Steelhaus Technologies Inc reposted this
Precision CT Sleeve Zipper Frac Steelhaus Canada is proud to share the successful completion of a complex, multi-stage precision coiled tubing (CT) sleeve 2 well zipper open/frac/close frac operation, involving over 60 stages each well in +2.3-mile (3700-meter) lateral wells, +3.2-miles (5200 meters) total drilled length. Our team achieved record efficiency, with each sleeve successfully pressure-tested post-closing and reopened in unprecedented timing. The Osprey Aero Shifting Tool was a critical component in making the process seamless, enabling swift, reliable opening and closing of the sleeves across the lateral wells. We extend our deepest gratitude to our hardworking field team, who deliver flawless and safe performance, ensuring success in even the most challenging conditions. Together with our valued clients, we’re pushing the boundaries of efficiency and safety in well operations. Thank you for your continued dedication and innovation. #TheNewEnergy #oilandgas #oilgas #energy #completions #Fracturing
President at The Cooper Precision Companies
1dOutstanding work guys! Congratulations