Contents Introduction
REL670 functionality Distance protection in REL670 Additional protection functions Control & Supervision functions Summary
Main application
Line distance protection terminal for: All voltage levels Directly earthed networks OH-lines Cables Double circuit lines Single-, two- or three pole trip
Main Characteristics
Line IED for protection, monitoring and control Building block in Substation Automation Systems Completely full scheme Functional flexibility Configuration flexibility Extensive self- supervision
Contents
Introduction
REL670 functionality
Distance protection in REL670 Additional protection functions Control and Supervision functions Communications and Tools Summary
Protection functions
= Option = Included
Current reversal & WEI logic for earth fault (EFCA) Current reversal & WEI logic for earth fault (EFCA) Scheme communication for earth fault (EFC) Scheme communication for earth fault (EFC) 4 stage earth fault protection (TEF) 4 stage earth fault protection (TEF) Instantaneous non-dir residual O/C (IEF) Instantaneous non-dir residual O/C (IEF) and phase overcurrent protection (IOC) and phase overcurrent protection (IOC) Time delayed 4 stage O/C protection (TOC) Time delayed 4 stage O/C protection (TOC) Current reversal & weak-end infeed (ZCAL) Current reversal & weak-end infeed (ZCAL) Scheme communication logic, (ZCOM) Scheme communication logic, (ZCOM) Power swing detection, (PSD) Power swing detection, (PSD) Local acceleration logic (PLAL) Local acceleration logic (PLAL)
ABB Ltd., Bangalore - 2007
Automatic switch onto fault (SOFT) Automatic switch onto fault (SOFT) Distance protection (ZM, GFPS) Distance protection (ZM, GFPS)
PSS-SAP/NRV 6
Protection functions
= Option = Included
General current & voltage measuring function, General current & voltage measuring function, 1 or 2 CB, (GF) 1 or 2 CB, (GF) Two stage time delayed residual over-voltage, Two stage time delayed residual over-voltage, 1 or 2 CB, (TRV) 1 or 2 CB, (TRV)
Two stage time delayed over-voltage, 1 or 2 CB, (TOV) Two stage time delayed over-voltage, 1 or 2 CB, (TOV) Two stage time delayed under-voltage, 1 or 2 CB, (TUV) Two stage time delayed under-voltage, 1 or 2 CB, (TUV) Pole-discordance, 1 or 2 CB, (PD) Pole-discordance, 1 or 2 CB, (PD) Stub protection, 2 CB, (STB) Stub protection, 2 CB, (STB) Breaker failure protection, 1 or 2 CB, (BP) Breaker failure protection, 1 or 2 CB, (BP)
Thermal overload protection, 1 or 2 CB, (BP) Thermal overload protection, 1 or 2 CB, (BP) Distance protection with Mho characteristic Distance protection with Mho characteristic
PSS-SAP/NRV 7
Apparatus control, single bay max 8 apparatuses Apparatus control, single bay max 8 apparatuses Autorecloser for 1, 2 &/or 3 ph, single, 1 or double CB, (AR) Autorecloser for 1, 2 &/or 3 ph, single, 1 or double CB, (AR) Synchrocheck & energizing check, 1,1 or double CB, (SYN) Synchrocheck & energizing check, 1,1 or double CB, (SYN) Fuse failure supervision, 1or 2 CB (FFD) Fuse failure supervision, 1or 2 CB (FFD) Current circuit supervision, 1 or 2 CB (CCS) Current circuit supervision, 1 or 2 CB (CCS)
Contents
Introduction Functionality
PSS-SAP/NRV 10
PSS-SAP/NRV 11
Contents
Introduction Functionality Main features in REL670
PSS-SAP/NRV 12
I XS XL RL
X . di u = i .R + . o dt
PSS-SAP/NRV 13
Import
B
No compensation
Export
Adaptive compensation
Import
ZL
PSS-SAP/NRV 14
Characteristic for Ph-Ph loops Fault resistance for reverse direction is defined from the Yaxes Few setting parameters = easy handling
R ( / phase)
ArgNegRes
X1
ArgDir X1
R1+RFPP/2
ABB Ltd., Bangalore - 2007
RFPP/2
PSS-SAP/NRV 15
Individual timers for Ph-Ph and Ph-E fault loop Both Ph-Ph and Ph-E fault loops have a settable minimum operating current IMinOpPP, respective IMinOpPE and IMinOpIN
ABB Ltd., Bangalore - 2007
PSS-SAP/NRV 18
To ensure secure operation of the phase selector in case of combination of line to earth fault and phase to phase fault there is a check of the relation between IN and Iph which is used to release the correct fault loop
Phase Selection
Phase to earth fault
X
/loop
X1 RFFwPE
/phase
Kr X1 RFFwPP/2
RFRvPE
Kr
RFRvPP/2
X1+XN 60 deg R
X1 60 deg R X1 60 deg
/loop
X1+XN 60 deg Kr = 1 / tan(60deg)
/phase
Kr = 1 / tan(60deg)
RFRvPE
Kr
X1
RFFwPE
RFRvPP/2
Kr X1
RFFwPP/2
PSS-SAP/NRV 20
90 deg
2 X1 K3
RFFwPP K3 R
RFRvPP K3
K3 = 2 / sqrt(3)
30 deg
Load encroachment
X
ZM3 ZM4
ZM2
ZM1
LOAD R
TRIP ZM4
ZM5
ABB Ltd., Bangalore - 2007
PSS-SAP/NRV 22
Load encroachment
Load encroachment allows
better fault resistance coverage without interference with load
Releases the measuring zones including the phase selection for phase selective tripping
Contents
Introduction Functionality Main features in REL670 Distance protection in REL670
PSS-SAP/NRV 24
IF
Each stage can be set Off, Nondirectional, Forward or Reverse Each stage can be Definite- or Inverse time delayed. Taylor made curve is available Each stage can be blocked from second harmonic inrush currents.
UL1+UL2+UL3
IN>
ABB Ltd., Bangalore - 2007
Directional polarizing from calculated UL1+UL2+UL3 or by external Open delta to a separate Analogue input.
4
PSS-SAP/NRV 25
The communication schemes are of two basic types: Permissive schemes, where a permissive condition to trip is sent. Gives high security but lower dependability.
underreaching, overreaching,
Z<
Z<
Carrier send CS = Z< Forward, under- or overreach Trip = Z< Forward Z1, Z2 or Z3 & Carrier received
Blocking system
B
Blocking schemes, where a blocking signal preventing "instantaneous tripping" is sent. Gives high dependability but lower security.
Z<
ABB Ltd., Bangalore - 2007
Z<
_____________
21
21
Z<
Z<
The loss of communication guard is considered equal to a received signal and accelerate the tripping Continuously During a time window The signal PLC Guard is connected to the GRG input in ZCOM logic.
Carrier send CS = Z< Forward, under or overreach Trip = Z< Forward Z1, Z2 or Z3 & Carrier received or Loss of PLC Guard signal.
PSS-SAP/NRV 28
Z< Z<
21
Z<
CS CR
21
Z< Z<
21
Z<
CS CR?
21
21
Z<
Z<
ZM2
CR 60 & 40
ABB Ltd., Bangalore - 2007
&
Trip
ZM3R
&
Carrier send
PSS-SAP/NRV 29
Weak-End Infeed
L1N/L2N A Forw L1N/L2N B
L1N
Z<
Z< WEI
Z<
Z< WEI
For cases when one side has a weak, or non-existant source a WEI logic is advantageous. Strong side will send Permissive OVERREACH signal. At Weak-end the signal received will be
ABB Ltd., Bangalore - 2007
mirrored back on detection of low voltage to accelerate the strong end tripping Tripping with local undervoltage (Ph-Ph, Ph-E) check logic
PSS-SAP/NRV 30
RLdOutRv
L
R1LIn
RLdOutFw KLdRFw*RLdOutFw
X1InRv
ABB Ltd., Bangalore - 2007
X1InRv * KLdRRv
PSS-SAP/NRV 31
Z<
jX ( / phase)
Zone2 or Zone3 Zone1 ArgNegRes
A basic protection function which enables instantaneous trip at closing of breaker. Non directional to cover zero voltage due to forgotten earthing switch Two versions: A binary input (bc) which releases the SOTF overreaching zone at breaker closing command Internal measurement detects that no voltage and no current is available for a certain time(DLD). The instantaneous, non directional measurement is then activated internally.
L
R ( / phase)
ArgDir
An overreaching zone shall be used to allow operation also at AR achieving trip for all line faults
PSS-SAP/NRV 32
STUB protection
Instantaneous overcurrent protection of busbar connection (STUB) when a line disconnector is open Required in Multi-breaker arrangements with CVT (VT) on line side of DS Z< (21) function cannot measure when line disconnector is open and must be blocked.
Trip
Line discon.
open
ABB Ltd., Bangalore - 2007
25 ms
&
I STUB >
PSS-SAP/NRV 33
IL
zero sequence voltage and current: U0 > Uref and I0 = 0 negative sequence voltage and current: U2 > Uref and I2 = 0 Sudden change in current and voltage:
>Z
ABB Ltd., Bangalore - 2007
DI/Dt and DU/Dt Programmable influence on the operation of zone measuring elements
PSS-SAP/NRV 34
T R S
R S T
PSS-SAP/NRV 35
Auto-Reclosing
Input signals typical connections
CB ready CB closed
Auto Reclosing
Single-/ Two-/ Three-phase reclosing programs
Program
1 2
1st attempt
2nd attempt
3 phase 1 phase 2 phase 3 phase 1 phase 2 phase 1 phase 2 phase 1 phase 2 phase 3 phase 1 phase 2 phase 3 phase
3 phase 3 phase 3 phase 3 phase 3 phase 3 phase 3 phase ---3 phase 3 phase ---3 phase -------
3 phase 3 phase 3 phase 3 phase 3 phase 3 phase 3 phase ---3 phase 3 phase ---3 phase -------
3 4 5
1/2 phase (No 3 phase) 1/2 phase (No 3 phase) 1/2/3 phase
6
ABB Ltd., Bangalore - 2007
1/2/3 phase
PSS-SAP/NRV 37
Put AR on hold e.g. waiting for Thermal relays to reset to have less sag before reclosing
PSS-SAP/NRV 38
Energizing Check
UA A ILoad
Inductive and Capacitive charging of dead line
UB B
Uhigh
27 SC/VC
Ulow
The dead line and Live bus conditions are checked. Uhigh and Ulow are verified
Synchronism Check
UA A ILoad B UB
UAL
Icap
25 SC/VC
d dU
Paralleling (synchronism conditions are checked , f, U and Uhigh are within set values
Synchrocheck function
U-Line U-Bus
SYNC
Paralleling (Synchronism) Check Frequency difference f < 3-1000mHz Voltage difference U < 2 - 50 % of Ub Phase difference < 5 - 90o Operate time 80 ms (typical)
Accuracy of frequency measurement about 0,5 mHz!
BLOCK
ABB Ltd., Bangalore - 2007
Fuse fail
PSS-SAP/NRV 41
Conditions for AR Conditions for Man close Test conditions fulfilled Fuse fail on sel fuse Information that the voltage is included in the synchrocheck Information that the conditions for voltage, diff voltage phase angle diff etc are fulfilled
PSS-SAP/NRV 42
SYN1
ULN1
3U
IED
1U UB1
1U UB2
SYN1
ULN1
ABB Ltd., Bangalore - 2007
SYN2
LN1Q
3U
PSS-SAP/NRV 43
1U
IED
ULN1 B1Q
1U
UB1
SYN1
SYN1
3U
LN1Q
IED 2
1U
SYN1
1U 1U
SYN2
IED 3
1U LN2Q B2Q
SYN1
3U 1U
1 U ULN2 UB2 1U
REC670
1U 3U
SYN1
SYN2
SYN3
3U 1U
Summary
Platform of products for all type of objects. Increased user friendliness with common PC tool box Configuration flexibility Pre-defined user-friendly packages Serial communication flexibility for easy integration in Substation Automation Systems New IEC61850-8-1 Station Bus Extensive self-supervision allows minimal scheduled maintenance. Improved tool communication speed