CC Road Model Estimate With SSR 2012-13 Excel
CC Road Model Estimate With SSR 2012-13 Excel
CC Road Model Estimate With SSR 2012-13 Excel
410
3.75
0.2
x
y
20
20
SPECIFICATION REPORT
Specification report accompanying the detailed estimate for the work
The above wok has been administratively santioned for Rs. 15.00 Lakhs vide Proc. No. Plg. III/379/2012,
Dated : 07.11.2012 of Chairperson, Integrated Action Plan, District Level Committee & District Collector, Karimnagar,
under IAP 2012-13 grant.
The estimate is prepared with the following specifications
1
Construction of granular Sub-Base by providing local materials (Table 400.13) spreading in uniform layers with
motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with
smooth wheeled roller to achieve the desired density complete as per Clause 407 as per Technical Specification Clause
408. including overhead charges & Contractor profit, but excluding VAT & Seignorage charges.
2
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete
pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause
1501.22 M25(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding
25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix
design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film,
wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes,
compacted using needle, screed and plate vibrators and finished in continous operation including provision of
contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near
approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days,
curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification
clause 1501.22 including overhead charges & Contractors profit but excluding VAT & Seignorage charges.
Construction of granular Shoulders by providing local materials (Table 400.13) spreading in uniform layers mixing
by mix in place method as per Technical Specification. including overhead charges & Contractor profit, but excluding
VAT & Seignorage charges.
The estimate is prepared with current Revised SSR 2012-13 and accordingly submitted for Technical
sanction
Asst. Exe.Engineer,
(PR) PIU Sub Division,
Dy.Executive Engineer,
(PR) PIU Sub Division,
Executive Engineer,
(PR) PIU Division,
GENERAL ABSTRACT
Name of the work : Laying of CC Road in --------------------------- village of ---------------------- Mandal
(Devunuri Ramesh (H) to I. Rajamouli (H))
S.No
Item
Amount
Add 5% VAT
83920.00
Seignorage Charges
23991.00
1676403.00
2000.00
Asst. Exe.Engineer,
(PR) PIU Sub Division,
Executive Engineer,
(PR) PIU Division,
Page 5 of 18
8392.00
1794706.00
Dy.Executive Engineer,
(PR) PIU Sub Division,
Sl.
No
Description of Item
Nos
Length
Width
Thick
ness
6
Qty
Rate
Unit
Amount
10
246.00
360.20
Cum
spreading in uniform layers with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC and compacting with smooth wheeled roller to
achieve the desired density complete as per Clause 407 as per Technical Specification
Clause 408. including overhead charges & Contractor profit, but excluding VAT &
Seignorage charges.
(------------------(H) to --------------------------(H))
410.00
4.00
0.15
88609.00
plain cement concrete pavement, thickness as per design, over a prepared sub base,
with 43 grade cement or any other type as per clause 1501.22 M25(Grade), coarse and
fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding
25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate
weigh batcher using approved mix design, laid in approved fixed side form work
(steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel
plates including levelling the form work as per drawing), spreading the concrete with
shovels, rakes, compacted using needle, screed and plate vibrators and finished in
continous operation including provision of contraction and expansion, construction
joints, applying debonding strips, primer, sealant, dowel bars, near approachs to
bridge/culvert and construction joint, admixtures as approved, curing of concrete
slabs for 14 days, curing compound (where specified) and water finishing to lines and
grade as per drawing and technical specification clause 1501.22 including overhead
charges & Contractors profit but excluding VAT & Seignorage charges.
(------------------(H) to ------------------1
--------(H))
410.00
3.75
0.20
307.50
307.50
5036.35 Cum
1548678.00
238.51 Cum
39116.00
410.00
1.00
0.20
164.00
164.00
Cum
TOTAL
Rs :
Asst. Exe.Engineer,
Dy.Executive Engineer,
Executive Engineer,
Page 6 of 18
1676403.00
Index
Code
Desription of Item
Unit
Qty
Rate
Amount
RBR Construction of granular Sub-Base by providing local materials (Table 400.13) spreading in uniform layers with motor
SBBS- grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with smooth
wheeled roller to achieve the desired density complete as per Clause 407 as per Technical Specification Clause 408.
1
including overhead charges & Contractor profit, but excluding VAT & Seignorage charges.
a)
b)
Unit = Cum
Taking output = 300 cum
Labour
Mazdoor (Skilled)
Mazdoor (Unskilled)
Machinery
Motor grader for grading 110 HP @ 50 cum per hour
c)
a)
c)
Water
Basic rate of Granular shoulder for 300 cum
Basic rate of Granular shoulder per cum
Add 14% for over head charges & Contractors profit
(excl.4%VAT)
Add for conveyance for Gravel
Rate per cum
2.48
10.00
285.00
250.00
706.80
2500.00
hour
hour
hour
hour
6.00
30.00
12.00
5.00
920.60
367.00
372.00
0.00
27618.00
4404.00
1860.00
cum
384.00
75.00
28800.00
kl
30.00
0.00
0.00
65888.80
219.63
30.75
cum
1.28
85.80
250.38
109.82
360.20
RBR-CCPV-5
day
day
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete
pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per
clause 1501.22 M25(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate
not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh
batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing
of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing),
spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished
in continous operation including provision of contraction and expansion, construction joints, applying
debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint,
admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water
finishing to lines and grade as per drawing and technical specification clause 1501.22 including overhead
charges & Contractors profit but excluding VAT & Seignorage charges.
Unit = cum
Taking output = 75cum (172.50 t)
(100x3.75 x 0.200)
a)
Labour
Mason (1st class)
day
5.00
315.00
day
5.00
285.00
1,575.00
1,425.00
Mazdoor (unskilled)
day
150.00
250.00
37,500.00
Mazdoor(skilled)
day
6.00
250.00
1,500.00
Surveyor
day
2.00
285.00
570.00
Mazdoor (semi-skilled)
day
6.00
250.00
1,500.00
day
1.00
285.00
285.00
44355.00
b)
Machinery
Page 7 of 18
Hour
36.00
370.00
13,320.00
Screed vibrator
Plate vibrator
Hour
9.00
40.00
360.00
Hour
9.00
40.00
360.00
Hour
5.00
372.00
1,860.00
Hour
2.00
402.00
Hour
804.00
16,704.00
c)
(I)
(ii)
Material
Crushed stone coarse aggregates, grading will be as per clause 1501.2.4.1 (Table 1500.1) of specifications @
0.90 Cum/cum of concrete
20mm
Cum
44.55
1183.75
52,736.06
10mm
Cum
22.95
811.25
18,618.19
cum
33.75
335.00
11,306.25
tonne
26.25
4400.00
115,500.00
(iii)
sqm
412.5
15.00
6,187.50
(iv) Polythene sheet 125 micron
(v) Mild steel dowel bar 25mm dia of grade S 240.500 mm long 20 Nos. at culvert/bridge slab and at
construction joiont including 5 percent wastage
Kg
117.6
45.50
tonne
0.005
0.00
0.00
Litre
19.00
46.20
877.80
90.00
5.00
450.00
90.00
9.00
810.00
No
483.00
0.50
241.50
Litre
122.00
75.00
9150.00
Litre
131.25
123.00
16143.75
sqm
3.00
570.00
1710.00
(4x3.75x0.200 = 3 sqm)
5350.8
239081.85
300140.85
(d)
9004.23
(e)
309145.08
4121.93
4699.01
577.07
Conveyance charges
(I)
(ii)
Crushed stone coarse aggregates, grading will be as per clause 1501.2.4.1 (Table 1500.1) of
specifications @ 0.90 Cum/cum of concrete
20mm & 10mm
Cum
0.90
242.60
218.34
cum
0.45
242.60
109.17
327.51
327.51
9.83
5036.35
RBR Construction of granular Shoulders by providing local materials (Table 400.13) spreading in uniform layers mixing by
SBBS- mix in place method as per Technical Specification. including overhead charges & Contractor profit, but excluding VAT
& Seignorage charges.
1
a)
Unit = Cum
Taking output = 300 cum
Labour
Mazdoor (Skilled)
Mazdoor (Unskilled)
day
day
Page 8 of 18
2.48
10.00
285.00
250.00
706.80
2500.00
b)
Machinery
Motor grader for grading 110 HP @ 50 cum per hour
c)
a)
c)
Water
Basic rate of Granular shoulder for 300 cum
Basic rate of Granular shoulder per cum
Add 14% for over head charges & Contractors profit
(excl.4%VAT)
Add for conveyance for Gravel
Rate per cum
hour
hour
hour
hour
6.00
30.00
12.00
5.00
372.00
0.00
0.00
0.00
1860.00
cum
384.00
75.00
28800.00
kl
30.00
0.00
0.00
33866.80
112.89
15.80
cum
1.28
85.80
128.69
109.82
238.51
Asst. Exe.Engineer,
(PR) PIU Sub Division,
Executive Engineer,
(PR) PIU Division,
Page 9 of 18
Dy.Executive Engineer,
(PR) PIU Sub Division,
Description in Material
Name of the
Quarry
Lead in
Km
Initial
Conveyance
charges
Blasting
Charges
Machine
Crushing
Charges
Gravel
Local
6.00
75.00
85.80
75.00
20.00
335.00
242.60
335.00
20 mm HBG metal-(SS5)
20.00
891.00
242.60
70.00
222.75
1183.75
10 mm HBG Metal-(SS5)
20.00
593.00
242.60
70.00
148.25
811.25
Cement Sep' 12
Local
4400.00
4400.00
CERTIFICATE:1) The Leads Provided above are true and nearest to the site to the best of my knowledge and belief.
Asst. Exe.Engineer,
Dy.Executive Engineer,
Executive Engineer,
Asst. Exe.Engineer,
(PR) PIU Sub Division,
Executive Engineer,
(PR) PIU Division,
4618.24
23991.00
Dy.Executive Engineer,
(PR) PIU Sub Division,
Metal
7
276.75
276.75
50.00
13837.50
PRE MEASUREMENTS
Name of the work : Laying of CC Road in --------------------------- village of ---------------------Mandal
(Devunuri Ramesh (H) to I. Rajamouli (H))
Sl.
No
1
1
Description of Item
Nos
Length
Width
Thick
ness
2
3
4
5
6
Premeasurements of built-up spray grout layer over prepared base consisting of a
two layer composite 75mm thick
1/2 to 1/4 km
1
1.20
0.30
0.075
1
5.00
0.20
0.075
1/4 to 1/6 km
2
3.00
0.20
0.075
1
3.00
0.50
0.075
1/6 to 1/8 km
1
30.00
0.30
0.075
1
5.00
0.20
0.075
1/8 to 2/0 km
2
30.00
0.20
0.075
2/0 to 2/2 km
1
0.60
0.25
0.075
3/0 to 3/2 km
1
0.60
0.45
0.075
1
10.00
0.20
0.075
1
6.00
0.45
0.075
1
0.60
0.25
0.075
3
1.20
0.20
0.075
1
1.20
0.20
0.075
3/2 to 3/4 km
1
6.00
0.70
0.075
2
1.80
0.40
0.075
3
1.00
0.90
0.075
1
0.90
3.75
0.075
1
3.00
0.50
0.075
3
0.50
0.30
0.075
2
0.70
0.60
0.075
2
4.20
0.50
0.075
3/4 to 3/6 km
2
6.00
1.50
0.075
2
0.60
0.30
0.075
3
0.90
0.40
0.075
2
0.60
0.45
0.075
3
0.50
1.00
0.075
3/6 to 3/8 Km
1
3.00
1.00
0.075
1
1.00
1.50
0.075
CC to be laid
3/8 to 4/0 Km
4/0 to 4/2 km
2
1.00
0.50
0.075
1
0.20
3.75
0.075
3
0.60
0.45
0.075
4/2 to 4/4 km
3
1.80
1.20
0.075
1
1.20
1.00
0.075
1
1.50
0.50
0.075
1
7.00
1.50
0.075
1
0.50
1.00
0.075
3
0.60
0.40
0.075
1
0.65
0.50
0.075
WMM
4/4 to 4/650 km
4/8 to 5/0 Km
3
1.50
1.00
0.075
2
1.80
0.90
0.075
2
0.60
0.50
0.075
2
3.00
0.60
0.075
3
0.45
0.60
0.075
1
1.50
0.50
0.075
1
30.00
0.30
0.075
5/0 to 5/2 km
1
3.00
0.30
0.075
2
75.00
0.20
0.075
5/2 to 5/4 km
1
2.20
0.55
0.075
2
1.50
0.80
0.075
2
3.00
0.50
0.075
5/4 to 5/6 km
3
0.45
0.30
0.075
1
5.00
0.25
0.075
2
1.00
0.50
0.075
2
0.50
0.30
0.075
1
0.30
0.30
0.075
Page 12 of 18
Qty
0.03
0.08
0.09
0.11
0.68
0.08
0.90
0.01
0.02
0.15
0.20
0.01
0.05
0.02
0.32
0.11
0.20
0.25
0.11
0.03
0.06
0.32
1.35
0.03
0.08
0.04
0.11
0.23
0.11
0.08
0.06
0.06
0.49
0.09
0.06
0.79
0.04
0.05
0.02
0.34
0.24
0.05
0.27
0.06
0.06
0.68
0.07
2.25
0.09
0.18
0.23
0.03
0.09
0.08
0.02
0.01
Sl.
No
Description of Item
Nos
Length
Width
Thick
ness
Qty
3
1
1
2
2
1
2
2
1
3
1
2
1
3
2
2
2
1
2
1
2
2
3
1
2
2
1
1
3
1
3
2
2
1
3
2
3
3
2
3
2
1
1
1
3
1
2
1
3
2
2
2
3
1
2
3
2
2
2
2
2
1
1
2
2
1
4
1.00
0.50
0.30
2.00
0.75
0.90
0.60
0.80
0.70
1.00
0.60
0.80
0.70
0.50
0.60
0.25
6.00
0.60
2.20
1.50
3.00
0.30
5.00
1.00
0.50
0.30
2.00
2.00
1.50
2.90
1.40
0.75
50.00
0.70
3.00
2.20
0.65
0.60
0.90
0.60
1.00
0.75
0.60
0.90
40.00
0.60
0.80
0.70
0.50
0.40
0.50
0.60
1.50
0.45
0.50
0.60
0.75
0.45
1.00
1.20
0.50
11.00
2.00
0.40
0.40
5
1.00
0.30
0.30
0.30
0.60
0.30
0.45
0.50
0.55
0.70
0.45
0.50
0.55
0.60
0.25
0.90
0.30
0.25
0.55
0.80
0.50
0.45
0.25
0.50
0.30
0.30
0.30
1.50
0.45
0.50
0.75
0.45
0.30
0.35
0.45
0.45
0.90
0.30
0.40
0.45
0.50
0.60
0.45
0.50
0.25
0.45
0.50
0.55
0.60
0.30
0.90
0.30
3.75
0.30
0.25
0.45
0.40
0.30
0.50
0.45
1.00
1.30
1.00
0.25
0.25
6
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
7
0.08
0.01
0.01
0.09
0.03
0.04
0.04
0.03
0.09
0.05
0.04
0.03
0.09
0.05
0.02
0.03
0.14
0.02
0.09
0.18
0.23
0.03
0.09
0.08
0.02
0.01
0.05
0.68
0.05
0.33
0.16
0.05
1.13
0.06
0.20
0.22
0.13
0.03
0.08
0.04
0.04
0.03
0.02
0.10
0.75
0.04
0.03
0.09
0.05
0.02
0.07
0.04
0.42
0.02
0.03
0.04
0.05
0.02
0.08
0.08
0.04
1.07
0.30
0.02
0.01
1
6/0 to 6/2 km
6/2 to 6/4 km
6/4 to 6/6 km
6/6 to 6/8 km
6/8 to 7/0 km
7/0 to 7/2 km
7/8 to 8/0 km
8/0 to 8/2 km
8/2 to 8/4 km
8/4 to 8/6 km
8/6 to 8/8 km
8/8 to 9/0 km
9/0 to 9/2 km
9/4 to 9/6 km
9/6 to 9/8 km
9/8 to 10/0 km
10/0 to 10/2 km
Page 13 of 18
Sl.
No
Description of Item
2
10/4 to 10/6 km
10/6 to 10/8 km
10/8 to 11/0 km
11/0 to 11/2 km
11/2 to 11/4 km
11/4 to 11/6 km
11/6 to 11/8 km
11/8 to 12/0 km
12/0 to 12/2 km
12/2 to 12/4 km
12/4 to 12/6 km
Nos
Length
Width
Thick
ness
Qty
3
1
3
1
1
1
1
2
1
2
1
2
1
1
1
2
1
2
3
4
1
2
1
2
2
2
1
2
2
3
1
2
3
2
1
1
2
1
3
2
2
1
3
2
2
1
2
2
2
3
1
3
2
1
3
1
2
3
1
2
2
1
2
1
1
3
4
0.40
0.80
0.40
1.50
1.50
2.50
1.50
2.00
1.00
45.00
0.50
2.50
0.50
1.00
3.00
1.00
1.50
0.65
0.45
0.45
3.00
0.45
5.00
1.30
1.00
2.20
1.50
3.00
1.50
13.00
2.50
1.00
2.00
0.50
1.00
0.40
11.00
2.60
0.60
1.50
3.00
6.80
3.00
1.50
9.50
0.80
1.00
0.60
2.00
1.50
2.90
1.40
9.00
1.20
5.50
1.00
2.20
0.80
3.40
1.20
0.50
2.00
0.80
8.00
3.40
5
0.20
0.35
0.20
0.30
0.30
1.20
3.75
2.00
3.00
0.15
3.75
1.20
0.60
1.50
1.20
0.70
3.00
0.35
0.25
0.25
2.00
0.60
0.45
0.45
0.40
0.55
0.80
0.50
0.80
1.60
0.60
0.25
1.00
1.20
0.50
3.75
1.60
0.90
0.45
3.00
1.00
1.50
2.00
2.00
1.10
0.45
1.00
1.50
1.50
0.45
0.50
0.75
1.20
0.50
0.60
0.45
0.90
0.35
0.20
0.35
0.60
0.40
0.40
0.70
0.60
6
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
7
0.01
0.06
0.01
0.03
0.03
0.23
0.84
0.30
0.45
0.51
0.28
0.23
0.02
0.11
0.54
0.05
0.68
0.05
0.03
0.01
0.90
0.02
0.34
0.09
0.06
0.09
0.18
0.23
0.27
1.56
0.23
0.06
0.30
0.05
0.04
0.23
1.32
0.53
0.04
0.68
0.23
2.30
0.90
0.45
0.78
0.05
0.15
0.14
0.68
0.05
0.33
0.16
0.81
0.14
0.25
0.07
0.45
0.02
0.10
0.06
0.02
0.12
0.02
0.42
0.46
Page 14 of 18
Sl.
No
Description of Item
Nos
Length
Width
Thick
ness
3
2
2
4
2
3
3
4
3
2
2
3
4
1.40
0.95
1.90
3.00
2.20
0.65
2.50
1.80
1.00
2.20
1.00
5
0.65
0.70
0.30
0.45
0.45
0.90
0.70
0.40
0.40
0.60
0.40
6
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
12/6 to 12/8 km
12/8 to 13/0 km
2
Qty
7
0.14
0.10
0.17
0.20
0.22
0.13
0.53
0.16
0.06
0.20
0.09
43.10
Premeasurements of pot holes and removal of loose material, trimming of sides, cleaning of
surface by providing tack coat, 20mm thick
2/2 to 2/4 km
3/0 to 3/2 km
3/2 to 3/4 km
3/4 to 3/6 km
3/6 to 3/8 km
3/8 to 4/0 Km
4/0 to 4/2 Km
4/2 to 4/4 Km
5/0 to 5/2 Km
5/2 to 5/4 Km
5/4 to 5/6 Km
5/6 to 5/8 Km
5/8 to 6/0 Km
6/0 to 6/2 Km
6/2 to 6/4 Km
6/4 to 6/6 Km
2
1
1
1
1
1
1
1
1
1
6
1
5
1
1
1
1
2
1
1
3
2
2
1
5
1
4
2
10
2
3
10
10
2
5
3
1
1
3
1
2
3
4
4
1
17
3
10
1
1
10
0.40
1.50
0.60
1.20
0.75
0.30
1.20
1.20
1.80
10.00
1.00
5.00
0.50
1.20
5.00
2.00
7.00
1.00
7.00
3.00
10.00
30.00
15.00
10.00
0.45
3.75
1.20
10.00
0.60
1.50
1.00
0.90
0.40
0.30
0.45
0.40
0.50
1.00
0.40
1.00
2.60
0.60
0.45
0.50
0.10
0.40
1.20
0.40
1.00
1.50
0.40
Page 15 of 18
0.30
0.60
0.50
0.50
0.30
0.90
0.50
0.40
0.45
1.00
0.50
1.00
0.30
0.50
1.50
1.00
1.00
0.50
1.50
1.00
1.50
1.25
1.50
1.50
0.30
0.35
0.45
1.20
0.20
0.50
0.90
0.50
0.25
0.25
0.30
0.25
0.50
0.50
0.30
1.00
0.50
0.40
0.30
0.30
3.75
0.30
0.30
0.25
0.30
0.50
0.20
0.24
0.90
0.30
0.60
0.23
0.27
0.60
0.48
0.81
10.00
3.00
5.00
0.75
0.60
7.50
2.00
7.00
1.00
10.50
3.00
45.00
75.00
45.00
15.00
0.68
1.31
2.16
24.00
1.20
1.50
2.70
4.50
1.00
0.15
0.68
0.30
0.25
0.50
0.36
1.00
2.60
0.72
0.54
0.60
0.38
2.04
1.08
1.00
0.30
0.75
0.80
Sl.
No
Description of Item
Nos
Length
Width
3
5
3
2
1
5
1
3
2
6
1
2
1
1
1
3
1
3
3
3
5
2
7
10
6
2
3
2
4
1
6
3
4
4
2
5
2
1
2
1
2
4
5
3
7
3
6
6
3
6
6
5
2
2
3
6
1
1
2
1
3
1
1
1
1
3
2
4
0.40
1.80
3.00
1.00
0.30
1.00
0.40
3.00
0.20
0.40
1.00
1.80
0.20
1.00
0.40
1.00
0.75
0.70
2.00
0.40
0.90
0.65
0.50
0.60
2.20
1.50
1.00
0.60
4.20
0.55
0.50
0.60
0.45
5.00
1.80
3.00
1.00
2.00
0.60
2.60
3.00
1.70
2.00
0.40
0.60
0.45
0.50
0.90
0.90
0.90
0.90
0.50
1.50
5.10
2.90
0.35
1.80
0.20
1.00
0.40
1.00
0.50
0.50
1.00
0.40
3.00
5
0.25
0.40
0.60
0.50
0.20
0.50
0.30
2.00
0.20
0.30
0.50
0.30
3.75
3.75
0.30
1.00
0.45
0.40
0.30
0.30
0.40
0.30
0.30
0.45
0.45
0.55
0.45
0.30
0.50
0.40
0.40
0.40
0.30
0.80
0.40
0.60
0.50
0.60
0.30
0.50
0.40
0.90
1.00
0.25
0.35
0.35
0.30
0.45
0.45
0.45
0.50
0.70
0.90
1.20
0.60
0.25
0.30
3.75
3.75
0.30
0.40
1.00
0.50
0.50
0.30
2.00
1
6/6 to 6/8 Km
6/8 to 7/0 Km
7/2 to 7/4 Km
7/6 to 7/8 km
7/8 to 8/0 km
8/0 to 8/2 km
8/2 to 8/4 km
8/4 to 8/6 km
8/6 to 8/8 km
8/8 to 9/0 km
9/0 to 9/2 km
9/2 to 9/4 km
9/4 to 9/6 km
9/6 to 9/8 km
9/8 to 10/0 km
10/4 to 10/6 km
11/0 to 11/2 km
11/2 to 11/4 km
11/6 to 11/8 km
Page 16 of 18
Thick
ness
Qty
7
0.50
2.16
3.60
0.50
0.30
0.50
0.36
12.00
0.24
0.12
1.00
0.54
0.75
3.75
0.36
1.00
1.01
0.84
1.80
0.60
0.72
1.37
1.50
1.62
1.98
2.48
0.90
0.72
2.10
1.32
0.60
0.96
0.54
8.00
3.60
3.60
0.50
2.40
0.18
2.60
4.80
7.65
6.00
0.70
0.63
0.95
0.90
1.22
2.43
2.43
2.25
0.70
2.70
18.36
10.44
0.09
0.54
1.50
3.75
0.36
0.40
0.50
0.25
0.50
0.36
12.00
Sl.
No
Description of Item
Nos
Length
Width
3
2
1
6
6
4
7
2
2
3
6
5
3
4
2
12
4
7
3
4
0.60
4.20
0.55
6.00
3.50
4.20
0.50
1.50
5.10
2.90
2.10
4.00
3.40
6.00
0.40
0.60
0.50
0.50
5
0.30
0.50
0.40
0.55
1.20
1.00
0.70
0.90
1.20
0.60
0.50
0.70
0.40
1.20
0.20
0.35
0.35
1.00
12/0 to 12/2 km
12/2 to 12/4 km
12/4 to 12/6 km
12/6 to 12/8 km
12/8 to 13/0 km
Asst. Exe.Engineer,
Dy.Executive Engineer,
Executive Engineer,
(PR) PIU Division,
Page 17 of 18
Thick
ness
Qty
7
0.36
2.10
1.32
19.80
16.80
29.40
0.70
2.70
18.36
10.44
5.25
8.40
5.44
14.40
0.96
0.84
1.23
1.50
666.42
Description of work
Quantity
Rate
Per
Amount
1
1
2
Supply and fixing of Name Board including cost of
materials, fixing, painting, lettering etc., complete
1.00
5850.00
Each
5850.00
2500.00
Each
10000.00
2500.00
Each
2500.00
1200.00
Each
2400.00
5.00
400.00
Each
2000.00
TOTAL
22750.00
Dy.Executive Engineer,
(PR) PIU Sub Division,
Asst. Exe.Engineer,
(PR) PIU Sub Division,
Executive Engineer,
(PR) PIU Division,
Page 18 of 18