SWBS

Download as pdf
Download as pdf
You are on page 1of 13
PART vou vie v1 012 013 O14 015 016 017 1g 020 021 22 023 024 02s 030 FL 032 033 034 035 040 oul uaz 043 04a oso 051 052 053 954 060 061 062 063 064 065 066 067 068 069 IL CLASSIFICATION BY NUMERIC GROUPS SHIP WORK BREAKDOWN STRUCTURE TITLE GROUP 9 GENERAL GUIDANCE AND ADMINISTRATION GENERAL GUIDANCE AND ADMINISTRATION, COMBAT CAPABILITIES (OFFENSIVE AND DEFENSIVE) AIR “EAPONS VS AIR TARGETS AIR WEAPONS VS SURFACE TARGETS AIR WEAPC:. VS UNDERWATER TARGETS SURFACE « ONS VS AIR TARGETS SURFACE WEAPONS VS SURFACE TARGETS SURFACE WEAPONS VS UNDERWATER TARGETS UNDERWATER WEAPONS VS SURFACE TARGETS UNDERWATER WEAPONS VS UNDERWATER TARGETS STRATEGIC AND SPECIAL CAPABILITIES SURFACE 8ASED DETERRENT UNDERWATTR BASED DETERRENTS AMPHIBIOUS WARFARE MINE AND MINE COUNTERMEASURE WARFARE INSHORE WARFARE TACTICAL AND STRATEGIC OPER. SUPPORT CAPABILITIES COMMAND /CONTROL/ COMMUNICATIONS. SURVEILLANCE /RECONNA I SSANCE/ INTELLIGENCE ELECTRONIC WARFARE AND NUC/SIO/CHEMICAL DEFENSE Lor ISTICS/SEALIFT OThER SUPPORT SHIP SYSTEM MANAGEMENT PROJECT MANAGEMENT GENERAL ADMINISTRATIVE REQUIREMENTS. LIFE CYCLE COSTING SHIP OPERATION SHIP SYSTEM PERFORMANCE SHIP SYSTEM PERFORMANCE CONCEPTS SHIP SUE 3YSTEM PERFORMANCE CONCEPTS SELECTED CONCEPTS COMPONENT DEVELOPMENT SUBSYSTEM CHARACTERISTICS (INTERFACES AND CNO CONT.) HULL STRUCTURE PROPULSION PLANT ELECTRIC PLANT COMMAND AND SURVEILLANCE AUXILIARY SYSTEMS OUTFITTING WEAPONS INTEGRATION AND ENGINEERING SHIP ASSEMBLY 070 o71 072 073 074 075 076 077 073 079 ogo oar a2 va3 084 08s 086 087 vga 089 090 91 092 093 094, 095 096 097 098 099 100 1c lle ql. 112 113 114 115 116 17 11g 119 SHIP WORK BREAKDOWN STRUCTURE TITLE GENERAL REQUIREMENTS FOR DESIGN AND CONSTRUCTION ACCESS, SHOCK. NOISE AND VIBRATION FASEANG, *HELDING»RIVETING ALLIED PROCESSES (GENERAL) THREADED FASTENERS STANDARDS RELIABILITY ANO MAINTAINABILITY SAFETY MATERTAL 3 SEAWORTHINESS INTEGRATED LOGISTIC SUPPORT REQUIREMENTS Mo NTENANCE SUPPORT AND TEST EuUIPMENT SUPPLY SUPPORT TRANSPORTATION AND HANDLING ENGINEERING DRAWINGS TECHNICAL MANUALS AND OTHER DATA FACILITIES PERSONNEL AND TRAINING TRAINING EQUIPMENT QUALITY ASSURANCE REQUIREMENTS SHIP INSPECTIONS SHIP TESTS COMBAT SYSTEMS CHECKOUT REGULAR SHIP TRIALS + WHOLE SHIP TESTING WEIGHT CONTROL INCLINING EXPERIMENT AND TRIM DIVE MODELS AND MOCKUPS PHOTOGRAPHS GROUP 1 HULL STRUCTURE HULL STRUCTURE» GENERAL GENERAL ARRANGEMENT=STRUCTURAL DRAWINGS SHELL AND SUPPORTING STRUCTURE SHECE BLATINGs SURF« SHIP AND SUBMARINE PRESS« HULL SHELL PLATING? SUBMARINE NON-PRESSURE HULL INNER BOTTOM SHELL APPENDAGES STANCHIONS Frans, ERAMINGs SURF.SHIP AND SUBMARINE PRESS.HULL TRANSVs FRAMING? SURFsSHIP AND SUBMARINE PRESS stone LONGI TeAND TRANSV SUBMARINE NON-PRESS HULL FRAMING + LIFT SYSTEM FLEXIBLE SKIRTS AND SEats 120 121 122 123 124 125 126 130 13 132 135 136 137 138 139 140 141 142 143 164 145 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 163 170 71 iz a> SHIP WORK BREAKOOWN STRUCTURE TITLE HULL SiRUCTURAL BULKHEADS LONGITUDINAL STRUCTURAL BULKHEADS TRANSVERSE STRUCTURAL BULKHEADS. TRUNKS A'ID ENCLOSURES BULKHEADS IN TORPEDO PROTECTION SYSTEM SUBMARINE HARD TANKS SUBMARINE SOFT TANKS HULL DECKS MAIN DECK 2ND DECK 3RD DECK 4Tr DECK 57h DECK AND DECKS BELO™ O1 HULL DECK (FORECASTLE AND POOP DECKS) 02 HULL DECK 03 HULL DECK 04 HULL DE-K AND HULL DECKS ABOVE HULL PLATFORMS AND FLATS . 1ST PLATFORM 2ND PLATFORM 3RD PLATTORM 4TH PLATFORM 5TH PLATFORM FLATS DECK HOUSE STRUCTURE DECKHOUSE STRUCTURE TO FIRST LEVEL 1ST DECKHOUSE LEVEL 2ND DECKHOUSE LEVEL 3RD DECKHOUSE LEVEL 4TH DECKHOUSE LEVEL 5TH DECKHOUSE LEVEL 6TH DECKHOUSE LEVEL 7TH DECKHOUSE LEVEL @TH DECKHOUSE LEVEL AND ABOVE SPECIAL STRUCTURES STRUCTURAL CASTINGS» FORGINGS+ AND EQUIV. WELDMENTS STACKS AND MACKS (COMBINED STACK ANO MAST) SEA CHESTS BALLISTIC PLATING SONAR DOMFS SPONSONS HULL STRUCTURAL CLOSURES DECKHOUST STRUCTURAL CLOSURES SPECIAL PURPOSE CLOSURES AND STRUCTURES MASTS» KINGPOSTS» AND SERVICE PLATFORMS MASTS, TOWERS» TETRAPODS KINGPOSTS ANO SUPPORT FRAMES SERVICE PLATFORMS 180 181 182 183 1e4 185 186 187 190 191 192 195 198 199 2uu 201 202 210 2u1 2l2z 213 214 215 216 217 218 219 220 221 222 223 224 230 231 232 233 234 235 236 237 238 239 SHIP WORK BREAKOOWN STRUCTURE TITLE FOUNDATIONS HULL STRUCTURE FOUNDATIONS PROPULSION PLANT FOUNDATIONS ELECTRIC PLANT FOUNDATIOKS COMMAND ANO SURVEILLANCE FOUNDATIONS AUXILIARY SYSTEMS FOUNDATIONS OUTFIT AND FURNISHINGS FOUNDATIONS ARMAMENT FOUNDATIONS SPECIAL PURPOSE SYSTEMS, BALLAST» FIXED OR FLUID» AND BUOYANCY UNITS COMPARTMENT TESTING ERECTION OF SUB SE-TIONS (PROGRESS REPORT ONLY) FREE FLOODING Lrauios HULL REPAIR PARTS AND SPECIAL ToOLS GROUP 2 PROPULSION PLANT PROPULSION PLANT» GENERAL, GENERAL ARKANGEMENT ~ PROPULSION DRAWINGS MACHINERY PLANT CENTRAL CONTROL SYSTEMS ENERGY GENERATING SYSTEM (NUCLEAR) (RESERVED) NUCLEAR STEAM GENERATOR REACTORS, REACTOR COOLANT system REACTOR COOLANT SERVICE system REACTOR PLANT AUXILIARY SYSTEMS NUCLEAR POWER CONTROL AND INSTRUMENTATION RADIATION SHIELDING (PRIMARY) RADIATION SHIELDING (SECONDARY) ENERGY GENERATING SYSTEM (NON-NUCLEAR) PROPULSTIN BOILERS GAS GENERATORS. MAIN PROPULSION BATTERIES MAIN PROPULSION FUEL CELLS PROPULSION UNITS PROPULSION STEAM TURBINES PROPULSION STEAM ENGINES PROPULSION INTERNAL COMBUSTION ENGINES PROPULSION GAS TURBINES ELECTRIC PROPULSION SELF-CONTAINED PROPULSION SYSTEMS AUXILIARY PROPULSION DEVICES SECONDARY PROPULSION (SUBMARINES) EMERGENCY PROPULSION (SUBMARINES) 260 241 262 243 246 245 246 247 248 250 251 252 253 254 255 256 258 259 peu 261 262 363 54 ou 298 299 300 3uL 302 3u3 3u4 3U5 31u Bll 312 313 314 320 321 322 323 324 330 331 932 SHIP WORK BREAKDOWN STRUCTURE TITLE TRANSMISSION AND PKOPULSOR SYSTEMS. PROPULSION REDUCTION GEARS PROPULSION CLUTCHES AND COUPLINGS PROPULSION SHAFTING PROPULSION SHAFT BEARINGS PROPULSC 7% PROPULSGR SHROUDS AND DUCTS WATER JET PROPULSOPS + LIFT SYSTEM FANS AND DUCTING PROPULSICN SUPPORT SYS. (EXCEPT FUEL AND LUBE OIL) COMBUSTICN AIR SYSTEM PROP "ON CONTROL SYSTEM MAIN €AM PIPING SYSTEM CONDENSERS AND AIR EVECTORS FEED AND CONDENSATE SYSTEM CIRCULATING AND COOLING SEA WATER SYSTEM H.Pe STEAM DRAIN SYSTEM UPTAKES (INNER CASING) PROPULSION SUPPORT SYSTEMS (FUEL AND LUBE OIL) FUEL SERVICE SYSTEM MAIN PROPULSION LUBE OIL SYSTEM SHAFT LUBE OIL SYSTEM (SUBMARINES) LUBE OIL FILL» TRANSFER+ AND PURIFICATION SPECIAL PLRPCSE SYSTEMS PROPULSION PLANT OPERATING FLUTOS PROPULSION PLANT REPAIR PARTS AND SPECIAL TOOLS GROUP 3 ELECTRIC PLANT ELECTRIC PLANT» GENERAL GENERAL AKRANGEMENT-ELECTRICAL DRAWINGS. MOTORS ANU ASSOCIATED EGUIPMENT PROTECTIVE DEVICES ELECTRIC CABLES ELI SIRICAL DESIGNATING AND MARKING ELECIRIC POWER GENERATION SHIP SERVICE POWER GENERATION EMERGENCY SENERATORS BATTERIES ANO SERVICE FACILITIES POWER CONVERSION EQUIPMENT POWER DISTRIBUTION SYSTEMS SHIP SERVICE POWER CABLE EMERGENCY POWER CABLE SYSTEM CASUALTY POWER CABLE SYSTEM SwITCHGEAR AND PANELS LIGHTING SYSTEM CIGHTING DISTRIBUTION LIGHTING FIXTURES 340 34L 342 343 390 353 399 abe aor 402 403 404 aus 46, 407 408 410 4i1 412 413 ala 415 417 420 421 422 423 424 425 426 427 428 430 431 432 433 434 435 436 427 438 439 SHIP WORK BREAKDOWN STRUCTURE TITLE POWER GE'YERATION SUPPORT SYSTEMS SSTG LUBE OIL DIESEL SUPPORT SYSTEMS TURBINE SUPPORT SYSTEMS SPECIAL PURPOSE SYSTEMS ELECTRIC PLANT OPERATING FLUIDS ELECTRIC PLANT REPAIR PARTS AND SPECIAL TOOLS GROUP 4 COMMAND AND SURVEILLANCE COMMAND ANO SURVEILLANCE» GENERAL GENERAL’ ARRANGEMENT - CONMAND AND SURVEILLANCE SECURITY REQUIREMENTS PERSONNEL SAFETY RADIO FREGUENCY TRANSMISSION LINES ANTENNA EQUIREMENTS GROUNDING AND BONOING ELECTROMAGNETIC INTERFERENCE REDUCTION (EMI) SYSTEM TEST REQUIREMENTS COMMAND AND CONTROL SYSTEMS DATA DISPLAY GROUP DATA PROCESSING GROUP DIGITAL DATA SWITCHBOARDS INTERFACE EQUIPMENT DIGITAL DATA COMMUNICATIONS COMMAND AND CONTROL ANALOG SWITCHBOARDS NAVIGATION SYSTEMS NON-ELECTRICAL/ELECTRONIC NAVIGATION AIDS ELECTRICAL NAVIGATION AIDS (INCL NAVIG. LIGHTS) ELECTRONIC NAVIGATION SYSTEMS, RADIO. ELECTRONIC NAVIGATION SYSTEMS, ACOUSTICAL PERISCOPES ELECTRICAL NAVIGATION SYSTEMS INERTIAL NAVIGATION SYSTEMS NAVIGATION CONTROL MONITORING INTERIOR COMMUNICATIONS SWITCHBOARCS FOR 14C. SYSTEMS TELEPHON7 SYSTEMS ANNOUNCING SYSTEMS ENTERTAINMENT AND TRAINING SYSTEMS VOICE TUBES AND MESSAGE PASSING SYSTEMS ALARM» SAFETY» AND WARNING SYSTEMS INDICATING? ORDER» AND METERING SYSTEMS INTEGRATED CONTROL SYSTEMS RECORDING AND TELEVISION SYSTEMS 44u wal 442 443 pee 445 446 450 451 452 453 454 45s 455 459 460 461 462 463 464 465 70 a7. 472 473 47 475 476 480 481 482 483 484 439 490 491 492 493 494 498 498 499 beet SHIP WORK BREAKDOWN STRUCTURE TITLE EXTERIOR COMMUNICATIONS. RADIO SYSTEMS UNDERWATER SYSTEMS VISUAL _AND AUDIBLE SYSTEMS TELEMETRY SYSTEMS. TTY AND FACSIMILE SYSTEMS SECURITY EQUIPMENT SYSTEMS SURVEILLANCE SYSTEMS (SURFACE) SURFACE SEARCH RADAR AIR SEARCH 2ADAR (2D) AIR 9° “RCH RADAR (3D) AIRCK CONTROL APPROACH RADAR IDENTir LCATION SYSTEMS (TFF) MULTIPLE MODE RADAR SPACE VEHICLE ELECTRONIC TRACKING SURVEILLANCE SYSTEMS (UNDERWATER) ACTIVE SONAR PASSIVE SONAR MULTIPLE MCDE SONAR CLASSIFICATION SONAR BAT 4YTHERMOGRADH COUNTERMEASURES ACTIVE ECM (INCL COMBINATION ACTIVE/PASSIVE} PASSIVE ECM TORPEDO DECOYS DECOYS (OTHER) DEGAUSSING MINE COUNTERMEASURES FIRE CONTROL SYSTEMS GUN FIRE, CONTROL SYSTEMS MISSILE FIRE CONTROL SYSTEMS UNDERWATER FIRE CONTROL SYSTEMS INTEGRATED FIRE CONTROL SYSTEMS WEAPON SYSTEMS SWITCHBOARDS SPECIAL PURPOSE SYSTEMS ELECTRONIC TEST» CHECKOUTs AND MONITORING EQUIPMENT FLIGHT CONIROL AND INSTRUMENT LANDING SYSTEMS NON COMSAT DATA PROCESSING SYSTEMS METEOROLOGICAL SYSTEMS SPECIAL PURPOSE INTELLIGENCE SYSTEMS COMMAND AND SURVEILANCE OPERATING FLUIDS COMMAND ANC SURV. REPAIR PARTS AND SPECIAL TOOLS 500 501 502 503 504 505 5U6 507 5ug 509 516 511 512 513 514 515 516 317 520 521 522 523 524. 525 527 528 529 52) $31 532 533 534 535 536 540 541 542 543 546 545 549 550 551 552 553 554 555 SHIP WORK BREAKOOWN STRUCTURE TITLE GROUP 5 AUXILIARY SYSTEMS AUXILIAPY SYSTEMS» GENERAL GENERAL ARRANGEMENT—AUXILIARY SYSTEMS DRAWINGS AUXILIARY MACHINERY PUMPS INSTRUMENTS AND INSTRUMENT BOARDS GENERAL PIPING REQUIREMENTS OVERFLOWS» AIR ESCAPES» AND SOUNDING TUsES MACHINERY AND PIPING DESIGNATION AND MARKING THERMAL INSULATION FOR © ING AND MACHINERY THERMAL INSULATION FOR VT AND A/C DUCTS CLIMATE CONTROL COMPARTMENT HEATING SYSTEM VENTILATION SYSTEM MACHINERY SPACE VENTILATION SYSTEM AIR CONDITIONING SYSTEM AIR REVITALIZATION SYSTEMS (SUBMARINES) REFRIGERATION SYSTEM AUXILIARY BOILERS AND OTHER HEAT SCOURCES SEA WATER SYSTEMS FIREMAIN AND FLUSHING (SEA WATER) SYSTEM SPRINKLER SYSTEM WASHUQWN SYSTEM AUXILIARY SEA WATER SYSTEM SCUPPERS AND DECK DRAINS FIREMAIN ACTUATED SERVICES - OTHER PLUMBING DRAINAGE DRAINAGE AND BALLASTING SYSTEM FRESH WATER SYSTEMS DISTILLING PLANT COOLING WATER POTABLE WATER AURe STEAM AND DRAINS WITHIN MACHINERY BOX AUX« STEAM AND DRAINS OUTSIDE MACHINERY BOX AUXILIARY FRESH WATER COOLING FUELS AND LUBRICANTS» HANDLING AND STORAGE SHIP FUEL AND FUEL COMPENSATING SYSTEM AVIATION AND GENERAL PURPOSE FUELS. AVIATION AND GENERAL PURPOSE LUSAICATING OIL LIQUID CARGO TANK HE TING + SPECIAL FUEL AND LUBRICANTS+HANDLING AND STOWAGE AIR» GAS» ANO MISC. FLUID SYSTEMS. COMPRESSED AIR SYSTEMS COMPRESSED GASES 02 N2 SYSTEM LP Low FIRE EXTINGUISHING SYSTEMS 956 957 553 560 561 562 563 564 565 566 567 368 570 571 572 573 874 5au 581 582 583 584 585 506 587 588 589 590 591 592 593 594 595 596 597 598 599 60) oul ou2 603 604 605 610 li 612 SHIP WORK BREAKDOWN STRUCTURE TITLE HYDRAULIC FLUID SYSTEM LIQUID GASES *CARGO SPECIAL PIPING SYSTEMS SHIP CONTROL SYSTEMS STEERING AND DIVING CONTROL SYSTEMS Rut 3ER HOVERING AND DEPTH CONTROL (SUBMARINE) TRIM SYSTEM (SUBMARINES ) + TRIM AND HEEL SYSTEMS (SURFACE SHIPS) DIVING PLANES AND STABILIZING FINS (SUBMARINES) + STRUT ANO FOIL SYSTEMS Mat’ YERING SYSTEMS UNC JAY REPLENISHMENT SYSTEMS REPLENISHMENT-AT-SEA SYSTEMS SHIP STCWES AND EQUIP. HANDLING SYSTEMS CARGO HANDLING SYSTEMS VERTICAL KEPLENISHMENT SYSTEMS MECHANICAL HANDLING SYSTEMS ANCHOR HANDLING ANO STOWAGE SYSTEMS MOORING AND TOWING SYSTEMS + BOATS+BOAT HANOLING AND STOWAGE SYSTEMS MECHANICALLY CPFRATED DOOR »+GATR +RAMP» TURNTABLE SYS« ELEVATING AND RETRACTING GEAR AIRCRAFT RECOVERY SUPPORT SYSTEMS AIRCRAFT LAUNCH SUPPORT SYSTEMS AIRCRAFT HANDLINGs SERVICING AND STOWAGE MISCELLANECUS MECHANICAL HANDLING SYSTEMS SPECIAL PURPOSE SYSTEMS SCIENTIFIC AND OCEAN ENGINEERING SYSTEMS SWIMMER ANO DIVER SUPPORT AND PROTECTION SYSTEMS ENVIRONMENTAL POLLUTION CONTROL SYSTEMS SUBMARINE RESCUE+ SALVAGE» AND SURVIVAL SYSTEMS TOWING» LAUNCHING AND HANDLING FOR UNOERWATER SYS« HANDLING SYS. FOR DIVER AND SUBMERSIBLE VEHICLES SALVAGE SUPPORT SYSTEMS AUXILIARY SYSTEMS OPERATING FLUIDS AUXILIARY SYSTEMS REPAIR PARTS AND TOOLS GROUP 6 OUTFIT AND FURNISHINGS OUTFIT AND FURNISHINGS» GENERAL GENERAL ARRANGEMENT - OUTFIT AND FURN« DRAWINGS HULL DESIGNATING AND MARKING DR/7T MARKS LOCKS+ KEYS+ AND TAGS RODENT AND VERMIN PROOFING SHIP FITTINGS HULL FITTINGS RAILS* STANCHIONS+ AND LI INES 613 620 621 622 623 624 625 630 631 632 633 634 635 636 627 638 639 640 641 642 643 644 645 65u 651 652 653 654 555 656 660 661 662 602 664 665 670 671 672 673 690 698 699 SHIP WORK BREAKDOWN STRUCTURE TITLE RIGGING AND CANVAS HULL COMPARTMENTATION NON~STRUCTURAL BULKHEADS FLOOR PLATES AND GRATINGS LADDERS NON=STRUCTURAL CLOSURES AIRPORTS» FIXED PORTLIGHTS+ AND WINDOWS PRESERVATIVES AND COVERINGS PAINTING ZINC COATING CATHODIC PROTECTION OECK COVERING HULL INSULATION HULL_DAMP ING SHEATHING REFRIGERATED SPACES RADIATION SHIELOING LIVING SPACES, OFFICER BERTHING AND MESSING SPACES NONCOMMISSIONED OFFICER BERTHING AND MESSING SPACES ENLISTED PERSONNEL BERTHING AND MESSING SPACES E SANITARY SPACES AND FIXTURES * LEISURE AND COMMUNITY SPACES SERVICE SPACES COMMISSARY SPACES MEDICAL SPACES. DENTAL S>ACES UTILITY SPACES LAUNDRY SPACES, TRASH DISPOSAL SPACES WORKING SPACES OFFICES MACHIKERY CONTROL CENTERS FURNISHINGS ELECTRONICS CONTROL CENTERS FURNISHINGS DAMAGE CONTROL STATIONS WORKSHOPS °LABS+TEST AREAS(INCL PORTABLE TOOLS+EQUIP) STOWAGE SPACES LOCKERS AND SPECIAL STOWAGE STOREROOMS ANO ISSUE ROOMS CARGO STOWAGE SPECIAL PURPOSE SYSTEMS OUTFIT AND FURNISHINGS OPERATING FLUIDS OUTFIT AND FURNISH REPAIR PARTS AND SPECIAL TOOLS 700 701 702 743 71€ mL 712 713 720 721 722 123 724 728 726 727 728 729 730 731 732 733 740 Tar TH? 743 75u 751 752 753 754 160 761 162 763 770 772 7173 78u 782 783 790 792 793 797 798 799 SHIP WORK BREAKDOWN STRUCTURE TITLE GROUP 7 ARMAMENT Teeter ARMAMENT» GENERAL GENERAL ARRANGEMENT ~ WEAPONRY SYSTEMS ARMAMENT INSTALLATIONS. WEAPONS HANDLING AND STOWAGE» GENERAL GUNS AND AMMUNITION GUNS AMMUNITION HANDLING AMMUNITION STOWAGE MISSILES AND ROCKETS LAUNCHING DEVICES (MISSILES AND ROCKET": MISSILEs ROCKET» AND GUIDANCE CAPSULE * “ JLING MISSILE AND ROCKET STOWAGE MISSILE HYDRAULICS MISSILE GAS MISSILE COMPENSATING MISSILE LAUNC.s€R CONTROL MISSILE HEATING» COOLING, TEMPERATURE CONTROL MISSILE MONITORING? TEST AND ALINEMENT MINES MINE LAUNCHING DEVICES MINE HANDLING MINE STOWAGE DEPTH CHARGES DEPTH CHARGE LAUNCHING DEVICES DEPTH CHARGE HANDLING DEPTH CHARGE STOWAGE TORPEDOES Tor 2€D0, TUBES TORPEDO HANDLING TORPEDO STOWAGE SUBMARINE TORPEDO EJECTION SMALL ARMS AND PYROTECHNICS SMALL ARMS AND PYROTECHNIC LAUNCHING DEVICES. SMALL ARMS AND PYROTECHNIC HANDLING SMALL ARMS AND PYROTECHNIC STOWAGE, CARGO MUNITIONS CARGO MUYITIONS HANDLING CARGO MUNITIONS STOWAGE AIRCRAFT RELATED WEAPONS AIRCRAFT RELATED WEAPONS HANDLING AIRCRAFT RELATED WEAPONS STOWAGE SPECIAL PURPOSE SYSTEMS SPECIAL WEAPONS HANDLING SPECIAL WEAPONS STOWAGE MISC+ ORDNANCE SPACES ARMAMENT OPERATING FLUIDS ARMAMENT REPAIR PARTS AND SPECIAL TOOLS SYSe aor 802 803 804 a6 10 811 12 813 320 830 831 332 83 834, 835 836 837 838 839 Bau 841 aa2 843 844 845 as0 a51 852 853 854 855 856 857 aes as9 ago as. 92 493 aga 895 896 897 SHIP WORK BREAKDOWN STRUCTURE TITLE sree eee INTEGRATION/ENGINEERING (SHIPBUILOER RESPONSE) MAE TESS AAS SEES EE RESO REEAa ERED eRAEEEEE REET EEE EEN ET INI EGRAT ION/ENGINEERING(SHIPBUILDER RESPONSE? SHIPBUILDERS INFORMATION DRAWINGS CONTRACT DRAWINGS. STANDARD DRAWINGS. TYPE DRAWINGS STUDY DRAWINGS PRODUCTION ENGINEERING CONFIGURATION MANAGEMENT CHANGE FROPOSALS» SC" iG AND SHIPCHECKING PLANNING AND PRODUCTI‘. CONTROL SPECIAL DRAWINGS FOR NUCLEAR PROPULSION SYSTEMS DESIGN SUPPORT CONSTRUCTION DRAWINGS SPECIFICATIONS WEIGHT ENGINEERING COMPUTER PROGRAMS ENGINEERING CALCULATIONS MODELS AND MocKUPS PHOTOGRAPHS DESIGN/ENGINEERING LIAISON LOFTING QUALITY ASSURANCE TESTS AND INSPECTION» CRITERIA. AND PROCEDURES TRIALS AGENDA PREPARATION DATA COLLECTION AND ANALs INCLINING EXPERIMENT AND TRIM OIVE COMEAT SYSTEMS CHECKOUT CRITERTA AND PROCEDURES CERTIFICATION STANDARDS INTEGRATED LOGISTIC SUPPORT ENGINEERING MAINTENANCE SUPPORT AND TEST EQUIPMENT SUPPLY S'JPPORT TRANSPORTATION ENGINEERING DRAWINGS AND SPECIFICATIONS TECHNICAL MANUALS AND OTHER DATA FACILITIES PERSONNEL AND TRAINING TRAINING EQUIPMENT SPECIAL PURPOSE ITEMS SAPTTY HUMAN FACTORS STANDARDIZATION VALUE ENGINEERING RELIABILITY AND MAINTAINASILITY DATA MANAGEMENT PROJECT MANAGEMENT gue 901 980 981 982 983 984 985 9e5 987 388 983 990 991 992 993 994 995 796 SHIP “ORK BREAKDOWN STRUCTURE TITLE GROUP 9 SHIP ASSEMBLY ANO SUPPORT SERVICES SEBO IONE a EE IEEE EER SHIP _ASSEMBLY AND SUPPORT SERVICES 901 THRU 979 RESERVED FOR IDENT. OF ASSEMBLIES CONTRACTUAL AND PRODUCTION SUPPORT SERVICE INSURANC? TRIALS DELIVERY OPEN AND INSPECT (CONVERSIONS ONLY) FIRE AND FLOCNING PROTECTION TESTS AND INS + TION WEIGHING, AND :._ORDING CONTRACT DATA REQUIREMENTS (ADMINISTRATION) FITTING-OUT CONSTRUCTION SUPPORT STAGING» SCAFFOLDING» AND CRIPAING TEMPORARY UTILITIES AND SERVICES MATERIAL HANDLING AND REMOVAL, CLEANING SERVICES MOLDS AND TEMPLATES» JIGS» FIXTURES, AND SPEC. TOOLS LAUNCHING DRYDOCKING

You might also like