Gunkul Opp Day
Gunkul Opp Day
Gunkul Opp Day
Presentation Outline
Strictly Private & Confidential
1. Company Overview
Who is GUNKUL
Strictly Private & Confidential
Gunkul Engineering PCL (GUNKUL or the Company) is an integrated energy player. GUNKUL has been one of the biggest high-voltage electrical equipment supplier and manufacturer; currently gearing more toward renewable power business with the vision to become Thailand's no. 1 one-stop providers for the electrical equipment as well as a dominant player in Thailands renewable energy arena
Entered into renewable energy business and achieved the set up and supply of Thailands first wind turbine to EGAT
Expanded its trading business to neighboring countries Myanmar, Lao PDR, and Vietnam Set up the first offshore office in Yangon, Myanmar
1982
1992
1997
2009
Since 2010
Embarked its Power Producer Business as well as EPC business to serve power producers Possess a current renewable energy pool of 117 MW PPA (57 MW PPA of Solar Power Plants and 60 MW PPA of Wind Power Plants)
Source of Revenue
GUNKULs future revenue will be generated from the 3 main businesses, each of which benefits from GUNKULs integrated business model and over 30-year experience and proven track records in Thai energy industry Solar and wind power producer EPC contractors for power plants Conventional business Conventional business
Business Structure
Strictly Private & Confidential
We have structured our business into three business units1) Conventional BU, 2) EPC Contractor BU and 3) Power Producer BU, each of which leverages expertise of each other
1
GUNKUL Group 60% Public shareholders 40% GKA GKP
Manufacturer
Customer
Govt Private Foreign
External Manufacturers
GUNKUL PCL
2
100% 100% 40%
Supplier
GKA
Manufacturing Electrical Products
Customer
GPG & GPS
KNP
Supplying Electrical Products
100%
GKP
Manufacturing Electrical Products
GUNKUL
70% 30%
GUNKUL offers a wide range of products and services from upstream to downstream of the electricity supply system (over 5,000 electricity items)
Electricity plants: Wind turbine components Solar panel components Substation: Battery and chargers Capacitors Grounding Maintenance equipment Meters Tools and instruments Transformers Distribution lines: Cables and accessories Capacitors Fuse and switches Grounding Hardware and connectors Insulators Lightning protection Live part covers Maintenance equipment Meters Preformed Tools and instruments Transformers
Transmission lines: Cable and accessories Fuse and switches Hardware and connectors Insulators Lightning protection Maintenance equipment Tools and instruments
Low voltage lines: Capacitors Explosion proof products Fuses and switches Grounding Hardware and connectors Insulators Lightning protection Meters Preformed Street lighting and control Telephone hardware
Customers Characteristics
High qualification requirements i.e. requiring products to meet 3 industrial standards Continuously order for replacement & expansion
Barrier to entry
GUNKUL
1. Government
High barrier to entry Product meeting industrial standard (TISI) Expensive type test for each product Difficulty to be a vendor list Limitation for 1st order, only 20% of total order for some product (that could have a significant impact to the electric system) Moderate to high barrier to entry For those contractors awarded turnkey projects from government, they will also be required to meet the governments quality specifications. Accordingly, suppliers such as GUNKUL will face the same circumstances as selling to government segment High barrier to entry Accessible and knowledgeable in this type of customers Funding capability
Approval for vender list Offers approx. 300 owned product items to this segment, GUNKULs manufacturing facilities have put the Company at advantage Expertise in sourcing quality products to fulfill remaining categories Stay in good position and easy to access this segment due to: GUNKUL is in an approved vender list from state enterprise It offers more than 5,000 product items to this segment
Wholesalers and contractors might come in a form of project based needs, therefore, they may require diverse kinds of products with certain quality at a time
2. Private
Myanmar Electric Power Enterprise (MEPE), Yangon Electricity Supply Board (YESB), Electricite Du Laos (EL)
3. Foreign
Might come in a form of project based needs, therefore, this segment may require diverse kinds of products at a time
Long established relationship and network Fully understand characteristic of customers Well recognized and supported from financial institutional
With more 30-year experience in the electrical system and its integrated business model, GUNKUL diversifies its business to provide one-stop services for constructing power plants
EPC Contractor BU Flow
Supplier
GKA GUNKUL GKP
Sub Contractor
Business Partner
Customers
GPG & GPS WED External Customers
Main Contractor
Project Reference
Project Owner 1) 2) 3) 4) 5) 6) Gunkul Powergen (Phase 1) G-Power Source (Phase 1) Gunkul Powergen (Phase 2) G-Power Source (Phase 2) CK & Sun Solar Power Plant Solatra Solar Power Plant Total MW 4.4 19.5 23.5 6.5 8.0 8.0 73 Status Complete Complete Under Construction Under Construction Under Construction Under Construction
Plant Information
Project Owner
1) 2) 3) 4) Gunkul Powergen (Phase 1) G-Power Source (Phase 1) Gunkul Powergen (Phase 2) G-Power Source (Phase 2) Total Contract Value Date of Completion Technology Selling price Adder BOI Tax Exemption ~ THB 3,000 mm Q4, 2012. Current work progress 72% Thin Film CIS, Crystalline Silicon ~ THB3.0 per kWh THB8.0 per kWh for 10 years since start of COD Year 1st - 8st : 100%, 9th 13th : 50%
MW
4.4 19.5 23.5 6.5 54
Status
Complete Complete Under Construction Under Construction
Project 1 (Operating) Capacity: 6.5 MW Location: Tasang, Nakorn -Sawan Project 2 (Operating) Capacity: 6.5 MW Location: Takeed, Nakorn -Sawan Project 3 (Operating) Capacity: 6.5 MW Location: Dong-Korn, Chainat Project 4 (Under Construction) Capacity: 6.5 MW
Location: Bung Samphan, Petchaboon
Project 1 (Operating) Capacity: 3.0 MW and 4.4 MW Location: Chondan Petchaboon Average Radiation: 5.08 kWh/m2/d Project 2 (Under Construction) Capacity: 8.0 MW Location: Petchaboon Average Radiation: 5.08 kWh/m2/d Project 3 (Under Construction) Capacity: 4.5 MW Location: Pichit Average Radiation: 5.08 kWh/m2/d Project 4 (Under Construction) Capacity: 8.0 MW Location: Nakorn Nayok Average Radiation: 5.04 kWh/m2/d Project 5 (Under Construction) Capacity: 3.0 MW
Location: Bung Samphan, Petchaboon
WED Plants
Total Capacity 60 MW Project 1 (Under Development) Capacity: 2 MW Location: Nakorn Ratchasima Project 2 (Under Development) Capacity: 8 MW Location: Nakorn Ratchasima
GPG Plants GPS Plants Total Plants: 12 Plants Already Operate : 27 MW Under Construction : 30 MW Going to Construction : 60 MW Total :117MW
Key Information
Investment Technology Selling price (Base Tariff) Adder BOI Tax Exemption Revenue ~ THB80 100 mm per MW Thin Film CIS modules without cadmium or Crystalline Silicon Module ~ THB 3.0 per kWh THB8.0 per kWh for 10 years since start of COD Year 1st - 8st : 100%, 9th 13th : 50% ~ THB19 mm per MW
Installed Capcity
(MW) 7.5 19.5 6.5 8 8 4.5 3
Solar Power 57 MW
X X X X X
10
Mounting installation 75 %
13
Compaction access road and backfilling of Unit sub dike D layer #1 progress 100%.
Compaction access road and backfilling of Unit sub dike layer #1 progress 100%.
PV Installation 86%
Key Information
Investment
Technology Selling price (Base Tariff) Adder BOI Tax Exemption Revenue
Shareholding Structure
GUNKUL
70% 30%
~ THB60 70 mm per MW
Horizontal Wind Turbine ~ THB3.0 per kWh THB3.5 per kWh for 10 years since start of COD Year 1st - 8st : 100%, 9th 13th : 50% ~ THB14 mm per MW
WED
PEA (8 MW)
PEA (2 MW)
Wind Power 60 MW
Project 1 Project 2
16
5 Tentative Plan
17
Site Layout
18
by GL GH is expected to
finish within Nov 2012
19
Presentation Outline
Strictly Private & Confidential
1. Company Overview
20
Revenue from electricity generated as well as EPC construction will be majority income for GUNKUL in the future.
3,736
THB mn
416
2,651
Q3/11
449 73
1,126 (54.11%)
Private
1,543 (46.48%)
Foreign
Electricity
295 (8.89%)
Construction
Q3/12
Note: Total Revenue from Government, Private and Foreign Customer is considered as revenue from Conventional Business
Government Private Foreign Electricity Construction
21
3,500
3,000 2,500 2,000 1,500
24.1 25.5
Margin%
30
25
THB mn
800 600
17.83
Margin
20 18 16 14 12 10 8 6 4 2 0
20 700 15 500
400
831 535 406 458 987
6.2
9.55 3.35
1,000 500
0
10
379
300 200
100 0
302
5
0
205 2011
54
2009
123
2010
89
2011 Q3/2012 Q3/2012
2008
2009
2010
Q3/2012
Rev.from Trading&Construction
Rev.from Manu.
Gross Margin(%)-RHS
Net Profit
22
Gunkuls Liabilities
THB mn
D/E Ratio
4
3.68
3.5
14
902
3
29
3,000
2,500 2,000 1,500
3005
864
2.5
2 1.82
1859
1.5
1
1,000
500 0
11 276 75
66
7 140 74
131
4 431 153
69
0.7
0.7
0.58
434
956
0.5
0 2008 2009 2010 2011 Q3/2012
2008
2009
2010
2011
Q3/2012
AP LT-int.bearing
23
Asset
11.69%
%
14 12 10 8 6
4 2 0
THB mn
Liability
THB mn
2,500
35 30 25 20 15 10 5 0
Asset
Q3/2012 ROA
Q3/2012
Transaction Asset (MB) Liability (MB) Equity (MB) Paid-up (MB) Revenue (MB) Net Profit (MB) ROA (%) ROE (%) Net Profit (%)
* Consolidated
30/09/2012* 5,747.78 3,708.67 2,039.11 440.00 3,767.30 671.80 11.69 32.95 17.83
31/12/2011* 5,539.78 4,356.18 1,183.60 400.00 2,651.51 89.52 1.62 7.56 3.35
31/12/2010* 1,789.71 657.51 1,132.20 400.00 1,288.7 123.17 6.88 10.88 9.56
31/12/2009* 856.90 351.79 505.20 300.00 864.07 53.66 6.26 10.62 6.21
31/12/2008* 1,051.36 428.17 632.19 240.00 1,366.20 123.01 11.70 19.74 9.00
24
Balance Sheet
Unit : THB mn
2,815.64 Current Liabilities 1,716.51 Current Asset 893.02 916.18 Non Current Asset 3,823.27 1,183.60 3,195.83 2,039.11 Non Current Liabilities 3,440.00 2,551.95
Shareholders Equity
As of Dec 31,2011
As of Sep 30,2012
25
1,137
190 311
11
Sales Backlog of as at 27/11/2012 (secure for the year 2012 of THB 1,649 m)
26
Presentation Outline
Strictly Private & Confidential
1. Company Overview
27
Conventional BusinessHigher investments in transmission and distribution is positive due to increasing demand
1
Strictly Private & Confidential
Demand for electricity continued to expand. In 1H12 electricity demand in Thailand picked up rapidly at 8.8% YoY, compared with the average of 4.6% over the past ten years
Investment in transmission and distribution systems will remain substantial. As indicated in PDP 2010, the investments for the main electricity authorities during 2010-20F is budgeted to reach THB328 bn.
THB bn.
+ 8.8% YoY
Higher investments in the transmission and distribution are supported by: Govt to improve the grids efficiency Govt to enlarge coverage to accommodate economic growth and the rising urbanization trend Expansion of the mass transit system in Bangkok
28
EPC Contractor Business--Great opportunity from being a one stop service of solar EPC contract
2
Strictly Private & Confidential
Since PPA of 1,770 MWs are approved and signed with an expiration, GUNKUL as a one stop provider can serve this big chuck solar power producers with estimated market value of over THB150 bn.
MW
Estimated cost breakdown of building a solar power plant. GUNKUL can offer services, value of which accounts for nearly 50% of total pie
Source: EPPO as of Mar, 2012 (SPP + VSPP) * Including Solar Thermal ~ 1,400 MW
Source: Company
29
Having entered into the renewable energy business since 2010, GUNKUL has actively sought and acquired PPA of renewable power plants and will continue to add PPA to its portfolios at a more aggressive pace
PDP-2010 is promoting greater use of renewable energy in power generation. The proportion of renewable energy is forecasted to rise from 21% in 2012 to 29% in 2030. EGAT will offer an adder to the base tariff rates as an incentive to encourage the participation of private operators to build renewable energy power plants
Proportion of renewable energy
20% 0% 2012
Renewable
2021
Cogeneration
2030
Thermal
Source: EGAT
2010
2011
2012
2013
PPA Approved with Signature 1,981.49 81.96 1,463.66 48.91 6.2 395.83 3,978.05
PPA Approved Consider 292.92 1,227.67 50.37 31.55 588.92 518 122.86 82.2 0.09 15.57 861.96 1821.84 1,917.12 3,696.83 30
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Project 1 Project 1-3 Project 4 Project 2 Project 4 Project 3 Project 5 Project 1 Project 2
Solar Power 57 MW
Chondan Operated since 2011 Tasang, Taked, DongOperated since 2011 Khon Bung Samphan Petchaboon Nakorn Nayok Pichit Bung Samphan Huai Bong 1& 2 Wayu
7.5 19.5 X X X X X
Planned COD
Planned COD
6.5 8 8 4.5 3 10 50
Wind Power 60 MW
WED WED
Total 117 MW
31
32
Remark: One year wind data collecting will complete on 9 Sep, 2012
33
34
35
Site Information Orange Red Wind Potential Area Road Access with National Grid at foothill Small Road Access to the site Concerns: Full with Pagodas and Monasteries
36
Site Information Yellow Wind Potential Area Continuous Mountain Beside the road constructed by ITD Future Transmission Line, Road Access, Railway. Oil and Gas Pipeline will be constructed by ITD
37
Special Project
38
Project Owner: EGAT Project Location: Lamtaklong Wind Turbine: 12 x 1.5 MW Budget: 872.180 MTHB (1,700 MTHB)
Project Schedule
Estimate submit: Quarter 4/2555 Estimate sign contract: Quarter 4/2555 Delivery: Quarter 4/2556 Installation and finish: Quarter 2/2557
39
Q&A