Luke Beniston

Luke Beniston

Greater Perth Area
25K followers 500+ connections

About

Owner/Director of Mill Street (Aust). Our team has a fantastic track record and prides…

Services

Activity

Join now to see all activity

Experience

  • Mill Street (Aust) Graphic

    Mill Street (Aust)

    Perth, Western Australia, Australia

  • -

    Perth, Australia

  • -

    Perth St Georges Tce, Western Australia, Australia

  • -

    Perth, Australia

  • -

    Perth, Australia

  • -

  • -

  • -

Licenses & Certifications

Projects

  • Western Turner Syncline

    The Western Turner Syncline (WTS) project connected the Rio Tinto S10 pit to the existing Tom Price Process Plant, increasing the iron ore capacity from 22 Mtpa of high-grade saleable ore to 25 Mtpa and ultimately then to 32 Mtpa.

    Other creators
    See project
  • Bayu-Undan & Darwin LNG

    Bayu-Undan, operated by Santos, has been a major contributor to the Timor-Leste economy for 16 years. The field is 250 kilometres southeast of Suai in Timor-Leste and 500 kilometres northwest of the Northern Territory in Australia.

    Gas travels through a 502 kilometre pipeline from the Bayu-Undan Field to Darwin in the Northern Territory where it is converted to LNG and shipped to international markets.

    Other creators
    See project
  • Blacktip Gas Field Project & Platform

    Eni Australia Limited operates the Blacktip facilities, approximately 300 km west-south-west of Darwin, located in Lease Area WA-33-L, within Commonwealth waters in the Joseph Bonaparte Gulf. The field commenced production in 2009. Blacktip field has an estimated production life of 25 years and an installation design life of 30 years.
    The facilities consist of a well-head platform (WHP), two producing wells, flowlines and a subsea gas export pipeline bringing gas, condensate and produced…

    Eni Australia Limited operates the Blacktip facilities, approximately 300 km west-south-west of Darwin, located in Lease Area WA-33-L, within Commonwealth waters in the Joseph Bonaparte Gulf. The field commenced production in 2009. Blacktip field has an estimated production life of 25 years and an installation design life of 30 years.
    The facilities consist of a well-head platform (WHP), two producing wells, flowlines and a subsea gas export pipeline bringing gas, condensate and produced water to the Yelcherr Gas Plant (YGP) near Wadeye in the Northern Territory.
    Additionally, stabilised condensate is stored on site at the YGP before being exported via subsea pipeline to a single point mooring (SPM), located approximately 7 km offshore in Commonwealth waters, for loading to tankers and subsequent transport to market.
    Offshore activities are generally limited to WHP normal (unmanned) production operations, inspection, maintenance and repair activities to topside and subsea infrastructure, periodic tanker vessel off-takes of condensate from the SPM, and rigless well intervention activities.

    Other creators
    See project
  • Kemerton lithium hydroxide processing plant

    In 2019, Albemarle Corporation commenced construction at the Kemerton Strategic Industrial Area in Western Australia to develop the Kemerton lithium hydroxide processing plant (“Kemerton”). Once construction is complete, Kemerton will process spodumene ore to produce lithium hydroxide product and a sodium sulfate by-product. Kemerton is expected to have an initial capacity of about 50,000 metric tons LCE of lithium hydroxide, with an ability to expand to 100,000 metric tons LCE over…

    In 2019, Albemarle Corporation commenced construction at the Kemerton Strategic Industrial Area in Western Australia to develop the Kemerton lithium hydroxide processing plant (“Kemerton”). Once construction is complete, Kemerton will process spodumene ore to produce lithium hydroxide product and a sodium sulfate by-product. Kemerton is expected to have an initial capacity of about 50,000 metric tons LCE of lithium hydroxide, with an ability to expand to 100,000 metric tons LCE over time.

    To support a safe and successful plant construction process, Albemarle has engaged a number of largely local Western Australian based suppliers. Over 1500 construction jobs have been created to date and 370 further operational roles are forecast to be required for Kemerton.

    Other creators
    See project
  • Varanus Island

    Varanus Island is the largest of the Lowendal Islands, an archipelago off the north west coast of Western Australia, near Karratha in the Pilbara region. The island is approximately 59 kilometres (37 mi) from the mainland coast. It has facilities for piping oil and gas from various locations within the Harriet and East Spar oilfield, that was developed by the Bond Corporation in 1987, that is now known as the Varanus Island Processing Hub and owned by Santos Limited.

    Other creators
    See project
  • East Rockingham Waste to Energy Project

    East Rockingham Waste to Energy is a waste-to-energy power station under construction located in East Rockingham, Western Australia. Once completed, the facility is scheduled to process in excess of 300,000 tonnes of waste and will produce 29 MW of power.

    See project
  • Prelude FLNG

    The Prelude floating liquefied natural gas (FLNG) facility produces natural gas off the coast of Australia. In June 2019, it reached a significant milestone, shipping its first liquefied natural gas cargo to customers in Asia.

    Other creators
    See project
  • ALCOA WAGERUP OXALATE DESTRUCTION FACILITY (EPC)

    - Present

    Clough has been awarded and EPC contract to develop an impurity processing facility for Alcoa of Australia (Alcoa) at its Wagerup alumina refinery. The scope includes civil, structural, mechanical, piping, electrical and instrumentation works.

    Other creators
    See project
  • SNOWY 2.0

    - Present

    The Clough Salini joint venture, Future Generation, was awarded the AU$5.1bn contract for the Civil and Electro-Mechanical works for the Snowy 2.0 Project.

    Snowy 2.0 will link two existing Snowy Scheme dams, Tantangara and Talbingo, through underground tunnels to the depths of up to one kilometre and an underground power station with pumping capabilities. Snowy 2.0 will add 2,000 megawatts of energy generation and provide 175 hours of energy storage for the National Electricity Market…

    The Clough Salini joint venture, Future Generation, was awarded the AU$5.1bn contract for the Civil and Electro-Mechanical works for the Snowy 2.0 Project.

    Snowy 2.0 will link two existing Snowy Scheme dams, Tantangara and Talbingo, through underground tunnels to the depths of up to one kilometre and an underground power station with pumping capabilities. Snowy 2.0 will add 2,000 megawatts of energy generation and provide 175 hours of energy storage for the National Electricity Market, enough to ensure the stability and reliability of the system during prolonged weather events, such as wind or solar droughts. Snowy Hydro already plays a critical role in ensuring system stability at times of peak demand, and Snowy 2.0 will enhance this existing capability and ensure that we can continue to provide increased stability and security to the energy market well into the future.

    Other creators
    See project
  • The Koodaideri Project

    - Present

    Clough, as part as the Acciona Clough joint venture, is pleased to announce that it has been awarded a civil works contract for the construction of the northern rail formation for the Rio Tinto Iron Ore Koodaideri Project.

    The Koodaideri Project is a greenfield mine development for Rio Tinto Iron Ore, in the East Pilbara mining region. The Koodaideri mine will initially be developed with an annual capacity of 43 million tonnes. To allow the transportation of iron ore product to either…

    Clough, as part as the Acciona Clough joint venture, is pleased to announce that it has been awarded a civil works contract for the construction of the northern rail formation for the Rio Tinto Iron Ore Koodaideri Project.

    The Koodaideri Project is a greenfield mine development for Rio Tinto Iron Ore, in the East Pilbara mining region. The Koodaideri mine will initially be developed with an annual capacity of 43 million tonnes. To allow the transportation of iron ore product to either Dampier or Cape Lambert, the project requires a 170km rail spur to connect the Koodaideri mine to the existing Rio Tinto Iron Ore rail network, just south of Lyre Siding at Numbat.

    Other creators
    See project
  • BHP - NPI

    - Present

    Clough was awarded an Engineering, Procurement, and Construction (EPC) contract, to deliver the non-process infrastructure (NPI) for the BHP South Flank Project. The South Flank project will fully replace production from the 80Mtpa (100 per cent basis) Yandi mine which is reaching the end of its economic life. Clough will engineer, design and construct NPI facilities to support the mining activities at South Flank and the ore handling plant at Mining Area C.

    See project
  • BHP Southflank OHP

    - Present

    Clough was awarded of the construction of the Ore Handling Plant (OHP) for the BHP South Flank Project. The scope includes structural, mechanical, piping, electrical and instrumentation for the OHP structures, including the interconnecting conveyors and transfer stations.

    See project
  • ICHTHYS LNG CPF HOOK-UP

    - Present

    The Clough was contracted by Samsung Heavy Industries (SHI) to provide hook-up services on the Ichthys LNG Project Central Processing Facility (CPF). ​The scope of work includes the preparation and execution of offshore hook-up activities and assistance to commissioning. Work commenced in the first quarter of 2016 with the mobilisation of engineering and technical teams to the SHI fabrication yard located in Geoje, Korea before moving offshore in the Browse Basin, 200 km off the northern…

    The Clough was contracted by Samsung Heavy Industries (SHI) to provide hook-up services on the Ichthys LNG Project Central Processing Facility (CPF). ​The scope of work includes the preparation and execution of offshore hook-up activities and assistance to commissioning. Work commenced in the first quarter of 2016 with the mobilisation of engineering and technical teams to the SHI fabrication yard located in Geoje, Korea before moving offshore in the Browse Basin, 200 km off the northern coastline of Western Australia. The mooring hook-up of the CPF was successfully completed with no incidents and ahead of schedule.

    Gas-in was achieved on Ichthys CPF in the third quarter of 2018, celebrating a significant milestone that Clough and the client have been working towards.

    Other creators
    See project
  • ICHTHYS LNG FPSO HOOK-UP

    - Present

    Clough was contracted by Daewoo Shipbuilding & Marine Engineering (DSME) to provide hook-up services on the Ichthys LNG Project Floating Production, Storage and Offloading (FPSO) facility.

    The scope of work includes the preparation and execution of offshore hook-up and assistance to commissioning. Work commenced in the first quarter of 2016 with the mobilisation of engineering and technical teams to the DSME fabrication yard located in Geoje, Korea before moving offshore in the Browse…

    Clough was contracted by Daewoo Shipbuilding & Marine Engineering (DSME) to provide hook-up services on the Ichthys LNG Project Floating Production, Storage and Offloading (FPSO) facility.

    The scope of work includes the preparation and execution of offshore hook-up and assistance to commissioning. Work commenced in the first quarter of 2016 with the mobilisation of engineering and technical teams to the DSME fabrication yard located in Geoje, Korea before moving offshore in the Browse Basin, 200 kilometres off the northern coastline of Western Australia.

    Project management is being executed from Clough’s office in Perth with the technical support of Clough’s Korean joint venture CloughCoens. ​

    Other creators
    See project
  • Ichthys Project

    JGC Oceania Pty Ltd, along with our joint venture partners, KBR and Chiyoda Corporation, has formed JKC Australia LNG Pty Ltd (JKC) to deliver the engineering, procurement and construction (EPC) activities for the Ichthys Project onshore LNG facilities.

    The Project, one of the world’s largest LNG developments involves gas from the Ichthys Field in the Browse Basin off north-west Australia being exported to the onshore processing facilities in Darwin via an 889km pipeline.

    The…

    JGC Oceania Pty Ltd, along with our joint venture partners, KBR and Chiyoda Corporation, has formed JKC Australia LNG Pty Ltd (JKC) to deliver the engineering, procurement and construction (EPC) activities for the Ichthys Project onshore LNG facilities.

    The Project, one of the world’s largest LNG developments involves gas from the Ichthys Field in the Browse Basin off north-west Australia being exported to the onshore processing facilities in Darwin via an 889km pipeline.

    The Ichthys LNG Project is expected to produce 8.4 million tonnes of LNG and 1.6 million tonnes of LPG per annum, along with approximately 100,000 barrels of condensate per day at peak over its 40 year life-span.

  • Gorgon Project

    One of the world's largest natural gas projects and the largest single resource development in Australia's history. The Gorgon Project is developing the Gorgon and Jansz-Io gas fields, located within the Greater Gorgon area, between 130 and 220 kilometres off the northwest coast of Western Australia.

    Major growth in the region prompted the company to expand its presence and increase personnel nearly fourfold during the past three years. Chevron Pty Ltd awarded Baker Hughes a contract to…

    One of the world's largest natural gas projects and the largest single resource development in Australia's history. The Gorgon Project is developing the Gorgon and Jansz-Io gas fields, located within the Greater Gorgon area, between 130 and 220 kilometres off the northwest coast of Western Australia.

    Major growth in the region prompted the company to expand its presence and increase personnel nearly fourfold during the past three years. Chevron Pty Ltd awarded Baker Hughes a contract to provide pipeline precommissioning services on the Gorgon Project off the Northwest Shelf of Australia.

  • PNG LNG Project

    The PNG LNG Project is a 6.9 million tonne per annum (MTPA) integrated LNG project operated by Esso Highlands Limited, a subsidiary of Exxon Mobil Corporation. The gas will be sourced from the Hides, Angore and Juha gas fields and from associated gas in the Kutubu, Agogo, Moran and Gobe Main oil fields.

  • Wheatstone LNG Project

    The Wheatstone Project is one of Australia’s largest resource projects – providing greater security of supply and significant economic benefits such as employment, government revenue and local business opportunities.

    The Wheatstone Project is located at Ashburton North Strategic Industrial Area (ANSIA), 12 kilometres west of Onslow in Western Australia’s Pilbara region. The foundation project will include two LNG trains with a combined capacity of 8.9 million tonnes per annum (MTPA) and…

    The Wheatstone Project is one of Australia’s largest resource projects – providing greater security of supply and significant economic benefits such as employment, government revenue and local business opportunities.

    The Wheatstone Project is located at Ashburton North Strategic Industrial Area (ANSIA), 12 kilometres west of Onslow in Western Australia’s Pilbara region. The foundation project will include two LNG trains with a combined capacity of 8.9 million tonnes per annum (MTPA) and a domestic gas plant

    Chevron discovered Wheatstone in August 2004 and in March 2008 announced an intention to develop the gas resource as a greenfield onshore LNG and domestic gas project.

    Other creators
  • Beenyup Advanced Water Recycling Plant

    -

    The Clough SUEZ Water Partners joint venture has been awarded a contract to complete the Stage 2 expansion at the Advanced Water Recycling Plant in Craigie.

    The Clough SUEZ Water Partnership brings together Engineering and Construction Company, Clough, with global resource management firm, SUEZ, to design and construct the new plant for Water Corporation.

    As part of Water Corporation’s Groundwater Replenishment Scheme, the Advanced Water Recycling Plant currently has the capacity…

    The Clough SUEZ Water Partners joint venture has been awarded a contract to complete the Stage 2 expansion at the Advanced Water Recycling Plant in Craigie.

    The Clough SUEZ Water Partnership brings together Engineering and Construction Company, Clough, with global resource management firm, SUEZ, to design and construct the new plant for Water Corporation.

    As part of Water Corporation’s Groundwater Replenishment Scheme, the Advanced Water Recycling Plant currently has the capacity to treat secondary treated wastewater and recharge up to 14 billion litres of recycled water into groundwater supplies each year.​​​​

    The scope of the expansion project includes doubling the plant’s capacity to recharge up to 28 billion litres of recycled water each year, which will provide further water security to the residents of Perth.​

    Other creators
    See project
  • YARA PILBARA AMMONIA PLANT MAINTENANCE SERVICES

    -

    Clough AMEC’s scope includes maintenance services to Yara’s existing liquid ammonia plant (Yara Pilbara Ammonia Plant) and to the world’s first technical ammonium nitrate (TAN) manufacturing plant (TAN Plant) on the Burrup Peninsula, located near Karratha in Western Australia.

    The scope also includes providing maintenance planning support, supplying management services, supervision, tradespeople, tooling and systems, including the Clough Automated Maintenance system (CAMS), to perform…

    Clough AMEC’s scope includes maintenance services to Yara’s existing liquid ammonia plant (Yara Pilbara Ammonia Plant) and to the world’s first technical ammonium nitrate (TAN) manufacturing plant (TAN Plant) on the Burrup Peninsula, located near Karratha in Western Australia.

    The scope also includes providing maintenance planning support, supplying management services, supervision, tradespeople, tooling and systems, including the Clough Automated Maintenance system (CAMS), to perform routine maintenance services and shutdowns at the Yara Pilbara Ammonia Plant and the TAN Plant.

    Other creators
    See project
  • WHEATSTONE PROJECT OFFSHORE HOOK-UP AND COMMISSIONING

    -

    Clough is providing the offshore hook-up and commissioning component of the Chevron-operated Wheatstone Project over a 40 month period commencing February 2012. The agreed scope of work includes the provision of all project management services, engineering, labour, materials and an accommodation support vessel to assist Chevron with pre-commissioning, commissioning of integrated float over deck systems, offshore hook-up, and start-up assistance.​

    Project management is executed from…

    Clough is providing the offshore hook-up and commissioning component of the Chevron-operated Wheatstone Project over a 40 month period commencing February 2012. The agreed scope of work includes the provision of all project management services, engineering, labour, materials and an accommodation support vessel to assist Chevron with pre-commissioning, commissioning of integrated float over deck systems, offshore hook-up, and start-up assistance.​

    Project management is executed from Clough’s head office in Perth, while engineering and technical teams is deployed to the fabrication yard in Korea and subsequently to the offshore platform located 225 kilometres from the Onslow coast. At peak, Clough will employ an Australian workforce of over 400 people.

    The Wheatstone Processing Platform will be one of Australia’s largest offshore facilities with a topsides weight of about 37,000 tonnes. The topsides will be transported to the offshore installation site on a barge, and installed onto the substructure using a float over procedure. The platform topsi​des have a total deck area of 20,000 square meters and include primary processing equipment and facilities.

    Other creators
    See project

Recommendations received

More activity by Luke

View Luke’s full profile

  • See who you know in common
  • Get introduced
  • Contact Luke directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Others named Luke Beniston

Add new skills with these courses