MQP of Panel
MQP of Panel
MQP of Panel
Date
Sr. Component & Operation No. 1 Materials 1.1 1.2 1.3 1.4 1.5 1.6 1.7 2 Final 2.1 Enclosure Switchgears Transformer Indicating Lights Terminals SMPS Wires
QAP No. Angelique International Limited 13/02/2012 Panel Rating Rev. No.
Quantum of Check 100% 100% 100% 100% 100% 100% 100%
SMPL-P-288-D-48
Fuel
Sheet No. 1 of 1
0
Acceptance Norms Format of Record Agency M C N P P P P P P P V V V V V V V V V V V V V V
Type of Check
Class
Visual/MTC Review Visual/MTC Review Visual/MTC Review Visual/MTC Review Visual/MTC Review Visual/MTC Review Visual/MTC Review
Internal Reports/MTC Internal Reports/MTC Internal Reports/MTC Internal Reports/MTC Internal Reports/MTC Internal Reports/MTC Internal Reports/MTC
Physical Test
The Panel Dimensions and tightness of bus bar joints as well as wiring tightness are checked The meggering for the panel is done before and after the HV test. Megger rated at 1 KV The Panel is then energized and control logic is tested as per logic diagram
Major
100%
2.2
Megger test
Major
100%
2.3
Operational Test
Major
100%
LEGENDS : M - Manufacturer/Sub Vendor, C - SMPL,N - AIL/TPI, P - Perform, W - Witness, V - Verification SUPPLIER SIGNATURE CUSTOMER