Institution of Railway Signal Engineers’ Post

September's issue of #IRSE news features articles on the global challenges of skills integration, the role of the operator, and tabletop testing. Logged-in members can read it at: https://buff.ly/3T0u53U #IRSEmember #IRSEnews #Railnews #Railindustry

  • No alternative text description for this image
Joseph C.

Senior Design Engineer(Signals) - Toronto Transit Commission (Ret.)

3mo

Mike Palmer provided good illustration why the 3rd supplier for the Toronto interlocking refurbishment project was terminated in 2014. While client has the over sight of the whole project but they will rely on the consultants to ensure the interface design would match up smoothly between different suppliers (i.e. fixed block fall back system & CBTC system) in this TTC project. Look like there were some insufficient in here apart from the technical challenge.

Like
Reply
Ian Hughes

Managing Director at Green Dragon Ltd

3mo

And what an excellent read it is

See more comments

To view or add a comment, sign in

Explore topics