Lifting Study Calculation HaGun
Lifting Study Calculation HaGun
Lifting Study Calculation HaGun
RIGGING DEPARTMENT
ANALYZE AND PLANED ACTIVITY FOR LIFTING AND ERECTION WORK
START DATA MATERIAL 1. DIMENSION 2. WEIGHT
01. OBJECTIVE Rigging Study of Lifting Power Control Centers. 02. SCOPE OF APPLICATION Rigging study is describe the guidelines and operating step of Lifting Power Control Centers. 03. REFERENCE 1. HaGun Engineering RIGGING DEPARTMENT REFERENCE 04. EQUIPMENT No Equipment 01 Crawler Crane 02 Boom Length 48 meter 03 Trailer 05. RIGGING TOOLS No Equipment 01 Sling dia. 1.5" x 13 M 02 Chain Block 03 Shackle SWL 04 Manila Rope 7/8"x10M 06. SAFETY REQUIREMENTS No Equipment 01 Safety Barricade Red White 02 Safety Cone 07. SAFETY FACTOR CALCULATION No Equipment 01 Weight of material 02 Crane Block 03 Wire Sling 04 Spreader Beam 05 Shackle 06 Total Weight 07 Crane Capacity 08 Safety Factor
7.
REFERENCE 1. RIGGING BOOK 2. EQUIPMENT MANUAL 3. ASME B30.5-2004 Mobil & Locomotive cranes 4. ASME B30.6-2003 Derrick 5. ASME B30.10-1999 Hook 6. ASME B30.21-2005 manually lever operated hoist ASME B30.24-2003 Safety standard for cranes,derrick, hoist, jacks, and Sling 8. ASME B30.26-2004 Rigging Hardware 9. BS EN 5973 Scaffolding 10. Australian Standard, AS 3569--1989, Wire ropes 11. Australian Standard, AS 2759--1985, Wire ropes
No MONO CRANE
TAILING DESIGN
Risk
BO
Yes
OM
48
ME TER
3 METER SLING 1
ACTION
CONTROL
Final Inspection by HaGun Engineering Yes Prepare Final Report for ApprovaL Handover FINISH
20000
01. OBJECTIVE Rigging Study of Lifting Gasifier. 02. SCOPE OF APPLICATION Rigging study is describe the guidelines and operating step of Lifting Gasifier. 03. REFERENCE 1. HaGun Engineering RIGGING DEPARTMENT REFERENCE 04. EQUIPMENT No Equipment 01 Crawler Crane 02 Boom Length 57 meter 05. RIGGING TOOLS No Equipment 01 Sling dia. 1.5" x 8 M 02 Chain Block 03 Shackle SWL 04 Manila Rope 7/8"x100M 06. SAFETY REQUIREMENTS No Equipment 01 Safety Barricade Red White 02 Safety Cone 07. SAFETY FACTOR CALCULATION No Equipment 01 Weight of material 02 Crane Block 03 Wire Sling 04 Spreader Beam 05 Shackle 06 Total Weight 07 Crane Capacity 08 Safety Factor
LIFTING STUDY OBJECT 40 TON BY CRAWLER CRANE 150TON OVER ELEVATION 32 METER
SLING
BOOM 57 ME
FL+32000
TER
FL+29400
FL+26400
FL+23700
FL+16000
SF =
49.50 42.23
= 1.17
RIGGING DEPARTMENT
ANALYZE AND PLANED ACTIVITY FOR LIFTING AND ERECTION WORK
START DATA MATERIAL 1. DIMENSION 2. WEIGHT REFERENCE 1. RIGGING BOOK 2. EQUIPMENT MANUAL ASME B30.5-2004 Mobil & Locomotive cranes 4. ASME B30.6-2003 Derrick 5. ASME B30.10-1999 Hook 6. ASME B30.21-2005 manually lever operated hoist ASME B30.24-2003 Safety standard for cranes,derrick, hoist, jacks, and Sling 8. ASME B30.26-2004 Rigging Hardware 9. BS EN 5973 Scaffolding 10. Australian Standard, AS 3569--1989, Wire ropes 11. Australian Standard, AS 2759--1985, Wire ropes 12. AWS Dl4.1/D14.1M:2005 Specification for Welding of Industrial and Mill Cranes and Other Material Handling Equipment 3.
R max 14000 mm
7.
Yes
TAILING DESIGN
Risk
ACTION
CONTROL
Final Inspection by HaGun Engineering Yes Prepare Final Report for ApprovaL Handover FINISH
No
R1
40
00
Main Crane: Crawler Crane Terex Demag CC8800-1 Capacities 1600 ton Length of boom is 108 m. Counter weight is 640 t. Radius operational 30 m with capacity 613 t. Equipment to be lifted is 582 T. From analyze we find safety factor is 1,05. Tailing Crane: Crawler Crane Terex Demag cc2400-1 Capacities 440 ton Length of boom is 118.1 ft. Counter weight is 352.7klb + 88.2 klb ZB. Radius operational 23.0 ft with capacity 679.0. Equipment to be lifted is (582/2 = 291 ton) T. From analyze we find safety factor is 1,05.
01. OBJECTIVE Rigging Study of Lifting Gasifier. 02. SCOPE OF APPLICATION Rigging study is describe the guidelines and operating step of Lifting Vessel 590 ton. 03. REFERENCE 1. HaGun Engineering RIGGING DEPARTMENT REFERENCE 04. EQUIPMENT No Equipment 01 Crawler Crane 02 Boom Length 108 meter 05. RIGGING TOOLS No Equipment 01 Sling 02 Shackle SWL 04 Manila Rope 7/8"x100M 06. SAFETY REQUIREMENTS No Equipment 01 Safety Barricade Red White 02 Safety Cone 07. SAFETY FACTOR CALCULATION No Equipment 01 Weight of material 02 Crane Block 03 Wire Sling 04 Spreader Beam 05 Shackle 06 Total Weight 07 Crane Capacity 08 Safety Factor
Capacities
SF =
613.0 594.1
= 1.03
R3
00
00
LIFTING STUDY OBJECT 7.5 TON BY MOBILE CRANE 160TON ON OPERATING RADIUS 14 METER
Maximum Allowable Wind Speed is Steel plates 1.5m x 6m x 20 mm thickness for out rigger
LIFTING STUDY OBJECT 75 TON BY CRAWLER CRANE 550TON ON OPERATING RADIUS 24 METER
R24000
01. OBJECTIVE Rigging Study of Lifting Gasifier. 02. SCOPE OF APPLICATION Rigging study is describe the guidelines and operating step of Lifting Vessel 75 ton. 03. REFERENCE 1. HaGun Engineering RIGGING DEPARTMENT REFERENCE 04. EQUIPMENT No Equipment 01 Crawler Crane 02 Boom Length 42 meter 05. RIGGING TOOLS No Equipment 01 Sling dia. 2.5" x 8 M 02 Shackle SWL 04 Manila Rope 7/8"x100M 06. SAFETY REQUIREMENTS No Equipment 01 Safety Barricade Red White 02 Safety Cone 07. SAFETY FACTOR CALCULATION No Equipment 01 Weight of material 02 Crane Block 03 Wire Sling 04 Spreader Beam 05 Shackle 06 Total Weight 07 Crane Capacity 08 Safety Factor
SF =
86.4 78.1
= 1.11