Set up work resources - Microsoft Project Tutorial
From the course: Microsoft Project Step by Step: Planning for Successful Project Management
Set up work resources
Planning the people you will need to get things done is an important first step in resource planning. You enter your resource list on resource sheet, but how do you get there? Well, in the past, I've been showing you the right click option, but let's do something different. Let's use the View tab. Now, you may have noticed that there is a Gantt Chart button here that looks similar to the Gantt Chart button on Task tab, but there's a key difference. Over here when I click the down arrow, there's a long list, but on the View tab, when I do the same thing, the list is short. You might panic, but there is a reason why it was designed this way. It's because all the other view options are now buttons that you can click on and the one I want is resource sheet. So if you ever get confused, why is Gantt chart dropdown not showing me everything? Just go back to the Task tab. And I'm clicking "Resource Sheet" and it's blank. Let me enter my name in as the first resource and I'm just pressing…
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
-
-
-
-
(Locked)
Learning objectives52s
-
(Locked)
Set up work resources4m 10s
-
(Locked)
Enter the maximum capacity for work resources3m 32s
-
(Locked)
Enter work resource pay rates4m 56s
-
(Locked)
Adjust working time in a resource calendar4m 55s
-
(Locked)
Set up cost resources1m 36s
-
(Locked)
Document resources by using notes2m 26s
-
(Locked)
-
-
-
-