Very proud to be a part of this challenging project, well done to everyone involved.

View organization page for Transport for NSW, graphic

170,552 followers

An important project in Sydney’s south has taken a major step forward with the opening of the new bridge over the Woronora River at Heathcote. This upgrade will permanently improve this important connection between Sydney's south, Wollongong and the South Coast to Sydney's west. More than 22,000 motorists, including heavy vehicles, cross the Heathcote Road Bridge daily and we are now one step closer to improving traffic flow along this key route, with the new bridge eventually pairing with the existing bridge, which has spanned the ravine for 80 years. The new bridge has been opened to traffic in a temporary arrangement to allow maintenance work to be carried out on the old bridge, which was built in 1943 by the military during World War II and has provided great service. On completion of the project by mid-2023 (weather permitting) the new bridge will be for westbound traffic and the existing bridge will be for eastbound traffic. #Infrastructure #RegionalNSW #RoadSafety #TransportForNSW

Natalie Gulliver

Senior Manager, Network and Safety Services at Transport for NSW

1y

I have been watching this one closely (and listening to the nightworks across the bush from my back deck 😊) as both a resident and a traffic engineering and road safety practitioner. A great project with a lot of complex site constraints. I will have to go for a drive tomorrow to check it out now it is open to traffic.

Gareth Collins

Director Urban Design, Roads & Waterways, Transport for NSW

1y

Great project - well done to the whole team Transport, contractor and designers. Really good work values in getting this done, thinking laterally, pushing ahead and with an attention to quality and longevity.

Gideon de Wet

Director Safety and Assurance

1y

Patrick Cini Donna Powell Anand Thomas Congratulations team!!

Dan Reeve

Retired Engineer & Consultant. NFP Charity Director. Specialist in Project, Design & Risk Management, plus HSiD, Constructability and Workshop Facilitation.

1y

I'm proud to be on the ALT for this project and work with a great team from TfNSW, Fulton Hogan, and SMEC. It's not often you can design and build a new multispan highway bridge in 15 months. We'll done team.

Congratulations Paul, Ian and team to get this job done so quickly. What a great achievement and one to be very proud of.

Nice work Paul Leonard and the rest of the alliance team

Stephen Sherwin

Director at Menai Consulting Pty Ltd

1y

Well done on a successful project

Mary Whalan

Director Capital Project Development at Transport for NSW

1y

Well done. Great achievement.