CC Road Model Estimate With SSR 2012-13 Excel

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 18

Name of the Work:

Laying of CC Road in --------------------------- village of ----------------------- Mandal

Grant:- MRR 2012-13


Est. Cost :- Rs. 100.00 Lakhs
(------------------(H) to ---------------------------(H))
GSB
Length
410
Width
4
CC
Length
Width
thick
Quary
Metal
Sand

410
3.75
0.2

x
y

20
20

(Devunuri Ramesh (H) to I. Rajamouli (H

unuri Ramesh (H) to I. Rajamouli (H))

SPECIFICATION REPORT
Specification report accompanying the detailed estimate for the work

Laying of CC Road in --------------------------- village of ----------------------- Mandal


(Devunuri Ramesh (H) to I. Rajamouli (H))
Est. Cost :- Rs. 100.00 Lakhs

Grant:- MRR 2012-13

The above wok has been administratively santioned for Rs. 15.00 Lakhs vide Proc. No. Plg. III/379/2012,
Dated : 07.11.2012 of Chairperson, Integrated Action Plan, District Level Committee & District Collector, Karimnagar,
under IAP 2012-13 grant.
The estimate is prepared with the following specifications
1
Construction of granular Sub-Base by providing local materials (Table 400.13) spreading in uniform layers with
motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with
smooth wheeled roller to achieve the desired density complete as per Clause 407 as per Technical Specification Clause
408. including overhead charges & Contractor profit, but excluding VAT & Seignorage charges.
2

Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete
pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause
1501.22 M25(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding
25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix
design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film,
wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes,
compacted using needle, screed and plate vibrators and finished in continous operation including provision of
contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near
approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days,
curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification
clause 1501.22 including overhead charges & Contractors profit but excluding VAT & Seignorage charges.

Construction of granular Shoulders by providing local materials (Table 400.13) spreading in uniform layers mixing
by mix in place method as per Technical Specification. including overhead charges & Contractor profit, but excluding
VAT & Seignorage charges.

The estimate is prepared with current Revised SSR 2012-13 and accordingly submitted for Technical
sanction

Asst. Exe.Engineer,
(PR) PIU Sub Division,

Dy.Executive Engineer,
(PR) PIU Sub Division,

Executive Engineer,
(PR) PIU Division,

GENERAL ABSTRACT
Name of the work : Laying of CC Road in --------------------------- village of ---------------------- Mandal
(Devunuri Ramesh (H) to I. Rajamouli (H))
S.No

Item

Amount

Cost of Civil Work

LS For Sign board

Add 5% VAT

83920.00

Seignorage Charges

23991.00

Provision for QC Charges at 0.5%

LS For Unfore-seen items of work

1676403.00
2000.00

TOTAL ESTIMATE COST Rs.

Asst. Exe.Engineer,
(PR) PIU Sub Division,

Executive Engineer,
(PR) PIU Division,

Page 5 of 18

8392.00

1794706.00

Dy.Executive Engineer,
(PR) PIU Sub Division,

DETAILED AND ABSTRACT ESTIMATE


Laying of CC Road in --------------------------- village of ----------------------Name of the work : Mandal
(Devunuri Ramesh (H) to I. Rajamouli (H))
Grant:- MRR 2012-13

Est. Cost :- Rs. 100.00 Lakhs

Sl.
No

Description of Item

Nos

Length

Width

Thick
ness
6

Qty

Rate

Unit

Amount

10

246.00

360.20

Cum

1 Construction of granular Sub-Base by providing local materials (Table 400.13)

spreading in uniform layers with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC and compacting with smooth wheeled roller to
achieve the desired density complete as per Clause 407 as per Technical Specification
Clause 408. including overhead charges & Contractor profit, but excluding VAT &
Seignorage charges.
(------------------(H) to --------------------------(H))

410.00

4.00

0.15

88609.00

2 Construction of un-reinforced, dowel jointed at expansion and construction joint only,

plain cement concrete pavement, thickness as per design, over a prepared sub base,
with 43 grade cement or any other type as per clause 1501.22 M25(Grade), coarse and
fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding
25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate
weigh batcher using approved mix design, laid in approved fixed side form work
(steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel
plates including levelling the form work as per drawing), spreading the concrete with
shovels, rakes, compacted using needle, screed and plate vibrators and finished in
continous operation including provision of contraction and expansion, construction
joints, applying debonding strips, primer, sealant, dowel bars, near approachs to
bridge/culvert and construction joint, admixtures as approved, curing of concrete
slabs for 14 days, curing compound (where specified) and water finishing to lines and
grade as per drawing and technical specification clause 1501.22 including overhead
charges & Contractors profit but excluding VAT & Seignorage charges.

(------------------(H) to ------------------1
--------(H))

410.00

3.75

0.20

307.50
307.50

5036.35 Cum

1548678.00

238.51 Cum

39116.00

3 Construction of granular Shoulders by providing local materials (Table


400.13) spreading in uniform layers mixing by mix in place method as per
Technical Specification. including overhead charges & Contractor profit, but
excluding VAT & Seignorage charges.
(------------------(H) to ------------------2
--------(H))

410.00

1.00

0.20

164.00
164.00
Cum

TOTAL

Rs :

Asst. Exe.Engineer,

Dy.Executive Engineer,

Executive Engineer,

(PR) PIU Sub Division,

(PR) PIU Sub Division,

(PR) PIU Division,

Page 6 of 18

1676403.00

DATA - SHEET (As per 2012-13)


Name of the work : Laying of CC Road in --------------------------- village of ----------------------- Mandal
(Devunuri Ramesh (H) to I. Rajamouli (H))
S.
No.

Index
Code

Desription of Item

Unit

Qty

Rate

Amount

RBR Construction of granular Sub-Base by providing local materials (Table 400.13) spreading in uniform layers with motor
SBBS- grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with smooth
wheeled roller to achieve the desired density complete as per Clause 407 as per Technical Specification Clause 408.
1
including overhead charges & Contractor profit, but excluding VAT & Seignorage charges.

a)

b)

Unit = Cum
Taking output = 300 cum
Labour
Mazdoor (Skilled)
Mazdoor (Unskilled)
Machinery
Motor grader for grading 110 HP @ 50 cum per hour

c)

Vibratory Roller 80-100 KN @ 10 cum per hour


Tractor with rotavator @ 25 cum per hour
Water tanker 6kl capacity
Material
Naturally occurring gravel (Local materials as per Table
400.13)

a)
c)

Water
Basic rate of Granular shoulder for 300 cum
Basic rate of Granular shoulder per cum
Add 14% for over head charges & Contractors profit
(excl.4%VAT)
Add for conveyance for Gravel
Rate per cum

2.48
10.00

285.00
250.00

706.80
2500.00

hour
hour
hour
hour

6.00
30.00
12.00
5.00

920.60
367.00
372.00

0.00
27618.00
4404.00
1860.00

cum

384.00

75.00

28800.00

kl

30.00

0.00

0.00
65888.80
219.63
30.75

cum

1.28

85.80

250.38
109.82

360.20

Cement Concrete Pavement

RBR-CCPV-5

day
day

Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete
pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per
clause 1501.22 M25(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate
not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh
batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing),
spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished
in continous operation including provision of contraction and expansion, construction joints, applying
debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint,
admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water
finishing to lines and grade as per drawing and technical specification clause 1501.22 including overhead
charges & Contractors profit but excluding VAT & Seignorage charges.
Unit = cum
Taking output = 75cum (172.50 t)
(100x3.75 x 0.200)

a)

Labour
Mason (1st class)

day

5.00

315.00

Mason (2nd class)

day

5.00

285.00

1,575.00
1,425.00

Mazdoor (unskilled)

day

150.00

250.00

37,500.00

Mazdoor(skilled)

day

6.00

250.00

1,500.00

Surveyor

day

2.00

285.00

570.00

Mazdoor (semi-skilled)

day

6.00

250.00

1,500.00

Black smith for cutting of dowel bars including removal


of burrs, fabrications & fixing of dowel bars

day

1.00

285.00

285.00
44355.00

b)

Machinery

Page 7 of 18

Concrete mixer 0.28/0.40 cum capacity ( 6 mixers) with


weight batcher and suitable capacity calibrated water
tank
Needle vibrator

Hour

36.00

370.00

13,320.00

Screed vibrator
Plate vibrator

Hour

9.00

40.00

360.00

Hour

9.00

40.00

360.00

Water tanker 6 Kl. Capacity

Hour

5.00

372.00

1,860.00

Air compressor ( 1hour initial + 1 hour final)

Hour

2.00

402.00

Hour

804.00
16,704.00

c)
(I)

(ii)

Material
Crushed stone coarse aggregates, grading will be as per clause 1501.2.4.1 (Table 1500.1) of specifications @
0.90 Cum/cum of concrete
20mm
Cum
44.55
1183.75
52,736.06
10mm

Cum

22.95

811.25

18,618.19

Sand as per IS:383 and conforming to clause 1500.2.4.2.


@ 0.45 cum of concrete
Cement @ 350 Kg/cum of concrete

cum

33.75

335.00

11,306.25

tonne
26.25
4400.00
115,500.00
(iii)
sqm
412.5
15.00
6,187.50
(iv) Polythene sheet 125 micron
(v) Mild steel dowel bar 25mm dia of grade S 240.500 mm long 20 Nos. at culvert/bridge slab and at
construction joiont including 5 percent wastage

(4x20x0.500) + 5 per cent wastage = 42m @ 2.80 Kg per


m = 117.6 kg. (September 2012 Rate)
Bitumen primer @ 200ml. Per joint for 23 joints

Kg

117.6

45.50

tonne

0.005

0.00

0.00

Bitumenous sealant 800 ml. Per joint for 23 joints

Litre

19.00

46.20

877.80

Jute rope 12mm dia including 5 per cent wastage

90.00

5.00

450.00

Debonding strips 3.75m. (length) x 10mm (width) x 5


mm (thick) cut-out of rubber filler board or similar
material including 5 per cent wastage

90.00

9.00

810.00

Polythene sheathing, covering 2/3rd dowel bars (20x23)


and tight fit including 5 per cent wastage

No

483.00

0.50

241.50

Plasticizer 0.5 per cent by weight of cement

Litre

122.00

75.00

9150.00

Curing compound (if used) @ 0.33 litre per sqm

Litre

131.25

123.00

16143.75

Joint filler board 20mm thick as per IS:1838

sqm

3.00

570.00

1710.00

(4x3.75x0.200 = 3 sqm)

5350.8

239081.85
300140.85

(d)

Form work @ 3% on (a+b+c)

9004.23

Cost for 75 cum = a+b+c+d

(e)

309145.08

Rate per Cum = (a+b+c+d+e)/75


Over head charges & contracots profit @ 14.00% on (a+b+c+d)

4121.93

Rate per cum

4699.01

577.07

Conveyance charges

(I)

(ii)

Crushed stone coarse aggregates, grading will be as per clause 1501.2.4.1 (Table 1500.1) of
specifications @ 0.90 Cum/cum of concrete
20mm & 10mm

Cum

0.90

242.60

218.34

Sand as per IS:383 and conforming to clause 1500.2.4.2.


@ 0.45 cum of concrete
Total Conveyance charges

cum

0.45

242.60

109.17
327.51

Conveyance charges per cum

327.51

Form work @ 3% on conveyance charges

9.83

Rate per cum including conveyance

5036.35

RBR Construction of granular Shoulders by providing local materials (Table 400.13) spreading in uniform layers mixing by
SBBS- mix in place method as per Technical Specification. including overhead charges & Contractor profit, but excluding VAT
& Seignorage charges.
1

a)

Unit = Cum
Taking output = 300 cum
Labour
Mazdoor (Skilled)
Mazdoor (Unskilled)

day
day

Page 8 of 18

2.48
10.00

285.00
250.00

706.80
2500.00

b)

Machinery
Motor grader for grading 110 HP @ 50 cum per hour

c)

Vibratory Roller 80-100 KN @ 10 cum per hour


Tractor with rotavator @ 25 cum per hour
Water tanker 6kl capacity
Material
Naturally occurring gravel (Local materials as per Table
400.13)

a)
c)

Water
Basic rate of Granular shoulder for 300 cum
Basic rate of Granular shoulder per cum
Add 14% for over head charges & Contractors profit
(excl.4%VAT)
Add for conveyance for Gravel
Rate per cum

hour
hour
hour
hour

6.00
30.00
12.00
5.00

372.00

0.00
0.00
0.00
1860.00

cum

384.00

75.00

28800.00

kl

30.00

0.00

0.00
33866.80
112.89
15.80

cum

1.28

85.80

128.69
109.82

238.51

Asst. Exe.Engineer,
(PR) PIU Sub Division,

Executive Engineer,
(PR) PIU Division,

Page 9 of 18

Dy.Executive Engineer,
(PR) PIU Sub Division,

LEAD STATEMENT (AS PER SSR 2012-13)


Name of the work : Laying of CC Road in --------------------------- village of ----------------------- Mandal
(Devunuri Ramesh (H) to I. Rajamouli (H))
Sl
No.

Description in Material

Name of the
Quarry

Lead in
Km

Initial

Conveyance
charges

Blasting
Charges

Machine
Crushing
Charges

Total Amount with out


seignorage &
conveyance charges

Gravel

Local

6.00

75.00

85.80

75.00

Sand for Mortar

20.00

335.00

242.60

335.00

20 mm HBG metal-(SS5)

20.00

891.00

242.60

70.00

222.75

1183.75

10 mm HBG Metal-(SS5)

20.00

593.00

242.60

70.00

148.25

811.25

Cement Sep' 12

Local

4400.00

4400.00

CERTIFICATE:1) The Leads Provided above are true and nearest to the site to the best of my knowledge and belief.

Asst. Exe.Engineer,

Dy.Executive Engineer,

Executive Engineer,

(PR) PIU Sub Division,

(PR) PIU Sub Division,

(PR) PIU Division,

SEIGNEORAGE CHARGES STATEMENT


Laying of CC Road in --------------------------- village of ----------------------- Mandal
(Devunuri Ramesh (H) to I. Rajamouli (H))
Qty of Material
Sl. No
Description of item
Unit
Qty
Gravel/
Sand
Earth
1
2
3
4
5
6
1
Granular Sub-Base
Cum
246.00
314.88
2
CC Pavement
Cum
307.50
138.38
3
Granular Shoulders
Cum
164.00
209.92
TOTAL
138.38
209.92
Seigneorage Charges per CUM in Rs.
40.00
22.00
5535.00
Total Seigneorage Charges

Asst. Exe.Engineer,
(PR) PIU Sub Division,

Executive Engineer,
(PR) PIU Division,

4618.24

23991.00

Dy.Executive Engineer,
(PR) PIU Sub Division,

Metal
7

276.75

276.75
50.00
13837.50

PRE MEASUREMENTS
Name of the work : Laying of CC Road in --------------------------- village of ---------------------Mandal
(Devunuri Ramesh (H) to I. Rajamouli (H))
Sl.
No

1
1

Description of Item

Nos

Length

Width

Thick
ness

2
3
4
5
6
Premeasurements of built-up spray grout layer over prepared base consisting of a
two layer composite 75mm thick
1/2 to 1/4 km
1
1.20
0.30
0.075
1
5.00
0.20
0.075
1/4 to 1/6 km
2
3.00
0.20
0.075
1
3.00
0.50
0.075
1/6 to 1/8 km
1
30.00
0.30
0.075
1
5.00
0.20
0.075
1/8 to 2/0 km
2
30.00
0.20
0.075
2/0 to 2/2 km
1
0.60
0.25
0.075
3/0 to 3/2 km
1
0.60
0.45
0.075
1
10.00
0.20
0.075
1
6.00
0.45
0.075
1
0.60
0.25
0.075
3
1.20
0.20
0.075
1
1.20
0.20
0.075
3/2 to 3/4 km
1
6.00
0.70
0.075
2
1.80
0.40
0.075
3
1.00
0.90
0.075
1
0.90
3.75
0.075
1
3.00
0.50
0.075
3
0.50
0.30
0.075
2
0.70
0.60
0.075
2
4.20
0.50
0.075
3/4 to 3/6 km
2
6.00
1.50
0.075
2
0.60
0.30
0.075
3
0.90
0.40
0.075
2
0.60
0.45
0.075
3
0.50
1.00
0.075
3/6 to 3/8 Km
1
3.00
1.00
0.075
1
1.00
1.50
0.075
CC to be laid
3/8 to 4/0 Km
4/0 to 4/2 km
2
1.00
0.50
0.075
1
0.20
3.75
0.075
3
0.60
0.45
0.075
4/2 to 4/4 km
3
1.80
1.20
0.075
1
1.20
1.00
0.075
1
1.50
0.50
0.075
1
7.00
1.50
0.075
1
0.50
1.00
0.075
3
0.60
0.40
0.075
1
0.65
0.50
0.075
WMM
4/4 to 4/650 km
4/8 to 5/0 Km
3
1.50
1.00
0.075
2
1.80
0.90
0.075
2
0.60
0.50
0.075
2
3.00
0.60
0.075
3
0.45
0.60
0.075
1
1.50
0.50
0.075
1
30.00
0.30
0.075
5/0 to 5/2 km
1
3.00
0.30
0.075
2
75.00
0.20
0.075
5/2 to 5/4 km
1
2.20
0.55
0.075
2
1.50
0.80
0.075
2
3.00
0.50
0.075
5/4 to 5/6 km
3
0.45
0.30
0.075
1
5.00
0.25
0.075
2
1.00
0.50
0.075
2
0.50
0.30
0.075
1
0.30
0.30
0.075
Page 12 of 18

Qty

0.03
0.08
0.09
0.11
0.68
0.08
0.90
0.01
0.02
0.15
0.20
0.01
0.05
0.02
0.32
0.11
0.20
0.25
0.11
0.03
0.06
0.32
1.35
0.03
0.08
0.04
0.11
0.23
0.11
0.08
0.06
0.06
0.49
0.09
0.06
0.79
0.04
0.05
0.02
0.34
0.24
0.05
0.27
0.06
0.06
0.68
0.07
2.25
0.09
0.18
0.23
0.03
0.09
0.08
0.02
0.01

Sl.
No

Description of Item

Nos

Length

Width

Thick
ness

Qty

3
1
1
2
2
1
2
2
1
3
1
2
1
3
2
2
2
1
2
1
2
2
3
1
2
2
1
1
3
1
3
2
2
1
3
2
3
3
2
3
2
1
1
1
3
1
2
1
3
2
2
2
3
1
2
3
2
2
2
2
2
1
1
2
2
1

4
1.00
0.50
0.30
2.00
0.75
0.90
0.60
0.80
0.70
1.00
0.60
0.80
0.70
0.50
0.60
0.25
6.00
0.60
2.20
1.50
3.00
0.30
5.00
1.00
0.50
0.30
2.00
2.00
1.50
2.90
1.40
0.75
50.00
0.70
3.00
2.20
0.65
0.60
0.90
0.60
1.00
0.75
0.60
0.90
40.00
0.60
0.80
0.70
0.50
0.40
0.50
0.60
1.50
0.45
0.50
0.60
0.75
0.45
1.00
1.20
0.50
11.00
2.00
0.40
0.40

5
1.00
0.30
0.30
0.30
0.60
0.30
0.45
0.50
0.55
0.70
0.45
0.50
0.55
0.60
0.25
0.90
0.30
0.25
0.55
0.80
0.50
0.45
0.25
0.50
0.30
0.30
0.30
1.50
0.45
0.50
0.75
0.45
0.30
0.35
0.45
0.45
0.90
0.30
0.40
0.45
0.50
0.60
0.45
0.50
0.25
0.45
0.50
0.55
0.60
0.30
0.90
0.30
3.75
0.30
0.25
0.45
0.40
0.30
0.50
0.45
1.00
1.30
1.00
0.25
0.25

6
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075

7
0.08
0.01
0.01
0.09
0.03
0.04
0.04
0.03
0.09
0.05
0.04
0.03
0.09
0.05
0.02
0.03
0.14
0.02
0.09
0.18
0.23
0.03
0.09
0.08
0.02
0.01
0.05
0.68
0.05
0.33
0.16
0.05
1.13
0.06
0.20
0.22
0.13
0.03
0.08
0.04
0.04
0.03
0.02
0.10
0.75
0.04
0.03
0.09
0.05
0.02
0.07
0.04
0.42
0.02
0.03
0.04
0.05
0.02
0.08
0.08
0.04
1.07
0.30
0.02
0.01

1
6/0 to 6/2 km

6/2 to 6/4 km

6/4 to 6/6 km

6/6 to 6/8 km

6/8 to 7/0 km

7/0 to 7/2 km
7/8 to 8/0 km

8/0 to 8/2 km

8/2 to 8/4 km
8/4 to 8/6 km

8/6 to 8/8 km

8/8 to 9/0 km

9/0 to 9/2 km

9/4 to 9/6 km
9/6 to 9/8 km

9/8 to 10/0 km
10/0 to 10/2 km

Page 13 of 18

Sl.
No

Description of Item

2
10/4 to 10/6 km
10/6 to 10/8 km
10/8 to 11/0 km

11/0 to 11/2 km
11/2 to 11/4 km

11/4 to 11/6 km
11/6 to 11/8 km

11/8 to 12/0 km

12/0 to 12/2 km

12/2 to 12/4 km

12/4 to 12/6 km

Nos

Length

Width

Thick
ness

Qty

3
1
3
1
1
1
1
2
1
2
1
2
1
1
1
2
1
2
3
4
1
2
1
2
2
2
1
2
2
3
1
2
3
2
1
1
2
1
3
2
2
1
3
2
2
1
2
2
2
3
1
3
2
1
3
1
2
3
1
2
2
1
2
1
1
3

4
0.40
0.80
0.40
1.50
1.50
2.50
1.50
2.00
1.00
45.00
0.50
2.50
0.50
1.00
3.00
1.00
1.50
0.65
0.45
0.45
3.00
0.45
5.00
1.30
1.00
2.20
1.50
3.00
1.50
13.00
2.50
1.00
2.00
0.50
1.00
0.40
11.00
2.60
0.60
1.50
3.00
6.80
3.00
1.50
9.50
0.80
1.00
0.60
2.00
1.50
2.90
1.40
9.00
1.20
5.50
1.00
2.20
0.80
3.40
1.20
0.50
2.00
0.80
8.00
3.40

5
0.20
0.35
0.20
0.30
0.30
1.20
3.75
2.00
3.00
0.15
3.75
1.20
0.60
1.50
1.20
0.70
3.00
0.35
0.25
0.25
2.00
0.60
0.45
0.45
0.40
0.55
0.80
0.50
0.80
1.60
0.60
0.25
1.00
1.20
0.50
3.75
1.60
0.90
0.45
3.00
1.00
1.50
2.00
2.00
1.10
0.45
1.00
1.50
1.50
0.45
0.50
0.75
1.20
0.50
0.60
0.45
0.90
0.35
0.20
0.35
0.60
0.40
0.40
0.70
0.60

6
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075

7
0.01
0.06
0.01
0.03
0.03
0.23
0.84
0.30
0.45
0.51
0.28
0.23
0.02
0.11
0.54
0.05
0.68
0.05
0.03
0.01
0.90
0.02
0.34
0.09
0.06
0.09
0.18
0.23
0.27
1.56
0.23
0.06
0.30
0.05
0.04
0.23
1.32
0.53
0.04
0.68
0.23
2.30
0.90
0.45
0.78
0.05
0.15
0.14
0.68
0.05
0.33
0.16
0.81
0.14
0.25
0.07
0.45
0.02
0.10
0.06
0.02
0.12
0.02
0.42
0.46

Page 14 of 18

Sl.
No

Description of Item

Nos

Length

Width

Thick
ness

3
2
2
4
2
3
3
4
3
2
2
3

4
1.40
0.95
1.90
3.00
2.20
0.65
2.50
1.80
1.00
2.20
1.00

5
0.65
0.70
0.30
0.45
0.45
0.90
0.70
0.40
0.40
0.60
0.40

6
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075

12/6 to 12/8 km

12/8 to 13/0 km
2

Qty

7
0.14
0.10
0.17
0.20
0.22
0.13
0.53
0.16
0.06
0.20
0.09
43.10

Premeasurements of pot holes and removal of loose material, trimming of sides, cleaning of
surface by providing tack coat, 20mm thick

2/2 to 2/4 km
3/0 to 3/2 km
3/2 to 3/4 km

3/4 to 3/6 km

3/6 to 3/8 km
3/8 to 4/0 Km
4/0 to 4/2 Km
4/2 to 4/4 Km
5/0 to 5/2 Km

5/2 to 5/4 Km
5/4 to 5/6 Km
5/6 to 5/8 Km

5/8 to 6/0 Km
6/0 to 6/2 Km

6/2 to 6/4 Km
6/4 to 6/6 Km

2
1
1
1
1
1
1
1
1
1
6
1
5
1
1
1
1
2
1
1
3
2
2
1
5
1
4
2
10
2
3
10
10
2
5
3
1
1
3
1
2
3
4
4
1
17
3
10
1
1
10

0.40
1.50
0.60
1.20
0.75
0.30
1.20
1.20
1.80
10.00
1.00
5.00
0.50
1.20
5.00
2.00
7.00
1.00
7.00
3.00
10.00
30.00
15.00
10.00
0.45
3.75
1.20
10.00
0.60
1.50
1.00
0.90
0.40
0.30
0.45
0.40
0.50
1.00
0.40
1.00
2.60
0.60
0.45
0.50
0.10
0.40
1.20
0.40
1.00
1.50
0.40
Page 15 of 18

0.30
0.60
0.50
0.50
0.30
0.90
0.50
0.40
0.45
1.00
0.50
1.00
0.30
0.50
1.50
1.00
1.00
0.50
1.50
1.00
1.50
1.25
1.50
1.50
0.30
0.35
0.45
1.20
0.20
0.50
0.90
0.50
0.25
0.25
0.30
0.25
0.50
0.50
0.30
1.00
0.50
0.40
0.30
0.30
3.75
0.30
0.30
0.25
0.30
0.50
0.20

0.24
0.90
0.30
0.60
0.23
0.27
0.60
0.48
0.81
10.00
3.00
5.00
0.75
0.60
7.50
2.00
7.00
1.00
10.50
3.00
45.00
75.00
45.00
15.00
0.68
1.31
2.16
24.00
1.20
1.50
2.70
4.50
1.00
0.15
0.68
0.30
0.25
0.50
0.36
1.00
2.60
0.72
0.54
0.60
0.38
2.04
1.08
1.00
0.30
0.75
0.80

Sl.
No

Description of Item

Nos

Length

Width

3
5
3
2
1
5
1
3
2
6
1
2
1
1
1
3
1
3
3
3
5
2
7
10
6
2
3
2
4
1
6
3
4
4
2
5
2
1
2
1
2
4
5
3
7
3
6
6
3
6
6
5
2
2
3
6
1
1
2
1
3
1
1
1
1
3
2

4
0.40
1.80
3.00
1.00
0.30
1.00
0.40
3.00
0.20
0.40
1.00
1.80
0.20
1.00
0.40
1.00
0.75
0.70
2.00
0.40
0.90
0.65
0.50
0.60
2.20
1.50
1.00
0.60
4.20
0.55
0.50
0.60
0.45
5.00
1.80
3.00
1.00
2.00
0.60
2.60
3.00
1.70
2.00
0.40
0.60
0.45
0.50
0.90
0.90
0.90
0.90
0.50
1.50
5.10
2.90
0.35
1.80
0.20
1.00
0.40
1.00
0.50
0.50
1.00
0.40
3.00

5
0.25
0.40
0.60
0.50
0.20
0.50
0.30
2.00
0.20
0.30
0.50
0.30
3.75
3.75
0.30
1.00
0.45
0.40
0.30
0.30
0.40
0.30
0.30
0.45
0.45
0.55
0.45
0.30
0.50
0.40
0.40
0.40
0.30
0.80
0.40
0.60
0.50
0.60
0.30
0.50
0.40
0.90
1.00
0.25
0.35
0.35
0.30
0.45
0.45
0.45
0.50
0.70
0.90
1.20
0.60
0.25
0.30
3.75
3.75
0.30
0.40
1.00
0.50
0.50
0.30
2.00

1
6/6 to 6/8 Km

6/8 to 7/0 Km

7/2 to 7/4 Km
7/6 to 7/8 km
7/8 to 8/0 km
8/0 to 8/2 km
8/2 to 8/4 km

8/4 to 8/6 km
8/6 to 8/8 km
8/8 to 9/0 km

9/0 to 9/2 km

9/2 to 9/4 km

9/4 to 9/6 km
9/6 to 9/8 km

9/8 to 10/0 km

10/4 to 10/6 km

11/0 to 11/2 km

11/2 to 11/4 km
11/6 to 11/8 km

Page 16 of 18

Thick
ness

Qty

7
0.50
2.16
3.60
0.50
0.30
0.50
0.36
12.00
0.24
0.12
1.00
0.54
0.75
3.75
0.36
1.00
1.01
0.84
1.80
0.60
0.72
1.37
1.50
1.62
1.98
2.48
0.90
0.72
2.10
1.32
0.60
0.96
0.54
8.00
3.60
3.60
0.50
2.40
0.18
2.60
4.80
7.65
6.00
0.70
0.63
0.95
0.90
1.22
2.43
2.43
2.25
0.70
2.70
18.36
10.44
0.09
0.54
1.50
3.75
0.36
0.40
0.50
0.25
0.50
0.36
12.00

Sl.
No

Description of Item

Nos

Length

Width

3
2
1
6
6
4
7
2
2
3
6
5
3
4
2
12
4
7
3

4
0.60
4.20
0.55
6.00
3.50
4.20
0.50
1.50
5.10
2.90
2.10
4.00
3.40
6.00
0.40
0.60
0.50
0.50

5
0.30
0.50
0.40
0.55
1.20
1.00
0.70
0.90
1.20
0.60
0.50
0.70
0.40
1.20
0.20
0.35
0.35
1.00

12/0 to 12/2 km

12/2 to 12/4 km

12/4 to 12/6 km

12/6 to 12/8 km

12/8 to 13/0 km

Asst. Exe.Engineer,

Dy.Executive Engineer,

(PR) PIU Sub Division,

(PR) PIU Sub Division,

Executive Engineer,
(PR) PIU Division,

Page 17 of 18

Thick
ness

Qty

7
0.36
2.10
1.32
19.80
16.80
29.40
0.70
2.70
18.36
10.44
5.25
8.40
5.44
14.40
0.96
0.84
1.23
1.50
666.42

Road Furniture Sub-Estimate


Name of the work : Laying of CC Road in --------------------------- village of ----------------------Mandal
(Devunuri Ramesh (H) to I. Rajamouli (H))
S.No

Description of work

Quantity

Rate

Per

Amount

1
1

2
Supply and fixing of Name Board including cost of
materials, fixing, painting, lettering etc., complete

1.00

5850.00

Each

5850.00

Supply and fixing of Caution Board including cost of


materials, fixing, painting, lettering etc., complete
4.00

2500.00

Each

10000.00

Supply and fixing of Village Board including cost of


materials, fixing, painting, lettering etc., complete
1.00

2500.00

Each

2500.00

Supply and fixing of KM Stones including cost of


materials, fixing, painting, lettering etc., complete
2.00

1200.00

Each

2400.00

5.00

400.00

Each

2000.00

Supply and fixing of HM Stones including cost of


materials, fixing, painting, lettering etc., complete

TOTAL

22750.00

Dy.Executive Engineer,
(PR) PIU Sub Division,

Asst. Exe.Engineer,
(PR) PIU Sub Division,

Executive Engineer,
(PR) PIU Division,

Page 18 of 18

You might also like