based field visits given the data and information availability related limitations. Such interactions enabled us capture qualitative insights and servedin providing surrogate inputs to validate and overcome the generally faced limitations of data availability. For instance, we have collected budget documents at the beginning at the study and do the analysis of financials in parallel. A time period wise analysis of revenue and costs along with their drivers enabled us to spot data discrepancies in the initial stages and helped us to identify areas where greater time is required for data collection/scrutiny. Similarly in the area of service levels benchmarking, we have done a physical reconnaissance of municipal assets to validate reports made available to us. We concurred the activities and steps identified by MPUADD in the Terms of Reference in moving from a Situation Assessment to formulate the City Vision and translating that to Sector strategies and priority projects. Some specifics of our approach along each of these steps are described below:
Sector Analysis
We have chosen the specific sectors/issues for preparing detailed sectoral papers, based on the criticality of the sector (as viewed by the stakeholders) and the baseline status of the prevailing service levels in that city. While the exact list of sectors has been finalized during consultations, an indicative list of sectors that came out as critical areas include the following: a. Water Supply b. Sanitation and Sewerage
c. d. e. f. g.
Solid Waste Management Urban Housing Public Transportation Social amenities and infrastructure including Schools, Hospitals, Markets Heritage & Tourism
The sector level analysis covered the following steps. a. Review the baseline status of the sector in terms of operational service level and financial indicators vis-a-vis benchmarks/norms and desired levels of service to arrive at the normative gaps. b. Identification of the possible alternatives for improving service levels, policy changes/implications and the magnitude of investment required to improve service levels in a time-bound manner. c. Developing a sector strategy, targets for service level improvement and a list of potential priority projects to be undertaken along with an expected level of improvement in service levels through implementation of these projects. These steps has been undertaken in consultation with local counterparts. While carrying out the sector level analysis, aspects relating to the need for provisioning for urban poor, broad review of cost-benefits including social and environmental impacts were factored.
City Profile
In profiling the City and crystallizing its SWOT (Strength, Weakness, Opportunity, Threat), we looked at slightly wider issues beyond sectoral dimensions to cover the following: 20. 21. 22. 23. 24. 25. Spatial growth patterns and drivers Economic growth drivers - intrinsic and potential Infrastructure - Physical and Social Issues relating to Environment sustainability Extent of Urban Poor and their requirements Institutional Capacity gaps and requirements.
The city profiles has been drawn from the Sector analysis and assessment of the existing situation in all the sectors identified, emerging issues, analysis and projection of the present gaps and future requirements.
City Vision
Exhibit 1.2presents an extract from the JNNURM Toolkit considered for developing a Citys Vision which we believed summarizes the key contours of a City level Vision formulation quite succinctly. The City Profile has been presented to the stakeholders and Steering Group followed with a discussion on city perspective and city priorities as perceived by the stakeholders. With the background of city profile, perspective and priorities, the participants contributed to the development a collective and shared vision for the city. Discussion were initiated on strategies, priorities and major actions that may be required in the next fifteen years to move towards the vision.
Exhibit 1.2 Developing a City Vision (Source: JnNURM Toolkit)
10
Developing a vision for the city is central to the preparation of a CDP. A vision is a statement of where the city wishes to go, within a given timeframe, and is often expressed in terms of clear expectations. It defines the potential of the city and reflects its unique attributes in terms of comparative and competitive advantages, values and preferences of the citys residents, relationship of the city to the state, national and global economies, and of course, the history and physical characteristics of the city. A vision aligns stakeholders energies to work cohesively for the development of the city. Citie s need to systematically consider the future, and design strategies to accordingly shape the future. All objectives, strategies, programmes and projects must be aligned with the vision of the city. Developing a common vision requires a significant effort of consensus building in order to balance the competing demands arising from different economic infrastructure sectors, as also from different interest groups within the city. In order to achieve an understanding on a common vision, it is useful to choose milestones and targets such as provision of a minimum level of services to all; public disclosure and transparency in the formulation of budget proposals; introduction of a single window in matters of service delivery and management and the like. In developing the vision, cities must choose a set of criteria that are directly relevant to the JNNURM components. It is important that when cities define outcomes and milestones on the vision, they ensure that these are measurable and have a time frame.
11
Our approach involved the following steps: Estimation of unconstrained sector wise Investment requirements given normative gaps in service levels (5 year, 10 year and 15 year horizons), sector wise service level improvement targets and identified priority projects for the first five years Preparation of Financial and Operating Plan and Estimation of borrowing capacity with operating revenue surplus improvements and revenue reforms Developing a realistic and actionable Investment Plan and a Financial and Operating Plan within borrowing capacity limitations with a 5-year action plan and 15-20 year financial projections.
Developing 5 year action plan is an iterative process andfactored inputs from consultations with stakeholders on priority projects to be taken up in consonance with the City Vision, Sector wise strategy and service level targets.
12
on improving the quality of services provided by municipality and data on existing on-going projects if any. These interactions also included collection of data pertaining to services offered by ULB. Post this, we met with ULB officials several times to identify Issues and Gaps which were presented before the stakeholders during the second workshop. Apart from meeting the ULB officials the team also interacted with other stakeholders mainly the elected ward members and other eminent personalities of the town. First formal addressing of all stakeholders happened during first workshop i.e. Kick -off Stakeholder Consultation Workshop, on Nov 3rd, 2011. Outcomes of this workshop were; familiarization of stakeholders with purpose, methodology & expected outcomes of the study, improvisation in our understanding of city & its problems, innovative approaches to counter existing problems and building of enthusiasm, understanding and commitment for the successful completion of a comprehensive and ambitious but implementable, City Development Plan. Next formal meeting to all the stakeholders happened in the Second workshop which was organized in the month of December with the help of the Nagar Parishad. The main aim of presentation was to apprise stakeholders of the findings of in-depth analysis of all the sectors/services that come under the purview of Municipal Corporationnamely Water Supply, Solid Waste Management System, Sewerage & Sanitation, Drainage, Transportation, Street Lighting & Fire Fighting and Urban Services for Poor. Apart from these sectors, Health and Education were also dealt in detail. Presentation started off with a brief introduction of the study i.e. Preparation of City Development Plan for the Budni, so as to bring all the stakeholders on the same platform. It was followed by a presentation of city profile which included general, demographic and socioeconomic city profiling. General city profile comprised of location, connectivity and a brief on environment of Budni. Demographic profile dealt with population growth trend and its probable reasons, population projection and major issues & key observations related to the demography of Budni. Socio-Economic profile comprised of key socio-economic parameters, major economic base and major issues & main observations. City profiling was followed by the findings of Sector Analysis (of aforementioned sectors) for short and medium term, i.e. 5 years and 25 years respectively. Analysis comprised of existing status of service level indicators, Demand-Supply Gaps for short & long term and key observations & major issues. It was then succeeded by an analysis of financial status of the Nagar Parishad. The discussion was carried out in terms of various financial indicators viz. Operating Ratio, Capital Utilization Ratio, Tax Revenue as % of revenue income, Non-Tax revenue as % revenue income, Property tax as % of revenue income, Grant as % of revenue income, Salaries' Expenses to Revenue Income, Salaries' Expenses to Revenue Expenses, O&M as % of Revenue Expenses. After covering these sections, IMaCS team turned their focus on formulation of a vision for Budni. This part of the presentation included definition of vision, major concerns that need to be addressed while developing a vision and important aspects that define Budni. It was then followed by few sample Vision Statements from IMaCS team. Before discussing the individual sector goals, IMaCS team presented the findings of review of national and international best practices for various sectors. Formulation of City vision and Sectoral goals were supplemented by a Questionnaire survey (Refer Annexure II) with the aim of obtaining stakeholders vision of the city. The Questionnaire survey comprised of a Hindi questionnaire. Questionnaire survey included stakeholders view of problems in
13
the various sectors, evaluation of citys growth and infrastructure and ranking of major issues of Budni, as perceived by stakeholders. Post this; the findings were presented at a State Level Review. After a go ahead from the state, Capital Investment Plan (CIP) & a Financial Operating Plan (FOP) were prepared for Budni and were presented in the third and the final Workshop which was held in the town.
S. No. 1 2 3 4 5 6 7
Designation / Department District Collector, Sehore Sub Divisional Magistrate Adyaksha (President Ruling party) Leader of opposition SDOForest, Budni Chief Municipal Officer Sub Engineer
Name Dr. Sanjay Goel Mr. J.P. Sachan Mr. Subhash Punjabi Mr. Amrutlal Yadav Mr. Pathak Mr.Radheshyam Tiwari Mr. Mukesh Jain
1.5.3. Workshops
The objectives and outcomes of various stakeholders are: 1. Kick-off Workshop Inception Workshop A workshop was organized to familiarize the stakeholders with the purpose, process, and expected outcomes of the CDP, and build enthusiasm, understanding and commitment to the CDP. The kick off workshop helped in deriving a consensus along with the stakeholders firming the process and agreeing upon a structured programme to take the CDP forward. It happened during first workshop rd i.e. Kick-off Stakeholder Consultation Workshop, on Nov 3 , 2011. Presentation was followed by a participative session on discussion & suggestions. Outcomes of this workshop were; familiarization of stakeholders with the purpose, methodology & expected outcomes of the study, improvisation in our understanding of city & its problems, innovative approaches to counter existing problems and building of enthusiasm, understanding and commitment for the successful completion of a comprehensive and ambitious but implementable, City Development Plan. 2. Second Workshop City Vision, Sector Goals, Strategies and Prioritization Second formal meeting addressing all stakeholders happened during second workshop on Dec. 22 , 2011. Presentation was followed by a participative session and questionnaire round, which helped in finalizing the city vision, sector goals, strategies and priority actions for the development of the town. This workshop culminated in the consolidation of strategies, priority actions and projects. City Development plan - Budni
nd
14
3. Third Workshop Draft CDP Workshop The third workshop was conducted on 28 August, 2012 at Budni. In this workshop, findings and recommendations to achieve the vision has been presented to the city. Detailed list of proposed projects with broad cost estimates have been shared along with the sustenance capacity of ULB. This workshop also discussed about the reform process to make ULB more efficient. This workshop culminated in the consolidation of draft CDP, comments to improve sectoral issues have been suggested by stakeholders. The detailed proceedings of various stakeholder workshops are provided in Annexure 1. The second workshop also included a questionnaire survey to elicit st akeholders responses on key issues faced by city and extent of their severity. The details pertaining to questionnaire survey, viz. objective, methodology, questionnaire, analysis and findings, are provided in chapter 8 and questionnaire is attached in Annexure II.
th
15
16
Budni is also known for its Farm machinery testing and training institute which has the necessary expertise and infrastructure and has attained International Standards in its field of farm machinery training and testing. It is well recognized amongst the leading testing organizations in the world. Figure 2-2Map Showing location of Budni in Sehore There are only two industrial units i.e Abhishek industries and Vardhman spinning mills present in and around Budni. Refer Annexure IV Map 1 & 2
district
Source: Maps of India
17
agricultural with largepatches of forest are found in south west, along theboundary of Raisen district. The extremities of Sehoredistrict measures from 2230' to 2340' North latitudesand from 7622' to 7803' East longitudes. The Tropic of Cancer passes through its northern part. The districtcovers 6,578 kilometres and its north south extent is 457meters to 609 meters above the sea level. The districtboundary is aligned with the natural features on threesides. The Narmada River forms the southern boundary. The eastern boundary is marked by forests and hills. The Parbati River flows along the western andnorthwestern boundary, separating Shajapur andRajgarh districts. The district is bounded by districts of Bhopal on the north, Raisen on eastern side,Hoshangabad on southeast and Dewas on southwest.The entire district is drained by numerous nalas andstreams which denude the area during rainy season butremain mostly dry in rest of the year. The northern portionis drained by rivers Newaj, Parbati, Betwa and theirtributaries. The Narmada drains the southern portion of the district, including most of the northern slopes of themain Vindhyachal ranges. The climate of Sehore districtis relatively hot and dry except in Monsoon season.Due to diverse relief, somewhat greater extremes areencountered in the hilly regions and the Narmada valley.The Tropic of Cancer is passing through northern partof the district therefore; the temperatures remain highthroughout the year. Thus it is the rainfall, which is thedecisive factor in selection of crops. However,temperature is also considered important for growth of crops. The type of soil mainly found in Sehore District isblack cotton soil or Regur soil. It covers large tracts of the district and is mainly found at the foot- hills in thevalleys and plains. In Sehore district it is found withvariable fertility.Sehore District covers an area of 172,888hectares, under forest reserves which is 26.34 percent of total geographical area (656,368 hectares). The main typeof vegetation found in this region isMoistDeciduousforests.Teak(Tectona Grandis) is predominant speciesfound in district. It is primarily an agricultural district occupying Narmada and Chambal basin valley. Wheat, rice jowar, soyabean are the major crops grown in this area.
Exhibit 2-1 District Information - Sehore District/ Block Area Sq.km District Sehore 1. Sehore 2. Ashta 3. Ichhawar 4. Budhni 5. Nasrullaganj 6578 1584.25 1454.57 1110.85 1075.11 1353.22 Population 2001 1078912 355861 300000 132073 124320 166658 Density of Population
2
Source: Ground water information booklet- Sehore District MP (Dec, 2007) Ministry of water resources, Central ground water board
18
2.4.1. Climate&Rainfall
Budni has moderate climate. The climate of Budni can be divided into three distinct seasons, viz. 1. Summer from March to mid-June; 2. Monsoon lasting from mid-June to September; and 3. Winter from November to February. Budni, however, has a mild winter and the winter season is from November to February and is very pleasant. Minimum temperature during winter is 12C and maximum in 35C. Minimum temperature during summer is 28C and maximum is 45C.It has an average rain fall of 120 cm and the south-west monsoon begins late in June and remains upto late in September.
19
Exhibit 2-2Nagar Parishad area Village wise Name of villages Budni Wasapur Barkhedi Mana Jamoniya Jarapur Total Talpura Guwadiya Pilikarar Maukala Total Grand Total
Source: Nagar Parishad Budni
Area (acres) 1875.70 1073.62 652.22 672.12 963.37 537.71 5774.74 1690.27 672.12 817.17 1428.94 5464.65 11239.39
Area (sq.km.)
The master plan for the town has not been prepared, thus the town does not have any planning area for future growth. It has been observed that a large component of the existing municipal area is under Forest use and is undeveloped, thus it creates space for the spatial development of the town. The town boundaries were also not available in the form of to the scale map. So the town boundary and the ward boundaries were defined with the help of the officials of Nagar Parishad. Refer Annexure IV Map 3& Map 4.
2.6. Conclusions
This chapter dealt with the physical features of the town which included topography, natural drainage, climate, and rainfall and wind direction. It also provided information on its location and connectivity. The next chapter discusses the demographic profile of the town.
20
Source: Census of India Includes Population of 4 villages which is currently outside municipal jurisdiction of Budni Nagar Parishad
21
For the purpose of estimation of future population, a CAGR for population is estimated using different nd scientific methods* viz. Polynomial (2 order), incremental and geometric progression. The results of population projection by various methods for the year 2021, 2031 and 2035 is shown in exhibit below
Exhibit 3-3 Population Projection by various method Polynomial Year 1991 2001 2011 2021 2031 2035 2041 CAGR Average CAGR Population 10798 13,791 16,812 30618 41403 46308 54776 4% 21329 27357 30154 34895 2.5% 3.25% 23419 32624 37249 45446 3.4% 2nd Order Incremental Increase method Projected Population Geometric Progression
Source: IMaCS Analysis Arithmetic Increase has not been taken for analysis as the estimated projections from Arithmetic increase method do-not lie in line with the context of industrial growth.
Considering above mentioned trigger factors, an average CAGR of 3.25% has been considered for long term (2035) population projection. However, due-to lack of existing physical infrastructureand given the current pattern of Industrial workers preferring to reside in Hoshangabad rather than Budni, for short term (i.e. 2015), a CAGR of 3% has been appropriated for population projection growth. With the above approach, the population projections for Budni is estimated and summarized below in Exhibit 3-4.
Exhibit 3-4 Assumed Population projection Year 1991 2001 2011 2015 Population 10798 13,791 16,812 18,922 Population projection considered
22
Population
Thus for the Purpose of estimation of infrastructure utilities requirement, a population of 18,922, 25,927, and 35,871 is considered for short, medium and long term respectively.
7 66 244 38 2 8 13 15 14 5 4 8 8 5 3
7
Above table shows that ward number 3 has a very high density followed by ward number 2 and ward number 4. As per the information received from Budni Nagar Parishad the population in Ward number 2 and 3 is predominantly Scheduled Caste and Scheduled Tribe.
23
Total 775 673 1233 1599 926 752 1376 957 1401 738 1139 1554 1451 1178 1060 1681 2
Total 580 492 893 1281 682 566 1101 772 966 590 862 1039 1010 852 768 1245 4
Exhibit 3-7 Demographic Indicators - Budni vis-a-vis Sehore district and MP State Key Indicators Sex Ratio Literacy rate % Work Participation rate % (2001) Budni 874 74 28.2 Sehore district 918 71.11 41.8 Sehore district (Urban) 923 82.66 MP (State) 930 70.63 42.74 MP (Urban) 916 84.09 30.64
3.6. Issues
1. A high population growth rate has caused several problems in the recent times as existing physical infrastructure and level of service has been restrained by several factors such as lack of funds, lack of proper planning, etc. 2. Sex ratio is alarmingly low 3. A higher proportion of female among the illiterates indicate lower attention paid to female education.
24
Conclusion This chapter discussed population growth trend and population density of the town. It was followed by the analysis of other demographic indicators and ward-wise populations. The chapter ended with population projections for next 25 years. The next chapter deals with the socio-economic profile of the town.
25
4.2. Indicators
4.2.1. Sex ratio and Literacy rate
Exhibit 4-1gives us details of literates (Both Male and Female) along with details of sex ratio.
Exhibit 4-1 Literacy rate and Sex ratio
Name 'Total Population' 'Total Literates' 'Total Illiterates' 'Literacy Rate' 'Total Population 0-6Years' Sex ratio 'Sex ratio 0-6Years' 'Male Population' 'Male Literates' 'Male Illiterates' 'Female Population' 'Female Literates' 'Female Illiterates'
Source: Census of India
Budni 16812 12454 4358 74% 2131 874 937 8971 7151 1820 7837 5303 2534
Sex ratio of Budni town is low as compared to the sehore distric (urban) data (926) and state(urban) data (916) and overall sex ratio of adults is considerably less than the sex ratio amongst 0-6 years old. The sex ratio has increased sharply from 2001 to 2011 in Budni. Sex ratio was 816 in 2001, which grew to 874 in 2011. The increasing sex ratio shows the growing awareness amongst the people in the town, which can be attributed to schemes started by the state government. Government of Madhya Pradesh had started some effective schemes and interventions for the welfare of women which is improving the situation in the state. The schemes that focus on sex-ratio sensitivity is Ladli Laxmi Scheme, which is handled by Department of Women and Child Development, Madhya Pradesh for betterment of sex ratio, education and health status of girl child. It is a very effective scheme which has been playing important role in improving declining sex ratio in the state.
26
Ward wise Sex Rato is provided in Refer Annexure IV Map 6. Exhibit 4-2categorizes wards into four categories based on the sex ratio. It can be observed that ward number 2,6,7,8,9, 12,13 and 15 (maximum number of the wards in the town) the sex ratio is less than 900. There is no ward where female population is more than male population.
Exhibit 4-2 Categorisation of Sex Ratio Sex Ratio Number of Wards Ward Number
8 5 2 0
Literacy rate is 74 % and is low as compared to District urban data (82.66%) and state urban data (84.09%). Insufficient educational institutes, lack of quality infrastructure in the exiting schools and lack of awareness are the most probable reasons of low literacy rate.The literacy rate in females is lower than males as visible from Exhibit 4-1This can be attributed to low importance attached to female education.. With the initiation of centrally sponsored schemes in Education such as District Primary Education Programme, Sarv Shiksha Abhiyaan and Education Guarantee Scheme at school level had contributed in the increased level of literacy in the state in last two decades; but the most effective scheme had been Padhana-Badhana Movement for literacy by Government of Madhya Pradesh, started in 1996-97. As per 53rd round of National Sample Survey (NSS), it was established that there was nearly 11.8% increase in the rate of literacy of the state from 1991 to 1997, which to some extent was due to Padhana-Badhana Movement. According to provisional Figures of census 2001 the rate of Literacy had increased 44.20% to 64.11% which reflected 19.19% increase in literacy rate within a decade. Other schemes which attributed to increasing literacy rate in last two decades includes up-gradation of Madarsas scheme, Free of cost Distribution scheme of text books, Book Bank Scheme, Free of Cost School Uniform Scheme, etc. Exhibit 4-3categorizes the wards into three different categories based on the literacy rate. Literacy rate of 2 ward lies below 70% range. Ward number 8 have literacy rate above 80%. Rest 12 wards have literacy rate in the range of 70% to 80%.Details of Ward wise literacy rate are provided in Annexure IV Map 7.
Exhibit 4-3 Categorisation of Literacy rate Literacy Rate Number of Wards Ward Number
2 12 1
27
Total Population 775 673 1233 1599 926 752 1376 957 1401 738 1139 1554 1451 1178 1060 16812
Total Household 183 137 239 311 202 166 284 222 268 149 235 342 319 243 161 3461
Household Size 4.23 4.91 5.16 5.14 4.58 4.53 4.85 4.31 5.23 4.95 4.85 4.54 4.55 4.85 6.58 4.86
4.2.3. Workforce participation (Primary, Secondary and Tertiary occupation and income levels)
Work is defined as participation in any economically productive activity with or without compensation, wages or profit. Such participation may be physical and/or mental in nature. Work involves not only actual work but also includes effective supervision and direction of work. It even includes part time help or unpaid work on farm, family enterprise or in any other economic activity. All persons engaged in 'work' as defined above are workers. As per Census of India, Workers have been classified as Main workers, Marginal workers and Non workers depending on duration of their work months. Another classification has been on the basis of nature of work performed; Cultivators, Agricultural Labours, Household Industry Labours and Other Workers. Budni is surrounded by forest and is close to Bori national park. There is a lack of agricultural land in the area. Since centuries, people of Budni are engaged in woodcraft as means of livelihood. Madhya Pradesh State Tourism Development Corporation Ltd (MPSTDC) and Indo-European Chamber of Commerce & Industry (IECCI) have launched Rural Tourism Budni which focused on infrastructure development and capacity building of service providers and branding, packaging and marketing inorder to boost the woodcraft activity. Timber auctioning is another major activity that happens in the region. Approximately 779 ha i.e. 30 % of the Budni Nagar Parishad area is under agriculture. The major products of the area are Soyabean (800 quintals), Tur (50-60 quintals), Paddy (16000 quintals), Chana (1500 quintals). When compared to the nearing towns the agriculture production is lower in Budni. Refer Exhibit 4-5for work participation ratio
Exhibit 4-5 Work Participation rate Particulars Total Population Total 16812 Percentage 100 Male 8971 Female 7841
28
Percentage 28.2 -
Main worker Marginal worker Non workers Cultivators Agricultural Labours Household Industries Other Services
14 258 98 322
As per 2001 census data the work participation rate is 28.2% which is a little low as compared to national urban rate (32.23) and state rate (30.64).Lack of employment opportunities in the townresulted in low Work participation rate. Other than this, it is very much observable that around 22 % of the workers are involved in agricultural pursuits, which includes both cultivators as well as agricultural labours. Workers engaged in other services also account to large proportion. Almost 69 % of the workers are under Other Workers category. The type of workers that come under Oth er Worker category include all government servants, municipal employees, teachers, factory workers, plantation workers, those engaged in trade, commerce, business, transport banking, mining, construction, political or social work, priests, entertainment artists, etc. Small scale industries or household industries account to just 9 % workers under them.
29
4.3.4. Tourism
Budni lies on Bhopal Pachmarhi tourist circuit and has proximity to tourist sites like Bhimbetka, Bhojpur, Salkanpur, Delabadi, Madhai and Pachmarhi.There is an inflow of lot of tourist/ pilgrims as Budni has religious importance as it lies on the banks of River Narmada and is a part of Narmada Parikrama. Thousands of pilgrims come to the town during Narmada jayanti, Makar Sankrant, Sarvapitri Amavasya, etc. Rural Tourism project is being implemented byMinistry of Tourism, Government of India in Budni. Village Tourism Committee (VTC) is the nodal agency for rural tourism at Budni.This project is yet to create sufficient infrastructure to support the growth of tourism industry
4.4. Issues
A high percentage of non-workers suggest that a significant proportion of population remains unemployed for a substantial part of the year. This potential can be tapped by creating an investment friendly environment for development of medium and large scale industries in Budni. Potential ofForest-based industry can also be explored to promote household industries in this area. Promotion of tourism by developing tourist circuit and focusing on rural tourism can also result in new employment opportunities in the town
30
31
69plays a major role in the town and act as arterial road connecting Budni to different towns. The town also has a railway line and a railway station which is an added feature. The railway line runs parallel to NH 69 and the station lies on the Bhopal - Itarsi route.
Land Use Residential Commercial Public - semi public Industrial Roads Green area Developed area Water bodies Agriculture/Forest Total Area
6.80 0.21 0.85 0.21 1.06 0.13 9.27 0.60 90.14 100.00
0.05
0.25 0.03
2.18
0.09 21.2
100
0.66 99.34 100.00
23.47
32
Household size 5 5
2041 42832 5 8566 Source: Census of India, 2011(Provisional data) & IMaCS analysis
5.5. Conclusions
This chapter discussed physical growth of Budni and also presented maps and analysis of spatial and population growth, municipal boundary, ward delineation and tentative idea on land use of Budni. The next chapter deals with the assessment of existing situation of urban services which is followed by the demand-supply gap analysis, SWOT analysis and identification of critical issues in each urban sector
33
6. Citys Infrastructure Existing Status, Gaps, Issues, SWOT, Goals and Strategies
Development of any urban area depends on the availability and quality of infrastructure services. Economic activities are dependent on urban infrastructure like roads, water supply, transportation and other civic infrastructure like sanitation and solid waste management. The Urban Local Bodies (ULB) are primarily responsible for providing minimum basic services to the inhabitants. Steep and unplanned growth of urban population results in inadequacy of minimum basic services in urban areas which leads to deterioration of quality of life. The biggest challenge for any urban local body is to meet the present demand of basic services of its citizen and be prepared for the future requirement. Budni Nagar Parishad is responsible for providing basic infrastructure and services to the citizens of Budni town. This chapter deals with the current status of various components of city infrastructure and services provided by the Budni Nagar Parishad.. Sectors / Services identified for the analysis include: Water Supply, Sewerage & Sanitation, Solid Waste Management, Drainage, Traffic & Transportation, Street Lighting & Fire Fighting, Urban Poor and their Accessibility to Basic Services, Social Infrastructure, Environment, Heritage & Conservation, and Existing Institutional Framework for Development. Sector-wise analysis is presented in subsequent sub-sections
34
Sehore districts ground water has iron and fluorine, usage of ground water needs to be reassessed for safe drinking. (Water Aid, 2005, Water and Sanitation in Madhya Pradesh). Power cuts are also a big problem for the town. Without electricity, many municipal functions cannot be delivered properly and thus reduces the efficiency of the local body. In India, water supply projects are usually designed keeping 20 Hours per day pumping & treatment infrastructures live availabilit y; however, the efficacy of the entire system is disadvantaged when continuous power is not available at various stages of pumping/treatment. In Budni, the available water supply statistics show that average yield from various sources for water which is supplied to the town is about 2 MLD, which translates into about 119 lpcd availability for the citizens. Another statistics on power availability reveal that average per day power availability is for about 14-16 hours. A perspective look into the above available information would reveal that power cut acts as a major impediment in the provision of ample amount of per capita water availability in the town viz-a-viz existing infrastructure available. Thus, in the proposed strategy, in order to utilize the designed infrastructure at its optimum efficiency, and while tackling the power availability impediment, it would be worthwhile to have a direct power feeder for the proposed treatment plant and pump house.
6.1.2.
Water transmission and distribution network is old and in dilapidated state and demands a lot of maintenance. The raw water transmission network from the source to the OHT has an approximate length of 2 Km and the approximate length of distribution network is 10.2 km.Per capita water supply in Budni Nagar Parishad is approximately 50 liters.
35
S. No
Collection (Rs) Arrears Current Total Collection 2.04 2.04 4.07 6.48 29 59 39 4.41 3.26 7.67 2.82 68 81 73 1.97 2.69 4.66 2.16 70 67 68 1.76 3.06 4.82 1.25 81 78 79 0.89 3.19 4.08 1.75 71 70 70
Collection Performance - %
Exhibit 6-2 presents the existing service level indicators in the water supply system. It clearly shows the lower level of water supply system in the town.
Unit
ML D ML
36
Parameter
Indicator Capacity
Unit
Distribution % of road 25 % 85 Network length Elevated % ESR Storage Capacity 50 % 33 capacity w.r.t to Water Supply Supplied Refurbishment of old distribution network Source Budni Nagar Parishad and IMaCS Analysis
10.2
28.15
17.95
53.36
14.79
Km
1.00
0.85
1.85
0.51
ML
1.53
1.93
Km
It is evident from exhibit above that Budni needs a major revamping in distribution network in Water Supply sector as current level of service, as the present coverage is only 25% of the road network and also only 55% of the assessed properties are connected to distribution network. By the end of year 2035, Budnitown would require at least 5.56 MLDof water to serve the population of 35871 at a level of 135 lpcd including losses (15%).
37
3. People can be sensitized to adopt best practices on water savings with awareness improvement programs. 4. Weaknesses 1. Current level of water supply is way lower than level desired under the UDPFI guidelines. 2. Poor maintenance infrastructure of water supply
Threats 1. Dependence on Tube-wells for water supply threatens the citys water security. 2. Dilapidated state of existing water supply network. 3. Consumption of water from alternative sources could be a threat to revenue loss to the Nagar Parishad.
3. Unmetered water connections 4. Low water tariff, distribution coverage and collection efficiency resulting in revenue losses
6.1.9. Issues
Service Issues Budni has 15 Wards and a provisional population of 16812as per census 2011. Given municipal norms of 135lpcd under UDPFI, as against the current supply of 119 lpcd and taking an average CAGR as 3.25for population growth, anticipating rapid urbanization due to improved services, a demand of 5.5 MLD would be created in coming 25 years with the population going up to 35871. Metering of water connections completely absent. Deteriorated state of existing network
Policy level issues Short-term policy: Budni Nagar Parishad shall attain clarity on fixation of norms for water tariff and structure, cost recovery and illegal connections. These are the main policy issues to be addressed in the immediate future. Long term Policy: Budni Nagar Parishad shall plan for retaining and rejuvenating the ground water
38
level. Parallel to the implementation of this scheme, efforts should also be made towards metering of entire system.
Type
39
As shown inExhibit 6-5, Budni town would require a sewerage system to cater a population of 35871 by the end of year 2035. According to norms mentioned under the UDPFI, the sewerage system would need to cover 85 % of the road length during year 2035. A comprehensive sewerage system needs an integrated treatment plant which can be developed in a phased manner. A treatment plant with a capacity of 4.5 MLD should be developed to cater to the requirements of 2035.
Exhibit 6-5 Sewage and sanitation gap analysis Existing and Desired Level Parameter Indicator Existi Desire ng Unit d Level Level % Population Population covered by 0 % 100 Coverage UGD UGD % Sewer to 37 % 90 Network Road Length Treatment % Treatment 0 % 100 Capacity Capacity Service Gap by Year 2015 Exi Deman sti Gap d ng 0 15* 0 18,922 29.80 2.35 18,922 14.80 2.35 Service Gap by Year 2035 Deman d 35,871 56.50 4.45 Unit Gap Pers on Km ML
Source Budni Nagar Parishad and IMaCS Analysis *Work under UIDSSMT in progress and around 15 km of the network would be in place by the end of year 2012
1. Increased awareness among the 1. Provision of better services to slum and stakeholders for the improvement of floating population by improving the sanitation sanitation facilities. facilities of the city. 2. PPP mode can be explored for the provision of community sanitation facilities in the town and treatment of the sewage water and reusing for the municipal purposes. Weaknesses Threats 1. Slum Population without toilets per Seat of Public Convenience is more than 1000 against the UDPFI norm value of 60. 1. Improper usage of community toilet would leave these facilities unusable and would require more maintenance.
40
2. Lack of maintenance and absence of timely cleaning of free public conveniences renders them unusable for significant amount of time. 3. Non consideration of daily movement of people into the planning of Public Conveniences.
2. Overflow from individual septic tanks and from the houses are mixing with storm water resulting into pollution and unhygienic environment
6.2.8. Issues
1. Need for greater coverage and better maintenance of Public conveniences - Given the significant proportion of slum population and substantial floating population, there is a need for providing additional community toilets and work for their upkeep and maintenance. The existing level of one seat per 1000 persons is extremely less than the UDPFI norm of one seat per 60 persons. 2. Insufficient coverage of sewerage system in the town .As per UDPFI guidelines the desired coverage of UGD is 85%. Given the expected growth of the town an integrated UG system covering the entire town is critical. Sullage and stagnant pools of water can be seen in the entire town and arevisibly disturbing and lead to pollution and mosquito menace. A complete sewerage network for Budni is very much desired as lack of sewerage system leads to unhygienic conditions in the town.
S.No. A B C D F G H
Description Waste Generated Per Day (tons) Waste Collected Per Day (tons) Major Sources of Waste Generation Number of Dustbins in Town Average Capacity Per Bin Frequency Of Waste Collection Population covered by door to door collection by ULB
41
and transport it to the trenching ground.The collection frequency is once daily. The trenching ground has an area of 3 acres located on the eastern boundary of the town, close to the Shahganj Road. The town has staff of 14 sanitary workers, who work on daily wages. Exhibit 6-7 shows the service level indicators for solid waste management for Budni town
Exhibit 6-7 Solid Waste Management - Service Level Indicators
S. No 1 2 3 4 5 6 7 8 9
Service Level Indicator Waste Generated per capita (2011) % Waste Collected as per ULBs Estimate % Waste Collected as per available capacity % Households covered by Door-to-Door Collection Road length per Conservancy Staff Total Rated Capacity of Vehicles No. of Trips per Vehicle/day Average Spacing Between Dustbins Mode of Disposal
Service Gap by Year 2015 Existi ng 4.00 3.2 3 Dem and 4.46 4.46 0.4 Gap
Service Gap by Year 2035 Dem and 8.45 8.45 2.83 Unit Gap
0.46 1.26 -
2.40 2.40 -
An Analysis was carried out to project the future waste generation in the Budni town. Waste generation projection has been carried out in accordance to the UDPFI guidelines. A land-fill height of 5 meters and bulk density of 1 tons /Cu.mt have been assumed for the analysis. Result of this analysis shows that though the allotted site is of 3 acres against the demand of 2.83 acres in the year 2035, would be sufficient to cater the needs for coming 25 years. A regional approach for solid waste facility can be explored with States intervention to identify a collective disposal site and infrastructure for Budni and 3-4 towns in vicinity and explore the possibility of management of the site by private sector participation. The collection infrastructure of the town alone would have to be increased with an additional requirement of 20 pushcarts and 1 tractor trolley by 2035.\
42
Private participation could be explored for revenue generation and best usage of waste. Threats Failure of maintenance of extra capacity can result in loss of capacity Negligence from citizens can prove all efforts of Nagar Parishad futile Health hazards for the people due to insufficient collection and open incineration. Lack of safety procedures while handling the waste is a potential health hazard for the workers.
Lack of necessary safety measures for the workers. Several places of the city are not provided collection bins leaving no options with residents to dispose domestic waste but throw it in open.
6.3.4. Issues
1. Need for a comprehensive study There is an urgent need for a study inorder to know the characteristics of the waste generated, identify locations for the community bins, identify major Solid waste generation points, efficient transportation route, disposal methods, etc. 2. Generation: The waste generation would be more than two fold by 2035. This needs higher attention as it demands for advanced way of waste management. Another problem is the higher generation of waste per person, which needs to be managed by 3Rs; Reduce, Reuse and Recycle. 3. Collection: There is need for increasing awareness on SWM practices at the grassroots. Budni should progressively move towards source level segregation of waste for more efficient disposal and conversion. It may need to intensify promotion campaigns in this regard. In the absence of door-to-door collection facility, people dispose of their waste in the community bins, but it is spilled all over and around the bins.Therefore it is necessary to Intensify drive for segregation at source and 100% door-to-door collection in a phased manner 4. Transportation: Presently 15 pushcarts are there in the town, estimations show that more push carts would be needed, which can be either purchased or the frequency of one push cart can be increased to overcome the overall requirement. The present secondary transportation vehicles are almost with the existing requirements, but there is a need to add the vehicles in the coming years.
5. Treatment & Disposal: At present, the waste is just dumped on the flat land without any
treatment or processing. Sometimes it is openly burnt. This poses potential health hazards for the people. It is a usual practice of dumping waste into drains and has thus become a tedious task for
43
the Nagar Parishad to maintain the drains and prevent the irregular practice of waste disposal. There is a need to convert normal dumping site to a treatment site.
6.4. Drainage
The drainage system includes both natural drainage and manmade storm water drains to dispose off the water from the inner streets to outer drains and rivers. Budni town also has mixture of both natural drains and manmade drains. The natural drains consist of large kutcha drains whereas man made drains consists of narrow kutcha and pucca open drains.
Indicator Road Length Covered with Drains Distribution by Type % Pucca to Pucca I Total Drain Open Length
km
33
5.50
14.21
8.71
26.93
7.47
km
44
ii
Pucca Closed
NA
67
0.00
28.84
28.84
54.68
15.16
km
The existing drainage network is only 5.5 km in length and is along the major roads. The drains are pucca but open in nature. There is a requirement of 82 km (length) of drainage network by the year 2035.
1. Presence of a major water body to drain out 1. Development of an integrated drainage flood water from the city network to support the increasing population 2. Natural Topography of the town is towards of the city Narmada river 2. Strengthening of natural drains 3. Immediate identification of flood prone areas and an immediate action to avoid any flooding. Weaknesses Threats 1. 2. 3. 4. Encroachment of natural drains 1. Encroachments and improper maintenance of Mix of sewage and solid waste in the drains drains resulting floods and unhygienic Low capacity of natural drains. conditions Lack of maintenance leading to clogging of natural drains 5. Virtually non-existent drainage network
6.4.4. Issues
Existing Drainage system needs a major revampingas it is totally dilapidated and has been encroached at many places. It is evident that all the existing Kutcha open drains have to be upgraded to both Pucca Open and Pucca Closed Drains.Efforts should be concentrated towards the development of a new properly planned drainage system in the town. In Budni only 10% of the road length is covered by drains as compared to desired level of 130%. As an immediate measure, all the natural drains should be periodically cleaned to prevent overflowing of the water during monsoon and other occasional rains. Clean and properly maintained open drains and pond would also contribute towards the beautification of the town. Encroachments of the open drains are also major cause of concern and immediate attention requires clearing them free flow of waste water. Awareness programs have to be conducted amongst local citizens to avoid of dumping waste in the open drains
45
Nagar Parishads role with regard to road infrastructure in the city includes the construction and maintenance of all roads in its jurisdiction, except the roads belonging to the Public Works Department (highways and other district-level roads). The construction of internal roads, in case of a private colony development is the responsibility of the developer. The Municipal area is spread over 15 wards. The NH - 69 is the spine of all road networks in the city and is the connecting road to SH 22. All the major arterial roads either start or end on the NH -69. Most of the roads in the city are surfaced; the percapita road length as on date is 2.42meters, which is very good in comparison to other peer cities with similar population and size. The general street pattern is observed to be narrow with width varies from 6m to the major arterial roads to 3m internal roads, with 1 to 1.5 meter wide earthen roads. The average width of roads in the city is 3 meters.
Figure 6-2 Heavy vehicular traffic on Arterial
Due to absence of the bypass road, the NH - 69and Road remains remain busy and congested for most part of the day The high volume of traffic, mainly heavy traffic uses NH - 69 as thoroughfare which damages road surface. Total Municipal Road Network is30.19 km with 13.68 km of Concrete Road and 9.03 Km of motorable kutcha Roads and 7.49 km of kutcha non motorable roads. The length of State Highway 22 in Budni is 3 km and that of National highway 69 is 9 km. The Bhopal- Itarsi rail line passes through the length of the city. NH - 69 runs along the rail line. The eastern part of the city mostly has residential along with offices, schools, hospitals, markets, etc whereas western part has residential areas mostly slums. This situation generates a requirement of road over bridges (ROB) in the city to cross the railway line and avoid traffic congestion at railwaycrossings. At present, there are no ROBs across the rail line, and it causes time delays for the residents to cross the railway line.
Exhibit 6-10 Existing Road Network
46
Desired Existing By Year 2015 By Year 2025 By Year 2035 Unit level (2011) Demand Gap Demand Gap Demand Gap 75 25 0 0 Km Km Km Km 13.68 10.53 16.51 40.72 33.11 24.84 8.28 11.16 3.72 7.44 45.37 11.16 34.03 11.34 9.19 3.06 12.26 62.77 3.06 6.13 6.13 47.08 15.69 13.05 4.35 17.40 4.35 8.70 8.70
Road Surface Concrete Type (%) BT (%) WBM (%) Cut Stone/ Earthen/ Others(%) Total (%) Up-gradation BT to Concrete
2.42 m/p Km Km Km Km Km Km Km
WBM to Black Top Earthen to Black Top Earthen to Concrete New Formation Concrete Black Top
47
Weaknesses 1. The road condition is very poor and requires immediate maintenance. 2. Absence of Over-bridge/Under-pass for people to cross the railway line. 3. Several incidences of encroachments have reduced the effective width of city roads 4. Lack of pathways and bicycle tracks 5. Lack of organized parking lots
6.5.8. Issues
Entry and mix of regional traffic on city roads: 1. Deprived of a bypass road, the heavy vehicular traffic is compelled to pass through the city. Due to this, the arterial road i.e. NH - 69 experiences heavy traffic flow throughout the day. 2. Lack of appropriate and efficient road infrastructure: The internal roads are narrow and inconvenient for vehicular movement. With the demand estimations it is evident that there is a high requirement of the concrete and black top roads in the town for proper movement of vehicles and people.Poor surface quality lead to travel delays, congestion and pollution. There is lack of footpaths and pedestrian facilities; those available are encroached upon by informal activities and street hawkers.
48
Type Tube lights Sodium Vapor Lamps Mercury lamp Total Average distance between street lights
Source Budni Nagar Parishad and IMaCS analysis
This coverage of Street Lights is very low than the municipal norm of one street light every 30 m. A detailed analysis is required to examine the variations arising due to concentration of street lights along the important roads.
Parameter
Indicator
Existing and Desired Level Exist Desir ing Unit ed Level Level
Service Gap by Year 2015 Exist Dema Gap ing nd 2015 2011 2015
Uni t
Street Lighting
1 Additional street light poles Average Street Light Spacing % Share to Total % Share to Total % Share to Total 87 M 30.00 496 1,104 635 2,092 580 Nos
i ii iii
40 60 0.00
% % %
75.00 25 0
188 281 -
828 276 -
640 -
1,569 523 -
435 145 -
49
Weaknesses 1. High percentage of Sodium vapor lamp and tube lights resulting in the higher electricity consumption 2. Significant local concentration of street lights 3. Current level of service i.e. an average spacing between lamp poles is much more than that required under UDPFI guidelines
6.6.6. Issues
At present, the street lights comprise of high power lamps which consume lot of electricity and hence there is a need to replace these lamps with CFLs. This would help cut down on expenses on longer term. Presently, the cabling for lampposts is not underground. Due to this the cases of illegal connections and theft are observed. Thus, there is a need to have underground cabling to avoid such cases.
50
10, 11,12,13, 14& 15. Fourteen slums pockets have been identified by visual survey in these wards. As per the information available with Budni Nagar Parishad the population staying in slum is 8799 i.e. 52% of the total population.
6.7.4. Urban basic services in slums (In line with JNNURMs 7 point charter)
Access to basic services is now deemed as a criterion for identification of the poor and poor areas in a city (essentially slums). The responsibility for service provision in an adequate manner lies with the local body, which becomes a difficult job for increasing urban poor population. The basic services which are needed to be provided under seven point charter includes security of tenure at affordable prices, improved housing, water supply, sanitation and ensuring convergence of existing universal services for education, health and social security. Slums within the town do not have adequate infrastructure facilities.
6.7.6. Issues
Notification of slum pockets -All the wards in the town are declared as slums. The slums pockets have not been identified and notified in the town. This makes it difficult to comment on or identify the gaps in the service levels of the slums and improve upon the same. Higher proportion of Slum Population: The town has 4 slums; the slum population is 18 percent of the total population. Land ownership:Slums have encroached private or government land and reside over these areas. Many slum dwellers do not have tenure security for their land and house. Lack of awareness on slum development programs: There is a general paucity of awareness of the various slum development schemes and programs announced from time to time by the central and state governments. This leads to long delays in the implementation of the programmes and overall dissatisfying results, apart from the factor of the benefits of the programs not reaching the intended beneficiaries.
51
Parameter
Indicat or
No. of beds No. of beds
Service Gap by Year 2015 Exist Dema Gap ing nd 2015 2011 2015
30 38 8
Un it
No s. No s. No s.
ii
NA
No.
iii
13
13
24
Issues
The present condition of Health sector in Budni town shows that there is an immediate need of government nursing home in the town. Utilization of existing facilities at Government Hospital is severely constrained due to long power cuts. The town lacks adequate number of doctors and health professionals (found out on discussion with officials and stakeholders), which needs to be taken care of.
52
SWOT
Strengths Decent existing base of primary health in terms of numbers. Substantial awareness for the improvement Health Infrastructure. Opportunities Meeting of Gaps can develop Budni as an health care hub for the region. Development of new health facilities supported by an up-gradation/improvement of existing health facilities will help in an overall development of the region.
Weaknesses Lower Bed capacity of town than required. Absence of nursing homes and Lady doctor in the town is a matter of serious concern Quality of physical infrastructure of this sector demands major revamping.
Threats Lack of maintenance can degrade the existing infrastructure. Frequent power cuts hinder a continuous supply of services.
Exhibit 6-16 shows the demand and gap analysis of education facilities in Budni by the year 2035.
Exhibit 6-16 Demand Gap Analysis of Education facilities
Parameter
Indicator
No. /population No. /population No. /population
Service Gap by Year 2015 Exist Dema Gap ing nd 2015 2011 2015
12 2 1 8 3 1 -
Uni t
Nos . Nos . Nos .
i ii iii
53
ISSUE
1. Most of the schools in the town lack necessary infrastructure and hence, initiatives should be taken in equipping existing educational institutions with necessary infrastructure. 2. Citys higher secondary educational institutions are running at over-capacity and an immediate attention needs to be paid to the proper planning and development of new schools
SWOT
Strengths Decent existing base of education facilities in terms of numbers. Nearby villages students can come here for education. Opportunities Meeting of Gaps can develop Budni as an educational hub for the region. Development of new educational facilities supported by an up-gradation/improvement of existing educational facilities will help in an overall development of the region. Threats In absence of good education facilities a lot of children would migrate to cities for better education facilities Lack of maintenance can degrade the existing infrastructure. Frequent power cuts hinder a continuous supply of services.
Weaknesses Lack of integrated schools and school for handicapped. Quality of physical infrastructure of this sector demands major revamping. Shortage of primary schools in the town as compared to the standards
54
Issues
Starkly low number of Community halls Lack of sufficient parks or green spaces in general Absence of Cinema hall
6.9. Environment
A citys environment is dependent on several factors which impact air quality, water quality, land quality, noise levels, etc. Each of these aspects gets affected by individual factors or a combination of two or more factors. Some of these factors are: Shortcomings in Solid Waste Collection, Underdeveloped Storm Water Drainage system, Undeveloped Waste water disposal system, Dust and particulate matters from vehicular traffic and industries, etc.
6.9.1.
=Nagar Parishads inability to collect 100% generated waste leads to scattering of waste which ultimately find its way to drains, open lands and other sources of water. This leads to the pollution of land by improper disposal of harmful waste, ground water pollution by leachate and surface water pollution by mixing of waste with water. In addition to these, solid waste clogging the drains leads to stagnation of water which ultimately leads to the unhygienic milieu. Under-developed drainage network and undeveloped waste water conveyance system leads to the stagnation of storm water and waste water in various parts of the city leading to unhygienic conditions which poses severe threat to the health of the citizens. Heavy vehicular traffic on NH 69 is a constant source of dust and other particulate matter which pollutes towns urban space.
6.9.2.
The city has no dedicated Green Spaces. Tree Plantation could be found along few roads. As per UDPFI guidelines, the recreational area should be around 8 to 10 percent of the towns developed area, which is not there at present. As per the guidelines there should be 10 to 12 sq.m of green space per person. 35 ha of the green space requirement have been estimated to be added by 2035, as per the guidelines.
6.9.3.
Budni is located on the banks of Narmada river and has 4 ghats. This area lacks maintenance at present. Thus, it needs to be developed further and create a good recreational.
55
e) and Development, 1992 f) Madhya Pradesh Industrial Policy and Action Plan, 1994
g) Madhya Pradesh Housing Policy, 1995 h) Madhya Pradesh Mineral Policy, 1995 i) j) Madhya Pradesh Tourism Policy, 1995 Madhya Pradesh Rehabilitation Policy (Guiding Principles of
k) State Policy for Equitable and Sustainable Development), 1996. Legal a) The Indian Forest Act, 1927 b) The Motor Vehicles Act, 1939, amended in 1988 c) Factories Act, 1948, amended in 1987 d) The M P Public Health Act, 1949 e) The M P Control of Music & Noise Act, 1951 f) The M P Municipal Corporation Act 1956; The Municipalities Act, 1961; Palik Vidhi (Sansodhan) Adhiniyam, 1995 and the M P Nagar
g) Mines and Minerals (Regulation and Development) Act 1957, amended in 1986 h) The Wild-life (Protection)Act, 1972, amended in 1983, 1986 and 1991 i) j) The M P Nagar Tatha Gram Nivesh Adhiniyam, 1973 amended in 1994 The Water (Prevention and Control of Pollution) Act, 1974, amended in 1988
k) The M P Slum Area (Improvement & Clearance) Act, 1976 l) The Water (Prevention and Control of Pollution) Cess Act, 1977, amended in 1991
m) The Forest (Conservation) Act, 1980, amended in 1988 n) The Air (Conservation) Act, 1980, amended in 1988 o) The Air (Prevention and Control of Pollution) Act, 1981, amended in 1987 p) The Environment (Protection) Act, 1986 q) The Public Liability Insurance Act, 1991, amended in 1992 r) National Environmental Tribunal Act, 1995.
Weaknesses
Threats
56
Absence of any bypass leading to movement of heavy traffic through the arterial road of the town causing air and noise pollution
Failure to integrate the issue of urban environment with infrastructure development projects.
6.9.6. Issues
1. Leakages in Solid Waste Collection System leading to water and land pollution. 2. Clogging of drains and poor waste water handling system leading to threatening environmental situation 3. Impact of vehicular traffic on air quality of the city 4. Open defecation.
VTC coordinates for various tourist arrangements like home stay facilities, guide, food, site seeing, cultural programmes, etc. A typical itinerary has been crafted which includes following components A Warm welcome in Indian style by Budni Woods Committee. Special Welcome drinks. Home Stay facilities.
57
Local Guide. Visit to woodcraft work station. Visit to Narmada Ghat. Narmada Pooja. Boating. Local cuisines. Cultural evening- Narmada Ballet, folk dance- Lehngi/Faag, presentations by root artisans at the Ghat. Excursions to Adamgarh-natural and primitive rock shelters, Bhimbetka-World heritage site, BhojpurShivTemple, SalkanpurTemple, Madhai (Satpura Tiger Reserve) and Pachmari, etc
6.10.1.
Budni has 4 important Ghats Bada Ghat, Nav Ghat, Sindhi Ghat and Manjhi ghat. On the occasions like Makar Sankrant, Sarvapitri Amavasya, Narmada Jayanti etc. the town witnesses huge inflow of pilgrims. Bada ghat is the largest amongst all and most of the rituals are performed along this ghat.
6.10.2.
The ghats present in Budni town along the banks of River Narmada have historical importance and need a comprehensive restoration work. These Ghatsprovide access to the river for various purposes like, religious worship, washing, recreation, cremation, etc
6.10.3.
Budni lies on Bhopal Pachmarhi tourist circuit and has proximity to tourist sites like Adamgarhnatural and primitive rock shelters, Bhimbetka-World heritage site, Bhojpur Shiv Temple, Salkanpur Temple, Madhai (Satpura Tiger Reserve) and Pachmari, etc. These tourist circuits can be further explored with provision of better residing and other allied facilities in Budni as a center place.
6.10.4.
SWOT analysis
Opportunities The town has a Rustic feel with a predominance of natural environment and hence the already existing rural tourism project can be further explored and marketed.
Strengths Strategic location, close to a number of heritage and tourist sites and presence of River Narmada and ghats along its bank which makes it attractive destination for tourists Availability of Dodhi wood, used to make unique toys Good Connectivity through rail and road Weaknesses Poor state of existing physical & social infrastructure
Threats Failure in restoration of these heritage structures would result into further deterioration and eventually complete loss.
6.10.5.
Issues
58
Lack of promotion of tourism in the town Poor existing physical & social infrastructure of the town
6.11.1.
59
The Nagar Parishadis headed by a Chief Municipal Officer, who is appointed by UADD and is entrusted with the responsibility of all municipal affairs. The Nagar Parishad also has an elected council headed by President. Nagar Parishadin Budni has 15 elected members from 15 administrative wards headed by a President. Nagar Parishadis responsible for the approval of all major works. The total regular employees in Nagar Parishad Budni are 26 and there are 38 daily wage employees
6.11.2.
The activities of Town and Country Planning Department (TCPD) are guided by the provisions of the Madhya Pradesh Nagar Tatha Nivesh Niyam, 1973 (the Rules). The Rules provide for the appointment of a Director to head this department. There are other officers like Additional Director, Joint Director, Deputy Director and Assistant Director of TCPD to assist him. The State Government, as per provisions of the Rules declares a region including major urban areas and its surrounding settlements as a planning area, and orders the preparation of a development plan for the region. The Director of the TCPD, with the assistance of the administrative setup provided to him, carries out the following activities: Survey of the entire region; Preparation of existing land-use map; and Preparation of a regional development plan.
6.11.3.
Development authority
The Urban Administration and Development Department (UADD) of the Government of Madhya Pradesh is an administrative department that controls the organizations related to urban development, including municipal corporations, councils and Nagar Parishads. This department is also responsible for implementing the schemes related to urban poverty alleviation. The UADD is responsible for implementation of the following Acts in the state: Madhya Pradesh Municipal Corporation Act, 1956; Madhya Pradesh Municipal Council Act, 1961; Cruelty to Animals Act, 1971 (provisions applicable to urban areas); Vidisha (Bhelsa) Ramlila Act, 1956; Simhastha Mela Act; Slaughter of Animals Act (provisions applicable to urban areas); Madhya Pradesh Slum Area (Development and Irradiation) Act, 1976; and Madhya Pradesh Cycle Rickshaw (Regulation of License) Act, 1984.
The UADD is also responsible for implementation of various public welfare schemes sponsored by the Central and State Governments. Some such schemes include Conversion of Dry Latrine Program, Swarna Jayanti Urban Employment Scheme, National Slum Development Program, Social Security Group Insurance Scheme, Janashri Insurance Scheme etc. These schemes are implemented through the District Urban Development Agency. Being the parent organization of ULBs, UADD monitors the functioning of all ULBs in the state.
60
6.11.4.
The primary responsibility of providing health care lies with Department of Public Health and Family Welfare. This department sets up government health institutions and coordinates with private players in setting up private hospitals.
6.11.5.
Madhya Pradesh Housing Board (MPHB) falls under the administrative and functional control of the Housing and Environment Department of GoMP. The operations of the Board are governed by the provisions of the Madhya Pradesh Housing Board Act, 1972, and rules formulated therein, amended from time to time. The key functions of MPHB, as per its governing Act and rules include: To acquire land from the Government, private parties and/or other departments for construction of properties; To design, plan, construct, supervise and sell residential flats and commercial complexes; To undertake deposit works for Government departments like Education; Welfare, Tribal Welfare Departments, etc. for construction of schools, hostels, etc.; and To undertake repair and reconstruction work of old structures.
6.11.6.
Implementation, supervision and monitoring activities pertaining to Central Pollution Control Acts and Rules vests with the Central Pollution Control Board (CPCB), Government of India, and the respective State Pollution Control Boards formed/constituted under its rules. Madhya Pradesh State Pollution Control Board (MPPCB) headquartered in the state capital, Bhopal, carries out its operations through seven regional offices, each located at the divisional headquarters. The main function of the regional offices is to monitor the implementation of provisions of various Acts governing pollution control and prevention and the Rules framed under such Acts. The pollution prevention and control Acts include: The Water (Prevention and Control of Pollution) Act 1974; The Water (Prevention and Control of Pollution) Cess Act 1977; The Air (Prevention and Control of Pollution) Act 1981; The Environment (Protection) Act, 1986; and The Public Liability Insurance Act 1991.
MPPCB is also responsible for implementation of the Municipal Solid Waste (Management and Handling) Rules, 2000 of CPCB, which spell out responsibilities of the state pollution control boards and the urban local bodies. MPPCB is the monitoring authority with respect to ground water, ambient air, and compost quality in urban areas. The Board is also required to monitor processing and disposal facilities for municipal waste, with the approval of the State Urban Development Department, Town and Country Planning Department, and Ground Water Board. According to the Rules, the ULB
61
is responsible for implementation of the provisions and infrastructure development for collection, storage, segregation, transport and processing of solid waste in the town.
6.11.7.
Issues
Insufficient staff in Budni Nagar Parishad, restricts the function of the ULB and results into inefficiency in service delivery. Though roles of different organizations in the provisioning of urban services are clearly defined, plans formulated by different organizations suffer because of lack of coordination among various organizations. In case of street lighting, responsibility of installation of electricity poles and their electrification lies with MPSEB. Any failure in the coordination between Nagar Parishad and MPSEB results in poor urban governance. A substantial stretch of city land lies with Railways and any coordination issue between Railways and Nagar Parishad results in inefficiency in service delivery of urban services. Indian railways should be involved in the city planning at the initial stage itself to result in the implementable plans.MPPCB should be regularly contacted to keep a check on urban environment and curb pollution. Nagar Parishad should maintain a healthy interaction for effective and comprehensive city planning. The Departments of Health and Education should be provided with necessary assistance in the implementation of their plans and day-to-day activities. Nagar Parishad should consult MP Housing Board during the preparation of DPRs for various urban services.MP Housing Board should consult Nagar Parishad at the planning stage to avoid any issues later at the time of transfer of housing stocks to Nagar Parishad. Meetings at regular intervals should be organized between various governing organizations.
6.12. Conclusion
This chapter dealt with the current status of various components of city infrastructure and services provided by the Budni Nagar Parishad. Sectors/Services which were analyzed in the areas of existing status, demand-supply gap, critical issues and SWOT are physical Infrastructure (Water Supply, Sewerage & Sanitation, Solid Waste Management, Drainage, Traffic & Transportation and Street Lighting, Fire Fighting & Power), Social Infrastructure (Health, Education, Other Social Infrastructure recreational), Economic Development, Environment and Tourism (Urban Environment, Heritage and Tourism), Urban Poor and Accessibility to Basic Services, Urban Governance and Institutional Framework. The next chapter deals with the analysis of municipal finance.
62
Revenue Expenditure
Revenue Income
Capital Account
2010-11 2009-10 2008-09 2007-08 2006-07 0 50 100 150 Rs. lakhs. 200 250
Capital Income
Capital Expenditure
As we can observe that revenue expenditure is less than revenue income for 2009-10 and 2010-11. The overall financial status of the Nagar Parishad is visible in Exhibit 7-1. It shows that Revenue income is increasing over the years.
Exhibit 7-1 Financial Status at a Glance Items Revenue Account Income Expenditure Surplus/ Deficit Capital Account Receipts 80.6 123.8 87.6 133.8 178.8 22.0 81.4 65.3 16.1 81.4 85.2 (3.9) 76.3 83.5 (7.2) 117.9 106.4 11.4 141.1 112.8 28.3 14.7 14.7 2006-07 2007-08 2008-09 2009-10 2010-11 CAGR %
63
2007-08
2008-09
2009-10
CAGR % 47.0
Actuals in Rs. Lakhs 45.0 18.7 145.8 78.8 142.9 69.0 204.7 (12.0) 202.5
52%
Figure 7-3 Sources of revenue
Revenue Grants
Actuals in Rs. Lakhs Own Sources Tax Revenue Non Tax Revenue Assigned Rev Revenue Grants Total 19.60 9.83 9.77 41.24 20.56 81.41 30.34 16.69 13.65 35.33 15.72 81.39
64
Tax Revenue
Tax revenue comprises of property tax, integrated tax, education cess, export tax, advertisement tax and other taxes. However collection from other taxes happens to be the highest for all the years. Tax revenue accounts for 12 % share of revenue.Exhibit 7-4 shows the DCB statements of Property tax Collection. The collection amount for property tax in DCB varies from budget accounts. However, property tax DCB has been used for property tax projections for Nagar Parishads revenue. Collection performance of property tax has increased from 42% in FY 2006-07 to 66% in FY 2010-11.
Exhibit 7-3 Tax Revenue - Budni Nagar Parishad (last 5 years) in lakhs (Rs) Tax Revenue S.No 1 2 3 4 6 7 Property Tax Integrated tax Education cess Export tax Advertisement Tax Other Taxes Total (Tax Revenue)
Source: Annual Accounts, Budni Nagar Parishad
Items
Exhibit 7-4 Property tax Demand Collection Balance (last 5 years) in lakhs (Rs) S. No A Demand/ Collection (Rs) Demand (Rs) Arrears Current Total Demand B Collection (Rs) Arrears Current Total Collection C Balance (Rs) Collection Performance - % arrears Collection Performance - % Current D Collection Performance - %
Source: Annual Accounts, Budni Nagar Parishad
2006-07
2007-08
2008-09
2009-10
2010-11
65
electricity, entry charges for new made bridges etc.Collection performance of water charge shows the growth in last five years; shows the increase in from 39% in FY 2006-07 to 70% inFY 2010-11 which is a good performance as visible in Exhibit 7-6. The water charges collection is different in municipal budget accounts and DCB provided by Nagar Parishad. However, DCB statement has been used for projections for water charges.
Exhibit 7-5 Non Tax Revenue - Budni Nagar Parishad (Last 5 years) in lakhs (Rs) Budni Nagar Panchayat Non Tax Revenue S.No 1 2 3 4 5 6 Items Rental Income from Municipal Properties Water Charges License and Fees Development charges/ vikas shulkh Building permission Others Total (Non Tax)
Source: Annual Accounts, Budni Nagar Parishad
Exhibit 7-6 DCB Statement for Water Charge Collection S. No A Demand/ Collection (Rs) Demand (Rs) Arrears Current Total Demand B Collection (Rs) Arrears Current Total Collection C Balance (Rs) Collection Performance - % arrears Collection Performance - % Current D Collection Performance - % 2.04 2.04 4.07 6.48 29 59 39 4.41 3.26 7.67 2.82 68 81 73 1.97 2.69 4.66 2.16 70 67 68 1.76 3.06 4.82 1.25 81 78 79 0.89 3.19 4.08 1.75 71 70 70 7.11 3.45 10.56 6.48 4.00 10.49 2.82 4.00 6.82 2.16 3.91 6.07 1.25 4.58 5.83 2006-07 2007-08 2008-09 2009-10 2010-11
66
Exhibit 7-7 Assigned reveue and Compensation - Budni Nagar Parishad (Last five years) in lakh (Rs) Budni Nagar Panchayat Assigned Revenue and Compensations Items 1 2 3 4 Octroi compensation Stamp duty Passenger tax compensation Income under special acts Total (Assign Revenue) 2006-07 41.21 0.00 0.03 0.00 41.24 2007-08 35.28 0.00 0.05 0.00 35.33 2008-09 36.78 0.00 0.00 0.00 36.78 2009-10 67.81 0.00 0.00 0.00 67.81 2010-11 85.92 0.00 0.00 0.00 85.92
Actuals in Rs. Lakhs Budni Nagar Parishad Salaries/ Wages & Allowances Administrative Expenses Operation & Maintenance Programme Expenses Repayment of Loans Other Miscellaneous expenditure Total Revenue Expenditure 30.9 2.0 26.6 3.0 2.8 65.3 50.7 4.7 25.8 3.3 0.7 85.2 40.2 1.3 36.4 5.0 0.5 83.5 49.8 10.1 36.0 7.9 2.7 106.4 73.7 5.3 25.4 7.5 1.0 112.8
67
As we can observe from the pie chart below that O&Mis the second highest revenue expense accounting for 34% of the total. In case of O&M cost, major expenditure is towards water works. O&M expenditure has increased and has a negative CAGR of 1.2 % over the last 5 years. Administrative expenses includes stationary, printing expenses, furniture, advertisement, photo copy and other expenses which are accounting for 5 % of the total. Programme expenses include mid-day meal, donations and etc., where mid-day meal accounts the prominence in each year of the study. Program expenses accounts for 6% of total revenue expenditure . Items of Expenditure 6% 2% 0%
Salaries/ Wages & Allowances Administrative Expenses Operation & Maintenance Programme Expenses
34%
Repayment of Loans
53% 5%
Figure 7-4 Items of expenditure
Capital Expenditure 0% 1% 0%
99%
Capital Work in Progress Purchase of fixed assets Other Capital Expenditure Reserve Fund
Actuals in Rs. Lakhs A B C I Ii Iii Sale of asset Loans Grants & Contributions Special Projects Basic services UIDSSMT 31.93 10.72 0.00 70.93 0.00 43.78 74.36 0.00 0.00 24.78 50.00 50.00 84.46 0.00 87.79 0 0 0 0 0 0 0 0 0 0
68
Capital Account S.No. Capital Income 2006-07 2007-08 2008-09 2009-10 2010-11
Actuals in Rs. Lakhs Iv V Vi Vii Viii IHSDP Flood relief & NRCP State finance commssion (S.F.C) T.F.C Other Grants Total Grants & Contributions D E Public Contribution Other Capital income Total Capital Income
Source: Annual Accounts, Budni Nagar Parishad
Share % 0.00 0.00 9.47 7.55 8.29 99.84 0.00 0.16 100.00
Exhibit 7-11- Capital Expenditure Budni Nagar Parishad (past 5 years) in lakh (Rs) Budni Nagar Parishad Capital Expenditure 2006-07 2007-08 2008-09 2009-10 2010-11 Share
Actuals in Rs. Lakhs 1. 2. 3. 4. Capital Work in Progress Purchase of fixed assets Other Capital Expenditure Reserve Fund 50.9 0.00 0.00 0.00 42.90 43.6 0.06 0.00 1.29 43.83 18.7 0.00 0.00 0.00 1.28 145.8 0.00 0.00 0.00 132.28 238.1 0.00 0.00 0.00 197.72 99 0.03 0.00 0.59 100.00
S. No A
INDICATOR
Unit Rupees % % % %
Minimum
Value Maximum
Average 839.42
Resource Mobilisation 1 Per Capita Income 2 Source of Funds I Share of Taxes ii Share of Non Taxes Revenue iii Share of Assigned Revenues iv Share of Grants & Contributions 3 Growth in Income Sources
69
S. No
INDICATOR I Growth in Taxes ii Growth in Non Taxes iii Growth in Assigned Revenues iv Growth in Grants & Contributions V Growth in Own Sources' Receipts vi Growth in Total Receipts
S. No B
INDICATOR
Unit
Minimum
Value Maximum
Average
Expenditure Management 1 2 Per Capita Expenditure Functional Allocation i Share of Salaries & Wages ii Share of Administrative expenses iii Share of O & M Expenditure iv Share of Programme expense v Share of Debt Servicing Expenditure Growth in Items of Expenses i ii iii Growth in Salaries' Expenditure Growth in O & M Expenditure Growth in Total Expenditure Rupe es % % % % % % p.a. % p.a. % p.a. 46.78 1.55 22.48 3.82 0.00 -20.69 -29.45 -2.10 65.31 9.50 43.57 7.41 0.00 64.34 40.82 30.61 671.09 53.43 4.87 34.19 5.69 0.00 28.84 1.79 15.51
The Exhibit 7-13 presents the expenditure management of Nagar Parishad. It is visible that per capita expenditure is less than per capita income, which clearly remarks that the Nagar Parishad is in surplus. Maximum spending is on salaries and wages and then on operation and maintenance. Key financial ratios have been estimated based on the annual accounts of the Budni Nagar Parishad to highlight the existing position of the municipal finances. These ratios are the average ratios of last five years from 2006-07 to 2010-11. Exhibit 7-14 gives the ratio of the major financial indicators
Exhibit 7-14 Financial Indicators S.No i ii iii iv Ratios Operating Ratio Salaries' Expenditure to Revenue Income Salaries' Expenditure to Revenue Expenditure Capital Utilisation Ratio 2006-07 2007-08 2008-09 2009-10 2010-11 Average
70
The average operating ratio of the Budni Nagar Parishad is 0.93 which is less than 1, indicating that Budnis revenue expenditure levels are higher than the revenue income generated. This also indicates that the capital income is being utilized for paying off revenue expenditure. Capital Utilization ratio: Average Capital utilization ratio of Budni Nagar Parishad is 0.73 which is less than 1, indicating that Budnis capital expenditure is lower than its income . It also means that they are utilizing their capital income for revenue purposes or it is being kept idle. Keeping funds idle is not a good sign . If we look at the expenditure under capital expenditure category we can observe that they havent bought any new capital assets in the last 5 years . Any Nagar Parishad cannot develop without investing in new assets with advanced technology . Salaries expenditure to revenue income: If we look at this ratio we can observe that approximately 50 % of the revenue income is utilized for paying the staff employed by Nagar parishad . After paying off the salary not much revenue income is left to be utilized for other productive revenue purposes.
Encourage greater accountability among bill collection staff by introducing targets and incentivize the same by recognition of top performers. 2. Following steps/strategies shall be adopted to improve collection efficiency. Draw a systematic plan for sending demand notices and ensure dispatch of demand notices on time. Conducts ward wise analysis of collection efficiency to focus more on troublesome wards/ areas. Involve council members and resident welfare associations / NGOs as pressure groups to act against willful defaulters.
71
Simplify payment of property tax dues by providing multiple options; a) payment through banks b) additional facilitation / e-governance counters, c) mobile vans and door-to-door collection drives, d) online payment option and e) payment through credit cards etc. Make it compulsory for clearing property tax dues for provision of water and sewerage connections. Initiate a One-time drive and settlement scheme for arrears.
Prepare a list of top100 defaulters and disseminate the information online and through other media to put pressure on such defaulters. 3. Evaluate PPP options for development of projects like sports complex, clubs, parking lots etc. 4. Introduction of sewer charges and rationalization of water charges in order to meet the O&M. 5. Actively encourage corporate / NGO partnerships for city beautification and asset management in areas covering bus stops, street lighting, medians, parks and road junctions
7.6. Conclusion
This chapter presented analysis of Municipal Budgets for year 2006-07 to 2010-11. The financial analysis included review of financial statements for last four years, from 2006-07 to 2010-11. The analysis was carried out in four areas, Revenue Income, Revenue Expenditure, Capital Income and Capital Expenditure. The analysis was then used to calculate various indicators to assess the financial health of the Nagar Parshad. The next chapter deals with the City Vision, Sector Goals to achieve the City Vision and Sector Strategies to meet the Sector Goals. Sectoral strategies also discuss about long term and short term needs.
72
8. City Vision, Sector Goals, Strategies, Action Plan, Projects and Prioritization
The vision for Budni was formulated by consultations with the stakeholders and coming up with the consensus approach and continued consultations with the community. The consultations revolved around the citys strengths, current issues, concerns, problems and the areas that need to be focused on to achieve the desired results.
In addition to the outlining of a vision for the city, discussions were also carried out on the identification of major themes which would serve as the watchwords for initiatives and actions to achieve the vision. Some of the major themes that came out of workshop and consultations with stakeholders are as follows: 1. City has good connectivity, accessibility to water and availability of land in and around. Thus on basis of inherent strengths, focus should be on development of industrial sectors in order to generate local employment opportunities.
73
2. The city should attain a key position in small scale, Forest- based and Agro-based industriesso that employment opportunity can be developed. The city needs to promote the household industry of wooden toy making. 3. The city should be developed to cater to need tourists and develop River Narmada and the ghats on its bank for the purpose of tourism and utilisation of it water for services of its population. 4. Promote education, health institutions and a safe environment for the citizens. There should be good supply of water in the town.
74
8. Conserve Budni Environment A restoration plan should be prepared forNarmada River& the ghats along the river and a conservation plan for the natural environment of Budni Nagar Parishad. These Mission Statements would serve the purposes of aligning/initiating development works with the formulated vision, guidance during the policy formulations to achieve the goal and framework for the co-ordination among the various stakeholder agencies.
In the subsequent sections of this chapter, we have outlined the key areas in each sector, which would be the main focus of detailed strategies and action plan. We have also discussed the achievement targets for short, medium and long terms. These achievement targets have been decided according to the demand of that particular parameter in that year. The discussion on sector goals for each sector is followed by sector strategies that should be adopted to achieve the sector goals. Sector Strategies have been devised in accordance with the existing situation of the urban services, demand in future years and improvement in the service levels.
SECTOR
COMPONENTS Network coverage to households Per capita supply as per norms 24/7 water supply Quality of water Non revenue water Consumer metering Roof water harvesting Private sector participation
2015 100% of the properties assessed under property tax 135 no Good 15% No No
2025 100% of the properties assessed under property tax 135 no good 15% 80% yes O&M could
2035 100% of the properties assessed under property tax 135 Yes Good 15% 80% yes O&M could
WATER SUPPLY
75
SECTOR
COMPONENTS
2015
Water supply source requires to be augmented to 5.56 MLD in 2035. The water storage capacity would also have to be increased keeping in perspective the long-term requirements.Budni at present has storage capacity of 1 MLD which is very high as far as the present requirement is considered but by the year 2035 there would be an additional requirement of 0.85 MLD. Refurbishment of the old dilapidated distribution network has to be planned to reduce the loss in transmission. And distribution network needs to be enhanced considering the growth of the town. A distribution network of 54 km would be required by the year 2035 A 3 MLD Treatment plant is constructed under UIDSSMT and would cater to the demand for next 7-8 years after which the treatment plant capacity would need to be increased to 5.56 MLD by the year 2035
76
To improve the revenue from water charges, complete metering has to be executed.
Expected Outcome
Assured 135 lpcd water supply Improvement in water quality Improvement in the revenue from water charges, enhanced service delivery
For meeting the demand arising in 2035, the following sub projects are being recommended and would have to be executed by the ULB by 2021.
ULBs Suggestion Scheme to increase the per capita supply of water Project Rationale Water Supply in the town not adequate to meet the existing and future demand Current treatments chlorination were restricted only to
Projects Proposed Integrated Water supply Scheme for the town of Budni Sub- Projects Overall Water Supply augmentation to 5.56MLD source
Development of water treatment facility of 5.56 MLD capacity Increasing distribution network to 54 km by year 2035 which can be taken up in a phased manner.
Revenues from water charges are not adequate, and the installation of water meters becomes important both from the perspective raising revenues and checking water consumption
77
The additional water requirement can be met by adopting either of the following options: a. Drawing water from Narmada River b. Meeting some part of demand by implementing rain water harvesting project c. Sewerage Treatment Plant: The treated water can be used for industrial purposes.
2. Water treatment facility: The proposed water treatment facility which is under construction is for 3 MLD of water; hence treatment infrastructure needs to be installed for the additional 2.5 MLD by 2035 of water. 3. Distribution Network: As discussed with Budni Nagar Parishad officials, at present, Budni has a distribution network of 10.2 km. The demand for distribution network for the year is 54 km. In addition, to meet the growing demand, Budni would need an additional network of 44 km to increase the coverage to 85 % of road network by the year 2035. 4. Elevated Storage Capacity:At present Budni Nagar Parishad has a storage capacity of 1 MLD in 3 Elevated Storage Reservoir. Storage capacity would be required to be augmented by another 0.85 MLD by the year 2035. 5. Metering System: 100% properties need to be assessed and water meters need to be installed in all the properties with water connection, so that revenue income of the Nagar Parishad can be increased. There is a need to increase capacity of officials in this sector and create awareness among the Parshads and citizens.
Exhibit 8-4 Water Supply: Project development initiatives to be taken by the Nagar Parishad
Immediate measures to be taken Finalising the sub projects to be undertaken Preparation of DPRs for finalised projects Submission of DPR to funding agency for approvals Undertake measures for compulsory installation of water meters: Create awareness among the ward councillors and citizens on the need for installation of water meters
Authorities/Agencies responsible Budni Nagar Parishad Budni Nagar Parishad Budni Nagar Parishad Budni Nagar Parishad
78
Sector
Components Sewer network coverage to households Sewage Treatment and disposal arrangements
2015 70% Treatment plant to be built- capacity 2.35 MLD Treated water could be used for agricultural purpose or in industries, not for drinking use. 70% of households
2025 85% Expand the capacity by 3.21 MLD Treated water could be used for agricultural purpose or in industries, not for drinking use. 85% of households
2035 90% Expand the capacity by 4.45 MLD Treated water could be used for agricultural purpose or in industries, not for drinking use. 85% of households
In addition to above area, a constant effort should be devoted towards Community participation and awareness campaign for the proper maintenance of Public Toilets and Cost Recovery through collecting the user charges.
Laying of underground drainage system of 56.5 km Construction of a sewerage system which can handle a capacity of 4.5 MLD Additional Public toilets Synchronisation with water supply capacity, ability to meet service level targets and disposal norms
Projects Envisaged
79
For meeting the demand arising in 2035, the following projects are being recommended and would have to be executed by the ULB by 2021.
Exhibit 8-7Projects identified for Sewerage Sector
ULBs Suggestion Scheme for laying of sewerage network for the town Project Rationale The sewerage system in the town consists of septic tanks, soaks pits, open surface drainages and finally disposes into the natural drains and later into River Narmada. The city will consume about 5.5 MLD of water by the year 2035. About 80 percent of water supply as per CPHEEO norms) is estimated to be generated in the town. There is no underground drainage network in the city. The waste water flowing in open drain results in unhygienic milieu and pollution of water bodies and the conditions are severe during monsoon when the sewerage overflows on the road.
Projects Proposed Comprehensive Sewerage Scheme for the town for Budni Sub- Projects Construction of sewerage network with a total capacity of 4.5 MLD Construction of pumping stations sewage
80
and anaerobic filters. The aerobic modules have horizontal planted gravel filters and polishing ponds. DEWATS is based on different natural treatment techniques, put together in different combinations according to need. It is used for recycling both grey and black domestic wastewater. DEWATS systems include: Primary treatment, which includes pre-treatment and sedimentation in settlement tank or septic tank; Secondary anaerobic treatment in baffled reactors; Tertiary aerobic/anaerobic treatment in reed bed system; and Aerobic treatment in ponds
Typically, the space required per person (@100 lpd) is 0.27 sq m per person for sewage treatment. Out of this area, the system includes 0.25 sq m of green belt. Effectively, the system uses 0.02 sq m of area per person for sewage treatment. At places with less space, the system can be constructed in the form of multi-level bio-towers. The advantages of DEWAT system are that; it requires minimum space and hence be accommodated easily under paved pathways and parking lots etc. or small available spaces; It requires lesser energy and operation cost; This system promotes the reuse of water for nonpotable purposes; It can be easily blended with the landscape; It cannot be switched off so it ensures efficient working irrespective of external factors and it can treat waste water with high fat, suspended solids and BOD. Since this system is decentralized, the zones would be defined as per population and location for DEWATS and the treatment system would be developed to safely dispose-off the sewage. The treated water can be used for agricultural use. 3. Public Convenience Systems: To provide safe and sufficient sanitation facilities to the citizens, mainly slum dwellers, public toilet seats need to be added to the existing fleet of Budni Nagar Parishad. This can be done only once a detail study for identification of slum pockets in carried out in the town. At present there are no notified slums in the town. The norm of 1 seat per 60 persons can be considered for the same. From the sanitation data in Budni, it is observed that many of the households do not have access to toilets. Currently there are 2520 individual toilets, 954 individual septic tanks and only 1Community toilets in Budni and open defecation is prevalent for the remaining population which accounts for 22% of the total population. Therefore it is evident that the large amount of excreta generated is disposed unsafely. This imposes significant effect on public health especially urban poor women, children and the elderly. Inadequate and unsafe discharge of untreated domestic/ municipal waste water results in the contamination of surface water i.e. nearby rivers, ponds and lakes etc. Thus it is necessary to provide sanitation facilities for all for which there is a requirement of 70 additional seats to be constructed in the identifie slum pockets by 2015.
Exhibit 8-8 Sewerage & Sanitation: Initiatives to be taken by the Nagar Parishad
Authorities/Agencies responsible Budni Nagar Parishad in consultation with Councillors and other stakeholders Budni Nagar Parishad
81
This section discussed the technical details of the projects proposed as the realization of sector strategies.
YEAR
Components Door-to-door collection system Source segregation Improve waste collection efficiency Mechanized waste handling Scientific waste disposal Landfill site adequacy Cost recovery of O&M Private sector participation
Promoting door-to-door collection Up-gradation of the infrastructure required for effective collection and disposal of waste Adoption of scientific technology for disposal of waste Improve the skills of the conservancy staff
82
Expected Outcome
Hygienic conditions and a clean city Waste segregation at source Suitable treatment for different kinds of waste
Following are the projects proposed during the stakeholder consultation and also based on the rapid urban assessment carried out during the CDP preparation.
Exhibit 8-11: Projects identified for Solid Waste Management
Project Rationale As per the demand assessment, in 2025, Budni would generate 6.05 MT of waste daily. To effectively handle the generated waste, a preemptive action of developing a proper Solid Waste Management system is inevitable.
Sub- Projects Promoting door-to-door collection Augmenting Collection Infrastructure Development of landfill site
d. Development and augmentation of the landfill site: A concept of Regional Solid waste Management can be adopted by selecting a centrally located common disposal site for Budni, Shahganj, Rehti and other towns in vicinity. A single, relatively large site can be developed to serve the waste disposal requirements for the selected group of ULBs that would provide a way forward for pooling of resources to address some of the challenges in MSW management.
83
Regional facilities may incorporate treatment as well as disposal facilities, and generate sufficient scale to enhance technical and financial efficiencies. Furthermore, it would also facilitate the monitoring of environmental outcomes and performance due to a reduced number of sites. This approach would enable smaller ULBs to achieve compliance with minimal financial burden. CPHEEO guidelines suggest the need of development of composting plant so that at atleast the organic part of the waste can be taken care off. The organic waste which is otherwise burnt or used as land fillings can be converted into valuable resources containing plant nutrients and organic matter which are critical for maintaining soil productivity by way of composting. Segregation and composting of organic waste would also help in some revenue generation for Nagar Parishad. Vermi-composting is a simple biotechnological process of composting, in which certain species ofearthworms are used to enhance the process of waste conversion and produce a better endproduct. Method to prepare Vermi-Compost is that, the MSW is segregated i.e all the dry wastes such as clothes, carry bags and other dry wastes are segregated from wet waste. A thatched roof shed preferably open from all sides with unpaved (katcha) floor is erected in East West direction length wise to protect the site from direct sunlight. A shed area of 12X12 is sufficient to accommodate three vermin beds of 10X3 each having 1 space in between for treatment of 9-12 quintals of waste in a cycle of 40-45 days. The length of shed can be increased/decreased depending upon the quantity of waste to be treated and availability of space. The height of thatched roof is kept at 8 feet from the centre and 6 feet from the sides. The base of the site is raised at least 6 inches above ground to protect it from flooding during the rains. The wet waste is pulverized and arranged in the form of vermin bed over the raised ground. The loaded waste is finally covered with a Jute Mat to protect earthworms from birds and insects. Water is sprinkled on the vermin beds daily according to requirement and season to keep them moist. The waste is turned upside down fortnightly without disturbing the basal layer (vermin bed).The appearance of black granular crumbly powder on top of vermin beds indicate harvest stage of the compost. The earthworms go down and the compost is collected from the top without disturbing the lower layers (vermin bed). The first lot of Vermi-compost is ready for harvesting after 22 months and the subsequent lots can be harvested after every 6 weeks of loading. The vermin bed is loaded for the next treatment cycle.The utilization of vermi-compostresults in several benefits to farmers and environment To farmers: Less reliance on purchased inputs of nutrients leading to lower cost of production Increased soil productivity through improved soil quality Better quantity and quality of crops For landless people provides additional source of income generation
To environment: Wastes create no pollution, as they become valuable raw materials for enhancing soil fertility
Tests in India have shown that vermin compost application can double wheat yields and quadruple yields of fodder. Hence it is suggest to use Vermi composting, so that the compostcan be used in the neighbouring villages for improving agricultural production.
84
Exhibit 8-12 Solid Waste Management: Initiatives to be taken by the Nagar Parishad
Immediate measures to be taken Augmenting the size of the conservancy staff Purchase of additional equipments Identification of techniques scientific disposal of waste for the
Authorities/Agencies responsible Budni Nagar Parishad in consultation with Councillors and other stakeholders Budni Nagar Parishad Budni Nagar Parishad
This section discussed the technical details of the projects proposed as the realization of sector strategies.
8.2.4. Drainage
Sector Goals
To develop an efficient drainage system to ensure cleanliness of city Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal are provided in Exhibit 8-13.
Exhibit 8-13 Storm Water Drainage: Achievement Targets
Sector
2015 43 km New Formations: Pucca Open of 8.71 km, Pucca closed of 28.84 km. Upgradation: 5.5 km of Pucca open to Pucca closed Desilting of drains to increase their capacity No more flooding dueto better coverage of drains
2025 59 km New Formations: Pucca Open of 5.26 km, Pucca closed drain of 10.68km length
2035 82 km New Formations: Pucca Open of 7.47 km, Pucca Closed of 15.16 km
Pucca drains DRAINAGE Rehabilitation of existing primary nallahs and water bodies Flood prone areas
100%
100%
None
none
Core Strategy
In the case of storm water drainage, the broad strategy followed would be similar to that proposed in the case of road sector, wherein the existing gaps and the demand arising for the year 2015 may be taken up as priority projects.
85
Exhibit 8-14: Storm Water Drainage: Long Term and Short Term Interventions
Cleaning/ desilting of the existing natural drains, this will also include the removal of encroachments. Construction of storm water drains running into a length of: Pucca Open of 14.21 km, Pucca closed of 28.84 km (2015), New Formations: Pucca Open of 19.46 km, Pucca closed of 39.52 km (2025), New Formations: Pucca Open of 26.93 km, Pucca Closed of 54.68 km (2035)
Expected Outcome
Following are the projects proposed during the stakeholder consultation and also based on the rapid urban assessment carried out during the CDP preparation.
Exhibit 8-15: Projects identified for Storm Water Drainage
ULBs Suggestion Scheme for laying of storm water drainage network for the town Project Rationale
Projects Proposed Storm Water Drainage network for the town of Budni Sub- Projects
According to normative standards, the length of the drains are A. Cleaning/desilting of natural assumed at 130% of road length considering all divided roads drains such as nallah flowing in to have drains on either side and undivided roads on at least the southern part of the city. one side. Further the drains in the initial phase shall be open B. Upgradation of 5.5 km of Pucca and subsequently be made closed; hence the investment is open to Pucca closed by 2015 towards up-gradation annually and for construction of new closed drains. All existing open drains shall be first upgraded C. Construction of 28.84 km of pucca closed drains and 14.21 to closed drains and subsequently new drains shall be km of pucca open drains by constructed. 2015 Prominently, all the road and storm water projects are to be taken up simultaneously to match the levels of the roads with the drains and allow draining of rain water from the city.
86
system is most suited to decentralized wastewater treatment from small individual households, communities to small industrial units producing effluent with similar characteristics to domestic wastewater. It is a low-cost and maintenance free option that uses the capacity of plants (especially certain reeds hence also called reedbed technology) to absorb contaminants and structurally modify them for treating water.It is based on the principle of attached growth biological reactors similar to conventional trickling filters with combination of aerobic and anaerobic zones. The contaminants present in the wastewater are treated as they seep through the root-zone of the plants by a combination of plants, soil bacteria and hydraulic flow systems resulting in physical, chemical, and microbiological processes. A wide variety of microorganisms present in the rootzone of the plants results in efficient removal. There is efficient reduction of pathogens also by percolation through the bed material. Thus, it can be developed in Budni along the natural storm water drains.Root Zone Treatment System are planted filter-beds consisting of sand/gravel/soil and can be used as secondary treatment for the output of the septic tank. B. Construction of storm water drains: The Nagar Parishad should undertake the construction of Pucca Open of 14.21 km, Pucca closed of 28.84 km by 2015. This construction may be done in tandem to the construction/up-gradation ofroads. These construction activities would have to be carried out on an immediate basis to address the existing and future demand-supply gap. C. Upgradation of existing drains: The Nagar Parishad is also required to undertake drain upgradation works for the existing drains in town. In the short term, 5.5 km of existing open drains should be upgraded to Pucca closed or closed.
Exhibit 8-16: Storm Water Drainage: Initiatives to be taken by the Nagar Parishad
Authorities/Agencies responsible Budni Nagar Parishad in consultation Councillors and other stakeholders Budni Nagar Parishad Budni Nagar Parishad with
YEAR
Components Development of bus and truck terminus Development of Bypass/ road over bridgeto NH 69 Junctions and traffic
2015 development of bus stand and transport nagar Development of bypass Regulating traffic
2025 None
None Regulating
87
YEAR
Parking facilities
Core Strategy
In the case of the road sector, the broad strategy which the Nagar Parishad should follow is one wherein the existing gaps in this sector and the future requirements would be addressed in terms of two categories of priority or short term needs and long term needs. The overall plan in this sector should be based on two principles: 1. Medium term action plan aimed at improvement of the existingof transport infrastructure which includes improvement of the road surface quality which was rated as number 1 by the stakeholders amongst all the other issues in the questionnaire given to them asking about their perception on various issues. In addition to surface improvement of roads, the new areas would require additional road connectivity. Thus various infrastructure projects, which will be directed at network improvements such as parallel roads, link roads, slip roads and bridges would be needed. 2. Long-term action plan would examine a comprehensive multi-modal public transit system to bring about the most optimal mix of commuting within the Urban Area and thus providing a sustainable transit solution.
Construction of new roads in areas which are at present earthen. New roads to cater to missing links and developing areas Development of Parking Spaces Improved bus stand and related amenities
Following are the projects proposed during the stakeholder consultation and also based on the rapid urban assessment carried out during the CDP preparation.
88
Project Rationale The current road length per capita is very high than the norms; as the arterial road along which Budni has come up and internal roads would be required to be developed.
of
Authorities/Agencies responsible Budni Nagar Parishad in consultation with Councillors and other stakeholders Budni Nagar Parishad Budni Nagar Parishad
Sector Street
89
Sector Lighting
Components lights New Installation Energy savings 100% fire safety coverage Fully equipped power station 24/7 Electricity Supply
2015 High Power lamp) 635 Installation of street lights in the ratio of 75% : 25% of tube light: sodium lights Yes Yes To be ensured in close coordination with state govt To be ensured in close coordination with state govt No
2025 High Power lamp) 403 Installation of street lights in the ratio of 75% : 25% of tube light: sodium lights Yes Yes To be ensured in close coordination with state govt To be ensured in close coordination with state govt Yes (Options like energy from waste, biogas, solar, etc)
2035 High Power lamp) 580 Installation of street lights in the ratio of 75% : 25% of tube light: sodium lights Yes Yes To be ensured in close coordination with state govt To be ensured in close coordination with state govt Yes (Options like energy from waste, biogas, solar, etc)
Fire Fighting
Power
Increase in the number of tube lights and high power lamps, and installations of more streetlights w.r.t to roads Increasing the number of Street lights from 523 to 1143 by 2015 and to 2092 by year 2035
90
Expected Outcome
City wide coverage of road network with energy efficient street lights. 100 % coverage and safety against the fires.
ULBs Suggestion An overall coverage of city roads with street lights and safety against the fire
Projects Proposed Augmentation of street light coverage and laying of underground cable Procurement of water tender and development of fire stations with modern equipments
Project Rationale With the growth expected in future, citys road network would grow from 58 kms at present to 64.66 kms in year 2035. Hence, to ensure a city-wide coverage of street lights, a major capacity addition would have to be undertaken in this area to achieve the sector goal.
Sub- Projects Augmentation of street lights: 1143 (2015); 1512(2025); 2092 (2035) Development of fire stations Feasibility studies for alternative power sources
Projects Envisaged
Exhibit 8-24 Street Lighting, Fire Fighting and Power: Initiatives to be taken
Street Lighting and Fire Fighting Immediate measures to be taken Authorities/Agencies responsible Finalising the sub projects to be undertaken Budni Nagar Parishad in consultation Councillors and other stakeholders Budni Nagar Parishad with
91
Budni Nagar Parishad Power Authorities/Agencies responsible Budni Nagar Parishadand Govt of MP Budni Nagar Parishadand Govt of MP Budni Nagar Parishadand Govt of MP
Immediate measures to be taken Finalising the sub projects to be undertaken Preparation of DPR for finalised projects Submission of DPR to funding agency
Sector
Components Access to water connection Access to public toilets and urinal facilities for all slum households Access to dustbins and secondary storage points
2015 135 lpcd to all dwellers 100% of households (1 Community Toilet per 60 users) Door to Door Collection( could look for a PPP Project for the city) Provision under IHSDP Provision to provide drainage network alongside all the roads Yes Yes Govt. Hospital and dispensaries would cater to all the slums
2025 135 lpcd to all dwellers 100% of households (1 Community Toilet per 60 users) Door to Door Collection( could look for a PPP Project for the city) Maintenance and upgradation
2035 135 lpcd to all dwellers 100% of households (1 Community Toilet per 60 users) Door to Door Collection( could look for a PPP Project for the city) Maintenance and upgradation
Urban Poor
Upgradation of Kutcha roads to PCC roads in slums Improved drainage systems Adequate street lighting facilities Education facilities Adequate health facilities
Yes
Yes
Yes Yes Govt. Hospital and dispensaries would cater to all the slums
Yes Yes Govt. Hospital and dispensaries would cater to all the slums
These areas have been identified on the basis of workshops, consultations and review of best practices in the sector.
92
Core Strategy The following strategies are proposed to address the issues of urban poor and slum improvement in Budni. 1. For the planning and implementation of any slum development scheme, it is essential to create an updated database on the conditions of slum settlements, preferably through GIS and maintain this updated data. 2. Making land available to the poor at affordable prices and ensuring the provision of housing, urban infrastructure, and transport services on the fringes of the cities, can provide alternatives that would restrict the formation of new slums. Simple strategies like reservation of land for EWS housing can ensure the creation of sufficient and affordable housing stock in the city. 3. Wherever possible, community organizations should be supported and allowed to play an active role in preparing and executing plans for slum up gradation/redevelopment. It is critical to prioritize slums to be considered under slum development schemes through consultation and public opinion. Information about the scheme should be transparent and communicated through common platforms to ensure participation from communities as well. While housing quality is a concern, this can be addressed by training a committee of local people to take up construction contracts or monitor construction quality. 4. Strategies for improving security of tenure are central to the improvement of the lives of slum dwellers and land use in urban areas. This may require reform of tenure and land-use legislation, coupled with new legislation to prevent forced eviction.. 5. While planning for redevelopment of slums, Nagar Parishad should focus on infrastructure such as sewers, piped water, and electricity grids. Investments in improved sanitation should receive high priority to improve the quality of life and reduce the high burden of oral-fecal diseases in informal settlements caused by widespread open defecation. 6. Effective hygiene education and awareness-building programs are essential to create demand for sanitation and to ensure its adequate use by all household members. Other investments required as part of slum up gradation include investment in storm water drainage, community facilities, local markets, and street lighting. Health services require investments as well. As mentioned earlier, nutrition interventions for both the general population and vulnerable groups will reduce morbidity and mortality among the urban poor. Clinics/health posts need to be more accessible and hence should be located at an easy access, and open during hours that can accommodate the schedules of the working poor. Long term and Short term sector interventions required: The broad sector interventions to address both the short and long term requirements have been enlisted below:
Exhibit 8-26 Urban Poor : Short term and Long term Strategies
Strategy Identified
Identification of Slum pockets and find out existing status of the infrastructure of the slums Detail survey of the class of the poor living in the slums Development of pucca houses under State/ Central funded scheme in the slums Up-gradation and maintenance of the slum roads and Provision and
93
maintenance of streetlights in the slums Construction of pucca closed drains on both sides of the roads of the slums
Expected Outcome
Following are the projects proposed by the Nagar Parishad, to improve the slum infrastructure, thus creating a better and a hygienic environment for the slum dwellers.
Exhibit 8-27Projects identified for Slums & basic services for urban poor
ULBs Suggestion
Projects Proposed Identification of Slum pockets in the town Preparation of DPR Development of Slums by Resettlement or Relocation as proposed in DPR for various slum pockets
Sub- Projects Development of housing Up gradation and maintenance of civic & social infrastructure in the slums
8.2.8. Health
Sector Goals
To equip Budni with state-of-art health infrastructure so as to reduce the dependence on other cities Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal are provided in Exhibit 8-28 Exhibit 8-28 Health: Achievement Target Sector Components 2015 Doctors per 1000 population 1.5 Beds per 1000 population 1 Effective implementation of To be carried in health programmes and coordination of related services in the slum Dept. of Health, Health areas of the city GoMP Yes (Provision to Regular checks for water be made for contamination in all water necessary bodies of the city infrastructure) 2025 2 2 To be carried in coordination of Dept. of Health, GoMP Yes 2035 1 3 2 2.6 To be carried in coordination of Dept. of Health, GoMP Yes
1 2
As per Health Data from Organization for Economic Co-operation and Development (OECD) http://www.financialexpress.com/news/indias-patient-hospital-bed-ratio-not-in-pink-of-health/518361/
94
95
As discussed earlier, ULBs role in this sector is limited to the provision of providing basic services and catalyzing involvement of other departmentsExhibit 8-30. Exhibit 8-30 Health: Implementation Agencies Immediate measures to be taken Finalising the sub projects to be undertaken Preparation of DPR for finalised projects Submission of DPR to funding agency Authorities/Agencies responsible Budni Nagar Parishad and Dept of Health, GoMP Budni Nagar Parishad and Dept of Health, GoMP Budni Nagar Parishad and Dept of Health, GoMP
8.2.9. Education
Sector Goals
To achieve a 100% literacy rate with student-friendly educational institutions. Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal are provided in Exhibit 8-31 Exhibit 8-31- Education: Achievement Targets Sector Components Literacy Rate Enrollment in primary schools Education Teacher Student Ratio 85% 90% 60% of prescribed Teacher Student ratio No 2015 95% 100% 80% of prescribed Teacher Student ratio Yes 2025 100% 100% 100% of prescribed Teacher Student ratio No 2035
Core Strategy
For the provision of educational infrastructure, BudniNagar Parishads role is limited to primary level services. To promote higher-level education, Nagar Parishad must provide a conducive environment for other government agencies and private developers in the form of support infrastructure, incentives, etc. Nagar Parishad may encourage public private partnership in primary education for maintenance of buildings and infrastructure. It should take strong steps to ensure the quality of education in schools through standardization and performance incentives. To achieve the goals by finalized strategies, we have estimated the number of schools and other educational institutions that would be required to achieve a 100% literacy rate. These estimations have been done in accordance to the UDPFI guidelines.
96
8.2.10.
Sector Goal:
To provide a universal access to quality social infrastructure to improve the overall quality of life in Budni Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal are provided in Exhibit 8-34
97
Exhibit 8-34 Other Social Infrastructures: Achievement Target Sector Components Developed parks existing Yes 15% of town area (as per UDPFI) Play grounds 2015 Yes 15% of town area (as per UDPFI) Play grounds 2025 Yes 15% of town area (as per UDPFI) Play grounds 2035
Area coverage under recreational facilities Playing facilities Provision for greenbelts in future development plans Sufficient infrastructure at mela /exhibition ground
Yes
Yes
Yes
Yes
Yes
Yes
Core Strategy
The core strategy adopted in this sector focuses on the development of socio-cultural facilities which help in elevating overall quality of life in Budni Nagar Parishad. Some of the key facilities considered under this approach are community rooms, community hall, library, recreational club, parks, sport complex. Nagar Parishad may also encourage public private partnership in this area for maintenance of buildings and infrastructure.
Expected Outcome
98
2. Parks:Budni has one Public park at present. Additional vacant land in the city can be identified and developed as parks to serve the dual purpose of increasing the green cover in the city and provide citizens with open spaces for recreation. Exhibit 8-36 Other Social Infrastructures: Implementation Agencies Immediate measures to be taken Identifying the land for social infrastructure and Finalising the project Authorities/Agencies responsible Budni Nagar Parishad
8.2.11.
Sector Goals
Environment
To accomplish clean, green and safe living environment for all citizens. Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal are provided below. These areas have been identified on the basis of workshops, consultations and review of best practices in the sector. 1. Pollution Sources; Air, Water, Soil and Noise 2. Demand / Supply side control
Core Strategy
For retaining the healthy status of Budnis urban environment, several planning and conservation initiatives need to be taken. This could be achieved through the proper zoning of activities, provision for sufficient breathing space in new development and adoption of proper landscape design practices at the city level. It is also important to promote conservation in the region consciously. There should be a clear-cut strategy to conserve and protect the physical environment, including river and natural drains in and around Budni Nagar Parishad. It is important to weigh the environmental impact of the new programs or development schemes. It is important to devise a plan, which can check the growth of these unauthorized developments, especially within the citys precincts. River conservation should also be explored with the possibilities of reviving lakes as water sources or points of interest in the city.
99
related to the demand for treating large amounts of sewage generated in Budni, decentralized sewage treatment is recommended. This aspect would be addressed by the development and upgradation of Sewerage & Sanitation facilities, Storm water drainage infrastructure and strengthening of solid waste collection/transportation system. 3. Water Bodies Conservation: For water body conservation and rejuvenation, proper attention should be given to River Narmada. A comprehensive water body restoration or revival program in the region is of utmost importance. 4. Green Spaces: Budni has Public parks and allocation of land for development of more parks in future should be taken care in the proposed land use plan/ development plan of the town 5. Development of a Regional Plan: To ensure sustainable development with optimum resource utilization, it may be necessary to develop a Budni Development Plan or Master Plan. For maintenance of open space, the planning authority at the regional level should prepare a detailed inventory of the space and explore its probable multiple uses or forms for recreation and visual pleasure. Possibilities to include the private sector for maintenance of these areas should be explored.
8.2.12.
Sector Goal:
Economic Development
Sustainable economic development on the basis of inherent strengths of the city through promotion of health, education, tourism and industrial sectors focus on local employment opportunities.
Core Strategy
The town economy is predominantly agrarian/ forest based in nature with majority of the workers engaged in primary sector activities and educated youths migrate out of city for employment opportunity. The town lacks a sound economic activity base. The weak town economy has also resulted in the brain-drain which in turn affects the towns economy. Resources should be mobilised to provide support to boost the local economy. Measures should be taken to establish small and medium scale industries. Special care needs to be taken for women employment and education. In a nutshell, following strategies need to be adopted for sustainable economic development: 1. Promoting Forest based industries, Incentivizing agriculture, 2. Strengthening the markets, 3. Improving transportation infrastructure, 4. Promoting small & medium scale industries. 5. Promoting tourism
100
Exhibit 8-37- Local Economy: Long Term and Short Term Interventions Sector Interventions Required Development of an industrial area Promotional activities for development of forest based industries Promotion of tourism New employment opportunities Improved average income and access to better facilities
Expected Outcome
8.2.13.
Sector Goal:
Promote Budnias a tourism hub with state-of-art facilities to tourists Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal are: Hospitality Institutions and Entertainment infrastructure Development of Budni Ghat along Narmada River Promotion of Rural Tourism Concept Regional Connectivity
These areas have been identified on the basis of workshops, consultations and review of best practices in the sector.
Core Strategy:
101
As a measure to effectively utilize the citys potential, a comprehensive survey should be carried out for the tourist coming to Budni. The survey should try to elicit details like frequency of visit, willingness to stay in Budni, services they expect, willingness to pay for better infrastructure, etc. This survey would provide us with an extensive database and would be critical for public and private sector in setting up necessary infrastructure like hospitality institutions, transportation, recreational / entertainment infrastructure, etc. There lies enormous tourism potential in Budni in the form of religious tourism.
8.2.14.
Sector Goals
Urban Governance
Well managed city withproactive and proficient staff Key areas which would be addressed by detailed strategies and action plan to meet the sectoral goal are:
Exhibit 8-39 Urban Governance - Achievement Targets
No. 1 2 3 4
Achievement Target Decentralization of urban functions to local bodies Establish clarity of roles and responsibilities. Training to enhance capacity building. Peoples Participation in Governance
Core Strategy:
The decentralization of urban functions to local bodies would increase their responsibilities manifold. For the prescribed level of service delivery, Budni Nagar Parishad should take concerted actions to augment the capacity, wherever necessary, and enable existing staff to perform efficiently by
102
providing them with necessary training. E-governance will be very helpful in smoothening various process & procedures. It will also lead to an expeditious service delivery.
Details of Projects:
1. Computerization: BudniNagar Parishad should initiate the process of computerization in its administration. Computerization will benefit most of its functions ranging from municipal accounting to tax management. The introduction of E-Governance will help in smoothening the processes and improvement in the efficiency. 2. Capacity Building: The procurement of computers should be supplemented by providing training to the staff. 3. GIS Mapping: A GIS mapping of the city properties will be very helpful in the provision of efficient services to the citizens. This would also help in keeping a tab on tax evaders.
8.2.15.
Conclusion
This chapter dealt with the city vision, sector goals and sector strategies to achieve sector goals. The discussion on sector strategies was followed by the identification of interventions required in every sector. This was followed by the identification of projects and project implementation agencies.
103
The identified proposals in CDP will have to be implemented by Budni Nagar parishad as it the primary responsibility of delivering municipal services. The projects, prioritization, investment phasing, strategies and action plan are framed accordingly. The CIP involved the identification of public facilities to cater demand of the city populace in the years 2015 and 2035. The projects have been identified through a demand-gap analysis for various urban services. Identification of projects was followed by their prioritization based on the stakeholders consultation. The projects identified are aimed at ensuring the optimal and efficient utilization of existing infrastructure systems and enhancing the capacity of the systems/services to cater to the demands of future population. In addition to the projects which are related to major urban services,
104
CIP also includes developmental projects like park development, road side plantation, parking spaces, system modernization etc. The CIP and forecasted future needs for provision of capital facilities under each identified sector is presented below. These assets will help Budni in improving the quality and coverage of service for the current population as well as accommodate the expected increase in population. In some of the sectors like source augmentation for water supply, development of landfill site etc, a planning horizon of 25 years has been considered.
105
9 1 38% 33%
8 2
7 3
6 4
3 7
2 8
1 Score 9 25% 42 64 39 59 54 37 58 37 14
0%
22% 11% 44%
0%
11% 11% 22% 44%
0% 0% 0% 0%
33%
0% 0% 0%
11% 33% 11% 22% 22%
0% 0%
22%
0% 0%
22% 11%
0%
11% 11%
0% 0%
33% 22%
0%
11%
0%
33%
0% 0%
11%
0%
11% 33% 22%
0%
11%
0%
22% 11%
0% 0%
0% 0%
0%
0%
0%
0% 0%
0% 0% 0% 0% 0% 0% 0%
67%
In addition to a preliminary analysis, an overall rank for each sector was derived out of cumulative perception in terms of its criticality. A decreasing rank order of various infrastructure facilities is given in Exhibit 9-2. The ranking thus obtained lays down a path for prioritization of development works in the city. It would try to synchronize the usage of developmental funds with the needs of the city. It should be kept in mind that Exhibit 9-2 is only an indicator of relative criticality of various sectors/services.
Exhibit 9-2 Ranking of Infrastructure Facilities Main Problems Road surface Condition Sewerage facility Health Facility Storm Water Drainage facility Road Network Availability of water Solid Waste Education Facility Parks
Source: IMaCS Analysis
RANK 1 2 3 4 5 6 7 7 9
A detailed analysis was carried out for each sector in order to identify the most critical problem within each sector. The findings of this analysis will be useful while devising City Investment Plan, Annual Action Plan and Prioritization of projects within each sector. Exhibit 9-3 lists most critical problems in the various sectors/services of the city.
Exhibit 9-3 Critical Sectoral Issues Sector Water Supply Storm Water Drainage Transportation Solid Waste Management
Source: IMaCS Analysis
106
As for the social infrastructure, stakeholders were asked to rank their perception on a scale of 1 to 4 with 1 being good, 2 being Satisfactory, 3 being Poor and 4 being Very Poor. Exhibit 9-4 quantifies the stakeholders perception in terms percentage of responses that allotted every facility a particular rank. Exhibit 9-4 indicates that the city in-general suffers from poor social infrastructure which includes proper markets & parking space, recreational activities, and good education and health care.
Exhibit 9-4 State of Social Infrastructure Social Infrastructure Parks Market Movie Hall Hotel/Restaurants Street Shops Playground/Stadium
Source: IMaCS Analysis
1 4 0 0 0 0 0
2 5 0 0 0 2 4
3 0 6 0 2 3 4
4 0 3 9 7 4 1
Above was a brief analysis of the responses received during questionnaire survey. The findings of this survey were of great assistance during various stages of the study.
The planning horizon for the projects identified in sectors of urban poor/ slums, system modernization, city beautification etc which are immediate in nature is 2015 and accordingly the entire identified investment is proposed for funding by 2015 itself. In case of core service sectors of water supply, sewerage, drainage, solid waste management, education and health infrastructure 2035 is considered as the planning horizon and hence only part of the identified investment is proposed for funding by 2015. Budni will need to plan for the remaining identified investment to be funded beyond 2015. Also, the projects already under preparation by the ULB as indicated in the strategy section will form a part of the total investment need identified in the CIP excluding the components that are already completed. Exhibit 9-6 presents the summary of sector-wise total investment need and investments for 2015, 2025 & 2035.
107
Exhibit 9-6 Summary of Capital Investments Investment Required S.No. Budni Nagar Parishad Sectors A B C D E F G H I J K L M N O Water Supply Sewerage and Sanitation Urban Roads, Transport & Traffic Storm Water Drains Street Lighting Solid Waste Management Urban Poor/ Slums' Improvement Health Infrastructure Education Infrastructure Socio-Cultural Facilities Economy Heritage & Tourism Urban Environment Urban Governance Others Investment by 2015 Rs. Lakhs 460 196 1,116 653 62 18 818 266 260 100 15 8 125 6 150 4,251 Investment by 2025 Rs. Lakhs 390 123 587 299 42 55 272 300 5 63 2 2,138 Investment by 2035 Rs. Lakhs 540 175 785 400 61 52 390 520 8 23 2 2,955 Total Investment Need Rs. Lakhs 1,390 495 2,488 1,352 165 126 818 927 1,080 100 15 20 210 10 150 9,345
As can be observed from the table above, a total 46% of the identified investment need is proposed for funding by 2015. From the perspective of sector priorities, about 33% of the investment required for water supply will be proposed by year 2015 and Sewerage and Sanitation at 40%. Drains and roads sectors envisage around 48% and 45% respectively of the identified investment by 2015 while street lighting sector envisage about 38%, 29% is envisaged for health infrastructure and 24% for education infrastructure of the identified investment by 2015. Within the total investment proposed for Budni Nagar Parishad, apart from other investments which include, health, education, community development etc, and maximum share is taken by the Roads sector at 27 % followed by water supply and drain sector at 15% and 14% respectively. Sewerage accounts for 5% and solid waste management account for 1% of the investment. Sector wise details of the City Investment Plan, capital facilities costs, supportive actions and implementation aspects are discussed in the following sections in detail. Demand-gap assessment leading to various projects identification has already been done in chapter 6.
108
Exhibit 9-7Priority needs (2015) / Long term needs (2035) Sector/ Component Investment till 2015 (Rs. Lakhs) Water Supply 1 2 3 4 5 6 7 Source Augmentation Treatment capacity Distribution Network Elevated Storage capacity w.r.t Supply Refurbishment of the old network Metering System Public Stand Posts 849 71 76 567 24 43 58 9
Exhibit 9-8Action Plan for Implementation (2015) Water Supply Investment upto 2015(Rs. Rs. 849Lakhs lakhs) Capital Facilities Water supply Augmentation Treatment Plant Distribution network augmentation Elevated storage reservoirs of 3.04 ML capacity System refurbishment & replacements & Metering System Regularise unauthorised connections, Check distribution leaks and reduce UFW Improve collections to reach 85% collection efficiency by 2015 Sector Notes Performance Monitoring Indicators
2012 100
2013 292
2014 223
2015 234
Action Measures
Identify the areas hitherto not covered by water distribution network and develop a comprehensive plan for providing water supply to these areas. Increase the number of domestic connections Reserve land for zones that are good for water recharge and water conservation Capital investments on system refurbishment and replacement shall happen only after conducting water audit and identification of UFW sources Improvement of collection efficiency is applicable to both arrears and current demand Daily per capita water supply (min of 135 lpcd) Elevated storage capacity w.r.t supply (33%) Distribution network reach as % of road length (min 85%) System coverage water HSCs as % of PT assessments (min 85%) Cost recovery through user charges (100% O&M expenses)
109
Exhibit 9-9Priority needs (2015) /Long term needs (2035) Sector/ Component Sewerage & Sanitation 1 2 3 Network Treatment Capacity Public Sanitary Conveniences Investment till 2015 (Rs. Lakhs) 320 258 48 13 Investment till 2035 (Rs. Lakhs) 175 157 18 -
Exhibit 9-10Action Plan for Implementation (2015) Sewerage System/ UGD Investment Upto 2015(Rs. 320 lakhs)
2012 65
2013 97
2014 83
2015 76
Collection network augmentation Sewerage Treatment Plants Ensure every house tax assessment & water connection is also connected to the UGD Improve collections to reach 85% collection efficiency by 2015
Revising of DPR for laying of UGD system in the town Eradicate the conditions which give rise to conditions of malaria and other water borne diseases. Ensure access of sanitary facilities to the slum dwellers Isolate sewerage system from storm water and drinking water channels
103 1475
110
Exhibit 9-12Action Plan for Implementation (2015) Roads, Street lighting and Traffic Management Investment up to 2015 1116 (Rs. lakhs) Street Lights 62 Capital Facilities Roads Up-gradation New road formation Roads Widening & Strengthening Action Measures Sector Notes Performance Monitoring Indicators
2012 91 7
2013 409 19
2014 311 19
2015 304 17
Identification of earthen roads which need to be upgraded to BT/CC Improve connectivity within the Municipal area The design of the new roads should have provision for shoulder, foot paths, utility ducts and storm water drains under the foot paths. New roads development shall be integrated with the drain construction (i.e. for any new road drainage facility to be planned and constructed alongside) Road network Degree of connectivity in terms of per-capita road length (min 1.75 m) Road condition - % municipal roads surfaced (100% - CC/ BT surfacing)
Exhibit 9-14Action Plan for Implementation (2015) Storm Water Drainage Investment up to 653 2015 (Rs. lakhs) Capital Facilities Drains New Formation
2012 106
2013 199
2014 139
2015 208
Ensure that every divided road to have closed drains on either side and undivided roads have drains on at least one side
Sector Notes
Performance Monitoring
Preparation of DPR for augmentation of storm water system in the town Isolate sewerage system from drinking water and storm water lines Identify, delineate, sanitize and protect the natural drainage system of the city Improve drainage network on a priority basis in flood prone areas All new roads to be designed shall have adequate provision for storm water drains. Constructing new drains shall be integrated with the new roads development Drainage network should be 130% of road length All divided roads to have drains on either side and undivided roads on at least one
111
Indicators
Storm Water Drainage 2012 2013 2014 side Drains to be cleaned before and after monsoon for better functioning
2015
Implementation of complete door -to-door collection Part-privatisation of house-to-house collection at 80% households (Budni Nagar Parishad to cover only 35% households) Awareness campaign on source segregation
Increase the ambit of Solid Waste Management to include recycling and to facilitate and regulate the sector accordingly. Ensure optimum utilization of existing fleet Awareness among the urban poor and slum dwellers towards better SWM practices Initiate steps towards sharing the responsibility of primary collection of segregated garbage with citizens Budni Nagar Parishad shall be the prime implementing agency for the sector Development of landfill site for composting facility Source segregation reduction of waste to be collected (min 70 % of waste generated) Door-to-door collection as % of households covered (min 80%) Optimum fleet utilization (No. of trips/ vehicle/ day - average minimum of 2.5)
112
Solid Waste Management 2012 2013 2014 Vehicle capacity as % of rated capacity to waste generated (minimum 100%)
2015
Exhibit 9-17Action Plan for Implementation (2015) - Health Infrastructure Health Infrastructure 2012 Investment Up to 2015(Rs. lakhs) Capital Facilities General Hospital Nursing Home Dispensary Action Measures Sector Notes 266 66
2013 79
2014 60
2015 61
Augmentation of Bed Capacity of the city by either developing new facilities or upgrading the existing ones Development of Nursing home and Dispensaries Generating awareness about safe sanitation Provisions should be made for the optimal utilization of health infrastructure by tackling obstacles like shortage of power, medical staff, etc Primary care should be given due importance Hospital waste should be properly disposed
113
Exhibit 9-19Action Plan for Implementation (2015) - Education infrastructure Education Infrastructure 2012 Investment up 2015(Rs. lakh) Capital Facilities to 260 39
2013 91
2014 65
2015 65
Action Measures
Primary Secondary Integrated without Hostel College Development of New Schools at all level
Equipping Schools with necessary Infrastructure Complementing Education with employment opportunities Generating awareness about education Provisions should be made for the optimal utilization of education infrastructure by tackling obstacles like shortage of power, staff, etc Primary education should be given its due importance
Sector Notes
Exhibit 9-21Action Plan for Implementation (2015) - Socio - cultural infrastructure Socio-Cultural Facilities 2012 2013 (Rs. lakhs) 100 33 38
2014 18
2015 13
Capital Facilities
Development of Play ground Development of Shopping arcade Maintenance of these public facilities plays a crucial role in preserving the assets A healthy socio-cultural atmosphere fosters a healthy environment for growth Land for these facilities can be acquired under the Public Purpose
114
Exhibit 9-22Priority needs (2015) / Long term needs (2035) - Economy Sector/ Component Local Economy 3 Development of Hawkers Zone Exhibit 9-23Action Plan for Implementation (2015) - Economy Local Economy (Rs. lakhs) 15 Investment till 2014-15 (Rs. Lakh) 15 15 Investment 2035 (Rs. Lakh) till
2012 4
2013 4
2014 4
2015 3
Development and Up gradation of Market areas Identification and Development of Hawkers zone
Exhibit 9-25Action Plan for Implementation (2015) - Environment Urban Environment (Rs. lakhs) 125 Narmada Ghat development Tree Plantation
2012 1
2013 38
2014 38
2015 50
Tasks Identified
Action Measures
Strengthening of Waste Collection and Disposal Mechanism and Waste Water Conveyance System Development of green spaces and tree plantation Narmada Ghat development
115
Exhibit 9-26Priority needs (2015) / Long term needs (2035) - Heritage and tourism Investment till 2015 Investment till 2035 Sector/ Component (Rs. Lakhs) (Rs. Lakhs) Heritage and Tourism 1 Night shelters 2 Entry Gates 8 3 5 13 8 5
Exhibit 9-27Action Plan for Implementation (2015) - Heritage and Tourism Heritage and Tourism 2012 (Rs. lakhs) Tasks Identified Night Shelters Entry Gates Action Measures 8
2013 3
2014 3
2015 2
Ancillary tourism potential can be actualized by providing some kind of recreation alternative to tourists and well managed waiting rooms
Sector Notes
Providing for reservation of lands for EWS Frequent meetings with slum dwellers towards encouraging participation in slum development programmes, awareness creation on beneficiary contribution to project development and also assuming the responsibility of implementing the projects. Facilitate and encourage the neighborhood concept in slums to carry out towards recreational activities such as reading, sports and drama. Infrastructure and basic services provision in slums shall not be in isolation but in conjunction and in line with overall infrastructure development in the city. Awareness on health and hygiene shall be created among slum dwellers in line with the
116
Slums and Urban Poor 2012 2013 2014 long-term goal of moving towards individual toilets and doing away with public convenience systems. Performance Monitoring Indicators
2015
Water Supply Individual house service connections to all Sewerage - Individual house service connections to all Sanitation Community toilets in short run and individual toilets in long run Solid Waste Management- Coverage of all slum households under door-to-door collection and awareness campaigns on source segregation
Investment Snapshot
A sector wise investment plan was devised for the Urban Infrastructure considering the demand arising in the short, medium and long terms.
Exhibit 9-29Priority needs (2015) / Long term needs (2035) - Urban Governance Short Term(2011-2015) SNo. Component (Rs Lakhs) Urban Governance 1 2 3 Electronic Items for Computerization Training Modules GIS Mapping 6 3 3 Total(2011-2035) (Rs Lakhs) 4 2 2 -
This section discusses a yearly action plan, as shown below, for the capital investment proposed in the short term. Action plan has been devised considering the phasing of short term investment over a period of 5 years.
Exhibit 9-30Action Plan for Implementation (2011-12 to 2015-16) - Urban Governance Urban Infrastructure 12-13 13-14 14-15 15-16 Consolidated Yearly Investment (45 Lakhs) 1 2 3 Tasks Electronic Items for Computerization Identified Training Modules GIS Mapping Action Computerization for improving accountability in the system Measures GIS mapping for having a wide database which can be used for improving the revenue, better planning and implementation
117
on their own. Historically, ULBs have been dependent on conventional sources i.e., state and central support for funding infrastructure projects. While these sources still account for a considerable portion of the total fund flow in urban infrastructure sector, not 100% of these come as unconditional grant and ULBs are gradually made liable for funding their own projects by means of loan, beneficiary contribution etc. At the same time, other unconventional options for raising infrastructure finance such as pooled finance, Private Sector Participation (PSP) are also emerging. In this context, need for structuring infrastructure projects based on suitable financing options available in the sector becomes imperative. However, each of these options might have some risks associated with it and assessment of the same is also important. Detailed in the section below are the options for project structuring available in the present framework for financing ULB infrastructure with risk assessment for the same.
Borrowing
118
Pooled finance Pooled finance is a form of market borrowing. It is a financial instrument for tapping capital market to finance small city infrastructure projects. Like an independent financial entity, the Nagar Parishad can issue bond to raise money from market. The municipal bond has to be rated by a credit rating agency and then issued in the market. However, ULBs has to have a strong financial position to raise money by this instrument. Risk assessment: 1. This instrument is prone to market risk 2. ULB has to maintain consistently good financial position and credibility Financial institution borrowing For ULBs, borrowing from financial institutions has been generally from Govt. supported financial institutions like HUDCO, LIC etc. For, Budni, the ULB can borrow money from these financial institutions. Risk assessment: 1. Low risk as supported by Govt 2. The fund is focused towards urban development 3. Disbursement could be conditional Public Private Partnership This instrument seeks to have contribution from a private party in developing a facility and/or operating a facility. There are various standard form of contract that could be entered into between the public body (ULB) and the private party depending on the conditions best suited for a particular project. Typically, the private party would operate the facility over a certain period of time after developing in with some user charges and then hand it over to the public body Risk assessment: 1. Risk of opposition to user charges for basic public amenities 2. ULB has to have thorough monitoring over project development as well as operation period by private party Other capital sources There are some other Govt. capital sources, which are not dedicated to urban development but could be tapped for this purpose. For example funds from Member of Parliament Local Area Development (MPLAD), MLALAD, and Central Finance Commission Grants etc. These cannot be considered as regular sources of funds but can be tapped for one time investment by ULBs depending on availability and local situation. Risk assessment: 1. Highly uncertain as long as not committed 2. Most likely to be one time contribution, not a consistent source
119
9.11.2.
Water Supply
Given the scale of the project and the extent of capital investment which would be required for commissioning of the Integrated Water Supply Scheme, the project financing options available to the Nagar Parishad are limited. The total capital investment for improving water supply in the town has been estimated at Rs 1390 Lakh, of which Rs 849 Lakh would have to be planned for and invested by 2015. Of the varied funding options available to the Nagar Parishad, the probable sources which may be pursued are the following: Funding from on-going/new sector development schemes or programmes: The Nagar Parishad can structure its projects such that it can receive funding under state schemes which are predominantly aimed at urban development. During 2005-12 the centrally funded Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) was most viable option. Now the new state scheme can be availed for funding the water supply project, especially in the light of the unstable financial situation of the ULB; it would be forced to rely heavily on grants and higher states share in loan repayment.
Exhibit 9-31 Funding options - Water supply Proposed Project Title Sector Estimated Project Cost Project Financing Options Integrated Water Supply Scheme for Budni Water Supply Rs. 1390 lakh a) b) c) d) State Scheme Multilateral Financing ULBs own revenues Capital Sources (MPLAD funds, MLALAD funds, centre commission grants)
The Nagar Parishad can effectively plan and structure its water supply augmentation project such that, funding for the same may be received under state scheme. The pattern of project financing is envisaged as 70:30. Where 70 % is loan and 30 % is State grant. Out of the 70% loan the 75% of the loan repayment is to be done by state and 25% to be done by ULB
The Nagar Parishad may also look at receiving funds from multilateral agencies. The mix of grant, loan and own sources would have to be worked out between the Nagar Parshad and the funding agency once the detailed project report is approved. The Nagar Parishad may also look at options of receiving funds under MPLAD or MLALAD funds.
Sewerage
Given the scale of the project and the extent of capital investment which would be required for commissioning of the Sewerage Scheme, the project financing options available to the Nagar Parishad are limited. The total capital investment for improving water supply in the town has been estimated at Rs 503 Lakh, of which Rs 328 Lakh would have to be planned for and invested by 2015.
120
Of the varied funding options available to the Nagar Parishad, the probable sources which may be pursued are the following: Funding from on-going/new sector development schemes or programmes: The Nagar Parishad can structure its projects such that it can receive funding under state schemes which are predominantly aimed at urban development. During 2005-12 the centrally funded Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) was most viable option. Now the new state scheme can be availed for funding the sewerage project, especially in the light of the unstable financial situation of the ULB; it would be forced to rely heavily on grants and higher states share in loan repayment.
Exhibit 9-32 Funding option - Sewerage Proposed Project Title Sector Estimated Project Cost Project Financing Options Sewerage Rs 495 Lakh a) b) c) d) State Scheme Multilateral Financing ULBs own revenues Capital Sources (MPLAD funds, MLALAD funds, centre commission grants) Underground Drainage Scheme for Budni
The Nagar Parishad can effectively plan and structure its water supply augmentation project such that, funding for the same may be received under state scheme. The pattern of project financing is envisaged as 70:30. Where 70 % is loan and 30 % is State grant. Out of the 70% loan the 75% of the loan repayment is to be done by state and 25% to be done by ULB
Multilateral Financing/Capital The Nagar Parishad may also look at receiving funds from multilateral Sources
agencies. The mix of grant, loan and own sources would have to be worked out between the Nagar Parishad and the funding agency once the detailed project report is approved. The Nagar Parishad may also look at options of receiving funds under MPLAD or MLALAD funds.
121
Exhibit 9-33 - Funding option - Roads and urban transport Proposed Project Title Sector Estimated Project Cost Project Financing Options Integrated development scheme for roads & transport sector for Budni Roads and Urban Transport Rs 2488 Lakh for Roads, Street Lighting and traffic management a) b) c) d) Funding under State scheme State Scheme Multilateral Financing ULBs own revenues Capital Sources (MPLAD funds, MLALAD funds, centre commission grants)
The Nagar Parishad can effectively plan and structure its water supply augmentation project such that, funding for the same may be received under state scheme. The pattern of project financing is envisaged as 70:30. Where 70 % is loan and 30 % is State grant. Out of the 70% loan the 75% of the loan repayment is to be done by state and 25% to be done by ULB The Nagar Parishad may also look at receiving funds from multilateral agencies. The mix of grant, loan and own sources would have to be worked out between the Nagar Parishadand the funding agency once the detailed project report is approved. The Nagar Parishad may also look at options of receiving funds under MPLAD or MLALAD funds.
122
Storm water drainage for Budni state The Nagar Parishad can effectively plan and structure its water supply
augmentation project such that, funding for the same may be received under state scheme. The pattern of project financing is envisaged as 70:30. Where 70 % is loan and 30 % is State grant. Out of the 70% loan the 75% of the loan repayment is to be done by state and 25% to be done by ULB The Nagar Parishad may also look at receiving funds from multilateral agencies. The mix of grant, loan and own sources would have to be worked out between the Nagar Parishad and the funding agency once the detailed project report is approved. The Nagar Parishad may also look at options of receiving funds under MPLAD or MLALAD funds.
Funding under State schem The Nagar Parishad can effectively plan and structure its water supply
augmentation project such that, funding for the same may be received under state scheme. The pattern of project financing is envisaged as 70:30. Where 70 % is loan and 30 % is State grant. Out of the 70% loan the 75% of the loan repayment is to be done by state and 25% to be done by ULB
Multilateral Financing/Capital Sources
The Nagar Parishad may also look at receiving funds from multilateral agencies. The mix of grant, loan and own sources would have to be worked out between the Nagar Parishad and the funding agency once the detailed project report is approved. The Nagar Parishadmay also look at options of receiving funds under MPLAD or MLALAD funds.
123
The Nagar Parishad can look at its own revenue resources for purchase of the handcarts and also for land acquisition. SWM project can be developed on a PPP modal for door to door collection of waste and disposal after treatment. An approach of Regional Municipal Solid waste Facility can be explored and developed for Budni and surrounding ULBs
PPP
Other Amenities For regular upkeep of the parks and ponds, development of night shelters and for maintenance of Hospital facility, Budni Nagar Parishad may further explore PPP as an option for developmental works. The viability of the same would have to be worked out by the Nagar Parishad with suitable PPP structure to attract private participation. The construction of a new Municipal office building should also be carried out by use of the internal revenue of the Nagar Parishad.
124
125
Increase the property tax coverage by bringing 100% properties under tax assessment. The property tax per assessment is found to be very low in Budni and an hence initial revision of the annual rated value per assessment is proposed with subsequent revisions every five year Revision of Water charges at specific intervals. Though the revision in water tariff should be done on annual basis to recover 100% of the O&M cost. However, annual revision is not a general practice in all the ULBs across the state, so revision after every five years is envisaged for projections. Introduction of Sewerage Charges in 2014-15, after implementing the Sewerage Project Maintenance of the collection performance of taxes and charges at certain minimum levels for current and for arrears Borrowings from market or financial institutions (75% of repayment to be done by state and rest 25% by the ULB)
10.3.1.
The standard assumptions under which the projections are carried out and certain expenditure control and revenue augmentation measures proposed in line with the mandatory and optional reforms to be implemented by ULB, are presented below in Exhibit 10-1.
Exhibit 10-1Important assumptions made in the projections
Head
Assumptions
Guiding Factor for Assessing the Sustaining Capacity Surplus DSCR Positive surplus - year on year basis Greater than 1
Project Financing for admissible Components under JNNURM Project Costing New/Additional O & M and from second year of investment 5% growth is considered for the additional O & M Grant from GoI Unit Cost, with 5 % Cost escalation factor and 5% Physical contingency
5% of Capital cost -
126
Assumptions 30% of Proposed Projects 75% of repayment to be done by the state and ULB to bear the remaining 25% of repayment. Repayment in 12 years, with 3 year principal moratorium @ 8 % interest rate As per existing terms and conditions
Actual average growth with a minimum 8% and maximum of 12% (based on last five years trend) Pay Commission Revision Pay Commission revision- additional 10% from 2013-14 every five years Assumption for assessment of Budni Nagar Parishads sustainability Income Items Growth in revenue income Actual average growth with a minimum 8% and maximum of 12% (based on last five years trend) Property Tax: Propose to introduce from FY 2012-13 Annual growth in Assessment Increase in Assessments due to Survey/ PT Reforms Initial Revision in 2012-13 Revision of Tax Collection Performance 2 % per annum 888 properties 150% of the existing 50% every five years 85% or current average whichever is higher by 2015
Income Items- Water Supply Annual growth in Water Connection Regularisation connections Coverage of unaccounted 2% per annum 7,075 connections 85% of Assessed properties by 2015 by 150% in FY 20011 by 50 % every five years by 150% in FY 20011 by 25% every five years 85% by 2015-16
Initial revision in water tariffs Next Revisions in water tariffs Initial revision new Connection fee Future revision new Connection fee Collection Performance Income Items- Sewerage Coverage Sewerage Charge Initial revision - new Connection fee Future revision - new Connection fee Collection Performance
100% of water connections by 2015-16 50% of water charges from year 2014-15 Rs. 1000 per connections by 10% every five years 85% by 2015
127
10.3.2.
Given the existing financial position of Budni Nagar Parishad, the revenue and capital accounts are projected against the growth scenario and assumptions presented above. The City Investment Plan (CIP) displayed in the previous chapter shows that the total investment required to develop Budni Town is Rs. 47.70 crore at constant prices in short term i.e. till 2015 (of the total Rs. 93.43 crore investment identified for funding till 2035. Rs 47.70 crore include about Rs. 5.25 crore towards Education and Health sector, which are not provided by Nagar Parishad and Rs. 8.18 Crore towards Housing and infrastructure for Urban Poor which is to be taken up by PPP or under some other central/ state government funded scheme where the funding would be divided between the centre/ state and the beneficiary etc. and ULB would not be liable for the same. Hence a FOP is generated from the sustainable investment point of view in line with current growth trends against the identified investment for Nagar Parishad of Rs. 5.18 crore at constant prices till 2015, which excludes investment required for Health, Education and Urban Poor sector.
128
Assumptions (Revenue Improvement Measures) Impact of Reforms on Investment Capacity Base Case Scenario 1 Scenario 2 Scenario 3 Debt Funding No No No Yes
With reforms in Property Tax, Water Charges and Sewerage charges This case assumes the reforms in property tax, Water and Sewerage have been implemented and accordingly the investment capacity has increased by Rs. 0.86 crore above the base investment capacity. These reforms will increase the total sustainable capacity to 4.8 %. Reforms and State grants along without debt Funding This case assumes that all the reforms suggested above are being implemented and State grants are also availed. In this scenario Nagar Parishads sustainable capacity will increase to 12.20 %. Now Nagar Parishad will be able to sustain investment of about Rs. 4.18 crore at constant price and Rs. 4.77 crore at current price. Reforms and State grants along with debt Funding This case assumes that Nagar Parishad can increase their sustainable capacity by taking debt from any financial institution or private banks in addition to the implementation of reforms suggested above and grants under with State grants. In this scenario can sustain up to 15.10% of the total investment identified. Now Nagar Parishad will be able to sustain investment of about Rs. 5.18 crore at constant price and Rs. 5.90 crore at current price. The impact of the different scenario on the investment sustainability of Budni Nagar Parishad is shown below in Exhibit 10-3.
Exhibit 10-3Impact of reforms and grants on investment capacity
Debt funding and Reforms State Grants and 4.38 Reforms 3.40 PT Improvements & Sector reforms 0.86
129
Exhibit 10-4CIP Funding Pattern S. No Mode of Funding Source Amount (Rs. Crores) % of Total Investment
Budni Nagar Parishad Total Identified Investment till 2015 (current price) Investment by Nagar Parishad (current price) Investment by Nagar Parishad (constant price) Sustainable Investment till 2015 (constant price) Sustainable Investment (current) 1 2 3 Grants and support in repayment of loan Loan repayment (ULB) Own sources State Open Market/ FIs Nagar Parishad 47.64 39.01 34.21 5.18 5.90 4.89 0.46 0.54 83 7.8 9.2 100 100 15.10
From the above analysis, it is very clear that ULB alone even with the grant support scheme and reforms will not be able to implement 100% of the projects identified under the City Investment Plan (CIP). But they can substantially increase their sustainable capacity with these reforms. So, it is recommended that ULB along the support from UADD, GoMP should try to develop few projects at PPP model and additional grant support from GoMP. It is also recommended that on the same lines of the National Urban Information System (NUIS) programme for strengthening of information system at Municipal Corporation level, GoMP should also provide support to all the local bodies in Madhya Pradesh, which are not covered in the mentioned programme.
Financial Year -----> Figures in Rs. Lakhs Budni Nagar Parishad SUMMARY Opening I balance Revenue Ii Receipts Revenue iii Expenditure Municipal Iv receipts Municipal V expenditure New Debt Servicing Exp.
1 2011 -12
2 201213
3 2013-14 Projection
4 201415
5 201516
6 201617
7 2017-18
8 2018-19
9 2019-20
10 2020-21
130
Financial Year -----> Figures in Rs. Lakhs Budni Nagar Parishad New O&M Exp.
1 2011 -12
2 201213
3 2013-14 Projection
4 201415
5 201516
6 201617
7 2017-18
8 2018-19
9 2019-20
10 2020-21
13
22
31
33
35
36
38
40
42
vi vii Vi ii Ix
Revenue Surplus/ Deficit Municipal for the year Surplus/ Deficit for the year Closing balance Performance Indicators DSCR PT Collection Performance
14 2 30
3 (10) 20
0 (2) 17
9 10 27
17 47 74
32 32 106
37 37 143
42 42 185
47 47 233
54 54 286
70%
3.26 74%
1.16 77%
3.37 81%
4.71 85%
6.84 86%
7.02 86%
7.79 87%
8.65 87%
9.66 88%
10.6. Conclusion
This chapter discussed the Investment sustainability of Budni Nagar Parishad. The discussion on assumptions for various financial projections was followed by detailing of investment capacity of ULB. The investment capacity was analyzed for four scenarios; Base case, PT improvements & Sector Reforms, state Grants & Reforms and Debt Funding & Reforms. The investment capacity analysis was followed by a discussion on the fund requirement of the city. The next chapter deals with the urban reforms. The chapter discussed the objective and status of various state level and ULB level reforms.
131
Current Status
All the provisions of 74th CAA incorporated in Municipal Acts. Powers and functions of 12 Schedule transferred to ULBs. Powers of preparation of Zoning Plans vested in Municipalities DPCs constituted and are functional from the year 2005
th
132
Current Status
Implemented in 2008-09. Provision has been made in Acts and Rules have been framed The state government agrees to make provision for public disclosure and ULBs to pass such a resolution in a stipulated time. The state government has agreed to undertake all required reforms related to financial statements in a stipulated time frame.
Current Status
Reduction in rates by 0.5% Implemented in year 2008-09, that continued for FY 09-10 and 10-11. Rate reduced to 5% w.e.f. 1st April, 2011
Current Status
133
Current Status
The MP Parisar Kirayedari Vidheyak, 2010 passed by the State Assembly in March, 2010. Bill sent to GoI for Presidential Assent.
Current Status
Completed Mohalla samiti are formed as the third tier.
134
UIDSSMT requires certain reforms to be undertaken by states/ cities in the area of city planning, with an objective to assign or associate elected ULBs with city planning functions.
Current Status
In this area, all reforms have been achieved with the transfer of powers related to the provisioning of water supply & sewerage, public transport and solid waste management. This has been supported by the association of ULB with city planning functions. This has been achieved by the active participation of ULB in the preparation of city development plans.
Current Status
1. At present, Double Entry Cash Base system of accounting is being followed in Nagar parishad. 2. Double Entry Accrual Base accounting has not been adopted in the Nagar parishad. 3. State has drafted its own accounting manual which has been revised as per the provision of NMAM. 4. State has not modified its current laws and regulations to be in compliance with the double entry accrual based accounting. 5. A resolution has been passed by Government expressing commitment to establish modern municipal accounting system.
S.No. 1 2 3
Reform Completion and adoption of Manual Training of personnel Migration to Double entry accrual based accounting
2011-12 2012-13 2013-14 2014-15 2015-16 Yes 40% 30% 80% 70% 100% 100%
135
11.3.2. E-Governance
Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in E-Governance, with the objective of having a transparent administration, quick service delivery, effective MIS, and general improvement in the service delivery link.
Current Status
Till now, none of the services has been covered by e-governance applications. The applications which were proposed to bring under e-governance are registration of births & deaths, public grievance redressal, payment of property tax and bills of other utilities, municipal accounting, works management system, etc.
S.No. 1 2 3 4 A B C D E F
Reform Appointment of State-level Technology Consultant as State Technology Advisor Finalization of implementation action plan Appointment of Software consultant(s) / agency for deployment/training
Implementation of e-governance against the following modules Property tax Accounting Water supply and other utilities Birth and death registration Citizens grievance monitoring Personnel management system 30% 20% 25% 25% 50% 50% 50% 40% 30% 70% 80% 75% 75% 100% 30% 100% 100% 100% 100% 100%
136
UIDSSMT requires certain reforms to be undertaken by states/ cities in the levy of User Charges on different municipal services, with an objective of securing effective linkages between asset creation and asset maintenance and ultimately leading to self-sustaining delivery of urban services.
Current Status
Water tariff is collected at a flat rate of Rs 60 per month and Rs 800 for new connection in case of domestic consumers. For commercial consumers the monthly rental is Rs. 100 and new connection charges is Rs 1500 per connection. User Charges have been defined in the Municipal Acts Separate Provision for User Charges has been introduced in Municipal Acts Amendment as above have been notified in official gazette dated 19-4-2010
S.No. 1 2 3 4 A B C 5 A B C 6 A B C
Reform Formulation and adoption of a policy on user charges by State/ULB The State should set up a body for recommending a user charge structure Recovery of O&M cost
2011-12 2012-13 2013-14 2014-15 2015-16 Yes To be sorted out by State and ULB 70% 80% 90% 100%
Establishment of proper accounting system for each service so as to determine the O&M cost separately Water Supply Sewerage Solid Waste Management Water Supply (lpcd) Sewerage Solid Waste Management Defining user charge structure for the services Water Supply Sewerage Solid Waste Management Yes Yes Yes 70% 70% 75 25% 75 NA 80% 85% 90% Achievement of targeted service standards for the services 75 100 135 20% NA 50% 75% 50% 80% 100% 100% 100%
137
Desired Objective
Provision of basic services to the poor including security of tenure at affordable prices, improved housing, water supply, sanitation and ensuring delivery of other existing universal services of the Government for education, health and social security.
Current Status
It is ensured that all the projects pertaining to housing for urban poor necessarily have provision for basic amenities listed in the 7 point charter.
Current Status
State has identified all Urban Below-Poverty-Line families using financial and non financial criteria. While financial criterion uses monthly income as the parameter, non financial criterion attempts to cover social factors such as housing, water & hygiene, education, literacy, employment, etc. State Government has taken policy decision to have such an internal earmarking done in all the ULBs in the State. The Government order to this effect has been issued on dated 13.04.07. This fund has now been made Non-lapsable. Executive instructions in this regard have been th issued on 29 July, 2010.
138
S.No. 1
Reform A resolution between State Government and ULB on comprehensive policy on providing basic services to all urban poor Defining criteria for identification of the urban poor. Fresh enumeration based on the above Decision on the Funds Allocation Percentage Achievement of actual fund allocation budget
2 3 4 5
Current Status
Currently, Budni Nagar Parishad levies property tax on residential, commercial properties and its collection during the year 2010-11 was Rs.1.61 lakh. The property tax is being calculated on the basis of Unit Area method using self-assessment system which is in existence from year 1996. GIS mapping has been initiated in Budni on pilot basis (MPHS in one ward)
S.No. 1 2 3 4 5 6 7
Reform Migration to Self-Assessment System of Property Taxation Extension to uncovered properties Migration to the GIS-based property tax system Review and Revision of Property Tax guidelines Collection Efficiency Coverage Ratio (Registered Properties / Actual No. of Properties) Establish Taxpayer education programme
2011-12 2012-13 2013-14 2014-15 2015-16 Yes 50% 20% Yes 40% 60% 50% 70% Yes 60% 75% 72% 80% 85% 85% 100% 40% 75% 100%
139
Completed
Responsibility of implementing this reform has been assigned to Revenue Department of the State Government. Govt. of India has been requested to give technical and financial support to State for implementing this reform. Provision for earmarking15% Land for EWS already exists. Additional 10% reservation for LIG has been made in Municipal acts In March, 2010. Responsibility of implementing this reform has been assigned to Revenue Department of the State Government. Govt. of India has been requested to give technical and financial support to State for implementing this reform.
Earmarking at least 20-25% of developed land in all housing projects (both Public and Private Agencies) for EWS/LIG category with a system of cross subsidization.
Revision of bye-laws to make rain water harvesting mandatory in all buildings and adoption of water conservation measures. Bye-laws for reuse of recycled water. Administrative reforms i.e. reduction in establishment by bringing out voluntary retirement schemes, non-filling up of posts falling vacant due to retirement etc., and achieving specified milestones in this regard. Structural reforms
completed
completed New set up has been approved for all the JnNURM cities. Provision for contractual appointment. Service condition rules for Corporation being revamped Completed Municipal
140
SNo 10
11.5. Conclusion
This chapter provided the objective and status of various reforms mandated under UIDSSMT. The reforms were discussed under the headings of Mandatory Reforms at State level, Mandatory Reforms at ULB level and Optional Reforms at State and ULB level.
141
142
The presentation by IMaCS familiarized the stakeholders with the purpose, process, and expected outcomes of the CDP study. Members were then requested for their views and suggestions in formulating the City Development Plan with key stress on following areas: Vision for the town in the next 25 years Projects to be undertaken Ward specific issues that need immediate attention
A few suggestions that came out of the discussion are as under 1. The city has a religious importance and attracts a lot of tourists for the same reason. It is therefore necessary to have facilities to cater the needs of the tourists and promote tourism. 2. Source of Water for the city is ground water (i.e. hand pumps, tubewells). The ground water is connected to the ESR (elevated service reservoirs) and is supplied to the town. There is no treatment plant at present. With the growing populations other options need to be explored. 3. The town is divided by a railway line and there are no over bridge or under passes and it causes major connectivity issues which needs to be addressed 4. There is no sewerage system in the town at present. The sewerage is carried by the storm water drains or nallahs that flow along the natural ground topography and finally flow into NarmadaRiver or accumulate in the low lying area causing unhygienic conditions
143
144
2nd Workshop for Finalization of Strategies, Identification of Projects and Priorities Minutes of Meeting
Second workshop was conducted on 22 December 2011 in Budni Nagar Parishads community hall in. The objective of this workshop was to interact with various stakeholders to finalize City Profile; to finalize sector strategies in consonance with the city vision and sector goals; andto evaluate the strategies from the perspective of their contribution to achieving the vision and sector goals. In this workshop, city profile was presented to the stakeholders followed by a discussion on city perspectives and city priorities as perceived by the stakeholders. With the background of city profile, perspective and priorities, a collective and shared vision was developed for the city. In addition to the formulation of the vision and sector goals, the preliminary discussions were carried out on strategies, priorities and major actions that would be required in the next five years to move towards the vision 2035.This workshop also involved selection of strategies based on their contribution towards achieving the city vision and sector goals. The selection of strategies was followed by prioritization of identified projects and immediate actions required to achieve the sector goals. This workshop culminated in the consolidation of city vision, sector goals, strategies, priority actions and projects. The second work shopwas organised in the Community hall of Budni Nagar Parishad on 22 December 2011 and the following members were present during the workshop.
List of stakeholders present for Inception Workshop S. No. 1 2 3 4 5 6 7 8 9 10 Designation / Department Adyaksha (President - Ruling party) CMO Elected Ward Member (ward 4) Elected Ward Member (ward 1) Elected Ward Member (ward 7) Elected Ward Member (ward 8) Adhivakta Budni Nagar Parishad Employee Sub Engineer Social Worker Mr. Subhash Punjabi Mr. R.S. Tiwari Mr. Ramesh Patel Mr. Sunil Punjabi Mr. Prabhat Bhadoriya Mr. Gaya Prasad Yadav Mr. Pramod Chuahan Mr. Virendra Sengar Mr. M.K. Jain Mr. Dhirendra Tiwari Name
nd nd
Presentation started off with a brief introduction of the study i.e. Preparation of City Development Plan for the Budni Town, so as to bring all the stakeholders on the same platform. It was followed by a presentation of city profile which included general, demographic and socio-economic city profiling. General city profile comprised of location, connectivity and a brief on environment of Budni town. Demographic profile dealt with population growth trend and its probable reasons, population projection and major issues & key observations related to the demography of Budni. SocioSecond workshop
145
Economic profile comprised of key socio-economic parameters, major economic base and major issues & main observations. City profiling was followed by the findings of Sector Analysis (of aforementioned sectors) for short and medium term, i.e. 5 years and 25 years respectively. Analysis comprised of existing status of service level indicators, Demand-Supply Gaps for short & long term and key observations & major issues. It was then succeeded by an analysis of financial status of the Budni Nagar Parishad. The discussion was carried out in terms of various financial indicators viz. Operating Ratio, Capital Utilization Presentation during second workshop Ratio, Tax Revenue as % of revenue income, NonTax revenue as % revenue income, Property tax as % of revenue income, Grant as % of revenue income, Salaries' Expenses to Revenue Income, Salaries' Expenses to Revenue Expenses, O&M as % of Revenue Expenses. After covering these sections, IMaCS team turned their focus on formulation of a vision for Budni. This part of the presentation included definition of vision, major concerns that need to be addressed while developing a vision and important aspects that define Budni town. The vision of the town was developed by integration of our understanding of the town and stakeholders views. Before discussing the individual sector goals, IMaCS team presented the findings of review of national and international best practices for various sectors. Formulation of City vision and Sectoral goals were supplemented by a Questionnaire survey with a questionnaire in Hindi (Refer Annexure II) with the aim of obtaining stakeholders vision of the city. Questionnaire survey included stakeholders view of problems in the various sectors, evaluation of citys growth and infrastructure and ranking of major issues of Budni town, as perceived by stakeholders. Major discussion points were as follows: There is a shortage of water supply in the town and water source for future can be identified as River Narmada The condition of surface of road is very bad and needs immediate attention The town lacks in employment opportunities which is a cause of migration of youth to other places. The stakeholders emphasised on development of industrial area in the town with small and medium scale industries and promotion of tourism. Improvement required in health care and education facilities was also a major point of discussion.
Other than this, the stakeholders agreed on various strategies and sector goals and the actions required for the development of the town which was presented by our team. Thus the workshop helped us and the stakeholders to arrive at a vision for the city and decide upon the priorities for the town
146
147
Third workshop Draft Report Finalization The final workshop for City Development Plan th for Jawar was held on 28 August 2012 at Budni Nagar Parishad Bhawan. The workshop was attended by approximately 32 stakeholders including SDM, ex-MLA Adhyaksh, CMO, Sub-engineer, other staff, media and eminent citizens. Broad theme for this workshop was to appraise the stakeholders with the outcome of the plan and share with them the Projects which has come out from the detailed consultations in the preceding workshops and corresponding investments to implement those projects on ground. Municipal interventions which are needed in order to cope up with the projected Final Workshop at Budni town investments and the amount of revenue which the Nagar Parishad can generate upon doing the proposed reforms were also discussed. CIP and FOP were explained to the stakeholders with a road map on how to achieve it. The Exercise was well appreciated by the stakeholders and with that note; the final workshop for the CDP exercise for Budni was completed. List of Stakeholders present for final Workshop S. No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Designation / Department
Mr. Subhash Punjabi Mrs. Pushpa Rajput Mr. Rajendra Singh Rajput Mr. J.P. Sachan Mr. T. Pande Mr. Om Prakash Taneja Mr . Prakash Rai Mr. R.S. Tiwari Mr. Ramesh Patel Mr. Sunil Kaithawas Mr. Prabhat Bhadoriya Mr. Gaya Prasad Yadav Mr. Sunil Punjabi Mr. Naresh Chinmane Mr. Devendra Rajput Mr. Brijmohan Uike Mrs. Rukmani bai Mr. Kruti Jaga Upadyaksha Ex MLA
Name
Adyaksha (President - Ruling party)
Sub Divisional Magistrate Tehsildar Journalist Bhaskar Journalist Dainik Jagaran CMO Elected Ward Member (ward 4) Elected Ward Member (ward 1) Elected Ward Member (ward 7) Elected Ward Member (ward 8) Elected Ward Member (ward 3) Elected Ward Member (ward 5) Elected Ward Member (ward 9) Elected Ward Member (ward 11) Elected Ward Member (ward 14) Elected Ward Member (ward 15)
148
S. No.
19 20 21 22 23 24 25 26 27 28 29 30 31 32
Designation / Department
Mr. Pramod Chuahan Mr. Virendra Singh Mr. M.K. Jain Mr. Dhirendra Tiwari Mr. Nilesh Mr. Jitendra singh Baghel Mr. Jaikishan Mr. Anil Kaithawas Mr. Shishupal Mr. Gnpat Mr. Ghanshyam Sharma Mr. Pramod Yadav Mr. Rajkumar Mr. Shersingh
Name
Elected Ward Member (ward 6) Budni Nagar Parishad Employee Sub Engineer Social Worker Citizen Budni Nagar Parishad Employee Citizen Budni Nagar Parishad Employee Budni Nagar Parishad Employee Budni Nagar Parishad Employee Budni Nagar Parishad Employee Budni Nagar Parishad Employee Budni Nagar Parishad Employee Budni Nagar Parishad Employee
149
150
151
152
Annexure II Questionnaire
153
154
155
156
157
158
159
160
161
2006 -07
2007 -08
2009 -10
201 0-11
2012 -13
2013 -14
201415 Projection
2015 -16
2016 -17
2017 -18
201819
201920
202021
202122
25 81 65 162 117
71 81 85 205 133
Revenue Surplus/ Deficit for the year Municipal Surplus/ Deficit for the year Closing balance Performance Indicators DSCR DSR PT Collection Performance
16 45 71
(4) 72 143
(7) 62 205
11 (2) 202
28 (31) 172
(0) 28 28
14 2 30
3 (10) 20
1 (2) 17
9 10 27
17 47 74
32 32 106
37 37 144
42 42 186
48 48 233
54 54 287
0% 66% 0
0% 70%
3.30 1% 74%
1.20 2% 77%
3.41 2% 81%
4.75 2% 85%
6.90 2% 86%
7.07 2% 86%
7.84 2% 87%
8.71 2% 87%
9.73 2% 88%
REVENUE ACCOUNT RECEIPTS Own Sources I Tax Revenue 1 Property Tax 2 Integrated tax 3 Other Taxes
1 2 7
2 4 11
1 2 7
1 2 6
2 2 5
1 2 8
3 3 9
4 3 9
5 3 10
5 3 11
5 4 12
7 4 13
7 4 14
8 5 15
8 5 16
8 5 17
162
2006 -07
2007 -08
2009 -10
201 0-11
2012 -13
2013 -14
201415 Projection
2015 -16
2016 -17
2017 -18
201819
201920
202021
202122
1 3 0 4 19
2 5 0 7 30
1 3 0 7 21
1 5 0 5 19
2 4 0 6 21
2 12 0 0 6 35
2 15 0 0 7 40
2 17 2 0 7 47
2 28 8 0 8 66
2 30 14 0 9 75
3 44 21 0 9 101
3 46 23 0 10 108
3 47 24 0 11 112
4 49 24 0 12 117
4 50 25 0 13 122
41 0 0 0 41
35 0 0 0 35
37 0 0 0 37
68 0 0 0 68
86 0 0 0 86
60 0 0 0 60
67 0 0 0 67
75 0 0 0 75
84 0 0 0 84
94 0 0 0 94
105 0 0 0 105
118 0 0 0 118
132 0 0 0 132
148 0 0 0 148
166 0 0 0 166
186 0 0 0 186
I I I
6 4 10 1 22 81
7 3 6 0 16 81
5 5 8 0 19 76
5 14 12 0 31 118
6 8 21 0 35 141
6 8 13 0 27 110
7 8 14 0 30 131
8 9 16 0 33 149
8 11 18 0 37 168
9 12 20 0 41 201
9 13 22 0 46 226
10 15 25 0 51 269
11 17 28 0 56 296
12 19 32 0 63 323
13 21 35 0 70 353
14 23 40 0 77 385
Total Revenue Receipts EXPENDITURE I I I I I I Salaries/ Wages & Allowances Administrative Expenses Operation & Maintenance 1 2 Existing O&M New O&M
31 2
51 5
40 1
50 10
74 5
64 5
64 6
76 6
84 7
92 8
102 8
122 9
134 10
147 11
162 12
178.3 9 13.37
27
26
36
36
25
34 0
36 3
39 13
42 22
46 31
50 33
53 35
58 36
62 38
67 40
72.73 42.07
163
2006 -07
2007 -08
2009 -10
201 0-11
2012 -13
2013 -14
201415 Projection
2015 -16
2016 -17
2017 -18
201819
201920
202021
202122
3 0 3
3 0 1
5 0 1
8 0 3
8 0 1
V I
Total Revenue Expenses CAPITAL ACCOUNT RECEIPTS Sale of asset I I Loans I I Public Contribution I I Income from I Connection Fee V (Water & Sewerage) V Grants & Contributions 1 Special Projects 2 Basic services 3 UIDSSMT 4 IHSDP 5 Flood relief & NRCP 6 T.F.C 7 Other Grants 8 New Grants Sub Total Grants V I Other Capital income Total Capital Receipts
65
85
83
106
113
111
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0
0 17
0 15
0 15
0 0
0 0
0 0
0 0
0 0
0 0
15
30
32 11 0 0 0 4 33 80 0 81
71 0 44 0 0 9 0 123 0 124
74 0 0 0 0 13 0 88 0 88
25 50 50 0 0 9 0 134 0 134
84 0 88 0 0 6 0 179 0 179
62 13 36 0 0 9 7 128 0 128
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0 0 58 57.6 2
0 0 0 162 161. 60
0 0 0 129 128.6 9
0 0 0 140 140. 08
0 0 0 0 0.00
0 0 0 0 0.00
0 0 0 0 0.00
0 0 0 0 0.00
0 0 0 0 0.00
0 0 0 0 0.00
58
181
152
170
30
164
2006 -07
2007 -08
2009 -10
201 0-11
2012 -13
2013 -14
201415 Projection
2015 -16
2016 -17
2017 -18
201819
201920
202021
202122
51
45
19
146
238
100
70
195
155
169
165
Annexure IV - Maps
166
167
Disclaimer: The report is based on information collected by IMaCS from sources believed to be reliable. While all reasonable care has been taken to ensure that the information contained herein is not untrue or misleading, IMaCS is not responsible for any losses that the client may incur from the use of this report or its contents. The assessment is based on information that is currently available and is liable to change. The analysis that follows should not be construed to be a credit rating assigned by ICRAs Rating Division for any of the companys debt instruments. IMaCS is not a legal firm and our advice/recommendations should not be construed as legal advice on any issue.
ICRA Management Consulting Service Limited (IMaCS) LogixPark, 1st Floor, Tower A4&A5 Sector 16, Noida 201 301, Uttar Pradesh, India Tel: 91 120 4515800 Fax: 91 120 4515850 Website: www.imacs.in
168