can be used in both private and public sector organizations, and is valid for both demand
and supply side.
Contract management is the realization of intended contract objectives by proactively
monitoring the fulfillment of all contractually established responsibilities, obligations,
procedures, agreements, conditions and rates, resolving all ambiguities, contradictions and
white spaces, managing all contract-related risks, and implementing all desired changes to
the contract, during the execution phase.
CATS CM® offers a methodical and scalable approach to contract management. It
provides a description of the principles, roles, and main issues for the contract manager
and the best way of working. In addition to a description of the methodology, CATS CM®
version 4 also offers specific tools for implementing contract management, for policy as
well as for processes.
Increasingly, organizations recognize the importance of being in control of their business
ecosystem. CATS CM® assists organizations to increase control of their joint responsibility
both from a procurement and delivery point of view. A large number of organizations have
chosen CATS CM® as the standard for their contract management processes.
This new version of CATS CM® has been developed with these various practices in mind.
CATS CM® version 4 is based on the principle that the management of a contract in execution has strong similarities on both sides of the contract, i.e. demand and supply; both can best be described as working in conjunction with each other.
This book is intended for all who are responsible for, or deal with the execution of
contracts: contract managers, business managers, delivery managers, project managers,
service managers, facility managers, buyers, procurement managers, compliance managers,
risk managers, account managers, sales managers and HR managers, along with their
directors and board members on both sides of the contract.
Related to Contract management with CATS CM® version 4
Related ebooks
Microsoft Yammer A Complete Guide - 2021 Edition Rating: 0 out of 5 stars0 ratingsISO/IEC 20000 - An Introduction Rating: 0 out of 5 stars0 ratingsVendor Audits A Complete Guide - 2019 Edition Rating: 0 out of 5 stars0 ratingsBusiness Information Systems A Complete Guide - 2020 Edition Rating: 0 out of 5 stars0 ratingsCyber Security Risk Management A Complete Guide - 2021 Edition Rating: 0 out of 5 stars0 ratingsIT Security Management A Complete Guide - 2020 Edition Rating: 0 out of 5 stars0 ratingsTeach Yourself VISUALLY Office 2016 Rating: 4 out of 5 stars4/5CPTE Certified Penetration Testing Engineer A Complete Guide Rating: 0 out of 5 stars0 ratingsVendor Third Party Management A Clear and Concise Reference Rating: 0 out of 5 stars0 ratingsThreat Management Complete Self-Assessment Guide Rating: 0 out of 5 stars0 ratingsChief process officer Complete Self-Assessment Guide Rating: 0 out of 5 stars0 ratingsVendor Management Operations A Complete Guide - 2020 Edition Rating: 0 out of 5 stars0 ratingsService Transition Complete Self-Assessment Guide Rating: 0 out of 5 stars0 ratingsThe Change Manager's Handbook: A step by step guide to sustainable change Rating: 0 out of 5 stars0 ratingsOperational Risk Management System A Complete Guide - 2020 Edition Rating: 0 out of 5 stars0 ratingsHelpdesk A Complete Guide - 2020 Edition Rating: 0 out of 5 stars0 ratingsISO 21500 Guidance on project management - A Pocket Guide Rating: 0 out of 5 stars0 ratingsEC-Council Certified Incident Handler A Clear and Concise Reference Rating: 0 out of 5 stars0 ratingsCore UEBA Technologies A Complete Guide - 2019 Edition Rating: 0 out of 5 stars0 ratingsIncident response team Third Edition Rating: 0 out of 5 stars0 ratingsIncident Response Analyst Second Edition Rating: 0 out of 5 stars0 ratingsIncident and Problem Management The Ultimate Step-By-Step Guide Rating: 0 out of 5 stars0 ratingsChief Technology Officer A Complete Guide - 2021 Edition Rating: 0 out of 5 stars0 ratingsBusiness Relationship Manager Complete Self-Assessment Guide Rating: 0 out of 5 stars0 ratingsRelease Manager A Clear and Concise Reference Rating: 0 out of 5 stars0 ratingsOffice 365 Security Management A Complete Guide - 2019 Edition Rating: 0 out of 5 stars0 ratingsProject Status Report A Complete Guide - 2021 Edition Rating: 0 out of 5 stars0 ratingsIT Strategic Planning A Complete Guide - 2021 Edition Rating: 0 out of 5 stars0 ratings
Architecture For You
The New Bohemians Handbook: Come Home to Good Vibes Rating: 4 out of 5 stars4/5The New Bohemians: Cool & Collected Homes Rating: 4 out of 5 stars4/5Cozy Minimalist Home: More Style, Less Stuff Rating: 4 out of 5 stars4/5Lies Across America: What Our Historic Sites Get Wrong Rating: 5 out of 5 stars5/5The Little Book of Living Small Rating: 5 out of 5 stars5/5Brunelleschi's Dome: How a Renaissance Genius Reinvented Architecture Rating: 4 out of 5 stars4/5How to Fix Absolutely Anything: A Homeowner's Guide Rating: 4 out of 5 stars4/5House Rules: How to Decorate for Every Home, Style, and Budget Rating: 4 out of 5 stars4/5Become An Exceptional Designer: Effective Colour Selection For You And Your Client Rating: 3 out of 5 stars3/5Own Your Space: Attainable Room-by-Room Decorating Tips for Renters and Homeowners Rating: 5 out of 5 stars5/5The Nesting Place: It Doesn't Have to Be Perfect to Be Beautiful Rating: 4 out of 5 stars4/5Get Your House Right: Architectural Elements to Use & Avoid Rating: 4 out of 5 stars4/5Feng Shui Modern Rating: 5 out of 5 stars5/5Architecture 101: From Frank Gehry to Ziggurats, an Essential Guide to Building Styles and Materials Rating: 4 out of 5 stars4/5Martha Stewart's Organizing: The Manual for Bringing Order to Your Life, Home & Routines Rating: 4 out of 5 stars4/5Walkable City: How Downtown Can Save America, One Step at a Time Rating: 4 out of 5 stars4/5Move Your Stuff, Change Your Life: How to Use Feng Shui to Get Love, Money, Respect and Happiness Rating: 4 out of 5 stars4/5The Year-Round Solar Greenhouse: How to Design and Build a Net-Zero Energy Greenhouse Rating: 5 out of 5 stars5/5How to Build Shipping Container Homes With Plans Rating: 3 out of 5 stars3/5Live Beautiful Rating: 3 out of 5 stars3/5Home Sweet Maison: The French Art of Making a Home Rating: 4 out of 5 stars4/5Clean Mama's Guide to a Peaceful Home: Effortless Systems and Joyful Rituals for a Calm, Cozy Home Rating: 0 out of 5 stars0 ratingsComplete Book of Home Inspection 4/E Rating: 0 out of 5 stars0 ratingsThe Interior Design Sourcebook Rating: 0 out of 5 stars0 ratingsFoxfire Living: Design, Recipes, and Stories from the Magical Inn in the Catskills Rating: 5 out of 5 stars5/5Welcome Home: A Cozy Minimalist Guide to Decorating and Hosting All Year Round Rating: 0 out of 5 stars0 ratingsFlatland Rating: 4 out of 5 stars4/5The Giza Power Plant: Technologies of Ancient Egypt Rating: 4 out of 5 stars4/5Decorate: 1,000 Professional Design Ideas for Every Room in Your Home Rating: 5 out of 5 stars5/5Down to Earth: Laid-back Interiors for Modern Living Rating: 4 out of 5 stars4/5
Reviews for Contract management with CATS CM® version 4
0 ratings0 reviews
Book preview
Contract management with CATS CM® version 4 - Gert-Jan Vlasveld
A constantly changing world
Change is nothing new. It is continuous and eternal. Technological and social changes rapidly follow one another, which is why revised policies and goals are coming out of corporate boardrooms at an increasingly faster pace. Even though long-term plans were commonplace in every sector when we published earlier versions of the CATS CM methodology, we now see that the strategy has changed from a comprehensive multi-year plan to a multi-year vision that focuses much more on the options for making additional and faster adjustments.
Nobody can and wants to do it alone
Responding adequately and timely to this fast-changing environment is crucial for the organization’s operations and continuity. Moreover, in recent years both suppliers and clients have been involving more and more parties, resulting in new collaboration models to facilitate this. Both clients and suppliers have seen the number of contracts increase and/or have become part of complex contract chains. There is also an increasing awareness that an organization’s overall contract portfolio has become an ecosystem rather than simply the sum of those contracts. As an ecosystem, the cohesive whole is aimed at delivering added value to the entire system. Consequently, the way the collaboration works towards a joint goal can be more important than the implementation of an objective linked to an individual contract. Creating value is a joint effort. Being open to external influences is essential for the proper functioning of the ecosystem. This requires flexibility and strong control measures on the overall contract portfolio within this ecosystem.
Changing times require different contractual relationships
The acceleration mentioned above also means that the relationship between client and supplier often needs to change as well. As the initial situation in which the contract was created remains the same for increasingly shorter periods, the need to allow for adjustments within the existing contract increases. This growing need for and frequency of change demands contracts that offer scope to do that. Moreover, the contract manager’s input and expertise have only become more urgent during the phases before the finalized contract is signed, which is why this version of the CATS CM methodology describes the contract manager’s role and involvement, in this pre-award phase, even more extensively.
Contract management has become a strategic necessity
Shareholders, legislators and supervising bodies all demand transparency. In public organizations, there is an ever-increasing call for a demonstrable structure of responsibilities. Besides, executive boards and directors in the public domain have gained a better understanding of the fact that entering into contracts can be a risky enterprise. Whereas financial risks used to be the main concern in contracts, today, aspects like continuity are increasingly often identified as a risk. In a society specialized to a large degree, outsourcing has become fundamental. The result of this specialization leads to contracts covering a much larger part of the process, while organizations no longer have the in-house expertise to adjust for any possible discrepancies. Suppliers almost always use contracts to structure their relationships with clients. Most of all, the rise of the customer-success function, which has an even more intense focus on delivery, indicates the increasing importance of the contract management function. The same applies to timely and adequate risk management. With the increased demand for transparency and responsibility, as well as the fact that timely and adequate contract risk management is quickly becoming more relevant, the importance of proactive contract management only grows, and is being added to the organizations’ agendas on a strategic level.
In version 4 of the CATS CM methodology, which is significantly extended and offers many practical tools, we respond to the changes and issues in the market, for which we can draw upon our experiences with the many organizations that have allowed us to share our expertise on contract management in recent years.
illustration■INTRODUCTION
Companies are entering into a rapidly increasing number of contracts, driven in part by specializations and niche players in the market, as well as acceleration caused by technological developments. For quite some time now, the make-or-buy decision clients have to make is not being made based on an individual need that must be fulfilled. Ever more frequently, companies are choosing to make a strategic choice to ‘buy’. Sometimes, this is even necessary because organizations no longer have in-house expertise in a broad range of areas.
It is not just the number of contracts that is increasing, but the form of collaboration is changing as well. Consequently, this increasingly results in the ecosystem described in the introduction to this book. That means that the relationship between client and supplier must be structured in a different way. As a result, this changed relationship requires contracts that are more flexible and more focused on value creation and the adjustment of contracts that do not yet offer that flexibility. Furthermore, contracts are increasingly contributing to the full implementation of processes. The effects of a possible discrepancy in the contract agreements increase and the response time to deal with them gets shorter. This is why contract management must become more proactive. Proactive contract management means: focused on activities linked to the execution and modification of a contract while concentrating on anticipating specific situations where possible or necessary.
Entrepreneurship is inextricably linked to having contracts. Contracting parties are increasingly aware that entering into contracts with due care is not sufficient to control the realization of the desired results, and it offers insufficient direction to the above-mentioned collaboration dynamics. This makes effective and efficient contract management crucial. The first chapter of this book explains what effective and efficient contract management entails and how CATS CM helps to achieve this. CATS stands for Contract Administration and Tracking Scenarios.
Our vision on proactive contract management is based on the idea of having effective and efficient contract management. Chapter 2 lists the most important definitions and explanations. Chapter 3 is a description of the determining factors for successful contract management and its implementation at a strategic, tactical and operational level. Last but not least, Chapter 4 describes the CATS contract life cycle, the role of contract management during those stages, and it delves deeper into the other processes that sustain this contract life cycle at an operational level.
illustrationAs soon as an organization enters into contracts, each one of those specific contracts requires specific actions. This is a form of contract management. So, it is not a question of whether or not organizations need to use contract management but how they can execute the already existing contract management more effectively and efficiently. Applying CATS CM results in effective and efficient contract management through optimizing realizing of the contract objectives, minimizing possible contract risks, achieving costs savings and avoiding unnecessary costs. This chapter explains the correlation between organizational goals and contract objectives, and the elements of effective and efficient contract management.
■ 1.1 ORGANIZATIONAL GOALS AND CONTRACTS
Every organization has a mission and vision that determine its organizational goals. To realize those goals, the organization establishes a strategy that also takes laws and other regulations into account. Based on this strategy, the organization describes its goals for the short, medium and long term. When the organization enters into a contract with another party to realize its own organizational goals, these goals will also determine the contract objectives. The contract will describe how the objectives, for which the contract has been set up, are to be translated into performance. This performance can involve the delivery of both products and services. Figure 1.1 diagrams the relationship between organizational goals, contract objectives, and contract performance.
Every client uses suppliers, and therefore contracts, to carry out its activities to a lesser or greater extent, in order to realize its goals. Suppliers make choices when it comes to the products and services they offer and the markets in which they want to operate. Since the 1990s, the percentage of ‘contributions from suppliers’ relative to overall operations has been increasing significantly. Studies indicating that more than 70 percent of the total costs incurred by organizations can be attributed to the purchase or procurement of goods and services only confirm this. One of the main indicators that procurement has become even more important is the fact that Management Boards of both large and small organizations are choosing to appoint a Chief Procurement Officer (CPO), so that a solid embedding in the financial column is becoming the norm rather than the exception.
illustrationFigure 1.1 The relationship between organizational goals, contract objectives and contract performance
■ 1.2 EFFECTIVENESS OF CONTRACT MANAGEMENT WITH CATS CM
As described above, contract objectives are derived from the organizational goals. Such a relationship can still be a perfect match at the time the contract is finalized, but this balance may shift over time. The organizational goals may change and, partly influenced by the rapidly changing environment, the way contracts are executed is also in constant flux. Relationships between contractual parties can change, the required technical solution may already have been outstripped by the market, and contracted volumes may no longer meet the need.
Effective contract management ensures that the contract realizes the intention, for the correct compensation, with acceptable risks, and with the efforts planned by the organization. Whenever an organization’s needs change, effective contract management ensures that these changed needs lead to changes in the contract. The effects of good contract management contribute to achieving the contract objectives, the best possible relationship between contractual performance and contract value, as well as to savings and avoiding costs incurred by the organization in executing the contracts. The more contracts, and the more complex they are, the bigger the advantages of contract management.
1.2.1. Improved realization of contract objectives
The contract objectives describe what the organization wants to realize with the contract, and this applies to both purchaser and seller. Contract management following the CATS CM methodology is primarily focused on contract objectives and so it contributes substantially to achieving them. Sometimes, this contribution can be directly demonstrated in monetary terms, but there may also be a qualitative contribution.
A unique category of contract objectives are those related to compliance, meaning that the organization complies with laws and regulations. This is something every organization has to deal with. Even though there are many different areas in which laws and regulations are applied, there are some elements that apply to a broad range of laws and regulations to which good contract management contributes:
■Adequate documentation is very important.
■An organization is held responsible for structuring and implementing a quality system that guarantees compliance with laws and regulations.
■The compliance control measures carried out by the organization must be defined and their execution and conclusions must be visibly documented.
■Non-compliance has severe consequences (financial, reputation, continuity).
Considering these elements in advance, while the contract is being drafted, ensures that there is adequate focus on the completeness of the documentation, the control measures that must be implemented, and the assessment of these measures as soon as the contract comes into effect. This is even more applicable when some of the documentation or control measures have been outsourced as part of the contract.
Due to the abovementioned reasons, compliance officers and internal audit department staff are increasingly promoting contract management implementation.
1.2.2. Relationship between performance and contract value
The contract value is the sum of the client’s budgeted expenditure based on the contract with the supplier. The contract value reflects the compensation for the deliverables. The supplier benefits from a higher compensation while a lower compensation is a financial advantage for the client. This might lead to the assumption that a supplier focuses exclusively on achieving the highest possible contract value and the client the lowest. However, things are not that simple. For suppliers who invoice their budgeted sales to the penny and achieve exactly the expected return, contract management does not seem to have gained them anything on paper. However, without proactive contract management, they might not have achieved the expected return. For the supplier, contract management can have a substantial impact in terms of client satisfaction, more efficient use of internal resources, or the opportunity to try new innovations.
A client who pays the agreed amount to the supplier while, at the same time receiving a modified service that still meets the changing user needs, does not save on expenses but will have a more satisfied organization. If this same level of satisfaction would have been achieved without contract management, the client might have had to pay for additional work. In that case, we are not talking about cost savings but about cost avoidance.
1.2.3. The organization’s contract costs
The contract will cost the supplier more than just the cost price of the products and services provided. Other costs that may have to be included are costs for making the proposal, contract management, quality control on delivery, and storage. It goes without saying that suppliers are very much aware of the fact that the contracted delivery costs more than just the people and resources involved, and that this must be included in the cost price calculation on which the quoted price is based. Suppliers understand this concept very well. We now see that clients are also becoming increasingly aware of this. The costs incurred by a client for entering into and performing a contract include more than just the amounts payable to the supplier. Such costs can include activities related to the procurement department, legal advisers, contract management, quality controls on receipt, and the financial department.
The contract value plus the operational costs incurred by the party’s organization to ‘own’ the contract is called the Total Cost of Contract Ownership (TCCO). In addition to the contract value, TCCO also covers the costs of entering into the contract as well as contract execution and termination costs. The supplier has to include the sum of all these costs in the cost price of what is to be delivered. The client needs to include the TCCO in the make-or-buy decision: the business case based on which the decision for buying goods or services is made.
To understand the concept of TCCO, the organization must know which and how many employees are involved with the contract, in addition to the direct costs incurred in paying the supplier or spent by the supplier on the delivery to the client. These may include the employee responsible for the contract, the co-workers who have to be consulted regarding the contract, and colleagues who spend time ensuring the optimal execution of the contract. To this, costs for legal advice, financial administration, and the organization’s own project and service management must be added. Furthermore, the TCCO may also include costs for materials storage, workplaces for the supplier’s staff, and costs related to providing access to the organization’s locations. As the contract value grows, and with the increased variability of the environment, correspondingly larger budgets must be set aside to cover the costs of contract governance, contract extensions, continuing modified contracts, or terminating them. The termination of a contract also means that the supplier’s involvement with the client must be terminated organizationally. This contract phase-out also involves costs that are part of the Total Cost of Contract Ownership.
1.2.4. Quantifying the effectiveness of contract management
Only limited research has been done into the quantitative aspects of what contract management yields. Without exception, these studies look at the correspondence between performance and compensation and leave all other aspects aside. However, the results of these studies are consistent and indicate cost savings and cost avoidance between 5 and 10 percent of the contract value. Our experiences with businesses using CATS CM show that the implementation of CATS CM during the onboarding of already existing contracts can instantly achieve significant advantages.
■ 1.3 EFFICIENT CONTRACT MANAGEMENT
Efficiency means reaching a goal by using as few resources as possible. These resources may be related to the time spent on the contract, raw materials, or available systems. They can be translated into money and, thus, into costs. Contract management costs are those incurred in the deployment of the required staff to deal with contract management, the costs for support systems, and the indirect costs associated with these such as office, insurance, and workplace costs.
These costs for the entire organization depend on various factors:
■the number of contracts;
■the complexity of the contracts;
■the structure of the contract management scenarios;
■the extent to which the contracts are critical to business operations.
Once a contract manager has made a contract management plan for an individual contract, it is possible to estimate the time required to manage the contract based on this plan. The hourly rate can be used to calculate the estimated costs. Recording the time actually spent, and analyzing the differences between that and the estimated