HANDLING AND RUNNING BEST PRACTICES for Sumitomos High Alloy Materials With VAM Connection
Occupation
R&D Assistant Manager R&D Manager Section Manager
K.SUMITANI
July 2012
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 1/15
G2593 R6
General
This document defines the recommended practices applicable to handling, running and storage of Sumitomos High Alloy Materials. These materials used for different types of corrosive applications are split into 3 main groups: Martensitic: 13Cr, SM13CrS, SM13CrM, SM13CrI Duplex: SM22Cr, SM25Cr, SM25CRW Austenitic and Ni based: SM2535, SM2242, SM2550, SM2050, SMC276 R6
While the basic recommendations detailed in ISO10405 Petroleum and natural gas industries Care and use of casing and tubing remain the foundation for handling, storing and running practices, this document is a compilation of best in class practices based on prior experiences in handling storing and running high alloy materials. The key issues differentiating handling and running of High alloy materials versus Carbon or low alloy steels are: Atmospheric corrosion susceptibility of the martensitic materials Localized corrosion susceptibility in combined presence of Oxygen and Chlorides Specific care to be maintained at all time while handling as well as while in storage to reduce potential spot hardening and imbedded carbon steel contamination since this may affect the corrosion resistance of the material. Galling susceptibility of thread and seals while making up and breaking out.
Martensitic materials are susceptible to corrosion while in storage in a wet and saline atmosphere. Storage away from the sea shore or indoors in dry conditions is highly recommendable. Typically the pipe OD will be un-de-scaled and coated, while the ID will be de-scaled and coated. The remaining OD scale will provide some protection against atmospheric corrosion while in storage, however routine control of coating OD & ID condition will be carried out to ensure the absence of corrosion initiation. The control frequency will be adjusted depending upon the specific storage conditions. Please refer to paragraph I-4-1
Page 2/15
G2593 R6
The galling susceptibility of these materials is commensurate with their alloying elements (specifically Cr & Mo), and consequently require an even tighter control while running or pulling than the martensitic materials.
I.
General In order to retain the original materials corrosion resistance properties, adherence to this procedures requirements and recommendations is highly recommendable. High alloy materials are manufactured under stringent quality control to obtain the desired corrosion resistance. Improper handling may result in affecting the material performances and by extension their corrosion resistance. It is then recommendable that operators strictly adhere to the recommendations detailed in this document 1. 2. 3. 4. Never use direct-flame heating or welding Do not attempt to straighten a bent pipe. Please consult with an SMI rep. Use non marking tong system and lifting equipment inclusive of slips Never hammer the pipe
- Care shall be exercised to avoid for box ends to hang over. 3) Adequate supervision should be exercised at any point of loading and unloading
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 3/15
G2593 R6
I2.
Handling
1) Prevention of Iron Contamination Usage of unpadded hooks, chains, rails, unprotected wire slings is prohibited, and contact between pipes and carbon steel shall be avoided whenever possible. Qualitative judgment needs to be exercised to differentiate what is an acceptable form of contamination from what is not acceptable: Superficial C. steel contamination cannot be prevented during transportation and storage because of the immediate vicinity of C steel surfaces. Superficial C. Steel contamination has no detrimental effect on the integrity of CRA materials, and this type of contamination can be easily removed with Scotch Brite pads, even though this is not a necessity Imbedded C. steel contamination into the CRA matrix may become a preferential corrosion initiation point and needs to be cleaned off. For new unused material the only instance where this situation could occur would be in cases of: Handling or transportation incident where the pipe body scraped against a metallic section in which case repairs is advisable (Please refer to Para I-5) Uncontrolled usage of unprotected steel sling, in which case removal of the C steel contamination is advisable. (Please refer to Para I-5) R6
Prevention of Spot Hardening Stress concentration induced by spot hardening has a detrimental influence on the SSCC/SCC resistance of materials. To prevent such damages, it is recommended that materials should be kept in the original packing system until its usage. All pipe movements should be carried out in such a way to avoid damage. Please refer to I-2-3. The following precautions should be taken in handling pipe during unloading, loading, and inspection 1. Before any pipe movement ensure there is no untied protectors. In case of handling small size loose R3 tubing, in order to prevent bending, usage of a lift bar is recommendable. 2. Loose pipe handling should be restricted to 3 or 4 pipes maximum at any given
3)
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 4/15
G2593 R6
3. 4.
time to avoid pipe striking against each others. Set on racks protected with hard wood or plastic dunnage. Concerning hard wood quality please refer to I-3-2 Do not drop pipe down onto racks while unloading. The pipes should be handled carefully with lifting only one joint/bundle/RAP frame at a time and set on racks with proper supports. Avoid rough handling, which may produce damages. In case any transportation damage is detected upon arrival of the pipe cargo, it is recommended to quarantine the suspect material for additional inspection.
I3.
Storage
The following storage and related handling precautions shall be maintained at all times: 1. Never unload pipe directly onto ground, steel rail or bar, or concrete floors. To keep moisture and dirt away from pipe, the first tier of pipes should be stored to a sufficient height (at least 18 inches) from the ground. In desert conditions this height may be increased to avoid sand drifts to reach the bottom pipe row. Wooden stringers or strips fumigated by products containing either chlorine or bromide are unsuitable as dunnage, and its usage prohibited. Pipe should rest on skid racks properly spaced to prevent bending of pipe or damages to threads. For R3 length a 4 supports skid rack will be used. Dunnage must be placed between each row of pipe to prevent metal to metal contact of pipes and couplings. Dunnage shall be thick enough to allow for lifting slings or padded fork lift arms to fit in. For loose pipes, stagger adjoining pipes by a coupling length to allow each layer to remain parallel. Block each loose pipe row by nailing a wedge block at both ends of the dunnage spacer. For RAP frames stacking height will be restricted to 3 frames, and the frame elements staggered for good weight distribution. If open end protectors are used, in order for rain water to drain, the rack supports will be sloped by 2% minimum. The pin end will be located down slope. The storage recommendations are dependant upon the climate and environmental conditions of the storage yard. Example of critical conditions requiring corrective action (non exhaustive) - Air borne Industrial pollutants (cement dust, chemicals) - Sea spray, or air borne beach sand - Sand drifts reaching the bottom pipe row. Under the above conditions either indoor warehousing or the storage location needs to be reconsidered; R6
2. 3.
4. 5. 6 7 8.
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 5/15
G2593 R6
I-4
Storage management
a) b) c) The Yard shall be managed on a First In-First Out basis. Whenever possible pipes should be stored as far away as possible from C steel pipe in order to prevent air borne iron contamination. Identification marks shall be kept legible and if required re-applied.
I-4-1Inspection
The purpose of inspecting stored material is to maintain material traceability, and ensure that protection against corrosion remains efficient 1. The stored material will be inspected on an established frequency to be defined based on the type of material, and the storage conditions. The following table is an attempt to define the level of corrosion criticality while in storage versus climatic conditions on a scale from 0 to 10.
R6
Environment Hot&Humid
Temperate 4x 6x
Hot&Dry
Inland Coastal
6* 10*
4* 6*
2x 4x
Note: (*) Preferential corrosion initiation is likely to develop on the upper half of the pipe OD, as the mill varnish will be eventually burnt out by sun UVs. (x) preferential corrosion initiation is likely to develop at the interface between pipe OD and dunnage. 2 Storage being the most critical period of Martensitic material life cycle, specific attention will be given to corrosion initiation of the OD. As long as quality closed end protectors are in usage (avoiding water seepage), inspection of ID and threaded ends can be carried out on a much less frequent cycle than ODs; typically 10% of the protectors (not the same 10% at each inspection cycle) will be removed to verify threaded end and pipe ID condition. For critical storage conditions (identified as 10 per the above table), suggested inspection frequency is every 3 months. For level 6 per the above table, suggested inspection frequency is once per Year. Material showing degradation of the surface coating per below pics, will be required to undergo detailed inspection and reconditioning per Para I-4-2. Duplex, Austenitic and Ni based materials are much less susceptible to corrosion initiation while in storage and establishment of a regular inspection is recommended under worst storage conditions ie Coastal in hot and humid climate. Applicable to all material types, remedial action will be taken when either dried storage dope, fading identification marks and untied protectors are found. R6
Arctic
R6
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 6/15
G2593 R6
I-4-2 Reconditioning of unused Martensitic material showing signs of surface R6 coating degradation.
The below pics illustrate the type of OD coating degradation, eventually leading to pitting initiation.
Ideally the following sequence of events should be followed, but depending upon the available equipment set up, variations remain acceptable as long as inspection of the remaining wall thickness after removal of the corrosion, as well as recoating of the OD and re-stenciling the pipe identification is carried out. 1. Record all relevant pipe information, and maintain pipe traceability throughout the process 2. Load tubulars from preparation rack onto wire brush machine. 3. Brush the tubular externally to achieve ST 2 (Swedish Standard, ISO 8501-1 1988) 4. Load tubular onto full length inspection unit (EMI or UST). 5. Any indication of localized corrosion will be ground smooth until complete visual removal of the defect. The repaired pipe will then be re inspected through the full length inspection unit to ensure that the remaining wall is within specification. If this condition is not met the pipe is rejected. 6. Move tubular from inspection unit to OD coating area. 7. Stencil all relevant pipe identifications and if relevant re-colour code pipe body. 8. Apply specified coating 9. Touch up roller marks and allow coating to dry. 10. Install bumper rings on pipe body, if applied upon arrival. 11. Transport tubular from finishing rack to or transport/storage frame.
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 7/15
G2593 R6
R6
R6
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 8/15
G2593 R6
R6
b) c)
A power grinder shall be used for the removal of imbedded C. Steel contamination. The abrasive wheel will be No. 36 or finer, and shall not contain Iron or Iron oxides. The complete removal of the contamination will be visually confirmed The repair work should be carried out at sufficient distance (min 20 Meters) away from the other pipes to avoid any contaminations on pipes in vicinity. The operator carrying out this work shall have prior experience in handling specialty materials and will have undergone the specific SMI induction course on CRA material inspection practices. Grinding shall be performed in successive passes in order to avoid excessive material removal. The ground area shall blend uniformly with the surrounding surface as follows: Rounded bottom with a large radius Smooth transition to the original contour No discernible edges present. Upon completion of a repair, the ground area will be wiped clean with a cleaning solvent (such as Acetone), then visually inspected, to verify the complete removal of contamination. The remaining wall thickness after completion of repairs shall be measured using a calibrated UWT. If the remaining wall thickness measured value falls below the specified minimum wall thickness, the part shall be cropped off or the tube shall be rejected. The remaining pipe OD measured from the deepest point of repair will be measured using a calibrated caliper vernier. If the remaining OD measured value falls below the specified minimum OD, the part shall be cropped off or the tube shall be rejected.
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 9/15
G2593 R6
II.
Adherence to the procedures detailed in the below sections is highly recommendable. The following are critical bullet points: 1) 2) 3) 4) Prior to doping, threads and thread protectors must be absolutely clean, free of grit, nicks, or any other debris or iron powder from magnetic particle inspection Avoid thread damage by keeping protectors in place during all handling operations Only Use clean approved thread compound Use soft bristle brush for applying dope. Never use any type of metal brush. Prior to running or pulling out, ensure that the elevator/traveling block are correctly aligned with the rotary table. If substantial misalignment is found, it is advisable to request a rig trim up. Alignment is a critical criteria when running high alloy material. Stab vertically. Ideally make up to hand-tight position by hand or pipe wrench (strap wrench) Alternatively whenever local regulations do not allow for operators presence on the rig floor, rotate counter clock wise with power tong until the pin bumps up, then reverse the make up direction Usage of weight compensator is advisable for R2/R3 length pipes and highly recommendable for multiple lengths (stands). Keep the rotation speed below 5 RPM, and adhere to the recommended torque values. Verify that the torque gauge has been calibrated recently (< 2 months). It is advisable for critical or new material applications, to contract Vam Services engineer to help the operators crew in going through the learning curve in handling and running High value materials.
5)
6) 7) 8) 9)
2)
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 10/15
G2593 R6
gauge and a monitoring system having the following functions: - Load cell with electronic strain gauge - Hydraulic dump valve system activated automatically, when reaching the pre set optimum torque. - Monitoring system that graphically displays and records the torque turn Note: SMI maximum allowable die penetration criteria for CRA material is 0.3mm. 4) Stabbing Guide Stabbing guide shall be used when running or pulling high alloy materials. Thread Compound Only Use clean approved thread compound Never use any type of compound containing teflon particles Never mix the thread compound with any chemical. Cleaning materials Clean thread and seal area completely using preferably steam gun or approved solvent. Do not use oil based solvent such as gasoline or diesel. Use rags or bristle brush when cleaning. Blow dry the threads and seals insuring that no foreign material remains in the thread root. R6
5)
6)
2. Preparation Procedure of Pipes Details of preparation procedure are as follows : Unpacking 1. Pipes should be transferred to well site in the original packing system. Pick up Pipes 1. 2. 3. Remove Protectors 1. 2. Blow out the inside of pipe from box end to pin end to remove eventual foreign particles. Protectors should be cleaned, dried with compressed air and kept clean for re-use. Use non metallic or nylon encapsulated slings to lift the pipe. Pipe should be put on rack allowing space to permit for easy access for cleaning and inspection Use dunnage for the rack and between each pipe row
Drift 1. Drift from box end to pin end being careful not to damage threads, seal or shoulder. Usage of a Teflon coated drift or
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 11/15
G2593 R6
2. 3.
non metallic mandrel is mandatory. Drift through the protector in place when open end driftable protectors are used. Keep the drift clean
Measuring Length 1.Measure pipe end to pipe (from coupling end to pin end) 2.Subtract the Make-up loss value indicated in the VAM Running Book
Clean Thread 1. Clean thoroughly pin and box threads Use steam, fresh water or solvents Do not use oil or wire brush for cleaning Dry thread ends, and protectors using compressed air
Inspect visually thread, seal and shoulder. Minor thread damage can be field repaired by a qualified Vam Service or SMI representative. Any damage on the seal area is a cause for reject.
1. 2.
Stir the dope thoroughly before usage Apply approved thread Compound on pin (1/3) and box (2/3) uniformly using a soft bristle brush
Install Protector 1 Install clean thread protector Next Row 3. Preparation of Accessories Since accessories (hangers, safety valves, flow couplings, pup joints, crossovers) lengths are substantially shorter than standard pipe length, as well as often made from different metallurgies, material strengths, the standard practice is to make up these accessories into sub assemblies prior to the completion running, using a quality buck on machine. Usually the made up sub assemblies are pressure tested prior to their release.
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 12/15
G2593 R6
II 2. Running Procedure
Details of VAM running procedure for these materials are as follows: Pick up Joint to V-door 1. Pick up one joint at a time following the procedure in paragraph II-1-1
Pick Joint to Rig Floor 1. Pick up the joint using pick up elevator Check Thread and Seal 1. 2. 3. 4. Stabbing 1. 2. 3. Install stabbing guide before stabbing the pin in. Stab vertically & slowly with stabbers assistance (if applicable) in maintaining alignment. In conditions where rules and regulations prohibits the presence of a stabber, control and maintenance of pipe alignment throughout stabbing, and thread engagement will be exercised by every possible mean. Remove the pin protector just before stabbing If undoped, visually check the pin thread and seal for any damage If already doped check the pin thread and seal by running a finger over the surface. If undoped, apply dope.
Making-up 1. Hand Tight (Preferred) Tighten up the joint several turns by hand or strap wrench until difficult to turn Whenever hand tight is not possible Rotate counter clock wise with power tong until the pin bumps up, then reverse the make up direction, at 5 rpm Max or lower if the running conditions are not ideal (misalignment). Power Tight make up in low gear at 5 rpm Max, and make up to the recommended torque value. Ensure that pipe is properly aligned during the whole make up phase. Check torque value and torque-turn curve. Assemblies showing incorrect make up torque value or abnormal torque-turn pattern must be broken out, both threaded ends cleaned and visually inspected. When using standard dies, check for tong die marks and slip marks on pipe. If the die penetration is too important, take corrective action
2.
3.
4. 5.
6.
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 13/15
G2593 R6
II 3. Breaking-out Procedure
Break-out 1. 2. 3. Set the back-up tong on the lower half of the coupling Break out in low gear for first two turns at 2 RPM Max Ideally, at final breakout stage, switch from power tong to strap wrench to disengage the threads. Alternatively, spin out at Max 5rpm or lower if the running conditions are not ideal (misalignment), until the pin bumps into the box. 4. Ensure that pipe is properly aligned during the whole break out phase with stabbers assistance if applicable. 5. Install stabbing guide before lifting up the pin end from the box. Lift pipe slowly while avoiding damage to the pin seal area.
Install Thread Protector 1. Install clean thread protector Lay Down/ Stand Back 1. Stand back pipe on wooden matting Cleaning As soon as practical 1. Rinse pipe internally and externally with fresh water 2. Dry out pipe using compressed air 3. Check thread and pipe body internally and externally 4. Apply thread dope or storage compound on pin and box thread completely
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 14/15
G2593 R6
Brine applications identified with are NO GO areas Brines identified with are acceptable for Completion & packer fluid applications Brines identified with may be acceptable for short term completion fluid applications. Addition of corrosion inhibitor, biocide, and oxygen scavenger is recommended but these additives long term stability will be carefully ascertained prior to usage. Whenever possible an oil base solids free packer fluid will be preferred
Not to be distributed without prior written authorization without Sumitomo Metal Industries,Ltd.
Page 15/15