Piling Rate

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Assumption of 500mm dia Piles.

Dia of pile
capacity
No
Av. Cut off level
Termination level
Reinforcement

:
:

500 mm
95 MT
1 nos
:
4.0 mtr below ( +/- ) 0.00 level
:
25 mtrs below cut off level
: 4 - 16 Tor + 4 - 12 Tor for 6.0m from cut off level
8 - 12 Tor for rest length
8 Tor circular links @ 200mm c/c
16 Tor @ 1000 mm c/c Tie rod
Grade of concrete
: M25
[ min 400 kgs of cement / cum of concrete & slump 150 - 180mm ]
Considering over flow of 300mm for M25 grade of concrete ( 25.0 + 0.30 = 25.30 m )
2
So, M25 grade concrete
: 1x 3.14 x (0.50) /4 x 25.30
=
4.97 cum
=
4.97 cum / pile
Fine sand above cut off level ( considering av. depth of (4.0 - 0.3 )m above cut off level )
2
= 1x 3.14 x (0.50) /4 x 3.7
=
0.73 cum
=
0.73 cum / pile
Total qty of Concrete & Fine sand :
Dia of Pile
No of Pile Unit cum. per Pile Total qty ( cum ) Remarks
500mm - M25
1
4.97
4.97
5
Sub total M25 : ( Cum )
500mm - Fine sand
1
0.73
1
1
Sub total Fine sand: ( Cum )

Reinforcement detailing of Piling work.


For, 500mm dia.
Dia of reinforcement
No
Length
Unit wt.
12 Tor
4
7.5
16 Tor
4
7.5
12 Tor
8
19.3
16 Tor
26
1
130
1.5
8 Tor
Total wt. of reinforcement per 500mm dia pile :
So, effective unit wt. Of reinforcement of pile for Town House

0.89
1.58
0.89
1.58
0.39

Uom
Kg
Kg
Kg
Kg
Kg
Kg
Kg

Total wt.
26.7
47.4
137.4
41.1
76.1
296.0
11.8

Remarks
upto 6.0m below cut off level
upto 6.0m below cut off level
rest upto pile bottom ( 26-7.5+0.8)
Tie bar @ 1000mm c/c.
stirrups @ 200mm c/c.
0.296
effective length 20.0 m.

kg
sand
20mm
10mm

cum
627
788
525

Total qty of reinforcement :


Dia of Pile
No of Pile Unit wt. per Pile
Total wt. ( kg )
Remarks
500mm
1
296.0
296
Sub total : ( KG )
296
SAY : ( MT )
0.296

RATE ANALYSIS FOR CAST IN -SITU R.C.C. BORE PILE IN DMC METHOD
FOR
25
25.3
3 MTR LENGTH
DESCRIPTION
U.O.M
QTY
300MM
400MM
CEMENT
M. SAND
STONECHIPS
REINFORCEMENT
F. SAND
BENTONITE
LABOUR
REINFORCEMENT
FOR BORING
FOREMAN
PILE OPERATOR
MECHANIC
HELPER
FOR CONCRETING
FOREMAN
MASSON
BELDAR
COOLIE
WATERMAN

RATE

AMOUNT

500MM

BAG
CUM
CUM
K.G
CUM
BAG

300MM

39.76
390.00
2.08
918.19
2.549 1,959.98
296 FREE ISSUE
0.73
459.095
23.85
375

400MM
15,505.00
1,907.33
4,996.74
333.66
8,945.19
31,687.93

K.G

296

1,776.00

NOS
NOS
NOS
NOS

1.6
1.6
1.6
6.35

300
300
300
200

480.00
480.00
480.00
1,270.00

NOS
NOS
NOS
NOS
NOS

0.25
0.45
4
2.6
0.25

300
300
200
200
200

75.00
135.00
800.00
520.00
50.00

\
LAB +MAT

ADD 10% wastage & contingencies

6,066.00
37,753.93
3,775.39

VAT ON 25% @ 0% : ON 30% @4%: ON 55%- @13.5%

8.625

3,581.90

O.H & PROFIT @15%

6,766.68
TOTAL
RATE/MTR

51,877.91
2,075.12

500MM

kg/cum
cum/kg
0.418
1500 0.00067
0.513 1536.062 0.00065
0.362 1450.276 0.00069

You might also like