Preassembly and Welding FGD: EIM-POS-02-298

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Form

DATE:
CONTROL POINTS Yes No N/A Verified by
Preassembly
1. Control of components reception
2. Qualification of welders according to a qualified WPS
3. Fit-up dimension control
4. Reinforcement installed before welding
5. Welding sequence to avoid deformations
6. Preheating
Welding of FGD
REMARKS
EIMISA Owner : AES GENER
Jefe de Terreno Client : MITSUBISHI
Project : Guacolda Power
Signature Signature Signature Plant Unit 5, Mechanical
Installation Works
Name: Name: Name Contract N ::
Date: Date Date Work Code :
PREASSEMBLY AND WELDING
FGD
Register N
1
8/30/2014
WPS: EI-C-13
REFERENCE DRAWINGS: Rev.
PROJECT: YPK-I-210_Guacolda Power Plant Unit 5, Mechanical Installation Works
EIM-POS-02-298
AREA: FGD PROCESS: S.M.A.W
FILLER MATERIAL: E7018 DESCRIPTION :
WPS
HLD-10 HOT SIDE 141 E-016 10/8/2011 EI-C-40-233
Layer Drawings Joint Welder Date mm.
EI-C-40-233
HLD-10 HOT SIDE 143 E-016 10/13/2011 EI-C-40-233
HLD-10 HOT SIDE 142 E-016 10/8/2011
EI-C-40-233 HLD-10 HOT SIDE 144 E-016 10/13/2011
EIMISA
Supervisor
Jose Luis Candia Boris Arias
8/30/2014 8/30/2014 298
MITSUBISHI
ITO